UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio/Bexar County

  • Monday, August 2 until Friday, August 6. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, August 2 until Friday, August 6. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, August 1 until Thursday, August 5. 9 p.m. to 5 a.m. Single northbound mainlane closure from FM 1976 to Kitty Hawk Rd. for barrier removal.
  • Sunday, August 1 until Monday, August 2. 9 p.m. to 5 a.m. Northbound entrance from Kitty Hawk Rd. closed for barrier removal.
  • Tuesday, August 3 until Thursday, August 5. 9 p.m. to 5 a.m. Northbound entrance ramp from Kitty Hawk Rd. closed for barrier removal.
  • Thursday, August 5 until Friday, August 6. 9 p.m. to 5 a.m. Single lane closure on the southbound frontage road from Pat Booker Rd. to Palisades Dr. for barrier removal.
  • Monday, August 2 until Wednesday, August 4. 9 a.m. to 3 p.m. Single lane closure on the southbound frontage road from Pat Booker Rd. to Palisades Dr. for concrete pouring. 

Loop 1604 – North West San Antonio/Bexar County

US 281 – North Central San Antonio/Bexar County

  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, August 2 until Friday, August 6. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, August 2 until Friday, August 6. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, August 7 until Sunday, August 8. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, August 7 until Sunday, August 8. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, August 7 until Sunday, August 8. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, August 7 until Sunday, August 8. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  •  Saturday, July 31 until Sunday, August 1. 6 p.m. to 5 a.m. Alternating lane closures at Marshall Rd. for striping operations.
  • Saturday, July 31. 7 a.m. to 7 p.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Saturday, July 31. 7 a.m. to 7 p.m. Single northbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Sunday, August 1. 9 p.m. to 5 a.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Sunday, August 1. 9 p.m. to 5 a.m. Single northbound lane closure from Borgfeld Rd. to Cibolo Creek for sidewalk improvements.
  • Monday, August 2 until Thursday, August 5. 8:30 p.m. to 5:00 a.m. 3 northbound left mainlanes closed at Basse Rd. for bridge repairs.
  • Saturday, August 7 until Sunday, August 8. 7 p.m. to 7 a.m. Single northbound lane closure from Evans Rd. to TPC Parkway for beam setting.
  • Monday, August 2 until Friday, August 6. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road at Caleta Beach for utility work.
  • Tuesday, August 3 until Thursday, August 5. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road at Paso Del Norte for utility work. 

I-10 –East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Sunday, August 1 until Sunday, August 8. 5 a.m. to 7 p.m. Alternating lane closures at Trainer Hale Rd. for drill shaft work.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway.

US 90 – Bexar County

  • Monday, August 2 until Friday, August 6. 9 a.m. to 5 p.m. Single eastbound lane closure from Marian St. to Nogalitos Rd. for barrier removal.
  • Monday, August 2 until Thursday, August 5. 8 a.m. to 6 p.m. Double mainlane closures, in both directions, from Media County line to Montgomery Rd. for roadway replacement. The first crossover west of SH 211 and the westbound exit ramp to SH 211 will also be closed.
  • Wednesday, August 4 until Thursday, August 5. 8 p.m. to 5 a.m. Westbound exit ramp to southbound I-35 closed for lighting installation.
  • Thursday, August 5 until Friday, August 6. 8 p.m. to 5 a.m. Eastbound exit ramp to southbound I-35 closed for lighting installation. 

I-37 – Central San Antonio/Bexar County 

  • Monday, August 2 until Tuesday, August 3. 8 p.m. to 5 a.m. Southbound exit ramp to eastbound I-10 closed for lighting installation.
  • Tuesday, August 3 until Wednesday, August 4. 8 p.m. to 5 a.m. Northbound exit ramp to westbound I-10 closed for lighting installation. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, July 31. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 2252 to Hubertus Rd. for material haul-off.
  • Current until Saturday, July 31. 9 a.m. to 5:30 p.m. Single lane closure on the southbound frontage road from Hubertus Rd. to FM 2252 for material haul-off.
  • Current until Saturday, July 31. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for material haul-off.
  • Sunday, August 1 until Monday, August 2. 8 p.m. to 5 a.m. Southbound lower level mainlanes closed in downtown San Antonio. Single left mainlane closure on upper level also closed. Double mainlane closure on eastbound I-10 ramp to I-35 south.
  • Monday, August 2 until Saturday, August 7. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Monday, August 2 until Saturday, August 7. 9 a.m. to 5:30 p.m. Single lane closure on the southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Monday, August 2 until Saturday, August 7. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for material haul-off. 

I-410 – East San Antonio

  • Sunday, August 1 until Friday, August 6. 9 p.m. to 5 a.m. Various mainlane closures from I-35 to I-10 for overhead sign replacements.
  • Friday, July 30 thru Tuesday, August 3. NIGHT WORK. Northbound right lane closed at E. Houston St. from 9 p.m. to 5 a.m. each night for barrier work.
  • Friday, July 30 thru Tuesday, August 3. NIGHT WORK. Northbound entrance ramp from E. Houston St. closed from 9 p.m. to 5 a.m. each night. Entrance ramp detour: Traffic can continue on northbound frontage road, turn around at Ackerman Road, and use northbound I-410 entrance ramp from westbound I-10.
  • Current until August 20. Southbound frontage road left lane closed from I-10 to E. Houston St. for reconstruction.

I-410 – West San Antonio

  • Current until Saturday, August 7. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Saturday, August 7. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Current until Saturday, August 7. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Sunday, August 1 until Monday, August 2. 6 p.m. to 5 a.m. Full closure of the northbound mainlanes from Marbach Rd. to SH 151, including the Marbach Rd. entrance ramp, for bridge work. 

I-410 – Southwest San Antonio

  • Monday, August 2 until Wednesday, August 4. 10 p.m. to 5 a.m. Single mainlane closure, in both directions, from Old Pearsall Rd. to Ray Ellison Blvd. for striping operations.
  • Monday, August 2 until Friday, August 6. 10 p.m. to 5 a.m. Single lane closure on the southbound frontage road from Old Pearsall Rd. to Ray Ellison Blvd. for striping operations.   

SH 151 – West San Antonio

  • Current until Saturday, August 7. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Current until Saturday, August 7. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

SL 13 – Military Dr.

  • Monday, August 2 until Tuesday, August 31. 8 a.m. to 4 p.m. Single westbound lane closure from Bardwell Dr. to Alsbrook Dr. for sidewalk improvements.
  • Monday, August 2 until Tuesday, August 31. 8 a.m. to 4 p.m. Single westbound lane closure from New Laredo Hwy. to Somerset Rd. for sidewalk improvements. 

SH 211 – Bexar County

  • Monday, August 2 until Thursday, August 5. 8 a.m. to 6 p.m. Alternating lane closures from Potranco Rd. to US 90 for roadway replacement.
  • Thursday, August 5. 8 a.m. to 6 p.m. Full closure of SH 211 at FM 1957 for roadway replacement. 

Alamo Ranch Parkway – Bexar County

  • Friday, July 30 10 p.m. to Monday, August 2 5 a.m. Westwood Loop intersection closed for bridge work.
  • Friday, August 6 10 p.m. to Monday, August 9 5 a.m. Westwood Loop intersection closed for bridge repairs. 

FM 1535 – N.W. Military Highway

  • Saturday, July 31. 7 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for paving operations.
  • Monday, August 2. 9 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for paving operations.

FM 2252 – Bexar County

  • Thursday, August 5 until Friday, August 6. 7 p.m. to 7 a.m. Full closure of intersection at Evans Rd. for installation of bridge beams. DETOUR: Traffic will be directed to use FM 3009 to access I-35, Evans Rd. of Lookout Rd.

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

FM 345 – Fredericksburg Rd.

  • Current until Tuesday, August 31. 8 a.m. to 4 p.m. Single eastbound lane closure from Loop 410 to Hillcrest Dr. for sidewalk improvements.

US 87 – Rigsby Road

  • Monday, August 2 until Tuesday, August 31. 8 a.m. to 4 p.m. Single eastbound lane closure from Pecan Valley Rd. to Ancel Rd. for sidewalk improvements. 

SH 16 – Bandera Road

  • Friday, August 6. 8:30 a.m. to 1 p.m. Right northbound lane closed from Linkwood Dr. to Eckhert Rd. 

SH 46 – Kendall County

  • Current until September 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed. 

I-35 – Medina County

  • Current until Monday, August 9. 7 a.m. to 9 p.m. Single southbound mainlane closure from SH 173 to Francisco Perez Creek for bridge repairs.


Friday, July 23

UPCOMING SCHEUDLED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio/Bexar County

  • Monday, July 26 until Friday, July 30. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, July 26 until Friday, July 30. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, July 25 until Monday, July 26. 9 p.m. to 5 a.m. Full closure of eastbound mainlanes from SH 16 (Bandera Rd.) to Kyle Seale Parkway for removal of overhead signs. The eastbound entrance ramp from SH 16 (Bandera Rd.) will also be closed. DETOUR: All traffic will exit at Hausman Rd., continue on the eastbound frontage road, and take the entrance ramp after Kyle Seale Parkway.
  • Monday, July 26. 10 a.m. to 1 p.m. Single lane closure on the eastbound frontage road from La Cantera Parkway to I-10.
  • Monday, July 26. 10 a.m. to 1 p.m. Eastbound exit ramp to Vance Jackson Rd. closed.
  • Current until Friday, July 30. Weeknights 9 p.m. until 5 a.m. Single lane closure on the westbound to eastbound turnaround lanes at SH 16 (Bandera Rd.) and closure of one left turn lane from SH 16 (Bandera Rd.) southbound to Loop 1604 eastbound frontage road for placement of abutments and drill shafts. DETOURS: No detours required; one lane to remain open at all times.
  • Current until Friday, July 30. Weeknights 9 p.m. until 5 a.m. Single lane closure on the eastbound to westbound turnaround lanes at SH 16 (Bandera Rd.) and closure of one left turn lane from SH 16 (Bandera Rd.) northbound to Loop 1604 westbound frontage road for placement of abutments and drill shafts. DETOURS: No detours required; one lane to remain open at all times.
  • Current until Friday, July 30. Weekdays 9 a.m. until 3 p.m. Single lane closure on the eastbound frontage road right turn lane to W. Hausman Rd. for underground utility work. DETOURS: Traffic will continue on the Loop 1604 eastbound frontage road through the W. Hausman Rd. intersection to the Kyle Seale Pkwy. turnaround.
  • Current until Saturday, July 31. Weeknights 9 p.m. until 5 a.m. Single lane closure on the westbound mainlanes from Babcock Rd. to W. Hausman Rd. for barrier setting. DETOURS: No detours required; one lane to remain open at all times.
  • Current until Saturday, July 31. Weeknights 9 p.m. until 5 a.m. Single lane closure on the westbound mainlanes from W. Hausman Rd. to SH 16 (Bandera Rd.) for barrier setting. DETOURS: No detours required; one lane to remain open at all times.
  • Current until Saturday, July 31. Weeknights 9 p.m. until 5 a.m. Single lane closure on the eastbound mainlanes from SH 16 (Bandera Rd.) to Babcock Rd. for barrier setting and work on drill shafts. DETOURS: No detours required; one lane to remain open at all times.
  • Current until Friday, July 30. Weekdays 9 a.m. to 3 p.m. Single lane closure on the eastbound to westbound turnaround lane at W. Hausman Rd. for placement of drill shafts. DETOURS: Traffic to utilize the existing signalized intersection at Loop 1604 and W. Hausman Rd.
  • Current until Friday, July 30. Weekdays 9 a.m. to 3 p.m. Single lane closure on the westbound to eastbound turnaround lane at W. Hausman Rd. for placement of drill shafts. DETOURS: Traffic to utilize the existing signalized intersection at Loop 1604 and W. Hausman Rd.
  • Current until Friday, July 30. Weeknights 9 p.m. to 5 a.m. Single lane closure on the eastbound to westbound turnaround lane at W. Hausman Rd. for placement of drill shafts. DETOURS: Traffic to utilize the existing signalized intersection at Loop 1604 and W. Hausman Rd.
  • Current until Friday, July 30. Weeknights 9 p.m. to 5 a.m. Single lane closure on the westbound to eastbound turnaround lane at W. Hausman Rd. for placement of drill shafts. DETOURS: Traffic to utilize the existing signalized intersection at Loop 1604 and W. Hausman Rd. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, July 24 until Sunday, July 25. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 24 until Sunday, July 25. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, July 24 until Sunday, July 25. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 24 until Sunday, July 25. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, July 26 until Friday, July 30. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, July 26 until Friday, July 30. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, July 31 until Sunday, August 1. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, July 24. 7 a.m. to 7 p.m. Single southbound lane closed from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Saturday, July 24. 7 a.m. to 7 p.m. Single northbound lane closed from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Sunday, July 25 until Thursday, July 29. 9 p.m. to 5 a.m. Single northbound lane closed from Borgfeld Rd. to Cibolo Creek for sidewalk improvements.
  • Sunday, July 25 until Thursday, July 29. 9 p.m. to 5 a.m. Single southbound lane closed from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Saturday, July 31. 7 a.m. to 7 p.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements.
  • Saturday, July 31. 7 a.m. to 7 p.m. Single northbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk improvements. 

I-10 –East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Monday, July 26 until Friday, July 30. Daily 9 a.m. to 4 p.m. Westbound exit ramp to W.W. White Rd. closed for barrier removal. DETOUR: Traffic will be directed to the Houston St. exit, turnaround to the eastbound frontage road and travel to W.W. White Rd.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway. 

US 90 – Bexar County

  • Monday, July 26 until Friday, July 30. 9 a.m. to 5 p.m. Single lane closure on eastbound frontage road from Marian St. to Nogalitos Rd. for barrier removal.
  • Monday, July 26 until Wednesday, July 28. 8 a.m. to 6 p.m. Double mainlane closures, in both directions, from the Medina County Line to Montgomery Rd. for roadway improvements. The first crossover west of SH 211 will be closed.
  • Wednesday, July 28 until Thursday, July 29. 8 p.m. to 5 a.m. Westbound exit ramp to southbound I-35 closed for lighting installation.
  • Thursday, July 29 until Friday, July 30. 8 p.m. to 5 a.m. Eastbound exit ramp to northbound I-35 closed for lighting installation. 

I-37 – Central San Antonio/Bexar County 

  • Monday, July 26 until Tuesday, July 27. 8 p.m. to 5 a.m. Southbound exit ramp to eastbound I-10 closed for lighting installation.
  • Tuesday, July 27 until Wednesday, July 28. 8 p.m. to 5 a.m. Northbound exit ramp to westbound US 90 closed for lighting installation. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, July 24. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 2252 to FM 1103 for material haul-off.
  • Current until Saturday, July 24. 9 a.m. to 5:30 p.m. Single lane closure on the southbound frontage road from FM 1103 to FM 2252 for material haul-off.
  • Current until Saturday, July 24. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for material haul-off.
  • Sunday, July 25 8 p.m. until Monday, July 26 5 a.m. Southbound mainlanes closed on the lower level in Downtown San Antonio. All traffic will be directed to upper level mainlanes and must exit at Martin St. The left lane of the upper level mainlanes will also be closed. These closures will allow for bridge repairs.
  • Sunday, July 25 until Wednesday, July 28. 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 2252 to FM 1103 for barrier movement. g
  • Monday, July 26 until Saturday, July 31. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 2252 to Hubertus Rd. for material haul-off.
  • Monday, July 26 until Saturday, July 31. 9 a.m. to 5:30 p.m. Single lane closure on the southbound frontage road from Hubertus Rd. to FM 2252 for material haul-off.
  • Monday, July 26 until Saturday, July 31. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for material haul-off. 

I-410 – East San Antonio

  • Sunday, July 25 until Friday, July 30. 9 p.m. to 5 a.m. Various mainlane closures, in both directions, from I-35 to I-10 for overhead sign replacements. 

I-410 – West San Antonio

  • Current until Friday, July 30. 8 a.m. to 4 p.m. Single lane closure on southbound frontage road from Harrow Dr. to Oak for sidewalk improvements.
  • Current until Monday, July 26. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, July 26. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Monday, July 26. 8 p.m. to 5 a.m. Single northbound mainlane closure from Military Dr. to Culebra Rd. for bridge work.
  • Current until Monday, July 26. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, July 26. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Sunday, July 25 until Saturday, August 7. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Sunday, July 25 until Saturday, August 7. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Sunday, July 25 until Saturday, August 7. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work. 

I-410 – Southwest San Antonio

  • Sunday, July 25 until Friday, July 30. 10 p.m. to 5 a.m. Single northbound mainlane closed from Old Pearsall Rd. to Ray Ellison Blvd. for barrier installation.
  • Sunday, July 25 until Friday, July 30. 10 p.m. to 5 a.m. Single lane closure on northbound frontage road from Old Pearsall Rd. to Ray Ellison Blvd. 

SH 151 – West San Antonio

  • Current until Monday, July 26. 8 p.m. to 5 a.m. Full closure of westbound frontage road at Loop 410 for bridge work.
  • Current until Monday, July 26. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Sunday, July 25 until Saturday, August 7. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Sunday, July 25 until Saturday, August 7. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.

SL 13 – Military Dr.

  • Current until Friday, July 30. 8 a.m. to 4 p.m. Single lane closures, in both directions, from New Laredo Highway to Somerset Rd. for sidewalk improvements. 

FM 2252 – Bexar County

  • Thursday, August 5 until Friday, August 6. 7 p.m. to 7 a.m. Full closure of intersection at Evans Rd. for installation of bridge beams. DETOUR: Traffic will be directed to use FM 3009 to access I-35, Evans Rd. of Lookout Rd. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.  

FM 345 – Fredericksburg Rd.

  • Current until Friday, July 30. 8 a.m. to 4 p.m. Single eastbound lane closure from Loop 410 to Hillcrest Dr. for sidewalk improvements. 

SH 46 – Kendall County

  • Current until September 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed.  

I-35 – Medina County