Friday, June 24

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Monday, June 13 until Monday, June 27. Weeknights 9 p.m. until 5 a.m. Full closure of eastbound mainlane exit ramp to IH-10 for bridge construction.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Sunday, June 5 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Sunday, June 19 until Friday July 1. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams & rail demo.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Kyle Seale Parkway to Chase Hill Boulevard for bridge construction.
  • Monday, June 20 until Monday, July 4. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, June 26. 6 a.m. to 12 p.m. Full closure of the mainlanes, in both directions, from Vance Jackson Rd. to Lockhill Selma Rd. for utility work. Traffic will be stopped intermittently throughout the day in 15-min intervals.
  • Sunday, June 26 until Friday, July 1. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, June 26 until Friday, July 1. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, June 26 until Friday, July 1. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, June 26 until Friday, July 1. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Monday, June 27 until Friday, July 1. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete island removal and temporary traffic signal work. At no time will two consecutive
  • Monday, June 27 until Friday, July 1. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete island removal and temporary traffic signal work.
  • Monday, June 27 until Friday, July 1. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and NW Military Highway for concrete island removal and temporary traffic signal work.
  • Monday, June 27 until Friday, July 1. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and NW Military Highway for concrete island removal and traffic signal work.

Loop 1604 – West San Antonio/Bexar County

  • Sunday, June 26. 5 a.m. to 2 p.m. Full closure of the mainlanes, in both directions, at Schuwirth Rd. for utility work. Traffic will be stopped intermittently in 15-minute intervals throughout the day. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, June 26 until Friday, July 1. 8 p.m. to 5 a.m. Single mainlane closure westbound from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Sunday, June 26 until Friday, July 1. 8 p.m. to 5 a.m. Single lane closure on the westbound connector ramp from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work. All traffic must continue on northbound I-35 frontage road and make a U-turn at Forum Parkway to continue on southbound I-35 frontage road to access westbound 1604.

US 281 – North San Antonio/Bexar County

  • Monday, July 11. 8 p.m. to 8 a.m. Full closure of the Overlook Parkway intersection for bridge work.
  • Wednesday, July 13. 8 p.m. to 6 a.m. Full closure of the Wilderness Oak intersection for bridge work.
  • Monday, July 18. 8 p.m. to 6 a.m. Full closure of the Overlook Parkway intersection for bridge work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

I-410 – North East San Antonio

  • Sunday, June 26 until Friday, July 1. 8 p.m. to 5 a.m. Single lane closure on eastbound connector ramp from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work. 
  • Sunday, June 26 until Friday, July 1. 8 p.m. to 5 a.m. Eastbound entrance ramp closure between Perrin Beitel Road and Vicar Drive. Traffic should stay on frontage road, turn eastbound on Walzem Road to access I-35. 

I-410 – West San Antonio

  • Current until Monday, July 4. 7 p.m. to 5 a.m. Alternating full northbound mainlane closures from US 90 to Ingram Rd. for mill and overlay work.
  • Current until Monday, July 4. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road at Ingram Rd. for traffic switch.
  • Current until Monday, July 4. 8 p.m. to 5 a.m. Alternating full closure of the Culebra Rd. intersection for column work.
  • Current until Monday, July 4. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions at Culebra Rd. for concrete work.
  • Current until Monday, July 4. 9 a.m. to 5 p.m. Full closure of the southbound to northbound turnaround at Culebra Rd. for draining work.
  • Current until Monday, July 4. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads in both directions from Marbach Rd. to Bandera Rd. for signal work.
  • Current until Monday, July 4. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations. 

I-410 – South West San Antonio

  • Sunday, June 26. 7 a.m. to 2 p.m. Full closure of the mainlanes and frontage roads, in both directions, for utility work. Traffic will be stopped intermittently throughout the day in 15-minute intervals. 

SH 151 – West San Antonio

  • Current until Monday, July 4. 9 a.m. to 3 p.m. Single westbound mainlane closure from W. Military Dr. to Ingram Rd. for barrier removal. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, July 1. 9 a.m. to 4 p.m. Right turn lane closures, in both directions, at the N.W. Military Highway intersection for curb work. 

Lockhill Selma Rd. – Bexar County

  • Current until Friday, July 1. 9 a.m. to 4 p.m. Right turn lane closures, in all directions, at the Wurzbach Parkway intersection for island and corner work. 

FM 1535 – N.W. Military Highway

  • Current until Friday, July 1. 9 a.m. to 4 p.m. Right turn lane closures, in both directions, at the Wurzbach Parkway intersection for paving operations. 

SH 181 – Bexar County

  • Current until June 2022. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from I-37 to the Wilson County Line for roadway repairs. 

US 90 – Bexar County

  • Monday, June 27 until Friday, July 1. 9 a.m. to 5 p.m. Single mainlane closures, in both directions, at Montgomery Rd. for metal beam guard fence installation.
  • Sunday, June 26 until Thursday, June 30. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Montgomery Rd. for asphalt operations. 

Other – Bexar County

  • Sunday, June 26 until Friday, July 1. 8 p.m. to 5 a.m. Single lane closure on southbound Austin Highway (Loop 368) from I-35 (Exit 26) to Walzem Road for geotechnical and drilling work.

SH 123 – Guadalupe County

  • Tuesday, June 28 until Friday, July 1. 8 a.m. to 5:30 p.m. Single lane closures, in both directions, from Angel Lane to FM 477 for striping operations.


Friday, June 17

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Monday, June 13 until Monday, June 27. Weeknights 9 p.m. until 5 a.m. Full closure of eastbound mainlane exit ramp to IH-10 for bridge construction.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Sunday, June 5 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Sunday, June 19 until Friday July 1. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams & rail demo.
  • Sunday, June 19 until Friday, July 1. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Kyle Seale Parkway to Chase Hill Boulevard for bridge construction.
  • Monday, June 20 until Monday, July 4. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Friday, June 24 Weeknights 9 p.m. until 5 a.m. Full closure of Bandera Road (SH 16) at the Loop 1604 intersection in both directions, including turnarounds, for bridge construction.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Hausman Road to John Peace Boulevard/La Cantera Parkway for sidewalk construction.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 20 until Monday, July 4. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Friday, June 17 at 9:00 p.m. until Monday, June 20 at 5 p.m. Weekends only. Full closure of La Cantera Parkway/John Peace Boulevard at the Loop 1604 intersection in both directions, including turnarounds, for storm drain work. 

Loop 1604 – North Central San Antonio/Bexar County

  • Wednesday, June 22. Overnight 9 p.m. until 5 a.m. Full eastbound Loop 1604 direct connector to northbound US 281 for camera work. Detour by using the eastbound Loop 1604 frontage road and turn left at the intersection to access northbound US 281.
  • Wednesday, June 22. Overnight 9 p.m. until 5 a.m. Left westbound frontage road closure from Theater Boulevard to US 281 for camera work.
  • Wednesday, June 22 until Friday, June 24. Daily 9 a.m. until 3 p.m. Left westbound frontage road closure from Theater Boulevard to US 281 for camera work.
  • Saturday, June 25 until Monday, June 27. Nightly 9 p.m. until 5 a.m. Full eastbound Loop 1604 direct connector to northbound US 281 for camera work. Detour by using the eastbound Loop 1604 frontage road and turn left at the intersection to access northbound US 281.
  • Saturday, June 25 until Monday, June 27. Nightly 9 p.m. until 5 a.m. Left westbound frontage road closure from Theater Boulevard to US 281 for camera work.
  • Sunday, June 19 until Friday, June 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, June 19 until Friday, June 24. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, June 19 until Friday, June 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, June 19 until Friday, June 24. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Monday, June 20 until Friday, June 24. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete island removal and temporary traffic signal work.
  • Monday, June 20 until Friday, June 24. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete
  • island removal and temporary traffic signal work.
  • Monday, June 20 until Friday, June 24. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and NW Military Highway for concrete island removal and temporary traffic signal work.
  • Monday, June 20 until Friday, June 24. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and NW Military Highway for concrete island removal and traffic signal work. 

Loop 1604 – West San Antonio/Bexar County

  • Sunday, June 26. 5 a.m. to 2 p.m. Full closure of the mainlanes, in both directions, at Schuwirth Rd. for utility work. Traffic will be stopped intermittently in 15-minute intervals throughout the day. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single mainlane closure westbound from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single lane closure on the westbound connector ramp from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work. All traffic must continue on northbound I-35 frontage road and make a U-turn at Forum Parkway to continue on southbound I-35 frontage road to access westbound 1604.

Loop 1604 – East San Antonio/Bexar County

  • Friday, June 17, 8 p.m. until Monday, June 20, 5 a.m. Full closure of the intersection at I-10 for bridge work. Traffic will be detoured through the frontage roads. 

US 281 – North San Antonio/Bexar County

  • Monday, July 11. 8 p.m. to 8 a.m. Full closure of the Overlook Parkway intersection for bridge work.
  • Wednesday, July 13. 8 p.m. to 6 a.m. Full closure of the Wilderness Oak intersection for bridge work.
  • Monday, July 18. 8 p.m. to 6 a.m. Full closure of the Overlook Parkway intersection for bridge work.
  • Monday, June 20 until Tuesday, June 21. 9 p.m. to 5 a.m. Single lane closure at Marshall Rd. intersection for retaining wall work.
  • Wednesday, June 22. Overnight 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for camera work.
  • Wednesday, June 22. Overnight 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for camera work.
  • Wednesday, June 22 until Friday, June 24. Daily 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for camera work.
  • Wednesday, June 22 until Friday, June 24. Daily 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for camera work.
  • Wednesday, June 22 until Friday, June 24. Nightly 9 p.m. until 5 a.m. Full northbound US 281 direct connector to westbound Loop 1604 for camera work. Detour by using the northbound US 281 frontage road and turn left at the intersection to access westbound Loop 1604.
  • Saturday, June 25 until Monday, June 27. Nightly 9 p.m. until 5 a.m. Full northbound US 281 direct connector to westbound Loop 1604 for camera work. Detour by using the northbound US 281 frontage road and turn left at the intersection to access westbound Loop 1604.
  • Saturday, June 25. 9 a.m. to 3 p.m. Single southbound lane closure at the Borgfeld Rd. intersection for retaining wall work. 

I-10 – East San Antonio/Bexar County

  • Sunday, June 19 until Monday, June 20. 8:30 p.m. to 5:30 a.m. Single mainlane closures, in both directions, from FM 2538 to Zuehl Rd. for barrier work.
  • Saturday, June 17 through Monday, June 20. NIGHTTIME full northbound and southbound Loop 1604 closure at I-10 intersection from 8 p.m. to 5 a.m. for bridge demolition. Detour:
  • Northbound Loop 1604 traffic will detour to the I-10 eastbound frontage road, turn around at Pfeil Road, and take the I-10 westbound frontage road back to Loop 1604.
  • Southbound Loop 1604 traffic will be detoured to the I-10 westbound frontage road, turn around at FM 1516, and take the I-10 eastbound frontage road back to Loop 1604.
  • Monday, June 20 through Friday, June 24. DAYTIME alternating right lane northbound and southbound Loop 1604 closures at I-10 intersection from 9 a.m. to 3 p.m. to remove debris from demolition of westbound I-10 bridge. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Northbound exit ramp (173) to Olympia Parkway and single lane closure on the frontage road from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic should use the Loop 1604 exit ramp (172). Follow the detour signs.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Northbound exit ramp (exit 174A) closure to FM 1518 and left frontage road lane from exit 174A ramp to Pasatiempo for geotechnical and drilling work. Traffic must exit at Olympia Parkway (exit 173) and follow the detours.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single lane closure northbound from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single lane closure northbound exit 171 ramp closure and left lane closure on northbound frontage road of from Toepperwein Road to Shin Oak Road for geotechnical and drilling work.  
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single mainlane closure southbound from Forum Parkway to Pat Booker Road for geotechnical and drilling work.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single mainlane closure northbound from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Southbound connector ramp to southbound 1604 from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work. Traffic must continue on southbound I-35 frontage road and U-turn at I-35 Access Road to northbound I-35 frontage road to access southbound Loop 1604.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Various lane closures on northbound frontage road from Wayland Way to O’Connor Road for geotechnical and drilling work.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Northbound-to-southbound turnaround closure at Thousand Oaks Drive for geotechnical and drilling work. Traffic will use the traffic signals at Thousand Oaks intersection to access southbound I-35 frontage road.
  • Monday, June 20 until Wednesday, June 22. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from I-35 Access Road to Albrecht for utility and pothole work.
  • Monday, June 20 until Wednesday, June 22. 9 p.m. to 5 a.m. Double lane closure southbound between FM 306 to Guadalupe River Bridge for paving work.
  • Monday, June 20 until Thursday, June 23. 9 a.m. to 5 p.m. Single closure on northbound frontage road from Toepperwein Road to Sandpiper Drive for utility and pothole work.
  • Monday, June 20 until Friday, June 24. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Monday, June 20 until Friday, June 24. 9 a.m. to 5 p.m. Double lane closure on the southbound frontage road between Brewster Street and Whirlwind Drive for geotechnical and drilling work.
  • Monday, June 20 until Friday, June 24. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Monday, June 20 until Friday, June 24. 9 a.m. to 5 p.m. Single lane closure on the northbound connector ramp from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Monday, June 20 until Friday, June 24. 9 a.m. to 5 p.m. Double shoulder closure on the southbound frontage road and left shoulder closure on westbound Loop 410 frontage road from Whirlwind Drive to Fratt Road for utility work.
  • Monday, June 20 until Friday, June 24. 8:30 p.m. to 5 a.m. Double lane closure southbound between FM 306 to Guadalupe River Bridge for paving work.
  • Thursday, June 23. 8 p.m. to 5 a.m. Single lane closure on the southbound frontage road from Pat Booker Road to Ferrell Road for removal of traffic signal equipment. 
  • Thursday, June 23. 8 p.m. to 5 a.m. Single mainlane closure and single lane closure on the southbound frontage road from Judson Road to O’Connor Road for removal of traffic signal equipment. 

I-410 – North East San Antonio

  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Walzem Road exit ramp (exit 165) closure from the eastbound connector ramp to southbound I-35 for drilling and geotechnical work. Traffic should continue on southbound I-35 to Walzem Road exit ramp (exit 165). 
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single eastbound mainlane closure between Austin Highway (Loop 368) to Crestway Drive for geotechnical and drilling work.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Eastbound entrance ramp closure between Perrin Beitel Road and Vicar Drive. Traffic should stay on frontage road, turn eastbound on Walzem Road to access I-35.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single lane closure on eastbound connector ramp from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work. 
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single lane closure on the westbound frontage road from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • Monday, June 20 until Friday, June 24. 9 a.m. to 5 p.m. Walzem Road exit ramp (exit 165) closure from the eastbound connector ramp to southbound I-35 for drilling and geotechnical work.
  • Monday, June 20 until Friday, June 24. 9 a.m. to 5 p.m. Single lane closure on the westbound frontage road from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work. 

I-410 – East San Antonio

  • Saturday, June 18. 9 a.m. to 11 a.m. Northbound exit ramp to I-10E closed for crane work.
  • Continuing through Monday, July 4. NIGHTTIME northbound I-410 exit to eastbound I-10 closure from 9 p.m. to 5 a.m. for overpass work. Click here for detour map.
  • Continuing through Monday, June 4. DAYTIME southbound I-410 frontage road alternating lane closures between I-10 and East Houston Street from 8 a.m. to 5 p.m. for concrete work.
  • Continuing through Monday, July 4. DAYTIME northbound I-410 frontage road left lane closure between East Houston Street and I-10 as well as I-10 eastbound frontage road between I-410 and Ackerman Road from 8 a.m. to 5 p.m. for wall work.    

I-410 – West San Antonio

  • Current until Monday, June 20. 7 p.m. to 5 a.m. Full closure of the northbound mainlanes from US 90 to Ingram Rd. for mill and overlay work.
  • Current until Monday, June 20. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road at Ingram Rd. for traffic switch.
  • Current until Monday, June 20. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd. for concrete work.
  • Current until Monday, June 20. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for signal work.
  • Current until Monday, June 20. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations.
  • Current until Monday, June 20. 8 p.m. to 5 a.m. Alternating full closure of the intersection at Culebra Rd. for column work.
  • Monday, June 20 until Monday, July 4. 7 p.m. to 5 a.m. Alternating full northbound mainlane closures from US 90 to Ingram Rd. for mill and overlay work.
  • Monday, June 20 until Monday, July 4. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road at Ingram Rd. for traffic switch.
  • Monday, June 20 until Monday, July 4. 8 p.m. to 5 a.m. Alternating full closure of the Culebra Rd. intersection for column work.
  • Monday, June 20 until Monday, July 4. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions at Culebra Rd. for concrete work.
  • Monday, June 20 until Monday, July 4. 9 a.m. to 5 p.m. Full closure of the southbound to northbound turnaround at Culebra Rd. for draining work.
  • Monday, June 20 until Monday, July 4. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads in both directions from Marbach Rd. to Bandera Rd. for signal work.
  • Monday, June 20 until Monday, July 4. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations. 

I-410 – South West San Antonio

  • Monday, June 20 until Friday, June 24. 9 p.m. to 5 a.m. Single northbound mainlane closure from Old Pearsall Rd. to Ray Ellison Blvd. for barrier work. 

SH 151 – West San Antonio

  • Current until Monday, June 20. 9 a.m. to 3 p.m. Alternating westbound mainlane closures from W. Military Dr. to Ingram Rd. for barrier work.
  • Monday, June 20 until Monday, July 4. 9 a.m. to 3 p.m. Single westbound mainlane closure from W. Military Dr. to Ingram Rd. for barrier removal. 

PA 1502 – Wurzbach Parkway

  • Monday, June 20 until Friday, July 1. 9 a.m. to 4 p.m. Right turn lane closures, in both directions, at the N.W. Military Highway intersection for curb work. 

Lockhill Selma Rd. – Bexar County

  • Monday, June 20 until Friday, July 1. 9 a.m. to 4 p.m. Right turn lane closures, in all directions, at the Wurzbach Parkway intersection for island and corner work. 

FM 1535 – N.W. Military Highway

  • Monday, June 20 until Friday, July 1. 9 a.m. to 4 p.m. Right turn lane closures, in both directions, at the Wurzbach Parkway intersection for paving operations. 

SH 181 – Bexar County

  • Current until June 2022. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from I-37 to the Wilson County Line for roadway repairs. 

Other – Bexar County

  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single lane closure on Fratt Road from Austin Highway (Loop 368) to Interchange Parkway for geotechnical and drilling work.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single lane closure on southbound Austin Highway (Loop 368) from I-35 (Exit 26) to Walzem Road for geotechnical and drilling work.
  • Sunday, June 19 until Friday, June 24. 8 p.m. to 5 a.m. Single lane closure on southbound Austin Highway (Loop 368) ramp from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • Monday, June 20 until Friday, June 24. 9 a.m. to 5 p.m. Single lane closure on Fratt Road from Austin Highway to Interchange Parkway for geotechnical and drilling work.

Friday, June 10

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, June 12. 2 a.m. Full closure of the mainlanes, in both directions, from I-10 to Vance Jackson Rd. for utility work. Intermittent closures will take place in 15-minute interval throughout the day.
  • Sunday, June 5 until Friday, June 17. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, June 5 until Friday, June 17. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, June 5 until Friday, June 17. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, June 5 until Friday, June 17. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, June 5 until Friday, June 17. Weeknights 9 p.m. until 5 a.m. Full closure of Chase Hill Boulevard/Brennan Avenue at the Loop 1604 intersection in both directions, including turnarounds, for bridge construction.
  • Sunday, June 5 until Friday, June 17. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Sunday, June 5 until Friday, June 17. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Sunday, June 5 until Friday, June 17. Weeknights 9 p.m. until 5 a.m. Full closure of Babcock Road at the Loop 1604 intersection, both directions, including turnarounds, for bridge construction.
  • Monday, June 6 until Monday, June 20. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway  for bridge construction: caps, beams & rail demo.
  • Monday, June 6 until Monday, June 20. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Kyle Seale Parkway to Chase Hill Boulevard for bridge construction.
  • Monday, June 6 until Monday, June 20. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 13 until Monday, June 27. Weeknights 9 p.m. until 5 a.m. Full closure of eastbound mainlane exit ramp to IH-10 for bridge construction.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Hausman Road to John Peace Boulevard/La Cantera Parkway for sidewalk construction.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, June 6 until Monday, June 20. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Thursday, June 9 at 9:00 a.m. until Sunday, June 12 at 5 p.m. Full closure of the Entrance/Exit from UTSA Main Campus at Barshop Boulevard and the Loop 1604 intersection for gas utility work.
  • Saturday, June 11 at 10 p.m. until Sunday, June 12 at 12 p.m. Full closure of Babcock Road at the Loop 1604 intersection, including turnarounds, for bridge deck pour.
  • Saturday, June 11 at 10 p.m. until Sunday, June 12 at 12 p.m. Eastbound mainlane full closure from Kyle Seale Parkway to Chase Hill Boulevard for bridge deck pour.
  • Friday, June 17 at 9:00 p.m. until Monday, June 20 at 5 p.m. Weekends only. Full closure of La Cantera Parkway/John Peace Boulevard at the Loop 1604 intersection in both directions, including turnarounds, for storm drain work. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, June 12 until Thursday, June 16. Nightly 9 p.m. until 5 a.m. Full eastbound Loop 1604 direct connector to northbound US 281 for camera work. Detour by using the eastbound Loop 1604 frontage road and turn left at the intersection to access northbound US 281.
  • Sunday, June 12 until Thursday, June 16. Nightly 9 p.m. until 5 a.m. Left westbound frontage road closure from Theater Boulevard to US 281 for camera work.
  • Monday, June 13 until Friday, June 17. Daily 9 a.m. until 3 p.m. Left westbound frontage road closure from Theater Boulevard to US 281 for camera work.
  • Saturday, June 18 until Monday, June 20. Nightly 9 p.m. until 5 a.m. Full eastbound Loop 1604 direct connector to northbound US 281 for camera work. Detour by using the eastbound Loop 1604 frontage road and turn left at the intersection to access northbound US 281.
  • Saturday, June 18 until Monday, June 20. Nightly 9 p.m. until 5 a.m. Left westbound frontage road closure from Theater Boulevard to US 281 for camera work.
  • Sunday, June 12 until Friday, June 17. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, June 12 until Friday, June 17. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, June 12 until Friday, June 17. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, June 12 until Friday, June 17. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Monday, June 13 until Friday, June 17. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete island removal and temporary traffic signal work.
  • Monday, June 13 until Friday, June 17. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete island removal and temporary traffic signal work.
  • Monday, June 13 until Friday, June 17. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and NW Military Highway for concrete island removal and traffic signal work.
  • Monday, June 13 until Friday, June 17. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and NW Military Highway for concrete island removal and traffic signal work.  

Loop 1604 – West San Antonio/Bexar County

  • Sunday, June 26. 5 a.m. to 2 p.m. Full closure of the mainlanes, in both directions, at Schuwirth Rd. for utility work. Traffic will be stopped intermittently in 15-minute intervals throughout the day. 

Loop 1604 – West San Antonio/Bexar County

  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single mainlane closure westbound from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single lane closure on the westbound connector ramp from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work. All traffic must continue on northbound I-35 frontage road and make a U-turn at Forum Parkway to continue on southbound I-35 frontage road to access westbound 1604. 

Loop 1604 – East San Antonio/Bexar County

  • Friday, June 17, 8 p.m. until Monday, June 20, 5 a.m. Full closure of the intersection at I-10 for bridge work. Traffic will be detoured through the frontage roads. 

US 281 – North San Antonio/Bexar County

  • Friday, June 10 until Saturday, June 11. 9 p.m. to 6 a.m. Full closure of the Wilderness Oak intersection for bridge work.
  • Monday, July 11. 8 p.m. to 8 a.m. Full closure of the Overlook Parkway intersection for bridge work.
  • Wednesday, July 13. 8 p.m. to 6 a.m. Full closure of the Wilderness Oak intersection for bridge work.
  • Monday, July 18. 8 p.m. to 6 a.m. Full closure of the Overlook Parkway intersection for bridge work.
  • Sunday, June 12 until Thursday, June 16. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for camera work.
  • Sunday, June 12 until Thursday, June 16. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for camera work.
  • Monday, June 13 until Friday, June 17. Daily 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for camera work.
  • Monday, June 13 until Friday, June 17. Daily 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for camera work.
  • Monday, June 13 until Friday, June 17. Nightly 9 p.m. until 5 a.m. Full northbound US 281 direct connector to westbound Loop 1604 for camera work. Detour by using the northbound US 281 frontage road and turn left at the intersection to access westbound Loop 1604.
  • Saturday, June 18 until Monday, June 20. Nightly 9 p.m. until 5 a.m. Full northbound US 281 direct connector to westbound Loop 1604 for camera work. Detour by using the northbound US 281 frontage road and turn left at the intersection to access westbound Loop 1604. 

I-10 – East San Antonio/Bexar County

  • Monday, June 13 until Tuesday, June 14. 8:30 p.m. to 5:30 a.m. Full closure of mainlanes, in both directions, at FM 1518 for bridge work.
  • Saturday, June 11 from 4 a.m. to 6 p.m.  DAYTIME full westbound mainlane closure and eastbound left lane closure between Graytown Road and Loop 1604 for overpass work. Detour: Westbound I-10 traffic will take Graytown/Pfeil exit, use the frontage road, and take LP 1604 entrance ramp. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Northbound exit ramp (173) to Olympia Parkway and single lane closure on the frontage road from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic should use the Loop 1604 exit ramp (172). Follow the detour signs.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Northbound exit ramp (exit 174A) closure to FM 1518 and left frontage road lane from exit 174A ramp to Pasatiempo for geotechnical and drilling work. Traffic must exit at Olympia Parkway (exit 173) and follow the detours.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single lane closure northbound from Olympia Parkway to FM1518 (exit 174A) for geotechnical and drilling work.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Northbound-to-southbound turnaround closure at Thousand Oaks Drive for geotechnical and drilling work. Traffic will use the traffic signals at Thousand Oaks intersection to access southbound I-35 frontage road. 
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Various lane closures on northbound frontage road from Wayland Way to O’Connor Road for geotechnical and drilling work.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single mainlane closure southbound from Forum Parkway to Pat Booker Road for geotechnical and drilling work.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single mainlane closure northbound from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Southbound connector ramp to southbound 1604 from Gateway Boulevard to Pat Booker Road for geotechnical and drilling work. Traffic must continue on southbound I-35 frontage road and U-turn at I-35 Access Road to northbound I-35 frontage road to access southbound Loop 1604.
  • Monday, June 13 until Tuesday, June 14. 9 p.m. to 5 a.m. Double southbound mainlane closure from FM 1103 to FM 2252 for installing reflectors and pavement marking work.
  • Monday, June 13 until Friday, June 17. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Monday, June 13 until Friday, June 17. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road from IKEA/RBFCU Parkway to I-35 Access Road for geotechnical and drilling work.
  • Monday, June 13 until Friday, June 17. 9 a.m. to 5 p.m. Double lane closure on the southbound frontage road between Brewster Street and Whirlwind Drive for geotechnical and drilling work.
  • Monday, June 13 until Friday, June 17. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Monday, June 13 until Friday, June 17. 9 a.m. to 5 p.m. Single lane closure on the northbound connector ramp from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Monday, June 13 until Friday, June 17. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road of I-35 from Landmark 35 Drive to O’Conner Road for traffic signal and conduit repair.
  • Tuesday, June 14 until Wednesday, June 15. 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 2252 to FM 1103 for installing reflectors and pavement marking work.
  • Wednesday, June 15. 9 a.m. to 3 p.m. Double southbound shoulder lane closure from FM 2252 to Schwab Road for rumble strip work.
  • Thursday, June 16. 9 a.m. to 3 p.m. Double northbound shoulder lane closure from FM 2252 to Schwab Road for rumble strip work. 

I-410 – North East San Antonio

  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Walzem Road exit ramp (exit 165) closure from the eastbound connector ramp to southbound I-35 for drilling and geotechnical work. Traffic should continue on southbound I-35 to Walzem Road exit ramp (exit 165). 
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single eastbound mainlane closure between Austin Highway to Crestway Drive for geotechnical and drilling work.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single lane closure on the westbound frontage road from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Eastbound entrance ramp closure between Perrin Beitel Road and Vicar Drive. Traffic should stay on frontage road, turn eastbound on Walzem Road to access I-35.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single lane closure on eastbound connector ramp from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work. 
  • Monday, June 13 until Friday, June 17. 9 a.m. to 5 p.m. Walzem Road exit ramp (exit 165) closure from the eastbound connector ramp to southbound I-35 for drilling and geotechnical work.
  • Monday, June 13 until Friday, June 17. 9 a.m. to 5 p.m. Single lane closure on the westbound frontage road from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work. 

I-410 – East San Antonio

  • Continuing through Monday, June 20. NIGHTTIME northbound I-410 exit to eastbound I-10 closure from 9 p.m. to 5 a.m. for overpass work. Click here for detour map.
  • Continuing through Sunday, June 12. DAYTIME northbound I-410 right lane closure between East Houston Street and I-10 from 5 a.m. to 9 p.m. on Saturdays and Sundays for overpass work. I-10 exit ramp also closed. Detour: NB I-410 traffic to I-10 will take the East Houston Street exit, proceed through the intersection, and take the northbound I-410 frontage road to I-10.   
  • Continuing through Monday, June 20. DAYTIME southbound I-410 frontage road alternating lane closures between I-10 and East Houston Street from 8 a.m. to 5 p.m. for concrete work.
  • Continuing through Monday, July 4. DAYTIME northbound I-410 frontage road left lane closure between East Houston Street and I-10 as well as I-10 eastbound frontage road between I-410 and Ackerman Road from 8 a.m. to 5 p.m. for wall work.    

I-410 – West San Antonio

  • Current until Monday, June 20. 7 p.m. to 5 a.m. Full closure of the northbound mainlanes from US 90 to Ingram Rd. for mill and overlay work.
  • Current until Monday, June 20. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road at Ingram Rd. for traffic switch.
  • Current until Monday, June 20. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd. for concrete work.
  • Current until Monday, June 20. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for signal work.
  • Current until Monday, June 20. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations.
  • Current until Monday, June 20. 8 p.m. to 5 a.m. Alternating full closure of the intersection at Culebra Rd. for column work.
  • Current until Friday, June 17. 9 a.m. to 5 p.m. Full closure of the southbound to northbound turnaround at the SH 151 intersection for drainage work. 

SH 151 – West San Antonio

  • Current until Monday, June 20. 9 a.m. to 3 p.m. Alternating westbound mainlane closures from W. Military Dr. to Ingram Rd. for barrier work. 

PA 1502 – Wurzbach Parkway

  • Current until Tuesday, June 14. 9 a.m. to 3 p.m. Various lane closures at the intersection of West Ave. for ITS work.
  • Current until Friday, June 17. 9 a.m. to 4 p.m. Single westbound lane closure at the N.W. Military Highway intersection for paver installations.  
  • Current until Friday, June 17. 9 a.m. to 4 p.m. Single eastbound lane closure at the N.W. Military Highway intersection for paver installations.
  • Current until Friday, June 17. 9 a.m. to 4 p.m. Single westbound lane closure at the Lockhill Selma Rd. intersection for island work.
  • Current until Friday, June 17. 9 a.m. to 4 p.m. Single eastbound lane closure at the Lockhill Selma Rd. intersection for island work. 

Lockhill Selma Rd. – Bexar County

  • Current until Friday, June 17. 9 a.m. to 4 p.m. Single northbound lane closure at the Wurzbach Parkway intersection for island work.
  • Current until Friday, June 17. 9 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for corner work. 

FM 1535 – N.W. Military Highway

  • Current until Friday, June 17. 9 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for paver installations.
  • Current until Friday, June 17. 9 a.m. to 4 p.m. Single northbound lane closure at the Wurzbach Parkway intersection for paver installations.
  • Current until Friday, June 10. 7 a.m. to 6 p.m. Single lane closures, in both directions, from Loop 1604 to Huebner Rd. for utility work. 

FM 2252 – Nacogdoches Road

  • Monday, June 13 until Friday, June 17. 8 a.m. to 5 p.m. Single lane closures, in both directions, at the Evans Rd. intersection for milling operations. 

SH 181 – Bexar County

  • Current until June 2022. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from I-37 to the Wilson County Line for roadway repairs. 

Other – Bexar County

  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single lane closure on Fratt Road from Austin Highway to Interchange Parkway for geotechnical and drilling work.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single lane closure on southbound Austin Highway (Loop 368) from I-35 (Exit 26) to Walzem Road for geotechnical and drilling work.
  • Sunday, June 12 until Friday, June 17. 8 p.m. to 5 a.m. Single lane closure on southbound Austin Highway (Loop 368) ramp from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
  • Monday, June 13 until Friday, June 17. 9 a.m. to 5 p.m. Single lane closure on Fratt Road from Austin Highway to Interchange Parkway for geotechnical and drilling work.