Friday, March 3

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway entrance ramp to Vance Jackson Road exit ramp for eastbound direct connector bridge construction. Nightly frontage road full closure. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane entrance ramp closure after La Cantera Parkway for eastbound direct connector bridge construction. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Eastbound I-10 mainlane exit ramp closure to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from westbound IH-10 to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from IH-10 to Babcock Road for bridge construction – westbound direct connector beam placement. Excluding weekends. Only one full mainlane closure to occur per direction.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, March 6 until Monday, March 13. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Sunday, March 5 until Monday, March 13. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, March 5 until Friday, March 10. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, March 5 until Friday, March 10. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, March 5 until Friday, March 10. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, March 5 until Friday, March 10. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Monday, March 6 until Friday, March 10. Nightly 8 p.m. until 5:30 a.m. Westbound frontage road right lane full closure at Rogers Ranch Parkway / Bitters Road intersection for gas utility work.
  • Monday, March 6 until Friday, March 10. Nightly 8 p.m. until 5:30 a.m. Northbound Rogers Ranch Parkway mainlane full closure at westbound Loop 1604 intersection for gas utility work.
  • Monday, March 6 until Friday, March 10. Nightly 8 p.m. until 5:30 a.m. Southbound Rogers Ranch Parkway mainlane full closure at westbound Loop 1604 intersection for gas utility work.
  • Monday, March 6 until Friday, March 10. Daily 9 a.m. until 3 p.m. Westbound to eastbound turnaround short term full closure at Loop 1604 and Lockhill Selma Road for electrical work.
  • Monday, March 6 until Friday, March 10. Daily 9 a.m. until 3 p.m. Westbound to eastbound turnaround short term full closure at Loop 1604 and NW Military Highway for electrical work.
  • Friday, March 10 at 9 p.m. until Monday, March 12 at 5 a.m. Nightly Weekend Only. Eastbound mainlane full closure from NW Military Highway exit ramp to Blanco Road entrance ramp for bridge construction at both Salado Creek and Blanco Road.
  • Friday, March 10 at 9 p.m. until Monday, March 12 at 5 a.m. Nightly Weekend Only. Westbound mainlane full closure from Blanco Road Exit Ramp until NW Military Highway entrance ramp to for bridge construction at both Salado Creek and Blanco Road. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound Loop 1604 mainlanes to IKEA-RBFCU Parkway for barrier work. Traffic should use previous exit ramp.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to I-35 for barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from IKEA-RBFCU Parkway to I-35 for barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for drill shaft work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Lookout Road turnaround.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound bypass ramp of Loop 1604 from Lookout Road to Nacogdoches Road for barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound frontage road of Loop 1604 between Union Pacific Railroad and Nacogdoches Road for barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Left lane closure on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for construction entrance work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for retaining wall demolition work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from Union Pacific Railroad to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramp.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work and drill shaft work. Traffic must use Nacogdoches Road turnaround.
  • Wednesday March 15 Through Monday April 10 long-term closure (24/7). Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work. 

Loop 1604 – West San Antonio/Bexar County

  • Current until Wednesday, March 8. 9 a.m. to 4 p.m. Single northbound lane closure at 202 W. Loop 1604 S for the installation of a deceleration lane. 

I-10 – North West San Antonio/Bexar County

  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound mainlane closure between eastbound IH-10 exit ramp and eastbound Loop 1604 on ramp from westbound IH-10 for concrete traffic barrier relocation. Nightly closures. Excluding weekends. Only one full mainlane closure to occur per direction, per night.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from eastbound IH-10 to eastbound Loop 1604. Nightly closures. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound Loop 1604 to eastbound IH-10. Nightly closures. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound IH-10 to westbound Loop 1604. Nightly closures. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Eastbound IH-10 mainlane full closure between exit 556B and La Cantera Parkway (braided ramp) for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Eastbound IH-10 mainlane full closure between exit 556A and after Loop 1604 interchange for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, March 5 until Friday, March 10. Weeknights 9 p.m. until 5 a.m. Westbound IH‑10 westbound mainlane full closure between exit 556A and after the Loop 1604 interchange for bridge construction. Nightly closures. Excluding weekends.
  • Monday, March 6 until Friday, March 10. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, March 6 until Friday, March 10. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

US 281 – North San Antonio/Bexar County

  • Friday, March 3 until Tuesday, March 7. 9 a.m. to 3 p.m. Various lane closures on the southbound frontage road at Overlook Parkway for intersection work.
  • Tuesday, March 7 until Friday, March 10. 9 a.m. to 3 p.m. Various lane closures on the frontage roads at Bulverde Rd. for intersection work.
  • Thursday, March 9 until Monday, March 13. 9 a.m. to 3 p.m. Various lane closures on the frontage roads at Borgfeld Rd. for intersection work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday March 25 long term closure (24/7). Left lane closure on southbound frontage road of I-35 from Whirlwind Drive to Randolph Boulevard for drainage work.
  • Current until Monday, May 15 long term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for soil nail wall, drill shaft, column, and cap work.
  • Sunday, March 5. 7 a.m. to 3 p.m. All mainlanes and frontage road lanes in both directions on I-35 from FM 1102 to Comal/Hays County Line for a rolling lane closure for installing new transmission lines across I-35.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for striping and barrier work. Traffic must use the Forum Parkway turnaround and follow detour signs.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road closure of I-35 from Olympia Parkway to Gateway Boulevard for temporary pavement, striping, and barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for striping, barrier work and temporary pavement work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for striping, barrier, and temporary pavement work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound and westbound Old Austin Road from Chippewa Boulevard to southbound frontage road of I-35 for striping, barrier, and temporary pavement work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound and westbound Olympia Parkway at southbound frontage road of I-35 for striping, barrier, and temporary pavement work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Closure on southbound I-35 collector ramp at the Loop 1604 interchange for construction entrance. Traffic must use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for earthwork. Traffic must exit at westbound Loop 1604 and follow the detour signs to access eastbound Loop 1604.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound I-35 to westbound Loop 1604 connector ramp for striping, barrier, and temporary pavement work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane, exit ramp closure, and left lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson Road for tree removal work. Traffic should use next exit.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane, exit ramp closure, and left lane closure on northbound frontage road of I-35 at O’Connor Road for tree removal work. Traffic should use next exit.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Multiple lane closures on northbound I-35 mainlanes, alternating entrance and exit ramp closures and left lane frontage road closure from O’Connor Road to Pat Booker Road for striping work and barrier work. Traffic should follow the detour sign to the available ramps.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Gunn Road, and left lane closure on Randolph Boulevard at Judson Road for barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for barrier and striping work. Traffic should use next entrance and exit.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlane of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork, striping, and barrier work. Traffic should use next exit ramp.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road and flagging operation on I-35 from Toepperwein Road to Judson Road for earthwork and barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for earthwork.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for earthwork, paving, striping, and barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlane, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road for tree removal work. Traffic should use next exit.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for earthwork, paving, striping, and barrier work. Traffic should use next entrance and exit.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from O’Connor Road to Weidner Road for earthwork.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Left lane closures (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for temporary ramp construction work and drainage work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound mainlanes of I-35 and exit ramp closure to Randolph Boulevard between Thousand Oaks Drive and Walzem Road for striping and barrier work. Traffic should use prior exit ramp.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on southbound I-35 mainlanes from Thousand Oaks Drive to Walzem Road for striping and barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound I-35 connector ramp to westbound I-410 for striping and barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical and drill shaft work.
  • Sunday, March 12 until Saturday, March 18. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Pat Booker Road to Toepperwein Road for structures work.
  • Monday, March 13 through Thursday, May 11 long-term closure (24/7). Exit ramp closure of southbound I-35 to Randolph Boulevard. Traffic to use temporary ramp.
  • Monday, March 13 through Monday, November 27 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work. 

I-10 – East San Antonio/Bexar County

  • Friday, March 3 8 p.m. until Sunday, March 5 6 p.m. Full closure of the frontage roads, in both directions, from FM 1518 to FM 2538 for traffic switch.
  • Friday, March 3 until Tuesday, March 7. Full closure of the westbound frontage road at Haeckerville Rd. for construction work.
  • Continuing through Tuesday, March 14. NIGHTTIME alternating eastbound and westbound I-10 full mainlane closures between W.W. White Road and Ackerman Road from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights.)
  • Continuing through Wednesday, March 15. DAYTIME westbound I-10 frontage road alternating lane closure at Ackerman Rd. from 9 a.m. to 4 p.m. for overpass work.
  • Continuing through Wednesday, March 15. NIGHTTIME westbound I-10 frontage road closure at I-410 northbound on-ramp from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights). Westbound I-10 to I-410 and northbound I-410 to westbound I-10 ramps will remain open. Detour: Westbound frontage road traffic will take the westbound I-10 to the northbound I-410 ramp, continue on northbound I-410, take the FM 78 exit, turn around at the intersection, return on southbound I-410, and exit to westbound I-10.
  • Continuing through Wednesday, March 15. NIGHTTIME westbound I-10 frontage road closure between Ackerman Road and Cornerway Boulevard from 9 p.m. to 5 a.m. for overpass work. (No closures Friday or Saturday nights) I-10 on-ramp will also be closed. Detour: Westbound frontage road traffic to westbound I-10 will turn around at Ackerman, take the eastbound frontage road, turn around at Foster Road, and take the ramp to westbound I-10.
  • Continuing through Wednesday, March 15. NIGHTTIME I-10 eastbound exit to Ackerman Road closed from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights). Detour: Eastbound I-10 traffic can exit at Foster Road, turn around at the intersection, and use the westbound frontage road back to Ackerman. 
  • Friday, March 3. NIGHTTIME northbound and southbound Loop 1604 closed at I-10 from 10 p.m. to 10 a.m. for overpass work. Detour: Northbound Loop 1604 traffic will use the eastbound I-10 frontage road, turn around at Pfeil Road, and take the westbound I-10 frontage road back to Loop 1604. Southbound Loop 1604 traffic will use the westbound I-10 frontage road, turn around at FM 1516 road, and take the eastbound I-10 frontage road back to Loop 1604. 

I-410 – North East San Antonio

  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound Loop 1604 mainlanes to IKEA-RBFCU Parkway for barrier work. Traffic should use previous exit ramp.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to I-35 for barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from IKEA-RBFCU Parkway to I-35 for barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for drill shaft work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Lookout Road turnaround.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound bypass ramp of Loop 1604 from Lookout Road to Nacogdoches Road for barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound frontage road of Loop 1604 between Union Pacific Railroad and Nacogdoches Road for barrier work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Left lane closure on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for construction entrance work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for retaining wall demolition work.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from Union Pacific Railroad to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramp.
  • Sunday, March 5 until Saturday, March 11. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work and drill shaft work. Traffic must use Nacogdoches Road turnaround.
  • Wednesday March 15 Through Monday April 10 long-term closure (24/7). Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work. 

I-410 – East San Antonio

  • Continuing through Wednesday, March 15. NIGHTTIME alternating northbound and southbound I-410 full mainlane closures at I-10 interchange from 9 p.m. to 5 a.m. (No closures during northbound frontage road closures or on Friday and Saturday nights.) Detour: NB & SB I-410 traffic take exit towards I-10 collector ramp and continue straight to reenter I-410.
  • Continuing through Wednesday, March 15. DAYTIME alternating northbound and southbound I-410 frontage road lane closures between I-10 and Rigsby Avenue from 9 a.m. to 4 p.m.
  • Continuing through Wednesday, March 15. NIGHTTIME northbound I-410 frontage road closure from Eastgate Street to Ackerman Road from 8 p.m. to 5 a.m. Detour: Northbound I-410 frontage traffic wanting to access Ackerman Road may take northbound I-410 to I-10 eastbound exit ramp, turn around at Foster Road, and take the westbound frontage road to Ackerman.  
  • Continuing through Wednesday, March 15. NIGHTTIME. Northbound I-410 ramps to eastbound and westbound I-10 closed from 9 p.m. to 5 a.m. for ramp work. (Only one ramp will be closed at a time. No closures on Friday and Saturday nights.) Detour: Northbound I-410 traffic to eastbound I-10 will take the westbound I-10 cloverleaf ramp, follow the westbound I-10 to southbound I-410 cloverleaf ramp, and finally use the I-410 southbound to I-10 eastbound cloverleaf ramp. Northbound I-410 traffic to westbound I-10 will continue on I-410, exit at FM 78, turn around at the intersection, return on southbound I-410, and exit to westbound I-10.
  • Friday, March 3 through Monday, March 13. NIGHTTIME alternating northbound and southbound I-410 lane closures between FM 78 (Old Seguin Rd.) and East Houston St. from 9 p.m. March 3 continuously thru 5 a.m. Monday, March 13. Seek alternate routes.
  • Saturday, March 4 through Sunday, March 5. DAYTIME northbound I-410 ramp to westbound I-10 closed from 5 a.m. to 6 p.m. daily for road and sign work. Detour: Northbound I-410 traffic to westbound I-10 will continue on I-410, take the FM 78 exit, turn around at the intersection, return on southbound I-410, and exit to westbound I-10.
  • Sunday, March 5 through Wednesday, Sunday 19. NIGHTTIME southbound I-410 full mainlane closures between I-10 and E. Houston Street from 9 p.m. to 5 a.m. (No closures on Friday and Saturday nights.) Detour: southbound I-410 traffic will take W.W. White exit, turn around, take I-10 eastbound frontage road, and reenter southbound I-410 at the next entrance ramp. 

I-410 – West San Antonio

  • Current until Thursday, March 9. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Marbach Rd. to Pilar Dr. for utility work.
  • Current until Friday, March 31. 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from Bandera Rd. to Marbach Rd. for overhead sign work.
  • Current until Friday, March 31. 8 p.m. to 5 a.m. Alternating full closures of the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for mill and overlay work.
  • Current until Friday, March 31. 9 a.m. to 4 p.m. Alternating lane closures on the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for top soil work.
  • Current until Friday, March 31. 9 a.m. to 4 p.m. Full closure of the northbound mainlanes from SH 151 to W. Military Dr. for overhead sign work.
  • Monday, March 6 until Wednesday, March 8. 9 p.m. to 5 a.m. Full alternating closure of the mainlanes, in both directions, at Valley Hi Dr. for bridge work.
  • Sunday, March 12 until Monday, March 13. 9 p.m. to 5 a.m. Single lane closure on westbound Valley Hi Rd. for concrete work.
  • Monday, March 13 until Wednesday, March 15. 9 p.m. to 5 a.m. Single lane closure on the northbound frontage road at Valley Hi Rd. for road repairs. Exit ramp to Valley Hi Rd. will also be closed.
  • Sunday, April 2 until Monday, April 3. 9 p.m. to 5 a.m. Single lane closure on eastbound Valley Hi Rd. for concrete work.
  • Sunday, March 5 until Wednesday, March 8. Alternating closures on the cloverleaf intersection at US 90 for pavement repairs. 

I-410 – South San Antonio

  • Monday, March 6 until Friday, March 10. 8 a.m. to 5 p.m. Various eastbound mainlane closures from Somerset Rd. to S. Presa Rd. for rail repairs. 

SH 151 – West San Antonio

  • Current until Friday, March 31. 9 a.m. to 4 p.m. Alternating lane closures on the frontage roads, in both directions, from Loop 410 to Ingram Rd. for top soil work.
  • Current until Friday, March 31. 8 p.m. to 5 a.m. Full closure of the westbound mainlanes from W. Military Dr. to Potranco Rd. for overhead sign installation. 

PA 1502 – Wurzbach Parkway

  • Monday, March 6 until Friday, March 31. 9 a.m. to 3 p.m. Various lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for roadway work. 

SH 16 – Bandera Road

  • Sunday, March 5 until Friday, March 10. 8 p.m. to 6 a.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for utility work.
  • Monday, March 6 until Friday, March 10. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for utility work. 

US 90 – West San Antonio/Bexar County

  • Sunday, March 5. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions at SH 211 for utility work. Traffic will be stopped in 15 minute intervals intermittently throughout the day. 

SH 46 – Kendall County

  • Monday, March 6. 8:30 a.m. to 3 p.m. Single lane closures, in both directions, at I-10 for traffic switch.

Friday, February 17

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway entrance ramp to Vance Jackson Road exit ramp for eastbound direct connector bridge construction. Nightly frontage road full closure. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane entrance ramp closure after La Cantera Parkway for eastbound direct connector bridge construction. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Eastbound I-10 mainlane exit ramp closure to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, February 19 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from westbound IH-10 to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, February 19 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from IH-10 to Babcock Road for bridge construction – westbound direct connector beam placement. Excluding weekends. Only one full mainlane closure to occur per direction.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 20 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Friday, February 24 at 9:00 p.m. until Monday, February 27 at 5 a.m. Weekend only. Westbound mainlane full closure between IH-10 and Babcock Road for relocation of concrete traffic barrier. Only one full mainlane closure to occur per direction.
  • Sunday, February 19 until Sunday, February 26. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, February 19 until Friday, February 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, February 19 until Friday, February 24. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, February 19 until Friday, February 24. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, February 19 until Friday, February 24. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Monday, February 20 until Friday, February 24. Nightly 8 p.m. until 5:30 a.m. Westbound frontage road right lane full closure at Rogers Ranch Parkway for gas utility work.
  • Monday, February 20 until Friday, February 24. Nightly 8 p.m. until 5:30 a.m. Northbound Rogers Ranch Parkway mainlane full closure at Loop 1604 intersection for gas utility work.
  • Monday, February 20 until Friday, February 24. Nightly 8 p.m. until 5:30 a.m. Southbound Rogers Ranch Parkway mainlane full closure at Loop 1604 intersection for gas utility work.
  • Monday, February 20 until Sunday, February 26. Nightly 9 p.m. until 5 a.m. Eastbound mainlane full closure from Blanco Road exit ramp to Blanco Road entrance ramp for setting deck panels/overhangs/flying steel for proposed northbound Blanco bridge.
  • Monday, February 20 until Sunday, February 26. Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure from Blanco Road exit ramp to Blanco Road entrance ramp for setting deck panels/overhangs/flying steel for proposed northbound Blanco bridge.
  • Saturday, February 25. 8 a.m. until 3 p.m. Weekend Only. Westbound mainlane exit ramp to Lockhill Selma/Vance Jackson Road for material haul off. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 between IKEA-RBFCU Parkway and I-35 for barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Right lane closure on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Lookout Road turnaround.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Left lane closure on eastbound Loop 1604 mainlane at Lookout Road for barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Full closure on eastbound frontage road, Lookout Road exit ramp, and the westbound to eastbound turnaround of Loop 1604 from Nacogdoches Road to Union Pacific Railroad for overhead sign board removal. Accommodations will be made for local traffic. Traffic must follow detour signs.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound frontage road of Loop 1604 between Union Pacific Railroad and Nacogdoches Road for barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road turnaround.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Right lane closure and exit ramp closures on westbound Loop 1604 connector from Gateway Boulevard to Gateway Place for barrier work. Traffic should use next exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from Union Pacific Railroad to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramp.
  • Wednesday, March 1 through Monday, March 27 long-term closure (24/7). Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work. 

I-10 – North West San Antonio/Bexar County

  • Sunday, February 19 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 19 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 19 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 19 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 19 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 19 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 19 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 19 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, February 20 until Friday, February 24. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 20 until Friday, February 24. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.

US 281 – North San Antonio/Bexar County

  • Saturday, February 18. 9 a.m. to 3 p.m. Alternating lane closure, in both directions, at Wilderness Oak for asphalt work.
  • Monday, February 20. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Mountain Lodge for asphalt work.
  • Friday, February 17 until Tuesday, February 21. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Overlook Parkway for pavement operations.
  • Tuesday, February 21 until Thursday, February 23. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Wilderness Oak for pavement operations.
  • Thursday, February 23 until Friday, February 24. Alternating lane closures, in both directions, at Mountain Lodge for pavement operations. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Monday, May 15 long term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for soil nail wall, drill shaft, column, and cap work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes from Retama Parkway to Loop 1604 for striping and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road and flagging operation on I-35 from Pat Booker Road to Toepperwein Road for barrier and striping work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for temporary pavement work. Traffic must use the Forum Parkway turnaround and follow detour signs.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2)  on southbound I-35 mainlanes and entrance ramp closure between Evans Road and Old Austin Road for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Retama Parkway to Old Austin Road for striping and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes from Evans Road to Olympia Parkway, entrance ramp closure between Retama Parkway and Olympia Parkway and exit ramp closure at Retama Parkway for striping and barrier work. Traffic should use next entrance and prior exit ramps.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for striping and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for temporary pavement, striping, and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road for striping and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Evans Road to Olympia Parkway for striping and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound and westbound Retama Parkway from Lookout Road to southbound frontage road of I-35 for striping and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes from Evans Road to Olympia Parkway for striping and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Southbound I-35 collector at Loop 1604 interchange for creating access to work area. Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for earthwork. Southbound I-35 traffic to eastbound Loop 1604 must exit at westbound 1604 and follow the detour signs to access eastbound Loop 1604.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earth work. Westbound Loop 1604 traffic to southbound I-35 must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure for striping and barrier work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane, exit ramp closure, and left lane closure on northbound frontage road of I-35 from Bludau Bishop Road to Judson Road for tree removal work. Traffic should use next exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane, exit ramp closure, and left lane closure on northbound frontage road of I-35 at O’Connor Road for tree removal work. Traffic should use next exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on northbound I-35 mainlines from O’Connor Road to Judson Road for striping work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on northbound I-35 mainlines, entrance ramp closure, exit ramp closure, and left lane closure on northbound frontage road of I-35 from O’Connor Road to Judson Road for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound I-35 mainlines, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Judson Road to Toepperwein Road for striping work. Traffic should use next exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on northbound I-35 mainlane from Judson Road to Toepperwein Road for striping work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on northbound I-35 mainlane from Toepperwein Road to Pat Booker Road for striping work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on northbound I-35 mainlanes and exit ramp closure from Toepperwein Road to Shin Oak Drive for striping work. Traffic should use prior exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Toepperwein Road to Pat Booker Road for striping work. Traffic should use next entrance ramp and prior exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earth, paving, striping, and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlane and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for tree removal work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlane, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road for tree removal work. Traffic should use next exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork, striping, and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road and flagging operation on I-35 from Toepperwein Road to Judson Road for earthwork and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for barrier work and striping work. Traffic should use next entrance and exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on the southbound frontage road of I-35 from Judson Road to O’Connor Road for striping work, barrier work, and paving. Traffic should use next entrance and exit ramps.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for earthwork, paving, striping, and barrier work. Traffic should use next entrance and exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from O’Connor Road to Weidner Road for earthwork.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for earthwork, paving, striping, and barrier work.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for earthwork.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Left lane closures (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for temporary ramp construction.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound mainlanes of I-35 and exit ramp closure to Randolph Boulevard between Thousand Oaks Drive and Walzem Road for striping and barrier work. Traffic should use prior exit ramp.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on southbound mainlanes of I-35 from Thousand Oaks Drive to Walzem Road for striping and barrier work.
  • Monday, February 20 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound I-35 connector ramp to westbound I-410 for striping and barrier work.
  • Monday, March 13 through Thursday, May 11 long-term closure (24/7). Exit ramp closure of southbound I-35 to Randolph Boulevard. Traffic to use temporary ramp.
  • Monday, March 13 through Monday, November 27 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.

I-10 – East San Antonio/Bexar County

  • Friday, February 17 – 9 p.m. to Saturday, February 18 – 12 p.m. Full closure of the eastbound mainlanes at Pfeil Rd. for bridge work.
  • Friday, February 24 until Saturday, February 25. 6 a.m. Full closure of the westbound frontage road from FM 2538 to FM 1518 for bridge work.
  • Sunday, February 19 through Sunday February 24. NIGHTTIME northbound and southbound Loop 1604 closed at I-10 from 8 p.m. to 5 a.m. to set panels. Detour: Northbound Loop 1604 traffic will use the eastbound I-10 frontage road, turn around at Pfeil Rd., and take the westbound I-10 frontage road back to Loop 1604. Southbound Loop 1604 traffic will use the westbound I-10 frontage road, turn around at FM 1516 road, and take the eastbound I-10 frontage road back to Loop 1604.
  • Continuing through Wednesday, March 1. DAYTIME westbound I-10 frontage road alternating lane closure at Ackerman Rd. from 9 a.m. to 4 a.m. for overpass work.
  • Continuing through Monday, February 20. NIGHTTIME westbound I-10 frontage road closure at I-410 northbound on-ramp from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights). Westbound I-10 to I-410 and northbound I-410 to westbound I-10 ramps will remain open. Detour: Westbound frontage traffic will take the westbound I-10 to northbound I-410 ramp, continue on northbound I-410, take the FM 78 exit, turn around at the intersection, return on southbound I-410, and exit towards westbound I-10. 

I-410 – North East San Antonio

  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit.
  • Sunday, February 19 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
  • Monday, February 20 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Monday, February 20 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Monday, February 20 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Monday, February 20 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Monday, February 20 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Multiple right mainlane closures (2) and exit ramp closure on westbound I-410 between I-35 and Perrin Beitel for striping and barrier work. Traffic should use next exit.
  • Monday, February 20 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel for striping and barrier work. 

I-410 – East San Antonio

  • Saturday, February 18 through Saturday, February 25. DAYTIME northbound I-410 ramp to westbound I-10 closed from 5 a.m. to 5 p.m. for ramp work. Detour: Northbound I-410 traffic to westbound I-10 will continue on I-410, take the FM 78 exit, turn around at the intersection, return on southbound I-410, and exit to westbound I-10.
  • Continuing through Wednesday, March 1. DAYTIME alternating northbound and southbound I-410 frontage road lane closures between I-10 and Rigsby Ave. from 9 a.m. to 4 p.m. for bridge and road work.  
  • Continuing through Monday, February 27. Alternating northbound and southbound I-410 lane closures between FM 78 (Old Seguin Rd.) and East Houston St. from 5 a.m. February 4 continuously thru 5 a.m. February 27. Seek alternate routes.
  • Continuing through Wednesday, March 1. DAYTIME alternating northbound and southbound I-410 frontage road lane closures between I-10 and East Houston St. from 9 a.m. to 4 p.m. for bridge and road work.   

I-410 – West San Antonio

  • Current until Sunday, February 26. 9 a.m. to 4 p.m. Alternating lane closures on the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for top soil work.
  • Current until Sunday, February 26. 8 p.m. to 5 a.m. Alternating full closure of the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for mill and overlay work.
  • Current until Sunday, February 26. 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from Bandera Rd. to Marbach Rd. for barrier work.
  • Current until Thursday, March 9. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Marbach Rd. to Pilar Dr. for utility work.

SH 151 – West San Antonio

  • Current until Sunday, February 26. 8 p.m. to 5 a.m. Full closure of the westbound mainlanes from W. Military Dr. to Potranco Rd. for barrier and guardrail work.
  • Current until Sunday February 26. 9 a.m. to 4 p.m. Alternating full closures of the frontage roads, in both directions, for top soil work.
  • Friday, February 17 until Tuesday, February 21. 5 a.m. to 5 a.m. Full closure of the turnarounds, in both directions, at Marbach Rd. for asphalt work. 

PA 1502 – Wurzbach Parkway

  • Current until Tuesday, February 28. 9 a.m. to 3 p.m. Various lane closures, in both directions, from N.W. Military Highway to Weidner Rd. roadway work.

SH 16 – Bandera Road

  • Sunday, February 19 until Friday, February 24. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for utility work.
  • Monday, February 20 until Friday, February 24. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for utility work.
  • Monday, February 20 until Monday, February 27. 9 a.m. to 3 p.m. Southbound lane closure at Cedar Trail for utility work. 

US 90 – West San Antonio/Bexar County

  • Current until Friday, February 24. Single eastbound mainlane closure from Los Galapagos to Castroville Rd. for roadway repairs.
  • Current until Friday, February 24. 8:30 p.m. to 5 a.m. Alternating eastbound mainlane closures from Horal St. to Acme Rd. for roadway repairs. 

I-10 – Kendall County

  • Sunday, February 19 until Sunday, February 26. 9 p.m. to 5 a.m. Alternating single mainlane closures, in both directions, from Scenic Loop Rd. to SH 46 for pavement operations. 

FM 78 – Guadalupe County

  • Friday, February 17 until Tuesday, February 21. 9 p.m. to 5 a.m. Full closure of lanes, in both directions, from CR 311 to FM 1044 for emergency repairs. 

FM 1103 – Guadalupe County

  • Monday, February 20 until Friday, February 24. 8 a.m. to 5 p.m. Intermittent closures of the eastbound lanes at the Turning Stone intersection for pavement operations.