Below you'll find lane closures expected due to construction work. This does not include ongoing lane closures - like the exit and entrance ramp closures along I-35 between Schertz Parkway and FM 1518 - but closures that are expected to begin within the next week.
REMEMBER THESE ARE PENDING WEATHER! If weather is adverse, these closures may be delayed.
Find the closures listed chronologically by highway designation - this is the format we'll use each week as we try and keep you posted on what to expect on our roadways.
If you'd like to see an interactive map with these lane closures, visit www.drivetexas.org - it's even optimized for use with a mobile device, if you want to try that. Also, keep in mind work on the Loop 1604-U.S. Hwy 281 interchange is being managed by the Alamo RMA, and information on closures related to that project are found at www.alamorma.org. And, just because we love sending announcements out, we'll try to publish any last-minute closures on our Twitter feed, www.twitter.com/txdotsanantonio.
Interstate 10
Saturday-Sunday, January 19-20
7 a.m. until 7 p.m. daily
East-bound I-10 between Foster Road and Loop 1604
The right lane will close while crews replace the road surface. No entrance or exit ramps are affected by this closure.
Monday-Thursday, January 21-24
9 a.m. until 4 p.m. daily
East-bound I-10 between Foster Road and Loop 1604
Alternating exit and entrance ramps will close while crews replace the road surface. Traffic will be detoured to the next available ramp and will turn around as needed. Expect delays.
Interstate 35
Sunday-Thursday, January 20-24
8 p.m. until 5 a.m. nightly
I-35 frontage roads between Tilden Street and Loop 1604
Alternating lanes will be closed while crews place pavement markings.
Wednesday-Thursday, January 23-24
10 p.m. until 5 a.m.
South-bound I-35 at Cibolo Creek
The two left lanes will be closed while crews repair a pothole in the road. Expect delays.
Interstate 37
No lane closures posted.
Interstate 410
Sunday-Monday, January 20-21
10 p.m. until 5 a.m.
North-bound I-410 between I-10 and Farm to Market 78 (Kirby area)
Alternating lanes will close while crews replace overhead highway signs. This closure includes the exit ramp from I-410 to I-10. Traffic will exit the next available ramp and use turnaround.
Monday-Friday, January 21-25
8 a.m. until 5 p.m. daily
I-410 between I-37 and state Highway 16 (south San Antonio)
Alternating lanes will close while crews repair bridge joints and roadway shoulders. This closure may include exit or entrance ramps. Traffic will use the next available ramp.
Loop 1604
Sunday-Thursday, January 20-24
8 p.m. until 5 a.m. nightly
Loop 1604 between Morin Road and Farm to Market 1937 (south Bexar County)
Alternating lanes will be closed while crews place pavement markings.
U.S. Highway 90
No lane closures posted.
U.S. Highway 281
No lane closures posted.
Farm-to-Market roads
Wednesday-Thursday, January 23-24
9 p.m. until 5:30 a.m.
Farm to Market 1518 at I-35 overpass
All lanes will close while crews lay storm drain pipe across the road. Traffic from FM 1518 will be detoured to Schertz Parkway. Traffic from Corporate Drive will be detoured to Evans Road. Expect delays.