Monday, April 30

This week's construction-related closures

I-10 – Fair Oaks Ranch
  • Monday, April 30 at 9 a.m. until Friday, May 25 at 5 a.m. Westbound frontage road west of Old Fredericksburg Road. All lanes will close while crews rebuild the intersection. Traffic will follow the posted detour route.
I-10 – Leon Springs
  • Friday, May 4 at 9 p.m. until Monday, May 7 at 5 a.m. Main lanes, both directions, at Camp Bullis. All lanes will close while crews set bridge support beams. Traffic will exit Camp Bullis, continue along the frontage road and re-enter the highway at the next available ramp.
I-35 – Schertz
  • Current and continuous until October 2018. Frontage roads, both directions, at FM 1103. One lane will close while crews replace the FM 1103 overpass bridge.
  • Current until Friday, May 4. 9 p.m. until 6 a.m. nightly. Main lanes, both directions, at FM 1103. Alternating lanes, two at a time, will close while crews set bridge deck panels overhead.
I-35 – Northeast San Antonio
  • Tuesday, May 1. 9 a.m. until 3 p.m. Southbound exit ramp to Eisenhauer Road. The ramp will close while crews repair crash cushions. Traffic will take the next exit and turn around to reach its destination.
I-35 – East San Antonio
  • Tuesday-Thursday, May 1-3. 9 a.m. until 3 p.m. daily. Northbound main lanes between Pine Street and George Beach. The left lane will close while crews work on drain inlets.
I-410 – North San Antonio
  • Current until Friday, May 4. 9 p.m. until 5 a.m. nightly. Eastbound frontage road between Harry Wurzbach and Perrin Beitel roads. Alternating lanes will close while crews resurface the road.
I-410 – Northwest San Antonio
  • Tuesday-Thursday, May 1-3. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Military Drive and Hwy 151. All lanes will close while crews move barrier. Traffic will exit Military Drive, travel through the intersections and re-enter the highway at the next available ramp.
  • Tuesday-Friday, May 1-4. 9 p.m. until 5 a.m. nightly. Northbound main lanes between Marbach Road and Military Drive. All lanes will close while crews move barrier. Traffic will exit Hwy 151, move through the intersections and re-enter the highway at the next available ramp.
  • Thursday, May 3 at 9 p.m. until Friday, May 4 at 5 a.m. Southbound exit ramp to Military Drive. The ramp will close while crews do bridge work. Traffic will exit Culebra Road to reach Military Drive and eastbound Hwy 151.
  • Sunday-Friday, May 6-11. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Culebra Road and Military Drive. The left two lanes will close while crews work on overhead sign supports.
I-410 – West San Antonio
  • Current and continuous until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection.
  • Current and continuous until December 2018. Northbound exit ramp to Marbach. The ramp will remain closed while crews reconstruct the road. Traffic will exit US Hwy 90 and continue along the frontage road to reach its destination.
  • Tuesday, May 1 at 8 p.m. until Wednesday, May 2 at 5 a.m. Main lanes and frontage roads, both directions, at US Hwy 90. All lanes will close while crews do overhead bridge work. Traffic will follow the posted detour route to reach its destination.
  • Wednesday-Friday, May 2-4. 8 p.m. until 5 a.m. nightly. Main lanes, both directions, at US Hwy 90. All lanes will close while crews pour concrete overhead. Traffic will exit US Hwy 90, continue along the frontage road and re-enter the highway at the next available ramp.
U.S. Hwy 90A – Seguin
  • Current until Friday, May 18. 7 a.m. until 6 p.m. daily, weekdays only. Main lanes, both directions, between Geronimo Creek and Dowdy Road. Alternating lanes will close while crews resurface the road. One-way traffic will be controlled by flaggers or off-duty police.
U.S. Hwy 90 – West San Antonio
  • Wednesday, May 2 at 9 p.m. until Thursday, May 3 at 5 a.m. Main lanes, both directions, between I-410 and Military Drive. All lanes will close while crews set bridge support beams overhead. Traffic will exit the highway, follow the frontage road and re-enter the main lanes at the next available ramp.
  • Wednesday-Friday, May 2-4. 8 p.m. until 5 a.m. nightly. Westbound frontage road between I-410 and Horal Drive. All lanes will close while crews do overhead bridge work. Traffic will follow the posted detour route.
U.S. Hwy 281 – Far North San Antonio
  • Monday, April 30-Friday, May 4. 9 p.m. until 5 a.m. nightly. Southbound frontage road at Loop 1604. The left turn lane and turnaround will close while crews do work on bridge support structures.
State Hwy 151
  • Friday, May 4 at 9 p.m. until Saturday, May 5 at 5 p.m. Eastbound main lanes between Military Drive and I-410. All lanes will close while crews put the highway into its final configuration and open the new eastbound connector to northbound I-410.
Loop 1604 – West San Antonio
  • Thursday-Saturday, May 3-5. 9 p.m. until 6 a.m. daily. Northbound main lanes at Marbach. The bridge over Marbach will close while crews set barrier.
Other roads – Converse
  • Monday, June 11 until Friday, August 24. FM 78 at FM 1516. The right turn lane will close while crews do road work. Oversized vehicles will use FM 3502 to reach its destination.
Other roads – New Braunfels
  • Wednesday, May 2. 9 a.m. until 4 p.m. Southbound Loop 337 between Hanz Drive and Gruene Road. The right lane will close while crews stage trucks to set bridge support beams.
Other roads – Helotes
  • Current until Friday, September 28. Northbound Bandera Road at FM 1560. The left turn lane will close while crews do road work. No left turns will be permitted. Traffic will continue to the next intersection and turn around to reach its destination. Cross traffic from Circle A is also blocked.
  • Tuesday, May 8 until Monday, July 2. Riggs Road, both directions, at FM 1560. All lanes will close while crews reconstruct the intersection. Through traffic on FM 1560 will continue but will not be able to turn onto Riggs Road. Traffic from Riggs Road will use Old Bandera Road to reach its destination.
  • Monday, April 30-Thursday, May 3. 9 p.m. until 5 a.m. nightly. Southbound Bandera Road between Legend Trail and Loop 1604. Alternating lanes will close while crews move barrier and restripe the road.
Other roads – Boerne
  • Current until Friday, May 25. 8:30 p.m. until 5:30 a.m. nightly. Business Loop 87 (Main Street), both directions, between Bandera Road and the I-10 intersection north of Boerne. Alternating lanes will close while crews repair and resurface the road.
Other roads – Leon Springs
  • Friday, May 4 at 9 p.m. until Monday, May 7 at 5 a.m. Camp Bullis, both directions, at I-10. All lanes will close while crews set bridge support beams overhead. Traffic will turn right onto the frontage road and turn around at the next intersection to reach its destination.
Other roads – Fair Oaks Ranch
  • Tuesday, May 1 at 9 a.m. until Friday, May 25 at 5 p.m. Buckskin Drive, both directions, at I-10. All lanes will close while crews rebuild the intersection. Traffic will use Teepee Lane and Indian Hills to reach its destination.
Other roads – Northwest San Antonio
  • Tuesday-Friday, May 1-4. 9 p.m. until 5 a.m. nightly. Bandera Road, both directions, between Brae Ridge Road and Old Prue. Alternating lanes will close while crews repair the road.
All closures are pending weather.