I-10 – Boerne
- Tuesday-Thursday, May 8-10. 9 p.m. until 5 a.m. nightly. Eastbound Exit 537. The ramp will close while crews resurface the road. Traffic will use the next available ramp and turn around.
I-10 – Fair Oaks Ranch
- Current and continuous until Friday, May 25 at 5 a.m. Westbound frontage road west of Old Fredericksburg Road. All lanes will close while crews rebuild the intersection. Traffic will follow the posted detour route.
I-10 – Leon Springs
- Friday, May 18 at 9 p.m. until Monday, May 21 at 5 a.m. Westbound main lanes at Camp Bullis. All lanes will close while crews set bridge support beams. Traffic will exit Camp Bullis, continue along the frontage road and re-enter the highway at the next available ramp.
- Friday, June 1 at 9 p.m. until Monday, June 4 at 5 a.m. Eastbound main lanes at Camp Bullis. All lanes will close while crews set bridge support beams. Traffic will exit Camp Bullis, continue along the frontage road and re-enter the highway at the next available ramp.
I-10 – East San Antonio
- Wednesday, May 9 at 9 p.m. until Thursday, May 10 at 3 p.m. Westbound frontage road between Foster Road and Woodlake Parkway. All lanes will close while crews install storm drain culverts. Traffic will follow the posted detour route.
I-35 – Schertz
- Current and continuous until October 2018. Frontage roads, both directions, at FM 1103. One lane will close while crews replace the FM 1103 overpass bridge.
- Tuesday, May 8 at 9 p.m. until Wednesday, May 9 at 6 a.m. Northbound main lanes at FM 1103. The left two lanes will close while crews work on the bridge support structures.
I-35 – East San Antonio
- Monday-Thursday, May 7-10. 9 a.m. until 3 p.m. daily. Northbound main lanes between I-37 and George Beach. The left lane will close while crews work on drain inlets.
I-410 – North San Antonio
- Sunday-Friday, May 6-11. 9 p.m. until 5 a.m. nightly. Eastbound frontage road between Harry Wurzbach and Perrin Beitel. Alternating lanes will close while crews resurface the road.
I-410 – Northwest San Antonio
- Sunday-Friday, May 6-11. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Culebra Road and Military Drive. The left two lanes will close while crews work on overhead sign supports.
I-410 – West San Antonio
- Current and continuous until December 2018. Turnarounds, both directions, at Marbach Road. The turnarounds will remain closed while crews construct the new Marbach overpass bridge. Traffic will use the signalized intersection.
- Current and continuous until December 2018. Northbound exit ramp to Marbach. The ramp will remain closed while crews reconstruct the road. Traffic will exit US Hwy 90 and continue along the frontage road to reach its destination.
U.S. Hwy 90A – Seguin
- Current until Friday, May 18. 7 a.m. until 6 p.m. daily, weekdays only. Main lanes, both directions, between Geronimo Creek and Dowdy Road. Alternating lanes will close while crews resurface the road. One-way traffic will be controlled by flaggers or off-duty police.
U.S. Hwy 90 – West San Antonio
- Monday, May 7. 9 a.m. until 4 p.m. West-to-east turnaround at Loop 1604. The turnaround will close while crews install guardrail.
- Monday-Friday, May 7-11. 9 p.m. until 6 a.m. nightly. West-to-east turnaround at Loop 1604. The turnaround will close while crews work on the direct connector overhead.
- Monday, May 14 at 9 p.m. until Tuesday, May 15 at 5 a.m. Main lanes, both directions, between I-410 and Military Drive. All lanes will close while crews set beams overhead. Traffic will follow the posted detour route.
U.S. Hwy 281 – Far North San Antonio
- Current and continuous until Friday, May 25. Southbound frontage road at Loop 1604. The left lane will close while crews work on the bridge support structure for one of the new direct connectors.
- Monday, May 7 until Thursday, May 31. 9 p.m. until 5 a.m. nightly. Northbound frontage road at Loop 1604. The right two lanes will close while crews do bridge work.
- Thursday, May 10 until Thursday, June 7. 9 p.m. until 5 a.m. nightly. Northbound main lanes at Loop 1604. The right lane will close while crews do road work.
- Saturday, May 12. 7 a.m. until 5 p.m. Southbound main lanes between Evans Road and Encino Rio. The right two lanes will close while crews work on traffic signals.
State Hwy 151
- Friday, May 4 at 9 p.m. until Monday, May 7 at 5 a.m. Eastbound main lanes between Military Drive and I-410. All lanes will close while crews put the highway into its final configuration and open the new eastbound connector to northbound I-410.
Loop 1604 – North San Antonio
- Thursday-Monday, May 10-14. 9 p.m. until 5 a.m. nightly. Westbound main lanes at US Hwy 281. The left lane will close while crews set barrier.
Loop 1604 – West San Antonio
- Tuesday, May 8 at 9 p.m. until Wednesday, May 9 at 5 a.m. Southbound main lanes between Hwy 151 and Valley Meadow Drive. The right lane will close while crews pave the new ramp.
- Tuesday-Thursday, May 8-10. 9 p.m. until 5 a.m. nightly. Northbound main lanes at Marbach Road. The left lane will close while crews remove barrier.
Other roads – Converse
- Monday, June 11 until Friday, August 24. FM 78 at FM 1516. The right turn lane will close while crews do road work. Oversized vehicles will use FM 3502 to reach its destination.
- Tuesday-Wednesday, May 8-9. 9 a.m. until 4 p.m. daily. Southbound Loop 337 between Hanz Drive and Gruene Road. The right lane will close while crews stage trucks to set bridge support beams.
- Current and continuous until Friday, September 28. Northbound Bandera Road at FM 1560. The left turn lane will close while crews do road work. No left turns will be permitted. Traffic will continue to the next intersection and turn around to reach its destination. Cross traffic from Circle A is also blocked.
- Tuesday, May 8 until Monday, July 2. Riggs Road, both directions, at FM 1560. All lanes will close while crews reconstruct the intersection. Through traffic on FM 1560 will continue but will not be able to turn onto Riggs Road. Traffic from Riggs Road will use Old Bandera Road to reach its destination.
- Current until Friday, May 25. 8:30 p.m. until 5:30 a.m. nightly. Business Loop 87 (Main Street), both directions, between Bandera Road and the I-10 intersection north of Boerne. Alternating lanes will close while crews repair and resurface the road.
- Friday, May 18 at 9 p.m. until Monday, May 21 at 5 a.m. Camp Bullis, both directions, at I-10. All lanes will close while crews set bridge support beams overhead. Traffic will turn right onto the frontage road and turn around at the next intersection to reach its destination.
- Friday, June 1 at 9 p.m. until Monday, June 4 at 5 a.m. Camp Bullis, both directions, at I-10. All lanes will close while crews set bridge support beams overhead. Traffic will turn right onto the frontage road and turn around at the next intersection to reach its destination.
- Current and continuous until Friday, May 25 at 5 p.m. Buckskin Drive, both directions, at I-10. All lanes will close while crews rebuild the intersection. Traffic will use Teepee Lane and Indian Hills to reach its destination.
- Monday, May 7 at 9 p.m. until Tuesday, May 8 at 5 a.m. Encino Rio, both directions, at US Hwy 281. The left lane will close while crews set barrier.
- Tuesday, May 8 at 9 p.m. until Wednesday, May 9 at 5 a.m. Wiseman Boulevard, both directions, at Loop 1604. All lanes will close while crews install drain culverts. Traffic will follow the posted detour route.
- Monday-Friday, May 7-11. 9 p.m. until 5 a.m. nightly. Southbound Bandera Road between Legend Trail and Loop 1604. Alternating lanes will close while crews set barrier.