Please plan accordingly in consideration of this week's closures:
- Current until Friday, August 31. 7 a.m. until 7 p.m. Eastbound I-410 for alternating lane closures from Roosevelt to Presa for pavement repair work.
- Current until Friday, August 31. 9 a.m. until 3 p.m. Westbound I-10 right frontage road from Dominion Drive to Camp Bullis Road for excavation work.
- Current until Sunday, August 2. 9 a.m until 4 p.m. Eastbound US 87 (Rigsby Avenue) from Grobe Road to Holmgreen Road for installation of driveways, sidewalks and ADA ramps.
- Current until Thursday, August 30. 9 a.m. until 4 p.m. Both lanes in both directions of FM 1957 (Potranco Road) from Leopard Claw to Rousseau Road for removal of equipment, new equipment installation and signal activation.
- Current until Thursday, August 30. 9 p.m. until 5 a.m. Both lates in both directions of FM 1957 (Potranco Road0 from Leopard Claw to Rousseau Road for pavement marking work.
- Wednesday, August 29 until Friday, August 31. 8 p.m. until 5 a.m. Both northbound I-410 frontage lanes at US 90 bridge underpass for bridge rial welding work. DETOUR: Traffic will be redirected to US 90 eastbound frontage road for turnaround at Military and back to I-410 northbound frontage road.
- Thursday, August 30 until Friday, August 31. 8 p.m. until 5 a.m. The right mainlane and the frontage road on Eastbound US 90 from just before I-410 bridge to 410 bridge for slip bridge rail work. DETOUR: Traffic will be redirected to southbound Loop 410 frontage road to turnaround at Valley Hi Drive back to US 90 eastbound.