Friday, September 25

Upcoming Scheduled Construction Closures

 


Loop 1604 – North Central San Antonio

  • Monday, September 28 until Friday, October 2. 9 a.m. to 4 p.m. Single lane closure on eastbound frontage road from Redland Rd. to Bulverde Rd. for erosion control.
  • Sunday, September 27 until Thursday, October 1. 9 p.m. to 5 a.m. Single lane closure on eastbound frontage road from Redland Rd. to Bulverde Rd. for pavement improvements.
  • Sunday, September 27 until Thursday, October 1. 9 p.m. to 6 a.m. Full mainlane closure, in both directions, from Bulverde Rd. to Redland Rd. for mill and overlay work.
  • Sunday, September 27 until Thursday, October 1. 9 p.m. to 5 a.m. Alternating lane and ramp closures, in both directions, from Redland Rd. to Green Mountain Rd. for mill and overlay work.
  • Friday, October 2 until Monday, October 5. Weekend continuous closure 9 p.m. until 5 a.m. Full eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work. DETOUR: Use the Redland Road exit ramp and take the next turnaround.
  • Friday, October 2 until Monday, October 5. Weekend continuous closure 9 p.m. until 5 a.m. Full westbound mainlane closure from Gold Canyon Road to Stone Oak Parkway for bridge work. DETOUR: Take the northbound US 281 exit ramp, go through the US 281 intersection and use the northbound US 281 entrance ramp west of Stone Oak Parkway.
  • Friday, October 2 until Monday, October 5. Weekend continuous closure 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work.
  • Friday, October 2 until Monday, October 5. Weekend continuous closure 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Gold Canyon Road to Stone Oak Parkway for bridge work. 

US 281 – North Central San Antonio/Bexar County

  • Monday, September 28 until Tuesday, September 29. 9 p.m. to 5 a.m. Single lane closure on southbound frontage road from Trinity Park to Bulverde Rd. for barrier placement.
  • Tuesday, September 29. 9 p.m. to 5 a.m. Single northbound mainlane closure from Bulverde Rd. to Trinity Park for barrier placement.
  • Friday, September 25 until Saturday, September 26. Weekend continuous closure 9 p.m. until 8 p.m. Full northbound mainlane closure from the Sonterra Boulevard exit ramp to Evans Road for a traffic switch. DETOUR: Use the Sonterra Boulevard exit ramp and continue along the northbound US 281 frontage road.
  • Friday, September 25 until Saturday, September 26. Weekend continuous closure 9 p.m. until 8 p.m. Full southbound mainlane closure from Evans Road to Sonterra Boulevard for a traffic switch. DETOUR: Use the southbound US 281 frontage road and take the southbound US 281 entrance ramp north of Sonterra Boulevard.
  • Friday, September 25 until Saturday, September 26. Weekend continuous closure 9 p.m. until 8 p.m. Alternating northbound frontage road closure from Encino Rio to Stone Oak/Tournament Players Club (TPC) Parkway for a traffic switch.
  • Friday, September 25 until Saturday, September 26. Weekend continuous closure 9 p.m. until 8 p.m. Alternating southbound frontage road closure from Stone Oak/Tournament Players Club (TPC) Parkway to Evans Road to for a traffic switch.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving. DETOUR: Turn left on the southbound US 281 frontage road, take the turnaround at Donella Drive and use the Donella Drive entrance ramp.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the Evans Road entrance ramp to Encino Rio for sound wall work. DETOUR: Take the southbound US 281 entrance ramp and take the Redland Road exit ramp.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure of the Sonterra Boulevard exit ramp for drainage work. DETOUR: Take the northbound US 281 frontage road exit ramp and go through the Loop 1604 intersection.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure of the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Redland Road.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure of the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure of the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Right lane southbound mainlane closure from Redland Road to Donella Drive for concrete paving.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Left lane northbound frontage road closure from Encino Rio to Stone Oak Parkway for concrete paving.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Left lane southbound frontage road closure from Redland Road to Loop 1604 for drainage work. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from the Sonterra Boulevard entrance ramp to the Donella Drive exit ramp for bridge work.
  • Monday, September 28 until Friday, October 2. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Donella Drive to Encino Rio for concrete paving.
  • Saturday, October 3 until Monday, October 5. Weekend overnight closure 2 a.m. until 5 a.m. Northbound mainlane closure of the north- to southbound turnaround at Evans Road for a traffic switch. DETOUR: Use the turnaround at Stone Oak/ Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, October 3 until Monday, October 5. Weekend overnight closure 2 a.m. until 5 a.m. Southbound mainlane closure of the south- to northbound turnaround at Evans Road for a traffic switch. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, October 3 until Monday, October 5. Weekend overnight closure 2 a.m. until 5 a.m. Northbound frontage road closure of the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, October 3 until Monday, October 5. Weekend overnight closure 2 a.m. until 5 a.m. Southbound frontage road closure of the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, October 3 until Monday, October 5. Weekend overnight closure 2 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for a traffic switch. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Saturday, October 3 until Monday, October 5. Weekend overnight closure 2 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for a traffic switch. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Saturday, October 3 until Monday, October 5. Weekend overnight closure 2 a.m. until 5 a.m. Left lane northbound frontage road closure from Encino Rio to Stone Oak Parkway for concrete paving.
  • Saturday, October 3 until Monday, October 5. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Sonterra Boulevard to the Donella Drive entrance ramp to for bridge work.

 Encino Rio – North Central San Antonio

  • Saturday, October 3 until Monday, October 5. Weekend overnight closure 2 a.m. until 5 a.m. Full westbound crossing closure from westbound Encino Rio to southbound US 281 for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.

 I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Sunday, September 27 until Friday, October 2. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Camp Bullis Rd. to Dominion Dr. for asphalt improvements.
  • Friday, October 2 until Saturday, October 3. 10 p.m. to 8 a.m. Full closure of westbound mainlanes from Camp Bullis Rd. to Dominion Dr. for asphalt improvements.

 I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, September 26. Eastbound I-10 alternating lane closures between FM1516 and Graytown from 6 a.m. to 7 p.m. for shifting traffic and road striping. The eastbound I-10 entrance ramp from Loop 1604 will also be closed intermittently during this time. DETOUR: Drivers wishing to access eastbound I-10 from Loop 1604 can continue to the entrance ramp just east of Pfeil Road.
  • Sunday, September 27 through Monday, September 28. NIGHTLY Eastbound I-10 left lane closure between FM1516 and Graytown from 7 p.m. to 5 a.m. to reset barrier.
  • Current until late-October: Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
  • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Monday, September 21 until Saturday, September 26. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for curb and landscape work.
  • Monday, September 21 until Saturday, September 26. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for sidewalk and driveway improvements.
  • Monday, September 21 until Saturday, September 26. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for landscaping.
  • Monday, September 28 until Tuesday, September 29. 9 p.m. to 5 a.m. Double right lane closures on northbound mainlanes from Hubertus Rd. to Schwab Rd. for barrier removal.
  • Monday, September 28 until Saturday, October 3. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for flat work.
  • Monday, September 28 until Tuesday, September 29. 9 p.m. to 5 a.m. Single lane closure on northbound frontage road from Schwab Rd. to Hubertus Rd. for barrier wall placement.
  • Tuesday, September 29 until Friday, October 2. 9 p.m. to 5 a.m. Double right lane closures on southbound mainlanes from Schwab Rd. to Hubertus Rd. for barrier removal.
  • Tuesday, September 29 until Saturday, October 3. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for slope and sidewalk improvements.
  • Friday, October 2 until Sunday, October 4. Single northbound mainlane closure from Watson Lane bridge to Conrad/Kohnelenberg bridge for barrier removal.

I-37 – Central San Antonio

  • Monday, September 28 until Tuesday, September 29. 8:30 a.m. to 4 p.m. Single southbound lane and ramp closures from Florida St. to US 90 westbound for mow strip installation.
  • Wednesday, September 30. 8:30 a.m. to 4 p.m. Northbound exit ramp to I-10 eastbound closed for mow strip installation.
  • Thursday, October 1. 8:30 a.m. to 4 p.m. Northbound exit ramp to US 90 westbound closed for mow strip installation.
  • Friday, October 2. 8:30 a.m. to 4 p.m. Southbound exit ramp to US 90 westbound closed for mow strip installation.

 I-410 – West San Antonio

  • Monday, September 21 until Monday, September 28. 9 a.m. to 3 p.m. Alternating lane closures on frontage road, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Monday, September 21 until Monday, September 28. 8 p.m. to 5 a.m. Double mainlane closures, in both directions, from Marbach Rd. to Military Rd. for bridge widening.
  • Monday, September 21 until Monday, September 28. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for concrete pour.
  • Monday, September 21 until Monday, September 28. 8 p.m. to 5 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Thursday, September 24 until Friday, September 25. 8 p.m. to 5 a.m. Full closure of northbound mainlanes from Marbach Rd. to Military Dr. for beam work.  
  • Monday, September 28 until Monday, October 5. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Monday, September 28 until Monday, October 5. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. to allow for concrete pour.
  • Monday, September 28 until Monday, October 5. 8 p.m. to 5 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for bent work.
  • Monday, September 28 until Monday, October 5. 8 p.m. to 5 a.m. Full mainlane closures, in both directions from Marbach Rd. to Military Dr. for placement of steel beams.
  • Monday, September 29 until Thursday, October 1. 8 p.m. to 5 a.m. Full closure of Military Dr. intersection for removal of concrete bridge rail.
  • Friday, October 2 until Monday, October 5. 8 p.m. to 7 p.m. Full closure of mainlanes, in both directions, from Marbach Rd. to Military Dr. for installation of steel beams.

 US 90 – West San Antonio

  • Sunday, September 27 until Friday, October 9. 7:30 p.m. to 6 a.m. Alternating lane and ramp closures, in both directions, from W. Military Dr. to S.W. 36th St. for pavement improvements.
  • Monday, September 28 until Friday, October 9. 9 a.m. to 3 p.m. Alternating lane and ramp closures, in both directions, from W. Military Dr. to S.W. 36th St. for pavement improvements.
  • Monday, September 28 until October 1. 8 a.m. to 3:30 p.m. Alternating eastbound ramp closures from S.W. 36th St. to W. Military Dr. for guardrail improvements. 

SH 151 – West San Antonio

  • Monday, September 21 until Monday, September 28. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Ingram Rd. to Loop 410 for bent work.
  • Monday, September 21 until Monday, September 28. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Monday, September 21 until Monday, September 28. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for bridge widening.
  • Monday, September 28 until Monday, October 5. 9 a.m. to 3 p.m. Alternating lane closure, in both directions, from Ingram Rd. to Loop 410 for bent work.
  • Monday, September 28 until Monday, October 5. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Monday, September 28 until Monday, October 5. 8 p.m. to 5 a.m. Full closure on eastbound frontage road from Loop 410 to Ingram Rd. for bridge widening.

 SH 16 – Bandera Road

  • Monday, September 28 until Friday, October 9. 9 a.m. to 4 p.m. Single westbound lane closure from Huebner Rd. to Westchase Dr. for driveway, sidewalk and ramp improvements.

 PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, September 25 until Monday, September 28. 9 p.m. to 5 a.m. Full closure, in both directions, from N.W. Military Hwy. (FM 1535) to Blanco Rd. (FM 2696) for bridge work.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, October 2 until Monday, October 5. 9 p.m. to 5 a.m. Full closure, in both directions, from N.W. Military Hwy. (FM 1535) to Blanco Rd. (FM 2696) for bridge work.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, October 9 until Monday, October 12. 9 p.m. to 5 a.m. Full closure, in both directions, from N.W. Military Hwy. (FM 1535) to Blanco Rd. (FM 2696) for bridge work.

 FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

I-10 – Kendall County

  • Friday, September 25 until Saturday, September 26. 9 p.m. to 5 p.m. Westbound exit ramp closure at Scenic Loop Rd. for roadway excavation.

RM/FM 1376 – Kendall County

  • Monday, September 21 until Saturday, September 26. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from N. School St. 0.5 miles past Wasp Creek Rd. for roadway reconstruction.

I-10 – Kerr County

  • Saturday, September 26. 8 a.m. to 1 p.m. Single eastbound lane closure from mile marker 522 to mile marker 524 for pavement marking improvements.
  • Monday, September 28 until Wednesday, September 30. Alternating lane closures, in both directions, from mile marker 522 to mile marker 524 for removal of barrier.
  • Thursday, October 1 until Friday, October 2. Alternating lane closures, in both directions, from mile marker 522 to mile marker 524 to removal of concrete barrier.
  • Friday, October 2 until Tuesday, October 6. 8 a.m. to 5 p.m. Alternating lane closures, in both directions, from mile marker 522 to mile marker 524 for removal of concrete barrier.

US 87 – Wilson County

  • Friday, September 25 until Friday, October 30. 6:30 a.m. to 7 p.m. Alternating lane closures, in both directions, from FM 539 to SH 123 for pavement improvements.

 

Thursday, September 24

Opening of US 281 Mainlanes North of Evans Road

 


During the weekend of Friday, Sept. 25, we will open new US 281 mainlanes north of Evans Road. Drivers will have new pavement and ramps as we continue to make progress in the area.

Later, following the new mainlanes, we will also open the Evans Road underpass intersection at US 281 allowing drivers to cross from one side of Evans Road to the other with both east- and westbound lanes of Evans Road along with both north- to southbound and south- to northbound turnarounds moving towards the frontage roads.



Please note that construction is weather permitting and subject to change.

You can stay informed of lane closures by receiving alerts to your e-mail by registering here or by following us on our Twitter feed.

Friday, September 18

Upcoming Scheduled Construction Closures


Loop 1604 – North Central San Antonio

  • Friday, September 18 until Monday, September 21. Full weekend overnight closure 9 p.m. until 5 a.m. Eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work. DETOUR: Take the Redland Road exit ramp and use the next turnaround.
  • Friday, September 18 until Monday, September 21. Weekend overnight closure 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work.
  • Sunday, September 20 until Thursday, September 24. 9 p.m. to 5 a.m. Ramp closures, in both directions, from Redland Rd. to Green Mountain Rd. for asphalt work.
  • Sunday, September 20 until Thursday, September 24. 9 p.m. to 5 a.m. Single lane closures, in both directions, from Redland Rd. to Green Mountain Rd. for asphalt work.
  • Sunday, September 20 until Thursday, September 24. 9 p.m. to 5 a.m. Single lane closure on eastbound mainlane from Redland Rd. to Bulverde Rd. for rail improvements.
  • Sunday, September 20 until Thursday, September 24. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Bulverde Rd. to Redland Rd. for asphalt work.
  • Monday September 21 until Friday, September 25. 9 a.m. to 4 p.m. Single lane closure on eastbound frontage road from Redland Rd. to Bulverde Rd. for erosion control.
  • Monday, September 21 until Friday, September 25. 9 a.m. to 3 p.m. Ramp closures, in both directions, from Redland Rd. to Bulverde Rd. for attenuator installation.
  • Friday, September 25 until Monday, September 28. Weekend continuous closure 9 p.m. until 5 a.m. Full eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for bridge work. Detour by using the Redland Road exit ramp and take the next turnaround.
  • Friday, September 25 until Monday, September 28. Weekend continuous closure 9 p.m. until 5 a.m. Full westbound mainlane closure from Gold Canyon Road to Stone Oak Parkway for concrete paving. Detour by taking the northbound US 281 exit ramp, go through the US 281 intersection and use the northbound US 281 entrance ramp west of Stone Oak Parkway.
  • Friday, September 25 until Monday, September 28. Weekend continuous closure 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for concrete paving.
  • Friday, September 25 until Monday, September 28. Weekend continuous closure 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Gold Canyon Road to Stone Oak Parkway for concrete paving.

 Loop 1604 – North West San Antonio

  • Monday, September 21 until Thursday, September 24. 9 p.m. to 5 a.m. Eastbound entrance ramp at Bandera Rd. closed for rail improvements.
  • Monday September 21 until Thursday, September 24. 9 p.m. to 5 a.m. Single eastbound lane closure from Bandera Rd. to Hausman Rd. for rail improvements.

Loop 1604 - Far East San Antonio

  • Tuesday, September 22 until Wednesday, September 23. 9 a.m. to 3 p.m. Northbound exit ramp to Pat Booker Rd. closed for pavement improvements. 

 US 281 – North Central San Antonio/Bexar County

  • Saturday, September 19 until Sunday, September 20. Continuous closure from 5 a.m. to 5 a.m. Single lane closure on southbound frontage road from just north of Marshall Rd. to just south of Marshall Rd for traffic switch.
  • Saturday, September 19 until Sunday, September 20. Continuous closure 5 a.m. to 5 a.m. Alternating southbound lane closures from just north of Overlook Parkway to Overlook Parkway for traffic switch.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 2 a.m. until 5 a.m. Full southbound mainlane closure of the south- to eastbound direct connector ramp to Loop 1604 for lighting work. DETOUR: Take the Redland Road/ Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn left on the eastbound Loop 1604 frontage road and use the Gold Canyon Road entrance ramp.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 2 a.m. until 5 a.m. Full southbound mainlane closure of the south- to westbound direct connector ramp to Loop 1604 for lighting work. DETOUR: Take the Redland Road/ Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn right on the westbound Loop 1604 frontage road and take the Loop 1604 entrance ramp.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 2 a.m. until 5 a.m. Northbound mainlane closure of the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 2 a.m. until 5 a.m. Southbound mainlane closure of the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 2 a.m. until 5 a.m. Northbound frontage road closure of the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 2 a.m. until 5 a.m. Southbound frontage road closure of the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 2 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Saturday, September 19 until Monday, September 21. Weekend continuous closure 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for striping work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 2 a.m. until 5 a.m. Left lane northbound frontage road closure from Encino Rio to Stone Oak Parkway for concrete paving.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving. DETOUR: Turn left on the southbound US 281 frontage road, take the turnaround at Donella Drive and use the Donella Drive entrance ramp.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the Evans Road entrance ramp to Encino Rio for soundwall work. DETOUR: Take the southbound US 281 entrance ramp and use the Redland Road exit ramp.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the Sonterra Boulevard exit ramp for drainage work. DETOUR: Take the northbound US 281 frontage road exit ramp and go through the Loop 1604 intersection.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure of the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure of the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure of the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Left lane northbound frontage road closure from Encino Rio to Stone Oak Parkway for concrete paving.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Left lane southbound frontage road closure from Redland Road to Loop 1604 for drainage work. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from the Donella Drive entrance ramp to Redland Road for bridge work.
  • Monday, September 21 until Friday, September 25. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from the Sonterra Boulevard entrance ramp to the Donella Drive exit ramp for bridge work.
  • Saturday, September 26 until Monday, September 28. Weekend overnight closure 2 a.m. until 5 a.m. Northbound frontage road closure of the north- to southbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 26 until Monday, September 28. Weekend overnight closure 2 a.m. until 5 a.m. Left lane northbound frontage road closure from Encino Rio to Stone Oak Parkway for concrete paving.
  • Friday, September 25 until Monday, September 28. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Sonterra Boulevard to the Donella Drive entrance ramp to for bridge work.
  • Friday, September 25 until Monday, September 28. Weekend continuous closure 9 p.m. until 5 a.m. Alternating northbound frontage road closure from the Donella Drive entrance ramp to Sonterra Boulevard for bridge work.
  • Saturday, September 26 until Monday, September 28. Weekend overnight closure 2 a.m. until 5 a.m. Full southbound mainlane closure of the south- to eastbound direct connector ramp to Loop 1604 for lighting work. DETOUR: Take the Redland Road/Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn left on the eastbound Loop 1604 frontage road and use the Gold Canyon Road entrance ramp.
  • Saturday, September 26 until Monday, September 28. Weekend overnight closure 2 a.m. until 5 a.m. Full southbound mainlane closure of the south- to westbound direct connector ramp to Loop 1604 for lighting work. DETOUR: Take the Redland Road/Sonterra Boulevard exit ramp to the southbound US 281 frontage road, turn right on the westbound Loop 1604 frontage road and use the Loop 1604 entrance ramp.
  • Saturday, September 26 until Monday, September 28. Weekend overnight closure 2 a.m. until 5 a.m. Northbound mainlane closure of the north- to southbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Stone Oak/ Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 26 until Monday, September 28. Weekend overnight closure 2 a.m. until 5 a.m. Southbound mainlane closure of the south- to northbound turnaround at Evans Road for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 26 until Monday, September 28. Weekend overnight closure 2 a.m. until 5 a.m. Southbound frontage road closure of the south- to northbound turnaround at Encino Rio for concrete paving. DETOUR: Use the turnaround at Redland Road. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, September 26 until Monday, September 28. Weekend overnight closure 2 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.

 Stone Oak Parkway – North Central San Antonio

  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 9 p.m. until 5 a.m. Alternating westbound crossing closure departing US 281 for striping work.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 9 p.m. until 5 a.m. Alternating eastbound crossing closure approaching US 281 for striping work.

Encino Rio – North Central San Antonio

  • Friday, September 18 until Monday, September 21. Full weekend overnight closure 3 a.m. until 5 a.m. Westbound crossing closure of the west- to southbound left turn lane for concrete paving. DETOUR: Use the turnaround at Evans Road.
  • Saturday, September 19 until Monday, September 21. Weekend overnight closure 2 a.m. until 5 a.m. Full westbound crossing closure from westbound Encino Rio to southbound US 281 for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
  • Saturday, September 26 until Monday, September 28. Weekend overnight closure 2 a.m. until 5 a.m. Full westbound crossing closure from westbound Encino Rio to southbound US 281 for concrete paving. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.

 I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Friday, September 18 until Saturday, September 19. 10 p.m. to 8 a.m. Full closure of eastbound mainlanes from Camp Bullis Rd. to La Cantera Parkway for asphalt work.
  • Friday, September 18 until Saturday, September 19. 10 p.m. to 8 a.m. Full closure of westbound mainlanes from La Cantera Parkway to Camp Bullis Rd. for asphalt work.
  • Sunday, September 20 until Friday, September 25. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Camp Bullis Rd. to Dominion Dr. for asphalt.
  • Sunday, September 20 until Friday, September 25. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Old Fredericksburg Rd. to La Cantera Parkway for the installation of overhead signs.

 I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, September 18 from 8:30 p.m. to 6:00 a.m. Westbound I-10 exit ramp to Ackerman Road closed for setting beams at Rosillo Creek Bridge. DETOUR: Take Foster Road exit ramp and stay on frontage road to Ackerman Road.
  • Saturday, September 19 from 6 a.m. to 7 p.m. Alternating eastbound and westbound lane closures from Loop 1604 to Pfeil Road for shoulder work.
  • Tuesday, September 22 until Thursday, September 24. 7 a.m. to 7:30 p.m. Alternating lane closures, in both directions, from US 183 to FM 2438 for sign placement. 
  • Current until mid-September: Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
    • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
    • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 I-10 – Central San Antonio

  • Wednesday, September 23 until Friday, September 25. 8:30 a.m. to 4 p.m. Westbound entrance ramp to southbound I-37 closed for mow strip installation.

 I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Wednesday, September 23 until Friday, September 25. 9 p.m. to 5 a.m. Double southbound mainlane closure from Schwab Rd. to Hubertus Rd. for barrier removal.
  • Wednesday, September 23 until Friday, September 25. 9 p.m. to 5 a.m. Double northbound lane closure from Hubertus Rd. to Schwab Rd. for barrier removal.
  • Monday, September 21 until Saturday, September 26. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for curb and landscape work.
  • Monday, September 21 until Saturday, September 26. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for sidewalk and driveway improvements.
  • Monday, September 21 until Saturday, September 26. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for landscaping.

 I-37 – Central San Antonio

  • Monday, September 21 until Tuesday, September 22. 8:30 a.m. to 4 p.m. Southbound closure of entrance ramp and right lane from Florida St. to I-10 westbound exit ramp for mow strip installation.

I-410 – North West San Antonio

  • Tuesday, September 22 until Wednesday, September 23. 9 a.m. to 4 p.m. Right turn lane closed on westbound frontage road for driveway improvements.

I-410 – West San Antonio

  • Saturday, September 19 until Sunday, September 20. 7 a.m. to 7 p.m. Full closure of southbound mainlanes from just before Culebra Rd. to just past Culebra Rd. for opening of new ramps.
  • Monday, September 21 until Monday, September 28. 9 a.m. to 3 p.m. Alternating lane closures on frontage road, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Monday, September 21 until Monday, September 28. 8 p.m. to 5 a.m. Double mainlane closures, in both directions, from Marbach Rd. to Military Rd. for bridge widening.
  • Monday, September 21 until Monday, September 28. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for concrete pour.
  • Monday, September 21 until Monday, September 28. 8 p.m. to 5 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Monday, September 21 until Friday, September 25. 8 p.m. to 5 a.m. Double southbound mainlane closures from Ingram Rd. to Military Dr. for barrier placement.
  • Thursday, September 24 until Friday, September 25. 8 p.m. to 5 a.m. Full northbound mainlane closure from Marbach Rd. to Military Dr. for beam setting. 
  • Friday, October 2 until Monday, October 5. 8 p.m. to 7 p.m. Full closure of mainlanes, in both directions, from Marbach Rd. to Military Dr. for installation of steel beams.

 US 90 – West San Antonio

  • Friday, September 18 until Saturday, September 19. 7:30 p.mm. to 6 a.m. Alternating single lane closures on eastbound frontage road from W. Military Dr. to S.W. 36th St. for asphalt improvements.
  • Wednesday, September 23 until Thursday, September 24. 7:30 p.m. Westbound exit ramp to Military Dr. closed for milling and paving. 
  • Thursday, September 24 until Friday, September 25. 9 a.m. to 3 p.m. Eastbound exit ramp to Enrique Barrera Parkway closed for guardrail improvements. 
  • Sunday, September 27 until Friday, October 9. 7:30 p.m. to 6 a.m. Alternating lane closures on frontage road, in both directions, from W. Military Dr. to S.W. 36th St. for milling and paving improvements. 
SH 151 – West San Antonio

  • Monday, September 21 until Monday, September 28. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Ingram Rd. to Loop 410 for bent work.
  • Monday, September 21 until Monday, September 28. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Monday, September 21 until Monday, September 28. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for bridge widening.

SH 16 – Bandera Road

  • Thursday, September 17 until Friday, September 25. 8:30 a.m. to 3 p.m. Single westbound lane closure from Huebner Rd. to Eckhert Rd. for sidewalk and driveway improvements.

 PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Saturday, September 19 until Sunday, September 20. 7 a.m. to 4 p.m. Single lane closure, in both directions, from N.W. Military Hwy. (FM 1535) to Blanco Rd. (FM 2696) for construction truck entry and exit.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, September 25 until Monday, September 28. 9 p.m. to 5 a.m. Full closure, in both directions, from N.W. Military Hwy. (FM 1535) to Blanco Rd. (FM 2696) for bridge work.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, October 2 until Monday, October 5. 9 p.m. to 5 a.m. Full closure, in both directions, from N.W. Military Hwy. (FM 1535) to Blanco Rd. (FM 2696) for bridge work.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, October 9 until Monday, October 12. 9 p.m. to 5 a.m. Full closure, in both directions, from N.W. Military Hwy. (FM 1535) to Blanco Rd. (FM 2696) for bridge work.
  • Wednesday, September 23. 9 a.m. to 11 a.m. Single lane closure, in both directions, at Lockhill Selma Rd. intersection for concrete barrier movement. 

 FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
  • Sunday, September 13 until Saturday, September 19. 6 p.m. to 7 a.m. Single lane closures, in both directions, from Loop 1604 to Hilltop Rd. for barrier placement.

FM 3009 – Comal County

  • Sunday, September 20 until Friday, September 25. 6 p.m. to 6 a.m. Alternating lane closures, from Triton Rd. to SH 78 for asphalt work.

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

I-10 – Kendall County

  • Thursday, September 24 until Friday, September 25. 9 p.m. to 6 a.m. Westbound exit ramp closure at Scenic Loop Rd. for roadway excavation.
  • Friday, September 25 until Saturday, September 26. 9 p.m. to 5 p.m. Westbound exit ramp closure at Scenic Loop Rd. for roadway excavation.

RM/FM 1376 – Kendall County

  • Monday, September 21 until Saturday, September 26. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from N. School St. 0.5 miles past Wasp Creek Rd. for roadway reconstruction.