Friday, January 29

UPCOMING SCHEDULED CONSTRUCTION CLOSURES


Loop 1604 – North Central San Antonio

  • Saturday, January 30 until Monday, February 1. Weekend closure 2 a.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for illumination work. DETOUR: Take the northbound US 281 exit ramp and turn right on the southbound US 281 frontage road. 
  • Monday, February 1 until Friday, February 5. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the northbound US 281 exit ramp and turn right on the southbound US 281 frontage road.
  • Saturday, February 6 until Monday, February 8. Weekend continuous closure 2 a.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for illumination work. DETOUR: Take the northbound US 281 exit ramp and turn right on the southbound US 281 frontage road. 
  • Saturday, February 6 until Monday, February 8. Weekend continuous closure 2 a.m. until 5 a.m. Full westbound mainlane closure of the west- to southbound direct connector ramp to US 281 for overhead concrete paving. DETOUR: Take the northbound US 281 exit ramp and turn left on the southbound US 281 frontage road.  

US 281 – North Central San Antonio/Bexar County

  • Saturday, January 30. 7 a.m. to 5 p.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for riprap pouring.
  • Saturday, February 6. 7 a.m. to 5 p.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for riprap pouring.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving and striping.
  • Sunday, January 31 until Friday, February 5. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Monday, February 1 until Friday, February 5. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Take the northbound US 281 frontage road exit ramp, go through the intersection at Loop 1604 and use the northbound US 281 frontage road.
  • Monday, February 1 until Friday, February 5. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
  • Monday, February 1 until Friday, February 5. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Monday, February 1 until Friday, February 5. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, February 6 until Monday, February 8. Weekend continuous closure 2 a.m. until 5 a.m. Full southbound frontage road closure of the south- to northbound turnaround at Loop 1604 for electrical work.
  • Saturday, February 6 until Monday, February 8. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for striping work. DETOUR: Take the northbound US 281 frontage road exit ramp and go through the Loop 1604 intersection.
  • Saturday, February 6 until Monday, February 8. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
  • Saturday, February 6 until Monday, February 8. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, February 6 until Monday, February 8. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Current until Sunday, February 14. Full closure of eastbound frontage road from Scenic Loop Rd. to Balcones Creek for road improvements.
  • Monday, February 1 until Friday, February 12. Daily 9 a.m. to 3 p.m. Westbound HOV lane closed at various locations from Old Fredericksburg Rd. to La Cantera Parkway for barrier work. 
  • Monday, February 1 until Friday, February 5. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, at the La Cantera Parkway intersection for laying of hot mix. 
  • Friday, February 5. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, at Camp Bullis Rd. intersection for laying of hot mix. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, January 29 through Monday, February 1. Westbound alternating closures between Foster Road and WW White Road from 8 p.m. Friday until 5 a.m. Monday for striping work.
  • Saturday, January 30. Full eastbound mainlane closure between Loop 1604 and Graytown Road from 6 a.m. until 6 p.m. for barrier work and pothole repair. Eastbound Loop 1604 exit ramp will also be closed.
  • Current until further notice. East and westbound I-10 frontage road traffic has the right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS: Southbound Ackerman traffic may travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster. Northbound Ackerman traffic may use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway.
  • Saturday, January 30. 7 a.m. to 7 p.m. Single lane closure on eastbound frontage road from Camp Bullis Rd. to La Cantera Parkway for laying hot mix.
  • Saturday, January 30. 7 a.m. to 7 p.m. Eastbound entrance and exit ramps at La Cantera Parkway closed for laying hot mix.
  • Monday, February 1 until Thursday, February 4. Daily 7:30 a.m. to 6:30 p.m. Single mainlane closures, in both directions, from US 183 to FM 2438 for foundation drilling.

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, January 30. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Current until Saturday, January 30. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for curb demolition.
  • Friday, January 29 until Saturday, January 30. 9 p.m. to 5 a.m. Single southbound lane closure from Parkway to Conrad bridge for roadwork.
  • Sunday, January 31 until Friday, February 5. Nightly 9 p.m. to 5 a.m. Various lane closures, in both directions, from US 90 to Olympia Parkway for replacement of overhead signs.
  • Monday, February 1 until Saturday, February 6. 9 a.m.to 5:30 p.m. Single northbound frontage road closure from Hubertus Rd. to Schwab Rd. for backfill work.
  • Monday, February 1 until Saturday, February 6. 9 a.m. to 5:30 p.m. Single northbound frontage road closure from Hubertus Rd. to Schwab Rd. for demolition work.
  • Monday, February 1 until Saturday, February 6. 9 a.m. to 5:30 p.m. Single southbound frontage road closure from Hubertus Rd. to FM 2252 for storm drain installation.
  • Monday, February 1 until Saturday, February 6. 9 a.m. to 5:30 p.m. Single southbound frontage road closure from Hubertus Rd. to FM 2252 for material excavation. 

PA 1502 – Wurzbach Parkway

  • Saturday, January 30. 9 a.m. to 4 p.m. Westbound left turn lane closure at Lockhill Selma Rd. for asphalt placement.
  • Monday, February 1 until Friday, February 5. Single lane closures, in both directions, from Starcrest to Weidner for pavement marking operations. 

US 90 – Central/West San Antonio

  • Current until Saturday, February 6. 7 a.m. to 7 p.m. Alternating lane closure on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for milling and paving improvements.
  • Current until Saturday, February 6. 7 a.m. to 7 p.m. Alternating lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete improvements. 

I-410 – West San Antonio

  • Current until Monday, February 1. 8 p.m. to 5 a.m. Full closure of southbound frontage road at SH 151 interchange for bridge work.
  • Current until Monday, February 1. 6 a.m. to 5 a.m. Double southbound mainlane closure, including alternating frontage road closures, from Culebra Rd. to Ingram Rd. for restriping and barrier setting.
  • Current until Monday, February 1. 8 p.m. to 5 a.m. Full closure of W. Military Dr. intersection for continued bridge work and beam setting.
  • Current until Monday, February 1. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for continued bridge work.
  • Current until Monday, February 1. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Roxburry Rd. for retaining wall work.
  • Current until Monday, February 1. 8 a.m. to 5 p.m. Single southbound frontage road lane closure from N.W. Crossroad to W. Military Dr. for concrete pouring.
  • Current until Monday, February 8. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, February 1 until Monday, February 8. 8 a.m. to 5 p.m. Alternating southbound lane closures, from N.W. Crossroads to Military Dr. for work on traffic rail.
  • Monday, February 1 until Monday, February 8. 8 p.m. to 5 a.m. Full closure of southbound frontage road from SH 151 westbound frontage road to SH 151 eastbound frontage road intersection.
  • Monday, February 1 until Monday, February 8. 8 p.m. to 5 a.m. Full closure of southbound mainlanes from Military Dr. to SH 151 for bridge work.
  • Tuesday, February 2 until Friday, February 5. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection, in both directions, for work on traffic signal switch. 

SH 151 – West San Antonio

  • Monday, February 1 until Monday, February 8. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from Ingram Rd. to Loop 410 for continued construction of flyover ramps.
  • Monday, February 1 until Monday, February 8. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Loop 410 to Ingram Rd. for continued construction of flyover ramps. 

FM 1535 – Northwest Military Highway

  • Current until Wednesday, February 3. Southbound right turn lane at Loop 1604 closed for sidewalk improvements. 

CR 8480 – Alamo Ranch Parkway

  • Current until Monday, February 1. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Loop 410 to Ingram for continued work on flyover ramps.
  • Monday, February 1 until Friday, February 5. Nightly 9 p.m. to 5 a.m. Single westbound mainlane closure, including right lane on frontage road, from Loop 1604 to Lone Star Parkway for pavement markings. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

FM 2252 – North Bexar County

  • Current until Monday, February 1. 7 a.m. to 6 p.m. Single lane closures, in both directions, from one mile south of Evans Rd. to one mile north of Evans Rd. for installation of concrete barriers and striping. 

RM 1376 – Kendall County

  • Current until Saturday, February 6. 8:30 a.m. to 8:30 p.m. Single lane closures at various culvert locations, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway construction.  

RM 337 – Bandera County

  • Current until March 2021. Full closure of bridge at Mill Creek for bridge replacement. 

SH 123 – Guadalupe County

  • Monday, February 1 until Friday, February 5. 7 a.m. to 5 p.m. Alternating lane closures, in both directions, from Wilson/Guadalupe County Line to 4 miles north of county line for traffic switch.


Monday, January 25

New Improvements Underway on I-10 in East Bexar County

The Texas Department of Transportation (TxDOT) has begun construction on a $149 million project that will improve roughly five miles on I-10 and frontage roads between Graytown Road and the Bexar/Guadalupe County line. 

The project kicked off on January 25, 2021 and is intended to expand from 4 lanes to 6 lane expressway with intersection operation improvements and conversion of frontage roads to one way operations. Construction is expected to complete by June 2025.

One of the most significant improvements is the conversion of the frontage roads from two- to one-way operations on both sides of IH-10 between Graytown Road to FM 2538. The conversion will take place at the project onset to allow for construction of utility infrastructure along the outside of the frontage roads. Appropriate signs, pavement markings and construction barrels will be utilized to guide traffic safely through the construction zone.

Below are a few more notable improvements planned for this project:

  • New mainlane overpass at Pfeil Road with turnarounds will be constructed. 
  • New mainlane underpasses at FM 1518 and FM 2538 will be constructed. These underpasses will include turnarounds for eastbound and westbound frontage roads. 
  • New mainlane bridges over Cibolo Creek and Woman Hollering Creek.
To stay informed on the project, follow us on Twitter or subscribe for updates

Friday, January 22

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio

  • Friday, January 22 until Monday, January 25. Weekend closure 9 p.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for illumination work. DETOUR: Take the northbound US 281 exit ramp and turn right on the southbound US 281 frontage road. 
  • Friday, January 22 until Monday, January 25. Weekend closure 9 p.m. until 5 a.m. Full westbound mainlane closure of the west- to southbound direct connector ramp to US 281 for illumination work. DETOUR: Take the northbound US 281 exit ramp and turn right on the southbound US 281 frontage road.
  • Saturday, January 23 until Monday, January 25. Weekend continuous closure 2 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 exit ramp to the westbound Loop 1604 entrance ramp for miscellaneous work. DETOUR: Take the Gold Canyon Road/Redland Road exit ramp, continue on the westbound Loop 1604 frontage road through the Gold Canyon Road/Redland Road intersections, turn left on the southbound US 281 frontage road and use the Donella Drive entrance ramp.
  • Monday, January 25 until Friday, January 29. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the northbound US 281 exit ramp and turn right on the southbound US 281 frontage road.
  • Monday, January 25 until Friday, January 29. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure of the west- to southbound direct connector ramp to US 281 for overhead signage work. DETOUR: Take the Gold Canyon Road/Redland Road exit ramp, continue on the westbound Loop 1604 frontage road through the Gold Canyon Road/Redland Road intersections, turn left on the southbound US 281 frontage road and use the Donella Drive entrance ramp.
  • Monday, January 25 until Friday January 29. Nightly 9 p.m. until 5 a.m. Right westbound mainlane closure from the US 281 exit ramp to the westbound Loop 1604 entrance ramp for concrete paving. DETOUR: Take the Gold Canyon Road/Redland Road exit ramp, continue on the westbound Loop 1604 frontage road through the Gold Canyon Road/Redland Road intersections, turn left on the southbound US 281 frontage road and use the Donella Drive entrance ramp.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 exit ramp to the westbound Loop 1604 entrance ramp for miscellaneous work. DETOUR: Take the Gold Canyon Road/Redland Road exit ramp, continue on the westbound Loop 1604 frontage road through the Gold Canyon Road/Redland Road intersections, turn left on the southbound US 281 frontage road and use the Donella Drive entrance ramp.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for illumination work. DETOUR: Take the northbound US 281 exit ramp and turn right on the southbound US 281 frontage road.  

US 281 – North Central San Antonio/Bexar County

  • Saturday, January 23. 6 a.m. to 6 p.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for pouring of riprap.
  • Saturday, January 23 until Monday, January 25. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for striping work. DETOUR: Take the Sonterra Boulevard exit ramp, continue through the intersection at Loop 1604 using the northbound US 281 frontage road.
  • Saturday, January 23 until Monday, January 25. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
  • Saturday, January 23 until Monday, January 25. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, January 23 until Monday, January 25. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, January 25 until Friday, January 29. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from Evans Road to Redland Road for barrier work.
  • Monday, January 25 until Friday, January 29. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Take the northbound US 281 frontage road exit ramp, go through the intersection at Loop 1604 and use the northbound US 281 frontage road.
  • Monday, January 25 until Friday, January 29. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
  • Monday, January 25 until Friday, January 29. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Monday, January 25 until Friday, January 29. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Full southbound frontage road closure from Redland Road to Loop 1604 for striping. DETOUR: Use the Donella Drive exit ramp and take the south- to northbound turnaround.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for striping work. DETOUR: Take the Sonterra Boulevard exit ramp and continue on the northbound US 281 frontage road.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, January 30 until Monday, February 1. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Current until Sunday, February 14. Full closure of eastbound frontage road from Scenic Loop Rd. to Balcones Creek for road improvements.
  • Monday, January 25 until Wednesday, January 27. 9 a.m. to 3 p.m. Single eastbound mainlane closure at La Cantera Rd. for mow strip pouring. 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, January 23. 7 a.m. to 5 p.m. Westbound single mainlane closure from Woodlake Parkway to Foster Rd for striping work.
  • Monday, January 25 until Thursday, January 29. 7:30 a.m. to 6:30 p.m. Single mainlane closures, in both directions, from US-183 to FM 2438 for drilling and striping.
  • Current until further notice. East and westbound I-10 frontage road traffic have right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Graytown Road bridge at I-10 closed. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway. 

I-10 – Central San Antonio

  • Tuesday, January 26 until Wednesday, January 27. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from S. New Braunfels to I-37 interchange for replacement of overhead signs.
  • Wednesday, January 27 until Thursday, January 28. 9 p.m. to 5 a.m. Double eastbound mainlanes closure from Steves Ave. to Martin Luther King Dr. for replacement of overhead signs. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, January 23. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material haul-off.
  • Current until Saturday, January 23. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage from exit #180 to Schwab Rd. for material haul-off.
  • Current until Saturday, January 23. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for curb demolition.
  • Current until Saturday, January 23. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for barrier movement.
  • Monday, January 25 until Tuesday, January 26. 9 p.m. to 5 a.m. Full closure of northbound exit ramp 158 to I-37 southbound and US 281 northbound for replacement of overhead signs.
  • Monday, January 25 until Saturday, January 20. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material haul-off.
  • Monday, January 25 until Saturday, January 30. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Monday, January 25 until Saturday, January 30. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for curb demolition.
  • Tuesday, January 26 until Wednesday, January 27. 9 p.m. to 5 a.m. Single northbound mainlane closure from Conrad entrance ramp to Watson exit ramp for overhang installations.
  • Wednesday, January 27 until Thursday, January 28. 9 p.m. to 5 a.m. Single northbound mainlane closure from Conrad entrance ramp to Watson exit ramp for overhang installations. 

I-35 – South San Antonio/Bexar County

  • Sunday, January 24 until Monday, January 25. 9 p.m. to 5 a.m. Full closure of southbound mainlanes from Lop 410 to Fischer Rd. for replacement of overhead signs.
  • Thursday, January 28 until Friday, January 29. 9 p.m. to 5 a.m. Double northbound mainlane closure from Jourdanton Highway to S. Zarzamora St. for replacement of overhead signs. 

PA 1502 – Wurzbach Parkway

  • Monday, January 25 until Friday, January 29. 8:30 a.m. to 4:30 p.m. Single lane closure, in both directions, from Starcrest Dr. to Weidner Rd. for pavement marking operations. 

US 90 – Central/West San Antonio

  • Monday, January 25 until Saturday, February 6. 7 a.m. to 7 p.m. Alternating lane closure on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for miling and paving improvements.
  • Monday, January 25 until Saturday, February 6. 7 a.m. to 7 p.m. Alternating lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete improvements. 

I-410 – West San Antonio

  • Current until Monday, January 25. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from Culebra Rd. to Ingram Rd. for concrete beam setting.
  • Current until Monday, January 25. 8 p.m. to 5 a.m. Double lane closure on frontage roads, in both directions, from Culebra Rd. to Ingram Rd.
  • Current until Monday, January 25. 9 a.m. to 3 p.m. Alternating single mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, January 25. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Current until Monday, January 25. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for concrete pouring.
  • Friday, January 22 until Saturday, January 23. 8 p.m. to 8 p.m. Full closure of southbound frontage road from Culebra Rd. to N.W. Crossroads for installation of drainage structures.
  • Saturday, January 23 until Sunday, January 24. 6 a.m. to 5 a.m. Double southbound mainlane closure from Culebra Rd. to Ingram Rd. for restriping and barrier setting.
  • Saturday, January 23 until Sunday, January 24. 6 a.m. to 5 a.m. Alternating lane closures on southbound frontage road from Bandera Rd. to Ingram Rd. for restriping and barrier setting.
  • Saturday, January 23 until Sunday, January 24. 6 a.m. to 5 a.m. Double southbound mainlane, including alternating frontage road closures, from Bandera Rd. to Culebra Rd. for pavement marking installations.
  • Saturday, January 23 until Sunday, January 24. 6 a.m. to 5 a.m. Double southbound mainlane closure, including alternating lane closures on frontage roads, from Bandera Rd. to Culebra Rd. for pavement marking installations.
  • Current until Monday, January 25. 8 p.m. to 5 a.m. Full closure of southbound frontage road, in both directions, at SH 151 interchange for bridge demolition.
  • Current until Monday, January 25. 8 p.m. to 5 a.m. Full closure of southbound frontage road at SH 151 interchange for bridge demolition.
  • Monday, January 25 until Monday, February 1. 8 p.m. to 5 a.m. Full closure of southbound frontage road at SH 151 interchange for bridge work.
  • Monday, January 25 until Monday, February 1. 6 a.m. to 5 a.m. Double southbound mainlane closure, including alternating frontage road closures, from Culebra Rd. to Ingram Rd. for restriping and barrier setting.
  • Monday, January 25 until Monday, February 1. 8 p.m. to 5 a.m. Full closure of W. Military Dr. intersection for continued bridge work and beam setting.
  • Monday, January 25 until Monday, February 1. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for continued bridge work.
  • Monday, January 25 until Monday, February 1. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Roxburry Rd. for retaining wall work.
  • Monday, January 25 until Monday, February 1. 8 a.m. to 5 p.m. Single southbound frontage road lane closure from N.W. Crossroad to W. Military Dr. for concrete pouring.
SH 151 – West San Antonio
  • Current until Monday, January 25. Nightly 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from Ingram Rd. to Loop 410 for continued construction of flyover ramps.
  • Current until Monday, January 25. 9 a.m. to 3 p.m. Single lane closure on frontage roads, in both directions, from Loop 410 to Ingram Rd. for continued construction of flyover ramps.
  • Current until Monday, January 25. 8 p.m. to 5 a.m. Full closure of Loop 410 intersection, including turnarounds, for continued bridge work and beam setting. 

CR 8480 – Alamo Ranch Parkway

  • Monday, January 25 until Tuesday, January 26. 9 a.m. to 4 p.m. Single westbound right lane closure at Westwood Loop intersection for traffic signal alterations.
  • Monday, January 25 until Friday, January 29. 9 a.m. to 3:30 p.m. Lanes will be narrowed, in both directions, at Westwood Loop intersection to allow for drill shaft operations.
  • Monday, January 25 until Tuesday, January 26. 9 a.m. to 4 p.m. Single westbound left lane closure at Westwood Loop intersection for traffic signal operations.
  • Monday, January 25 until Monday, February 1. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Loop 410 to Ingram for continued work on flyover ramps. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and
  • Walzem Road for barrier setting work and road rehab work.
FM 2252 – North Bexar County

  • Wednesday, January 27 until Monday, February 1. 7 a.m. to 6 p.m. Single lane closures, in both directions, from one mile south of Evans Rd. to one mile north of Evans Rd. for installation of concrete barriers and striping. 

RM 1376 – Kendall County

  • Monday, January 25 until Saturday, January 30. 8:30 a.m. to 8:30 p.m. Single lane closures at various culvert locations, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work. 

RM 337 – Bandera County

  • Current until March 2021. Full closure of bridge at Mill Creek for bridge replacement.


CONVERSION OF THE ENCINO RIO INTERSECTION AT US 281

 

As we continue to make progress in the area, we are glad to report the conversion of the Encino Rio intersection at US 281 to a conventional intersection with the inclusion of the southbound US 281 left turn lane to eastbound Encino Rio beginning Saturday, Jan. 23. 

This turn lane will allow southbound drivers to access Encino Rio heading east, while maintaining all existing US 281 turnarounds heading both north- and south, frontage road lanes, as well as the westbound left turn lane to southbound US 281 within the intersection.

Please note that construction is weather permitting and subject to change.

Want to stay informed of lane closures by receiving alerts directly to your e-mail? Click here to subscribe. You can also see closures across the San Antonio region by following us on our Twitter feed

Thursday, January 21

Southbound I-35 Mainlane Overnight Closure

The southbound I-35 mainlanes from the southbound I-35 Watson Lane/Old Bastrop Rd exit ramp (Exit 195) to the I-35 entrance ramp at Conrads Lane will be closed overnight on the following dates:
  • 9 p.m. Friday, Jan. 22 through 5 a.m. Saturday, Jan. 23
  • 9 p.m. Monday, Jan. 25 through 5 a.m. Tuesday, Jan. 26


During this operation, traffic will detour by taking the southbound I-35 Watson Lane/Old Bastrop Rd exit ramp (Exit 195) to the southbound I-35 frontage road and use the I-35 entrance ramp at Conrads Lane to return to the mainlanes. This operation will allow for improvements to the new overpass at the Parkway intersection which is scheduled to open at the end of 2021.

Want to keep up with progress on this project? Continue to check here for blog updates, as well as follow us on Twitter(@TxDOTSanAntoio). Also, you can sign up for email updates by subscribing here http://eepurl.com/gRtrwn.