Friday, February 26

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio

  • Friday, February 26 until Saturday, February 27. Weekend overnight 9 p.m. until 5 a.m. Full eastbound mainlane closure of the eastbound direct connector ramp to southbound US 281 for direct connector ramp opening. DETOUR: Take the northbound US 281 exit ramp and use the southbound US 281 frontage road.
  • Friday, February 26 until Saturday, February 27. Weekend overnight 9 p.m. until 5 a.m. Full westbound mainlane closure of the westbound direct connector ramp to southbound US 281 for direct connector ramp opening. DETOUR: Take the northbound US 281 exit ramp, use the southbound US 281 frontage road and take the Donella Drive entrance ramp.
  • Monday, March 1. 9 a.m. to 4 p.m. Single eastbound mainlane closure from Redland Rd. to Bulverde Rd. for pavement repairs.
  • Tuesday, March 2. 9 a.m. to 4 p.m. Single lane closure on eastbound frontage road from Redland Rd. to Bulverde Rd. for pavement repairs.  

Loop 1604 – North East San Antonio

  • Wednesday, March 3. 9 a.m. to 4 p.m. Single lane closure on westbound frontage road from Green Mountain Rd. to Redland Rd. for pavement repairs.
  • Friday, February 26 until Saturday, February 27. 9 p.m. to 9 p.m. Northbound exit ramp to northbound I-35 closed for traffic shift.
  • Friday, February 26 until Saturday, February 27. 9 p.m. to 9 p.m. Single northbound mainlane closure from Pat Booker Rd. to I-35 for traffic shift.
  • Sunday, February 28 until Monday, March 1. 9 p.m. to 5 a.m. Single southbound mainlane closure from Pat Booker Rd. to Kitty Hawk Rd. for deck pouring.  

US 281 – North Central San Antonio/Bexar County

  • Friday, February 26 until Saturday, February 27. 7 p.m. to 6 p.m. Alternating lane closures from Trinity Park to Overlook Parkway for traffic switch.
  • Friday, February 26 until Sunday, February 28. Weekend continuous closure 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Evans Road to Marshall Road for a traffic switch. DETOUR: Take the northbound US 281 Evans Road exit ramp.
  • Friday, February 26 until Sunday, February 28. Weekend continuous closure 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Evans Road to Marshall Road for a traffic switch.
  • Sunday, February 28 until Friday, March 5. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure of the Sonterra Boulevard exit ramp for concrete paving. DETOUR: Continue north on US 281 mainlanes, use the Evans Road exit ramp, and take the turnaround to access the southbound US 281 frontage road.
  • Sunday, February 28 until Friday, March 5. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving. DETOUR: Continue north on US 281 mainlanes, use the Evans Road exit ramp and take the turnaround to access the southbound US 281 frontage road.
  • Sunday, February 28 until Friday, March 5. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, February 28 until Friday, March 5. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Sunday, February 28 until Friday, March 5. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Sunday, February 28 until Friday, March 5. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, March 1 until Saturday, March 6. Daily 5 a.m. until 5 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Monday, March 1 until Saturday, March 6. Daily 5 a.m. until 5 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.  

I-10 – North West San Antonio/Bexar County/Kendall County/Kerr County 

  • Monday, March 8 until Wednesday, March 10. 9 a.m. to 3 p.m. Eastbound exit ramp to Dominion Dr. closed for sign installation.
  • Monday, March 8 until Wednesday, March 10. 9 a.m. to 3 p.m. Alternating lane closures through Boerne Stage Rd. intersection for sign installation.  

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, February 27. 6 a.m. to 9 p.m. Single eastbound mainlane closure from Graytown Rd. to Pfeil Rd. for barrier removal.
  • Sunday, February 28 until Monday, March 1. 8:30 p.m. to 5:30 a.m. Single eastbound mainlane closure from FM 2538 to Zuehl Rd. for barrier installation.
  • Monday, March 1 until Tuesday, March 2. 8:30 p.m. to 5:30 a.m. Single westbound mainlane closure from Zuehl Rd. to FM 2538 for barrier installation.
  • Tuesday, March 2 until Wednesday, March 3. 8:30 p.m. to 5:30 a.m. Single westbound mainlane closure from Zuehl Rd. to FM 2538 for barrier installation.
  • Wednesday, March 3 until Thursday, March 4. 8:30 p.m. to 5:30 a.m. Single westbound mainlane closure from Zuehl Rd. to FM 2538 for barrier installation.
  • Thursday, March 4 until Friday, March 5. 8:30 p.m. to 5:30 a.m. Single westbound mainlane closure from FM 2538 to FM 1518 for barrier installation.
  • Current until further notice. East and westbound I-10 frontage road traffic has the right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
  • Current until further notice. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS: Southbound Ackerman traffic may travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster. Northbound Ackerman traffic may use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp, just west of Foster.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from Foster Road closed. DETOUR: Take the next entrance ramp east of Woodlake Parkway.  

I-10 – Central San Antonio

  • Monday, March 1 until Tuesday, March 2. 8 p.m. to 5 a.m. Eastbound exit ramp to southbound I-35 closed for guard rail repair.  

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Friday, February 26 until Saturday, February 27. 9 p.m. to 7 p.m. Single northbound mainlane closure from Parkway Bridge to Conrad Bridge for bridge deck pouring.
  • Current until Saturday, February 27. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for demolition work.
  • Current until Saturday, February 27. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Current until Saturday, February 27. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for profile removal.
  • Current until Saturday, February 27. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to Hubertus Rd. for barrier placement.
  • Current until Saturday, February 27. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for milling and overlay operations.
  • Sunday, February 28 until Friday, March 5. Nightly 9 p.m. to 5 a.m. Various lane closures, in both directions, from US 90 to Olympia Parkway for overhead sign replacements.
  • Sunday, February 28 until Monday, March 1. 9 p.m. to 5 a.m. Double northbound mainlane closure from exit 193 to Conrad’s bridge for material haul-off.
  • Monday, March 1 until Tuesday, March 2. 8 p.m. to 5 a.m. Northbound exit ramp to I-10 westbound closed for guardrail repair.
  • Monday, March 1 until Tuesday, March 2. 9 p.m. to 5 a.m. Double northbound mainlane closure from Business 35 to FM 306 bridge for barrier removal.
  • Monday, March 1 until Saturday, March 6. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to Schwab Rd. for milling and overlay improvements.
  • Monday, March 1 until Saturday, March 6. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 2252 to FM 1103 for barrier placement.
  • Monday, March 1 until Saturday, March 6. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for storm drain installation.
  • Monday, March 1 until Saturday, March 6. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for barrier removal.
  • Monday, March 1 until Saturday, March 6. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Hubertus Rd. to FM 2252 for material excavation.
  • Monday, March 1 until Saturday, March 6. 9 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from Hubertus Rd. to Schwab Rd. for site work.
  • Monday, March 1. 11 p.m. to 5 a.m. Full closure of mainlanes from AT&T Parkway to Loop 410 interchange for overhead sign replacements.
  • Tuesday, March 2 until Thursday, March 4. 9 p.m. to 5 a.m. Single lane closure, in both directions, from Business 35 to FM 306 bridge for sign installations.
  • Tuesday, March 2 until Wednesday, March 3. 8 p.m. to 5 a.m. Southbound exit ramp to eastbound I-10 closed for guard rail repairs.
  • Tuesday, March 2 until Wednesday, March 3. 9 p.m. to 5 a.m. Double northbound mainlane closure from FM 2252 to FM 1003 for barrier movement.
  • Monday, March 1 until Friday, March 5. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road from Business 35 to Longhorn Steakhouse for milling and paving.
  • Tuesday, March 2 until Thursday, March 4. 9 p.m. to 5 a.m. Single northbound mainlane closure from Business 35 to FM 306 bridge for sign placement.  

I-37 – Central/South San Antonio

  • Tuesday, March 2 until Wednesday, March 3. Southbound exit ramp to westbound I-10 closed for guardrail repair.
  • Wednesday, March 3 until Thursday, March 4. 8 p.m. to 5 a.m. Northbound exit ramp to westbound I-10 closed for guardrail repair.
  • Wednesday, March 3 until Thursday, March 4. 8 p.m. to 5 a.m. Single northbound mainlane closure at Florida/Carolina exit ramp for guardrail repair.  

US 90 – Central/West San Antonio

  • Current until Saturday, February 27. 7 a.m. to 7 p.m. Alternating single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for paving improvements.
  • Monday, March 1 until Saturday, March 6. 7 a.m. to 7 p.m. Alternating lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for milling and paving improvements.  

I-410 – West San Antonio

  • Monday, March 1 until Monday, March 8. 8 p.m. to 5 a.m. Full closure of southbound frontage roads at SH 151 interchange for bridge work.
  • Monday, March 1 until Monday, March 8. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work. DETOUR: Traffic will be directed to frontage roads.
  • Monday, March 1 until Saturday, March 6. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection, including two mainlanes from Culebra Rd. to Ingram Rd., for bridge widening and underground work.
  • Sunday, February 28 until Wednesday, March 3. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Meadow Breeze Dr. to SH 151 for restriping and barrier setting.
  • Saturday, March 6. 6 a.m. to 6 p.m. Full closure of southbound mainlanes from N.W. Crossroads to W. Military Dr. for overhead sign removal.
  • Monday March 1 until Monday, March 8. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Monday, March 1 until Monday, March 8. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for rail pouring.
  • Current until Monday, March 1. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for bridge work.
  • Current until Monday, March 1. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to W. Military Dr. for rail pouring.
  • Current until Monday, March 1. 8 p.m. to 5 a.m. Full closure of southbound frontage road at SH 151 interchange for bridge work.
  • Current until Monday, March 1. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work.
  • Current until Monday, March 1. 8 p.m. to 5 a.m. Full closure of Culebra Rd. intersection, including two mainlane closures from Culebra Rd. to Ingram Rd., for bridge widening and underground work.
  • Saturday, February 27 to Sunday, February 28. 8 p.m. to 10 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work.
  • Sunday, February 28 until Monday, March 1. 6 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to SH 151 for bridge work.  

SH 151 – West San Antonio

  • Monday, March 1 until Saturday, March 6. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Monday, March 1 until Monday, March 8. 9 a.m. to 3 p.m. Alternating lane closures on eastbound frontage road from Loop 410 to Ingram Rd for bridge work.
  • Current until Monday, March 1. 9 a.m. to 3 p.m. Alternating lane closures on eastbound frontage road from Loop 410 to Ingram Rd.
  • Current until Monday, March 1. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.  

SH 218 – Pat Booker Road

  • Current until Sunday, February 28. 9 p.m. to 6 a.m. Single eastbound lane closure from Urban Bricks to Loop 1604 for road reconstruction.
  • Sunday, February 28 until Monday, March 1. 9 p.m. to 5 a.m. Full closure from Village Oak Dr. to Athenian Dr. for deck pouring.
  • Sunday, February 28 until Monday, March 1. 8 p.m. to 6 a.m. Full closure of turnarounds, in both directions, at Loop 1604 for deck pouring.  

FM 1957 – Potranco Road

  • Monday, March 1 until Friday, March 26. 9 a.m. to 4 p.m. Single eastbound lane closure from SH 211 to Talley Rd. for placement of communication lines.  

FM 1535 – N.W. Military Highway

  • Saturday, February 27. 7 a.m. to 4 p.m. Single northbound lane closure at the intersection of Wurzbach Parkway for potholing utilities.
  • Saturday, February 27. 7 a.m. to 4 p.m. Double southbound lane closure at the intersection of Wurzbach Parkway for median work.
  • Saturday, February 27. 7 a.m. to 4 p.m. Southbound right turn lane closed at Wurzbach Parkway intersection for potholing utilities.
  • Saturday, February 27. 7 a.m. to 4 p.m. Double northbound lane closure at Wurzbach Parkway intersection for median work.  

PA 1502 – Wurzbach Parkway

  • Saturday, February 27. 7 a.m. to 4 p.m. Westbound right turn lane closed at N.W. Military Highway for potholing utilities.  

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and
  • Walzem Road for barrier setting work and road rehab work.  

SH 46 – Comal County

  • Sunday, February 28 until Friday March 5. 7 p.m. to 6 a.m. Double lane closure, in both directions, from Independence Dr. to Woodland Ave. for roadway resurfacing.  

FM 3009 – Comal County

  • Tuesday, March 2 until Thursday, March 4. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, at Canham Ranch Rd. intersection for barrier setting.

RM 337 – Bandera County

  • Current until March 2021. Full closure of bridge at Mill Creek for bridge replacement.