Friday, January 14

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North East San Antonio/Bexar County

  • Monday, January 17 until Wednesday, January 19. 9 a.m. to 3 p.m. Single lane closure on the southbound frontage road from FM 1976 to Meadowland Dr. for rail installation.
  • Sunday, January 16 until Friday, January 21. 9 p.m. to 5:30 a.m. Full closure of the northbound mainlanes from FM 1976 to I-35 for striping operations.
  • Monday, January 17 until Friday, January 21. 9 a.m. to 3 p.m. Single lane closure on the northbound frontage road from Kitty Hawk Rd. to Cordoba Dr. for excavation.
  • Sunday, January 16 until Friday, January 21. 9 p.m. to 5:30 a.m. Full closure of the southbound mainlanes from I-35 to FM 1976 for striping operations.

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, January 16 until Saturday, January 29. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, January 16 until Saturday, January 29. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, January 16 until Saturday, January 29. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, January 16 until Saturday, January 29. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, January 16 until Monday, January 17. 9 p.m. until 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to La Cantera Parkway/John Peace Boulevard for dynamic message sign (DMS) removal. Eastbound mainlane traffic will exit at Hausman Road and continue on the frontage road until La Cantera Parkway/John Peace Boulevard.
  • Sunday, January 16 until Monday, January 17. 9 p.m. until 5 a.m. Eastbound entrance ramp from Bandera Road (SH 16) full closure for dynamic message sign (DMS) removal.
  • Sunday, January 16 until Monday, January 17. 9 p.m. until 5 a.m. Eastbound entrance ramp from Kyle Seale Parkway full closure for dynamic message sign (DMS) removal.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Northbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Southbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps & beams.
  • Sunday, January 23 until Monday, February 7. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps & beams.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 17 until Saturday, January 29. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, January 16 until Wednesday, January 19. Nightly 9 p.m. until 5 a.m. Eastbound frontage road left lane closure from Stone Oak Pkwy to Stone Oak Pkwy entrance ramp for drainage installation.
  • Sunday, January 16 until Friday, January 21. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Lockhill Selma Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, January 16 until Friday, January 21. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Lockhill Selma Road for barrier setting and striping.
  • Sunday, January 16 until Friday, January 21. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound frontage road lane closure from the Bitters Road exit ramp to the Blanco Road exit ramp for excavation.
  • Sunday, January 16 until Friday, January 21. Nightly 11 p.m. until 5 a.m. Periodic short term westbound frontage road lane closure from the Blanco Road exit ramp to the Bitters Road exit ramp for excavation.
  • Sunday, January 16 until Friday, January 21. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound mainlane closure from the Bitters Road exit ramp to the Blanco Road exit ramp for excavation.
  • Sunday, January 16 until Friday, January 21. Nightly 11 p.m. until 5 a.m. Westbound mainlane full closure from the Blanco Road exit ramp to the Bitters Road exit ramp for excavation.
  • Sunday, January 16 until Friday, January 21. Nightly 11 p.m. until 5 a.m. Periodic short term northbound Huebner Road closure at the Loop 1604 intersection for excavation.
  • Sunday, January 16 until Friday, January 21. Nightly 11 p.m. until 5 a.m. Periodic short term southbound Huebner Road closure at the Loop 1604 intersection for excavation.
  • Sunday, January 16 until Friday, January 21. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure from Country Club Lane/West Blanco Road to Huebner Road for barrier setting and striping.
  • Sunday, January 16 until Friday, January 21. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road closure from Huebner Road to Country Club Lane/West Blanco Road for barrier setting and striping.
  • Friday, January 21 until Saturday, January 22. 9 p.m. until 9 p.m. Alternating northbound Blanco Road closure from Country Club Lane/West Blanco Road to Huebner Road for utility crossing.
  • Friday, January 21 until Saturday, January 22. 9 p.m. until 9 p.m. Alternating southbound Blanco Road closure from Huebner Road to Country Club Lane/West Blanco Road for utility crossing. 

US 281 – North San Antonio/Bexar County

  • Saturday, January 15 until Monday, January 17. Continuous 3 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and striping.
  • Saturday, January 15 until Monday, January 17. Continuous 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and striping.
  • Sunday, January 16 until Friday, January 21. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and striping.
  • Sunday, January 16 until Friday, January 21. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and striping.
  • Sunday, January 16 until Friday, January 21. Daytime 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and striping.
  • Sunday, January 16 until Friday, January 21. Daytime 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and striping.
  • Sunday, January 16 until Friday, January 21. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and striping.
  • Sunday, January 16 until Friday, January 21. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and striping.
  • Saturday, January 22 until Sunday, January 23. Continuous 3 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and striping.
  • Saturday, January 22 until Sunday, January 23. Continuous 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and striping.
  • Saturday, January 22 until Sunday, January 23. Continuous 3 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and striping.
  • Saturday, January 22 until Sunday, January 23. Continuous 3 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and striping. 

I-37 – Central San Antonio

  • Monday, January 17 until Friday, January 28. 7 a.m. to 7 pm. Northbound exit ramp to Cesar Chavez Blvd. closed including the turnaround, for mill and inlay operations.
  • Monday, January 17 until Friday, January 28. 7 a.m. to 7 p.m. Northbound entrance ramp Commerce St. closed for mill and inlay operations.
  • Monday, January 17 until Friday, January 28. 7 a.m. to 7 p.m. Commerce St. southbound to northbound turnaround closed for mill and inlay operations.
  • Monday, January 17 until Friday, January 28. 7 a.m. to 7 p.m. Exit and entrance ramps to Florida/Carolina St. closed in both directions for mill and inlay operations. 

I-10 – North West San Antonio/Bexar County 

  • Sunday, January 16. 7 a.m. to 1 p.m. Full closure of the mainlanes, in both directions, near Camp Bullis Rd. for utility work.
  • Current until Friday, February 11. Surface ramp from westbound frontage road to eastbound Loop 1604 will be closed for utility work. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Monday, January 24 until Thursday, January 27. 9 a.m. to 5 p.m. Single southbound mainlane closure at S.W. Military Dr. for bridge repairs.
  • Monday, January 17 until Friday, January 21. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road from Judson Road to Toepperwein Road for geotechnical and drilling work. 
  • Monday, January 17 until Friday, January 21. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Toepperwein Road to Shin Oak Drive for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 a.m. to 4 p.m.  Single lane closure on the northbound frontage road between North Weidner Road and O’Connor Road for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road between Judson Road and O’Connor Road for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road between O’Connor Road and Tech Com Drive for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road between Weidner Road and Thousand Oaks Drive for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Exit ramp closure (170A) and double lane closure on the northbound frontage road from Bladau Bishop Road to Judson Road for geotechnical and drilling work. Traffic should use the O’Connor Road exit ramp (169).
  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Single southbound lane closure between Olympia Boulevard and Forum Parkway for geotechnical and drilling work. 
  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Single lane closure on the northbound frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work.
  • Monday, January 17 until Saturday, January 22. 9 a.m. to 5:30 p.m. Single northbound lane closure on the I-35 frontage road from FM 2252 to Schwab Rd. for cleaning, landscape, sidewalk and curb work.
  • Thursday, January 20 until Friday, January 21. 9 p.m. to 5 a.m. Exit ramp closure (170B) and single lane closure on the northbound frontage road from Judson Road to Toepperwein Road for geotechnical and drilling work. Traffic should use the Judson Road exit ramp (170A).
  • Wednesday, January 19 until Friday, January 21. 9 p.m. to 5 a.m. Exit ramp closure (171) and single lane closure on the northbound frontage road from Toepperwein Road to Shin Oak Drive for geotechnical and drilling work. Traffic should use the Toepperwein Road exit ramp (170B). 

I-410 – North East San Antonio

  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Single eastbound lane closure from Fratt Road to Interchange Parkway for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Single northbound lane closure on Austin Highway to I-410 eastbound frontage road from Cross Creek Drive to Fratt Road for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Single westbound lane closure from Perrin Beitel Road to Starcrest Drive for geotechnical and drilling work. 
  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Shoulder closure along the westbound frontage road from the I-410 Loop Interchange to Perrin Beitel Road for geotechnical and drilling work. 
  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Mandatory left turn lane closure on Austin Highway to westbound I-410 frontage road for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Single westbound lane closure from Brookhaven Drive to Sage Brush Lane for geotechnical and drilling work.
  • Monday, January 17 until Friday, January 21. 9 p.m. to 5 a.m. Single westbound lane closure from Post Oak Road to Norwich Drive for geotechnical and drilling work. 

I-410 – East San Antonio

  • Current until Friday, January 21. 9 a.m. to 5 p.m. Alternating lane closures on the northbound frontage road from E. Houston St. to Peggy Dr. for concrete work. 

I-410 – West San Antonio

  • Monday, January 17 until Monday, January 24. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Monday, January 17 until Monday, January 24. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Monday, January 17 until Monday, January 24. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, January 17 until Monday, January 24. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Sunday, January 16 until Monday, January 24. 8 p.m. to 5 a.m. Full closure of the Ingram Rd. intersection at Loop 410 for traffic switch and striping operations.
  • Monday, January 17 until Monday, January 24. 9 p.m. to 5 a.m. Southbound exit ramp to Marbach Rd. closed for bridge work.
  • Monday, January 17 until Monday, January 24. 9 a.m. to 3 p.m. Single southbound mainlane closure from W. Military Dr. to SH 151 for concrete work.
  • Monday, January 17 until Monday, January 24. 8 p.m. to 5 a.m. Double northbound mainlane closure from Ingram Rd. to Culebra Rd. for column work.
  • Monday, January 17 until Monday, January 24. 9 a.m. to 5 p.m. Southbound bypass ramp to W. Military Dr. closed for concrete work.
  • Sunday, January 16. Until Monday, January 24. 8 p.m. to 5 a.m. Southbound exit ramp to Ingram Rd. closed for traffic switch and striping operations. 

I-410 – Southwest San Antonio

  • Sunday, January 16 until Tuesday, January 17. 9 p.m. to 5 a.m. Single southbound mainlane closure from Ray Ellison Blvd. to Old Pearsall Rd. closed for traffic switch.
  • Sunday, January 16. 9 p.m. to Single lane closure on the southbound frontage road from Ray Ellison Blvd. to Old Pearsall Rd. for traffic switch.
  • Sunday, January 16. 9 p.m. Southbound entrance ramp from Ray Ellison Blvd. closed. Temporary entrance ramp will be opened.
  • Monday, January 17 until Tuesday, January 18. 9 p.m. to 5 a.m. Single northbound mainlane closure from Old Pearsall Rd. to Ray Ellison Blvd. for barrier movement.
  • Monday, January 17 until Tuesday, January 18. 9 p.m. to 5 a.m. Single southbound mainlane closure from Ray Ellison Blvd. to Old Pearsall Rd. for traffic switch.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Current until Monday, January 17. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Current until Monday, January 17. 8 p.m. to 5 a.m. Full alternating closure of the mainlanes, in both directions, at Loop 410 for bridge work.
  • Current until Monday, January 17. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.  
  • Monday, January 17 until Monday, January 24. Full alternating mainlane closures, in both directions, at Loop 410 for bridge work.
  • Monday, January 17 until Monday, January 24. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Monday, January 17 until Monday, January 24. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

PA 1502 – Wurzbach Parkway

  • Current until Monday, January 17. 9 a.m. to 4 p.m. Southbound right turn lane closed from Lockhill Selma to Wurzbach Parkway for utility work. 

I-10 – Kendall County

  • Current until Spring 2022. Full closure of the eastbound frontage road from Menger Springs to US 87 (Main St.) for road construction.
  • Monday, January 17 until Tuesday, January 18. 9 a.m. to 4 p.m. Westbound entrance ramp from Scenic Loop Rd. for ramp improvements.
  • Friday, January 21 9 p.m. to Monday, January 24 5 a.m. Full closure of the mainlanes, in both directions, from SH 46 to US 87 for bridge demolition.