Loop 1604 – North West San Antonio/Bexar County

  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround left inside lane closure at Loop 1604 and Bandera Road (SH 16) for bridge widening.
  • Sunday, May 8 until Friday, May 20. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround left inside lane closure at Loop 1604 and Bandera Road (SH 16) for bridge widening.
  • Wednesday, May 11 until Monday, May 23. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Wednesday, May 11 until Monday, May 23. Weeknights 10 p.m. until 12 p.m. Eastbound mainlane full closure from Kyle Seale Parkway to Babcock Road for bridge construction: bridge deck pour.
  • Wednesday, May 11 until Monday, May 23 Weeknights 9 p.m. until 5 a.m.  Full closure of Babcock Road at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Hausman Road to John Peace Boulevard/La Cantera Parkway for sidewalk construction.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for traffic signal work. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, May 9 until Monday, May 23. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for traffic signal work. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Friday, May 6 at 9 p.m. until Monday, May 9 at 5 a.m. Full closure of La Cantera Parkway/John Peace Boulevard at the Loop 1604 intersection, including turnarounds, for storm drain work.
  • Friday, May 13 at 9 p.m. until Monday, May 16 at 5 a.m. Full closure of La Cantera Parkway/John Peace Boulevard at the Loop 1604 intersection, including turnarounds, for storm drain work. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure from Lockhill Selma Road exit ramp to IH-10 for overhead sign bridge removal.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Eastbound mainlane full closure from IH-10 to Vance Jackson Road for overhead sign bridge removal.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Short-term full closure of NW Military Highway at the Loop 1604 intersection, including turnarounds, for temporary illumination installation. Anticipated 2-hour closures.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Eastbound frontage road left lane closure from the Lockhill Selma Road entrance ramp to the NW Military Highway exit ramp for temporary illumination installation.
  • Sunday, May 8 until Friday, May 13. Nightly 9 p.m. until 5 a.m. Westbound frontage road left lane closure from the NW Military Highway entrance ramp to the Lockhill Selma Road exit ramp for temporary illumination installation.
  • Monday, May 9 until Friday, May 13. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete removal and traffic signal work. 

Loop 1604 – North East San Antonio/Bexar County

  • Monday, May 9 until Friday, May 13. 8 p.m. to 5 a.m. Single westbound mainlane closure from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single westbound mainlane between northbound I-35 and Gateway Boulevard for geotechnical and drilling work.
  • Tuesday, May 10 until Thursday, May 12. 9 a.m. to 5 p.m. Single lane closure on westbound to eastbound turnaround on 1604 Access Road for utility pothole work.
  • Wednesday, May 11 until Friday, May 13. 9 a.m. to 5 p.m. Single shoulder closure on westbound frontage road from Old Austin Road to Gateway Place for utility pothole work.  

US 281 – North San Antonio/Bexar County

  • Friday, May 13. 10 p.m. to 12 p.m. Full closure of Wilderness Oak intersection for bridge work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Northbound exit ramp (173) to Olympia Parkway and single lane closure on the frontage road from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic should use the Anderson Loop exit ramp (172). Follow the detour signs.
  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Single northbound mainlane closure from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Northbound clover ramp closure to Loop 1604 westbound for geotechnical and drilling work. Traffic on the I-35 northbound frontage road will make a U-turn at Forum Parkway to southbound frontage road to westbound Loop 1604. Follow the detour signs.
  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Southbound clover ramp closure to Loop 1604 eastbound for geotechnical and drilling work. Traffic on the I-35 southbound frontage road will make a U-turn at I-35 access road to northbound frontage road to eastbound Loop 1604. Follow the detour signs.
  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Southbound frontage road entrance ramp closure from eastbound I-410 to Fratt Road for geotechnical and drilling work. Traffic should continue on the southbound frontage road to the entrance ramp at Walzem Road.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single southbound lane closure from Fratt Road to Walzem Road for geotechnical and drilling work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single southbound mainlane closure from Forum Parkway to Pat Booker Road for geotechnical and drilling work.
  • Monday, May 9 to Tuesday, May 10. 9 a.m. to 5 p.m. Various lane closures on southbound frontage road from Judson Road to Crownpoint Drive for soil sample work.
  • Monday, May 9 to Tuesday, May 10. 9 a.m. to 10:30 a.m. Singe lane closure on southbound frontage road and various lane closures on northbound frontage road from Wayland Way to Bladau Bishop for soil sample work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to southbound Loop 1604 for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on southbound frontage road from North Evans Road to Olympia Parkway for utility pothole work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road between Evans Road and Retama Parkway for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on southbound frontage road from Forum Parkway to Old Austin Road for utility pothole work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Double lane closure on northbound frontage road from Shin Oak Drive to Pat Booker Road for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Singe lane closure on the northbound frontage road from Toepperwein to Sandpiper Drive for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Forum Parkway to Forum Access for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on the southbound frontage road from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on southbound frontage road from O’Connor Road to Thousand Oaks Drive for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9:00 a.m. to 5 p.m. Single lane closure on the southbound frontage road between Brewster Street and Whirlwind Drive for geotechnical and drilling work.
  • Tuesday, May 10 to Thursday, May 12. 9 a.m. to 5 p.m. Various lane closures on southbound and northbound frontage roads at Weidner Road intersection for soil sample work.
  • Wednesday, May 11. 9 a.m. to 12 p.m. Southbound to northbound turnaround closure and various lane closures on northbound frontage road from Starlight Terrace to Weidner Road for soil sample work.
  • Wednesday, May 11. 1 p.m. to 5 p.m. Various lane closures on northbound and southbound frontage road and northbound to southbound turnaround closure at Starlight Terrace for soil sample work.
  • Wednesday, May 11 until Friday, May 13. 9 a.m. to 5 p.m. Single shoulder closure on northbound frontage road from Shin Oak Drive to Live Oak Crossing for utility pothole work.
  • Wednesday, May 11 until Friday, May 13. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from O’Connor Drive to Bladau Bishop drive for utility pothole work.
  • Thursday, May 12. 9 a.m. to 5 p.m. Various lane closures on northbound frontage road from Starlight Terrance to Crestway Drive for utility pothole work. 

I-410 – North East San Antonio

  • Sunday, May 8 until Friday, May 13. 8 p.m. to 5 a.m. Eastbound entrance ramp closure between Perrin Beitel Road and I-35 for geotechnical and drilling work. Traffic should use Austin Highway to I-35 for entrance ramp. Follow the detour signs.
  • Sunday, May 8 until Friday, May 13. 8 p.m. 5 a.m. Single lane closure on the westbound frontage road from Perrin Creek Road and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single northbound mainlane closure between Austin Highway to Crestway Drive for geotechnical and drilling work.
  • Monday, May 9 until Friday, May 13. 9:00 a.m. to 5 p.m. Single lane closure on the westbound frontage road from Perrin Creek Road and Perrin Beitel Road for geotechnical and drilling work.
  • Thursday, May 12. 12 p.m. to 5 p.m. Single lane closure on westbound frontage road from Perrin Creek Pump to Perrin Beitel Road for soil sample work.
  • Friday, May 13 to Friday May 13. 9 a.m. to 1 p.m. Single lane closure on eastbound frontage road at Starcrest Drive for soil sample work.
  • Friday, May 13 to Friday, May 13. 2 p.m. to 3:30 p.m. Single lane closure on westbound frontage road from Brookhaven Drive to Chisolm Trail for soil sample work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Various lane closures on Austin Highway between eastbound and westbound frontage road of I-410 for geotechnical and drilling work.
  • Sunday, May 8 to Friday, May 13. 8 p.m. to 5 a.m. Single lane closures on westbound Fratt Road between Interchange Parkway and Austin Highway for geotechnical and drilling work. Follow detour signs. 

I-410 – East San Antonio

  • Tuesday, May 10 from 9 p.m. to 5 a.m. NIGHTTIME southbound I-410 right lane closure between FM 78 and Houston Street for coring operations.
  •  Continuing through Monday, May 9. NIGHTTIME northbound I-410 left lane closures between Rigsby Avenue and I-10 from 9 p.m. to 5 a.m. on Monday through Thursday nights for barrier work. (No weekend work).
  • Ackerman Road from 9 a.m. to 5 p.m. each day for detour work. 
  • Continuing through Monday, May 23. NIGHTTIME alternating southbound I-410 closures between I-10 and Rigsby Avenue from 9 p.m. to 5 a.m. for barrier and striping work.
  • Continuing through Monday, May 16. NIGHTTIME Northbound I-410 exit to eastbound I-10 closed from 8 p.m. to 5 a.m. each night for overpass work. Click here for detour map.
  • Continuing through Monday, June 6. DAYTIME alternating northbound I-410 lane closures between Houston Street and I-10 as well as I-10 EB between I-410 and 

I-410 – West San Antonio

  • Monday, May 9 until Monday, May 23. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations.
  • Monday, May 9 until Monday, May 16. 8 p.m. to 5 a.m. Alternating lane closures on the southbound frontage road at Ingram Rd. for traffic and barrier switch.
  • Monday, May 9 until Monday, May 23. 8 p.m. to 5 a.m. Full closure of the northbound mainlanes from US 90 to W. Military Dr. for pavement operations.
  • Monday, May 9 until Monday, May 23. 8 a.m. to 5 p.m. Alternating closures of the turnarounds at the Culebra Rd. intersection for concrete work.
  • Sunday, May 15 until Sunday, May 22. 8 p.m. to 5 a.m. Alternating full closures, in both directions, at the Culebra Rd. intersection for column work.
  • Monday, May 9 until Monday, May 23. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Bandera Rd. for signal work. 

I-410 – Southwest San Antonio

  • Current until Monday, May 23. Northbound exit ramp to Valley Hi Rd. closed for pavement repairs. 

SH 151 – West San Antonio

  • Monday, May 9 until Monday, May 23. 8 p.m. to 5 a.m. Full alternating mainlane closures at Loop 410 for painting operations.
  • Monday, May 9 until Monday, May 23. 9 a.m. to 3 p.m. Single westbound mainlane closure from W. Military Dr. to Ingram Rd. for barrier work.
  • Friday, May 13 until Monday, May 16. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, at Loop 410 for signal work. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, May 27. 9 a.m. to 3 p.m. Single lane closures, in both directions, from N.W. Military Highway to Blanco Rd. for rail work 

SH 181 – Bexar County

  • Current until Saturday, April 30. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from I-37 to the Wilson County Line for roadway repairs. 

I-37 – Atascosa County

  • Monday, May 9 until Tuesday, May 10. 9 a.m. to 5 p.m. Single northbound mainlane closure at Coughran Rd. for bridge repairs.