Loop 1604 – North West San Antonio/Bexar County

  • Sunday, September 25 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding Weekends.
  • Sunday, September 25 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding Weekends.
  • Sunday, September 25 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding Weekends.
  • Sunday, September 25 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding Weekends.
  • Sunday, September 25 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Babcock Road to La Cantera Parkway for bridge construction – rail demo. Only one full mainlane closure to occur per direction, per night.
  • Sunday, September 25 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from La Cantera Parkway to Babcock Road for bridge construction – rail demo. Excluding Weekends. Only one full mainlane closure to occur per direction, per night.
  • Sunday, September 25 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Full intersection closure at Loop 1604 and Bandera Road (SH 16) in both directions, including turnarounds, for bridge construction – formwork removal.
  • Sunday, September 25 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Full intersection closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard in both directions, including turnarounds, for bridge construction – rail demo.
  • Monday, September 26 until Monday, October 10. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 to set portable concrete barrier, sidewalk construction and beam placement. Daily alternating frontage road closures. One lane to remain open at all times. Excluding Weekends.
  • Monday, September 26 until Monday, October 10. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) to set portable concrete barrier, sidewalk construction and beam placement. Daily alternating frontage road closures. One lane to remain open at all times. Excluding Weekends.
  • Monday, September 26 until Monday, October 10. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding Weekends.
  • Monday, September 26 until Monday, October 10. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding Weekends.
  • Monday, September 26 until Monday, October 10. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding Weekends.
  • Monday, September 26 until Monday, October 10. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding Weekends.
  • Monday, September 26 until Monday, October 10. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding Weekends.
  • Monday, September 26 until Monday, October 10. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Alternating. Only one turnaround to be closed at a time. Excluding Weekends.
  • Friday, September 30 at 9 p.m. until Saturday, October 1 at 12 p.m. Weekend Only. Eastbound mainlane closure between Babcock Road and La Cantera Parkway for bridge deck pour at La Cantera Parkway.
  • Sunday, October 2 at 9 p.m. until Monday, October 3 at 5 p.m. Weekend Only. Full intersection closure of Loop 1604 and La Cantera Parkway/John Peace Boulevard in both directions, including turnarounds for bridge deck pour at La Cantera Parkway. 

Loop 1604 – North Central San Antonio/Bexar County

  • Wednesday, September 28 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding Weekends.
  • Wednesday, September 28 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding Weekends.
  • Wednesday, September 28 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding Weekends.
  • Wednesday, September 28 until Friday, October 7. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding Weekends.
  • Monday, September 26 until Monday, October 10. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from La Cantera Parkway to IH-10 to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding Weekends.
  • Sunday, October 2 until Friday, October 7. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, October 2 until Friday, October 7. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, October 2 until Friday, October 7. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, October 2 until Friday, October 7. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Sunday, October 2 until Friday, October 7. Nightly 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and NW Military Highway for drilling shafts.
  • Sunday, October 2 until Friday, October 7. Nightly 11 p.m. until 5 a.m. Westbound mainlanes full closure from Blanco Road exit ramp to NW Military Highway exit ramp for retaining wall excavation work and temporary illumination.
  • Sunday, October 2 until Friday, October 7. Nightly 11 p.m. until 5 a.m. Eastbound frontage road periodic short term, full closure from Bitters Road exit ramp to Huebner Road for retaining wall excavation work and temporary illumination.
  • Sunday, October 2 until Friday, October 7. Nightly 11 p.m. until 5 a.m. Westbound frontage road periodic short term, full closure from Huebner Road to Bitters Road for retaining wall excavation work and temporary illumination.
  • Sunday, October 2 until Friday, October 7. Nightly 11 p.m. until 5 a.m. Eastbound mainlane periodic short term, full closure from Bitters Road exit ramp to Huebner Road for retaining wall excavation work and temporary illumination.
  • Sunday, October 2 until Friday, October 7. Nightly 11 p.m. until 5 a.m. Northbound Bitters Road periodic short term, full closure at Loop 1604 intersection for retaining wall excavation work and temporary illumination.
  • Sunday, October 2 until Friday, October 7. Nightly 11 p.m. until 5 a.m. Southbound Bitters Road periodic short term, full closure at Loop 1604 intersection for retaining wall excavation work and temporary illumination.
  • Monday, October 3 until Friday, October 7. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround full closure at Loop 1604 and Lockhill Selma Road for bridge widening construction.
  • Monday, October 3 until Friday, October 7. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround short term full closure at Loop 1604 and NW Military Highway for concrete placement for drilling shafts.
  • Sunday, October 2 until Sunday, October 9. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and NW Military Highway for bridge widening construction.
  • Sunday, October 2 until Sunday, October 9. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Lockhill Selma for bridge widening construction. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Lookout Road exit ramp closure on eastbound Loop 1604 between Nacogdoches Road and Union Pacific Railroad for overhead sign removal. Traffic must use the Nacogdoches exit to access Lookout Road.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Full lane closure on eastbound Loop 1604 mainlane from Nacogdoches Road to Union Pacific Railroad for overhead sign removal work. Traffic must exit Lookout Road to continue on the bypass to access eastbound Loop 1604.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Entrance ramp closure to eastbound Loop 1604 mainlanes from Nacogdoches Road to Union Pacific Railroad for overhead sign removal work. Traffic must continue on bypass to access eastbound Loop 1604. 

US 281 – North San Antonio/Bexar County

  • Monday, October 3 until Tuesday, October 4. 8 a.m. to 5 p.m. Alternating southbound mainlane closures from Wilderness Oak to Stone Oak Parkway for asphalt work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, October 2 until Monday, October 3. 10 p.m. to 5 a.m. Full mainlane closure in both directions between Watson Bridge and FM 306 for overhead bridge work. Traffic will need to use the frontage road.
  • Sunday, October 2 until Tuesday, October 4. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 from Joe Lee Street to Weidner Road for geotechnical drilling work.
  • Sunday, October 2 until Wednesday, October 5. 9:00 p.m. to 5:00 a.m. Exit ramp closure on northbound I-35 mainlane from Schertz Parkway to FM 3009 for crash cushion repair work. (maintenance)
  • Sunday, October 2 until Wednesday, October 5. 9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound I-35 mainlane from FM 1518 to Retama Parkway for crash cushion repair work. (maintenance)
  • Sunday, October 2 until Wednesday, October 5. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound I-35 frontage road from Utopia Boulevard to Forum Parkway for guardrail repair work.(maintenance)
  • Sunday, October 2 until Thursday, October 6. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound frontage road of I-35 from Starlight Terrace to Bomar Lane for subsurface utility work.
  • Sunday, October 2 until Friday, October 7. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane from Olympia Parkway to Pasatiempo for geotechnical drilling work.
  • Sunday, October 2 until Friday, October 7. 9:00 p.m. to 5:00 a.m. FM 1518 ramp closure (exit 174A) on northbound I-35 mainlane for geotechnical drilling work. Traffic must use the Olympia Parkway exit ramp (Exit 173).
  • Sunday, October 2 until Friday, October 7. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 from Olympia Parkway to Pasatiempo for geotechnical drilling work.
  • Sunday, October 2 until Friday, October 7. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from Arcadia Drive to Olympia Parkway for subsurface utility work.
  • Sunday, October 2 until Friday, October 7. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from McMorris Boulevard to Ferrell Road for subsurface exploration work.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Multiple left lane (3) closures on southbound I-35 from Forum Parkway to Ferrell Road for barrier work.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Multiple right lane (2) and alternating ramp closures on southbound I-35 connector from Loop 1604 to Toepperwein Road for striping and barrier work. Traffic must use next ramp to access I-35.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlanes and southbound I-35 entrance ramp closure from Pat Booker Road to Ferrell Road for drill shaft work. Traffic must use next entrance ramp to access I-35.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Right shoulder closure on northbound I-35 mainlane and left shoulder closure on northbound frontage road of I-35 from Judson Road exit ramp (exit 170A) to Judson Road for traffic signal equipment work.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Northbound-to-southbound turnaround closure on northbound I-35 frontage road at Judson Road for traffic signal equipment work.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane from Judson Road to Toepperwein Road for geotechnical drilling work.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlanes, alternating lane closures on frontage road and exit ramp closure on southbound I-35 from Toepperwein Road to Judson Road for barrier work. Traffic must use O’Connor Road exit to access Judson Road.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound and westbound Toepperwein Road from southbound frontage road of I-35 to northbound frontage road of I-35 for drill shaft work.
  • Sunday, October 2 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Alternating lane closure on southbound I-35 frontage road from Judson Road to O’Connor Road for earthwork.
  • Monday, October 3 until Wednesday, October 5. 9:00 p.m. to 5:00 a.m. Northbound-to-southbound turnaround closure on I-35 frontage road at Weidner Road intersection for geotechnical drilling work.
  • Tuesday, October 4 until Thursday, October 6. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on northbound frontage road of I-35 from Weidner to Bomar Lane for geotechnical drilling work. Traffic must use next ramp to access I-35.
  • Tuesday, October 4 until Thursday, October 6. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 from Bomar Lane to O’Connor Road for geotechnical drilling work.
  • Wednesday, October 5 until Friday, October 7. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 from O’Connor Road to Bladau Bishop for geotechnical drilling work.
  • Wednesday, October 5 until Saturday, October 8. 9:00 p.m. to 5:00 a.m. Exit ramp closure on northbound I-35 between Walzem Road and Crestwind Drive for geotechnical drilling work. 

I-10 – East San Antonio/Bexar County

  • Friday, September 30 until Saturday, October 1. 8:30 p.m. to 12 p.m. Full westbound mainlane closure from Zuehl Rd. to FM 2538 for bridge work. 

I-410 – North East San Antonio

  • Sunday, October 2 until Tuesday, October 4. 9:00 p.m. to 5:00 a.m. Left lane closure on eastbound frontage road of Loop 410 from Quail Creek Drive to Perrin Beitel Road for geotechnical drilling work.
  • Monday, October 3 until Friday, October 7. 9:00 p.m. to 5:00 a.m. Right shoulder closure on eastbound Loop 410 mainlane and alternating lane closure on eastbound frontage road of Loop 410 from Gold Star Drive to Perrin Beitel for subsurface utility work.
  • Tuesday, October 4 until Friday, October 7. 9:00 p.m. to 5:00 a.m. Right shoulder closure on westbound frontage road of Loop 410 and right lane closure on westbound connector ramp from I-35 to Perrin Beitel Road for subsurface utility work. 

I-410 – East San Antonio

  • Continuing through Wednesday, October 5. NIGHTTIME northbound and southbound Loop 1604 middle lanes at I-10 from 3 a.m. to 5 a.m. (No closures Saturday or Sunday) for barrier work.
  • Continuing through Saturday, October 8. DAYTIME westbound I-10 frontage road alternating lane closures between Ackerman Road and I-10 on-ramp from 9 a.m. to 4 p.m. for overpass work.
  • Continuing through Saturday, October 15, (except for Friday and Saturday nights). NIGHTTIME northbound I-410 mainlanes closed between E. Houston Street and I-10 on-ramp from 9 p.m. to 5 a.m. for overpass work. E. Houston Street entrance ramp to northbound I-410 also closed.
  • Continuing through Saturday, October 15. NIGHTTIME northbound I-410 frontage road closure from East Houston Street on-ramp to eastbound I-10 from 9 p.m. to 5 a.m. (No closures Friday or Saturday Night.)  Detour: Northbound I-410 traffic to Ackerman Road may take northbound I-410 to I-10 EB exit ramp, turn around at Foster Road, and take I-10 westbound frontage road to Ackerman.
  • Continuing through Saturday, October 15. NIGHTTIME northbound I-410 ramp to eastbound I-10 closed from 9 p.m. to 5 a.m. for overpass work. Detour: Northbound I-410 traffic to eastbound I-10 will take the I-410 northbound to I-10 westbound cloverleaf ramp, then the I-10 WB to I-10 Southbound cloverleaf ramp, and finally the I-410 southbound to I-10 eastbound cloverleaf ramp.
  • Continuing through Wednesday, October 19. DAYTIME northbound and southbound I-410 frontage road alternating lane closures between I-10 and East Houston Street from 9 a.m. to 4 p.m. for bridge and road work.  
  • Continuing through Friday, October 28. Loop 1604 and I-10 intersection, all left turn lanes closed continuously until 5 a.m. October 28 for bridge work.
  • Continuing through Friday, November 18. Daytime eastbound I-10 exit to southbound I-410 closed from 9 a.m. to 4 p.m. daily. Detour: Eastbound I-10 traffic to Southbound I-410 will exit at W.W. White Road, continue on the eastbound I-10 frontage road, and take entrance ramp at E. Houston Street. 

I-410 – West San Antonio

  • Friday, September 30 until Monday, October 30. 9 p.m. to 5 a.m. Exit ramp to Valley Hi Dr. closed for repairs.
  • Tuesday, October 4 until Thursday, October 6. 9 p.m. to 5 a.m. Single northbound mainlane closure from Old Pearsall Rd. to Medina Base Rd. for rail installation. 

US 90 – Bexar County

  • Wednesday, October 5. 9 a.m. to 5 p.m. Single westbound mainlane closure at Montgomery Rd. for sign installations. 

SH 16 – Bandera Road

  • Monday, October 3 until Friday, October 7. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, from Loop 1604 to Diamond Back Trail for storm sewer installations.
  • Monday, October 3 until Friday, October 7. 9 a.m. to 3 p.m. Single mainlane closures, in both directions, from Loop 1604 to Diamond K Trail for unloading materials. 

Potranco Road – Bexar County

  • Current until Monday, October 10. 9 a.m. to 4 p.m. Single eastbound lane closure from Empresario Dr. to Loop 1604 for utility work. 

FM 1535 – N.W. Military Highway

  • Sunday, October 2 until Friday, October 14. 8 p.m. to 5 a.m. Single northbound right lane closure at the Wurzbach Parkway intersection for striping operations.
  • Monday, October 3 until Friday, October 14. 9 a.m. to 4 p.m. Single southbound right lane closure at the Wurzbach Parkway for sidewalk replacement.
  • Sunday, October 2 until Friday, October 14. 8 p.m. to 5 a.m. Single southbound right lane closure at the Wurzbach Parkway intersection for striping operations.
  • Monday, October 3 until Friday, October 7. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd. for utility work. 

PA 1502 – Wurzbach Parkway

  • Sunday, October 2 until Friday, October 14. 8 p.m. to 5 a.m. Single westbound right lane closure at the N.W. Military Highway intersection for striping operations.
  • Sunday, October 2 until Friday, October 14. 8 p.m. to 5 a.m. Single eastbound right lane closure at the N.W. Military Highway intersection for striping operations.
  • Monday, October 3 until Friday, October 14. 9 a.m. to 4 p.m. Single eastbound right lane closure at the Lockhill Selma Rd. intersection for island construction. 

Lockhill Selma Rd. – Bexar County

  • Sunday, October 2 until Friday, October 14. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, at the Wurzbach Parkway intersection for striping operations. 

FM 1976 – Bexar County

  • Sunday, October 2. 9 a.m. to 4 p.m. Full closure of all lanes from Montgomery Dr. to Gibbs Sprawl Rd. for utility work. Traffic will be stopped in 15-minute intervals throughout the day. 

I-10 – Kendall County

  • Current until Friday, October 28. 9 p.m. to 5 a.m. Single mainlane closures, in both directions, from US 87 to FM 473 for pavement operations. 

Loop 337 – Comal County

  • Monday, October 3. 8 a.m. to 5 p.m. Single southbound lane closure at River Rd. for traffic switch.