Friday, February 10

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway entrance ramp to Vance Jackson Road exit ramp for eastbound direct connector bridge construction. Nightly frontage road full closure. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane entrance ramp closure after La Cantera Parkway for eastbound direct connector bridge construction. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Eastbound I-10 mainlane exit ramp closure to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, February 12 until Monday, February 27. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from westbound IH-10 to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, February 13 until Monday, February 27. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Sunday, February 12 until Sunday, February 26. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, February 12 until Friday, February 17. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, February 12 until Friday, February 17. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, February 12 until Friday, February 17. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, February 12 until Friday, February 17. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Monday, February 13 until Friday, February 17. Nightly 8 p.m. until 5:30 a.m. Westbound frontage road right lane full closure at Rogers Ranch Parkway for gas utility work.
  • Monday, February 13 until Friday, February 17. Nightly 8 p.m. until 5:30 a.m. Northbound Rogers Ranch Parkway mainlane full closure at Loop 1604 intersection for gas utility work.
  • Monday, February 13 until Friday, February 17. Nightly 8 p.m. until 5:30 a.m. Southbound Rogers Ranch Parkway mainlane full closure at Loop 1604 intersection for gas utility work.
  • Wednesday, February 15 until Saturday, February 18. Nightly 9 p.m. until 5 a.m. Eastbound mainlane full closure from Blanco Road exit ramp to Blanco Road entrance ramp for setting deck panels for proposed northbound Blanco bridge.
  • Wednesday, February 15 until Saturday, February 18. Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure from Blanco Road exit ramp to Blanco Road entrance ramp for setting deck panels for proposed northbound Blanco bridge.
  • Friday February 10 until February 12. Nightly 9 p.m. until 5 a.m. Weekend Only. Westbound mainlane full closure from the Blanco Road Exit Ramp to the Blanco Road entrance ramp for setting beams for northbound Blanco Road bridge.
  • Friday February 10 until February 12. Nightly 9 p.m. until 5 a.m. Weekend Only. Eastbound mainlane full closure from the Blanco Road Exit Ramp to the Blanco Road entrance ramp for setting beams for northbound Blanco Road bridge.
  • Saturday, February 18. 8 a.m. until 3 p.m. Weekend Only. Westbound mainlane exit ramp to Lockhill Selma/Vance Jackson Road for material haul off. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, February 12 until Wednesday, February 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Loop 1604 frontage road at Union Pacific Railroad for barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures and exit ramp closure to IKEA-RBFCU Parkway eastbound mainlanes of Loop 1604 from Nacogdoches Road to I-35 for barrier and striping work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 and exit ramp between Nacogdoches Road and Union Pacific Railroad for striping and barrier work. Traffic should use prior exit.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Lookout Road turnaround.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for sawcut and demolition work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane and exit ramp closures on westbound Loop 1604 connector from Gateway Boulevard to Gateway Place for barrier work. Traffic should use next exit.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound frontage road of Loop 1604 between I-35 and Lookout Road for barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound frontage road of Loop 1604 between Union Pacific Railroad and Nacogdoches Road for barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from Union Pacific Railroad to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramp.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound frontage road of Loop 1604 between Union Pacific Railroad and Nacogdoches Road for barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road turnaround.
  • Saturday, February 18 until Sunday, February 26. 9:00 p.m. to 5:00 a.m. Full closure on eastbound frontage road, Lookout Road exit ramp, and the westbound to eastbound turnaround of Loop 1604 from Nacogdoches Road to Union Pacific Railroad for overhead sign board removal. Accommodations will be made for local traffic. Traffic must follow detour signs. 

I-10 – North West San Antonio/Bexar County

  • Sunday, February 12 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 12 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 12 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 12 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, February 12 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 12 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 12 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, February 12 until Friday, February 24. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, February 13 until Friday, February 24. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, February 13 until Friday, February 24. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

US 281 – North San Antonio/Bexar County

  • Saturday, February 11 – 5 a.m. until Sunday, February 12 – 5 p.m. Single lane closure on the southbound frontage road from Borgfeld to Paul Harvill lane for guardrail work.
  • Saturday, February 11 – 5 a.m. until Sunday, February 12 – 5 p.m. Single lane closure on the northbound frontage road from Marshall Rd. to Sendero Verde for guardrail work.
  • Monday, February 13 until Tuesday, February 14. 9 a.m. to 3 p.m.  Alternating lane closures, in both directions, at Bulverde Rd. for asphalt work.
  • Wednesday, February 15 until Friday, February 17. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Overlook Parkway for asphalt work.
  • Saturday, February 18. 9 a.m. to 3 p.m. Alternating lane closure, in both directions, at Wilderness Oak for asphalt work.
  • Monday, February 20. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Mountain Lodge for asphalt work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Monday, May 15 long term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for soil nail wall, drill shaft, column, and cap work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple right lane (2) closures on southbound I-35 mainlanes from Retama Parkway to Loop 1604 for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for temporary pavement work. Southbound frontage road of I-35 traffic must use the Forum Parkway turnaround and follow detour signs.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple right lane (2) closures on southbound I-35 mainlanes and entrance ramp closure between Evans Road and Old Austin Road for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple left lane (3) closures on southbound I-35 mainlanes from Retama Parkway to Old Austin Road for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple right lane (3) closures on southbound I-35 mainlanes from Evans Road to Olympia Parkway, entrance ramp closure between Retama Parkway and southbound I-35 exit ramp closure at Evans Road for striping and barrier work. Traffic should use prior entrance and exit.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for temporary pavement, striping, and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple left lane (3) closures on southbound I-35 mainlanes from Evans Road to Olympia Parkway for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound and westbound Retama Parkway from Lookout Road to southbound frontage road of I-35 for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for earth work. Southbound I-35 traffic to eastbound Loop 1604 must exit at westbound 1604 and follow the detour signs to access eastbound Loop 1604.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earth work. Westbound Loop 1604 traffic to southbound I-35 must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure for barrier work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Closure on southbound I-35 collector ramp at the Loop 1604 interchange for creating access to work area. Traffic must use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closure on southbound frontage road and flagging operation on I-35 from Pat Booker Road to Toepperwein Road for barrier and striping work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane, exit ramp closure, and left lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson Road for tree removal work. Traffic should use next exit.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane, exit ramp closure, and left lane closure on northbound frontage road of I-35 at O’Connor Road for tree removal work. Traffic should use next exit.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and (2) left lane closures on the southbound frontage road of I-35 from Judson Road to O’Connor Road. for striping work, barrier work, and paving.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlane, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for barrier setting and striping work. Traffic should use next entrance and exit.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closure (2) on southbound I-35 mainlanes, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earth, striping, and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road and flagging operation on I-35 from Toepperwein Road to Judson Road for earth and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earth, paving, striping, and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlane and left shoulder closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for tree removal work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlane, shoulder closure, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road. for tree removal work. Traffic should use next exit.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for earth, paving, striping, and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closure on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for earth, paving, striping, and barrier work. Traffic should use next entrance and exit.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from O’Connor Road to Weidner Road for earthwork.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Left lane closure (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for temporary ramp construction.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound mainlanes of I-35 and exit ramp closure to Randolph Boulevard between Thousand Oaks Drive and Walzem Road for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on southbound mainlanes of I-35 from Thousand Oaks Drive to Walzem Road for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for earthwork.
  • Monday, February 13 until Saturday, February 18 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound I-35 connector ramp to westbound I-410 for striping and barrier work.
  • Saturday, February 18 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Southbound I-35 collector at Loop 1604 interchange for creating access to work area. Traffic must west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Saturday, February 18 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for earth work. Southbound I-35 traffic to eastbound Loop 1604 must exit at westbound 1604 and follow the detour signs to access eastbound Loop 1604.
  • Saturday, February 18 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earth work. Westbound Loop 1604 traffic to southbound I-35 must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Saturday, February 18 until Saturday, February 25. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure for striping and barrier work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Friday February 24 through Monday April 24 long-term closure (24/7). Exit ramp closure of southbound I-35 to Randolph Boulevard. Traffic to use temporary ramp.
  • Friday February 24 through Friday November 10 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work. 

I-10 – East San Antonio/Bexar County

  • Sunday, February 12. 6 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at FM 1518 for utility work.
  • Monday, February 13. 9 p.m. to 5 a.m. Alternating westbound mainlane closures from Cibolo Creek to Woman Hollering Creek for pavement work.
  • Friday, February 17 – 9 p.m. to Saturday, February 18 – 12 p.m. Full closure of the eastbound mainlanes at Pfeil Rd. for bridge work.
  • Sunday, February 12 through Friday, February 17. NIGHTTIME northbound and southbound Loop 1604 closed at I-10 from 8 p.m. to 5 a.m. to set panels. Detour: Northbound Loop 1604 traffic will use the eastbound I-10 frontage road, turn around at Pfeil Road, and take the westbound I-10 frontage road back to Loop 1604. Southbound Loop 1604 traffic will use the westbound I-10 frontage road, turn around at FM 1516 road, and take the eastbound I-10 frontage road back to Loop 1604.
  • Continuing through Wednesday, February 15. DAYTIME westbound I-10 frontage road alternating lane closure between Ackerman Road and I-10 on-ramp from 9 a.m. to 4 a.m. for overpass work. I-10 on-ramp will remain open.  
  • Monday, February 6 through Monday, February 20. NIGHTTIME westbound I-10 frontage road closure at I-410 Northbound on-ramp from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights). Westbound I-10 to I-410 and northbound I-410 to westbound I-10 ramps will remain open. Detour: Westbound frontage traffic will take the westbound I-10 to northbound I-410 ramp, continue on northbound I-410, take the FM 78 exit, turn around at the intersection, return on southbound I-410, and exit towards westbound I-10.
  • Wednesday, February 1 through Wednesday, February 15. NIGHTTIME westbound I-10 frontage road closure between Ackerman Road and Cornerway Boulevard from 9 p.m. to 5 a.m. for overpass work. (No closures Friday or Saturday nights) I-10 on-ramp will also be closed.
  • Tuesday, February 14 through Wednesday, February 15. NIGHTTIME. Full Westbound I-10 mainlane closure between Pfeil Road and Salitrillo Creek. Detour: All westbound I-10 traffic will exit at Pfeil Road and reenter at the next entrance ramp.  

I-410 – North East San Antonio

  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work.
  • Sunday, February 12 until Saturday, February 18. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit.
  • Monday, February 13 until Saturday, February 18 9:00 p.m. to 5:00 a.m. Multiple right mainlane closures (2) and exit ramp closure on westbound I-410 between I-35 and Perrin Beitel for striping and barrier work. Traffic should use prior exit.
  • Monday, February 13 until Saturday, February 18 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel for striping and barrier work.
  • Monday, February 13 until Saturday, February 18 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Monday, February 13 until Saturday, February 18 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Monday, February 13 until Saturday, February 18 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Monday, February 13 until Saturday, February 18 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp. 

I-410 – East San Antonio

  • Continuing through Wednesday, February 15. NIGHTTIME. Northbound I-410 ramp to eastbound and westbound I-10 closed from 9 p.m. to 5 a.m. for ramp work. Detour: Northbound I-410 traffic to eastbound I-10 will take the northbound I-410 to the westbound I-10 cloverleaf ramp, then the westbound I-10 to southbound I-410 cloverleaf ramp, and finally to the I-410 southbound to I-10 eastbound cloverleaf ramp. Northbound I-410 traffic to westbound I-10 will continue on I-410, take the FM 78 exit, turn around at the intersection, return on southbound I-410, and exit to westbound I-10.
  • Continuing through Wednesday, February 15. DAYTIME alternating northbound and southbound I-410 frontage road lane closures between I-10 and East Houston Street from 9 a.m. to 4 p.m. for bridge and road work.  
  • Saturday, February 4 through Monday, February 13. Alternating northbound and southbound I-410 lane closures between FM 78 (Old Seguin Road) and East Houston Street from 5 a.m. February 4 continuously thru 5 a.m. February 13. Seek alternate routes.
  • Wednesday, February 1 through Wednesday, February 15. NIGHTTIME alternating northbound and southbound I-410 full mainlane closures between I-10 exit ramp and I-10 bridge from 9 p.m. to 5 a.m. (No closures during northbound frontage road closures or on Friday and Saturday nights.) Detour NB & SB I-410 traffic take exit towards I-10 collector ramp and continue straight to reenter I-410.
  • Continuing through Wednesday, February 15. NIGHTTIME northbound I-410 frontage road closure from Eastgate Street to Ackerman Road from 8 p.m. to 5 a.m. Northbound I-410 frontage traffic wanting to access Ackerman Road may take northbound I-410 to I-10 eastbound exit ramp, turn around at Foster Road, and take I-10 westbound frontage road to Ackerman.  
  • Wednesday, February 1 through Wednesday, February 15. NIGHTTIME I-10 eastbound exit to Ackerman closed from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights). Detour: Eastbound I-10 traffic can exit at Foster Road, turn around at the intersection, and use the westbound frontage road back to Ackerman.  

I-410 – West San Antonio

  • Sunday, February 12 until Sunday, February 26. 9 a.m. to 4 p.m. Alternating lane closures on the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for top soil work.
  • Sunday, February 12 until Sunday, February 26. 8 p.m. to 5 a.m. Alternating full closure of the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for mill and overlay work.
  • Sunday, February 12 until Sunday, February 26. 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from Bandera Rd. to Marbach Rd. for barrier work.
  • Current until Thursday, March 9. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Marbach Rd. to Pilar Dr. for utility work.
  • Monday, February 13 until Tuesday, February 14. 9 p.m. to 5 a.m. Single southbound mainlane closure from Medina Base Rd. to Ray Ellison Blvd. for barrier work. 

SH 151 – West San Antonio

  • Sunday, February 12 until Sunday, February 26. 8 p.m. to 5 a.m. Full closure of the westbound mainlanes from W. Military Dr. to Potranco Rd. for barrier and guardrail work.
  • Sunday, February 12 until Sunday February 26. 9 a.m. to 4 p.m. Alternating full closures of the frontage roads, in both directions, for top soil work. 

PA 1502 – Wurzbach Parkway

  • Current until Tuesday, February 28. 9 a.m. to 3 p.m. Various lane closures, in both directions, from N.W. Military Highway to Weidner Rd. roadway work. 

SH 16 – Bandera Road

  • Sunday, February 12 until Friday, February 17. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for utility work. 

US 90 – West San Antonio/Bexar County

  • Current until Friday, February 24. Single eastbound mainlane closure from Los Galapagos to Castroville Rd. for roadway repairs.
  • Current until Friday, February 24. 8:30 p.m. to 5 a.m. Alternating eastbound mainlane closures from Horal St. to Acme Rd. for roadway repairs.
  • Monday, February 13 until Thursday, February 16. 8 p.m. to 5 a.m. Full closure of the eastbound mainlanes from Hunt Lane to Loop 410 for pavement repairs. 

I-10 – Kendall County

  • Monday, February 13. 9 a.m. to 3 p.m. Single eastbound mainlane closure from Scenic Loop Rd. to SH 46 for barrier removal.