Loop 1604 – North West San Antonio/Bexar
County
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 8 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 8 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane entrance ramp closure after La Cantera Parkway for eastbound direct connector bridge construction. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Eastbound I-10 mainlane exit ramp closure to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from westbound IH-10 to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weekdays 9 a.m. until 3 p.m. Eastbound to Westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. 12 a.m. until 12 a.m. Eastbound to
westbound turnaround closure at Loop 1604 and Hausman Road for bridge
widening/retaining walls. Only one turnaround to be closed at a time.
- Tuesday, May 30 until Monday, June 5. 12 a.m. until 12 a.m. Westbound to
eastbound turnaround closure at Loop 1604 and Hausman Road for bridge
widening/retaining walls. Only one turnaround to be closed at a time.
- Tuesday, May 30 until Monday, June 5. 12 a.m. until 12 a.m. Eastbound to
westbound turnaround closure at Loop 1604 and Babcock Road for bridge
widening/retaining walls. Only one turnaround to be closed at a time.
- Tuesday, May 30 until Monday, June 5. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
Loop 1604 – North Central San Antonio/Bexar
County
- Tuesday, May 30 until Friday, June 2. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
- Tuesday, May 30 until Friday, June 2. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
- Tuesday, May 30 until Friday, June 2. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
- Tuesday, May 30 until Friday, June 2. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
- Wednesday, May 31 until Friday, June 2. Nightly 9 p.m. until 5 a.m. Eastbound mainlane full closure between NW Military Highway exit ramp to Blanco Road entrance ramp for setting deck panels at Salado Creek.
- Wednesday, May 31 until Friday, June 2. Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure between Blanco Road exit ramp and NW Military Highway entrance ramp for setting deck panels at Salado Creek.
- Thursday, June 1 until Friday, June 2. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road at the Loop 1604 intersection lane closures for a traffic shift.
- Thursday, June 1 until Friday, June 2. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road at the Loop 1604 intersection lane closures for a traffic shift.
- Tuesday, May 30 until Friday, June 2. Daily 9 a.m. until 3 p.m. Eastbound to Westbound turnaround full closure at Loop 1604 and Lockhill Selma Road for drainage work.
- Tuesday, May 30 until
Friday, June 2. Daily 9 a.m. until 3 p.m. Westbound to Eastbound turnaround
full closure at Loop 1604 and Lockhill Selma Road for drainage work.
Loop 1604 – North East San Antonio/Bexar
County
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection and turnarounds for striping and barrier work. Traffic should follow detour signs.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic should use Lookout Road intersection.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should use Lookout Road intersection.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout Road to I-35 for barrier work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for drilled shaft work. Traffic should use Lookout Road intersection.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to I-35 and exit ramp closure to Nacogdoches Road for barrier work. Traffic should use next exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic should use next entrance ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and next entrance.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from Union Pacific Railroad to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from Union Pacific Railroad and Nacogdoches Road for barrier work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from I-35 to Lookout Road for construction entrance and temporary pavement work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound bypass ramp of Loop 1604 from Lookout Road to Nacogdoches Road for barrier work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use next exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604 connector ramp from southbound I-35 to Lookout Road for striping work. Traffic should use next exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road turnaround.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic should use Lookout Road intersection.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should use Lookout Road intersection.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout Road to I-35 for barrier work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for drilled shaft work. Traffic should use Lookout Road intersection.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to I-35 and exit ramp closure to Nacogdoches Road for barrier work. Traffic should use next exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic should use next entrance ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and next entrance ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road turnaround.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection and turnarounds for striping work. Traffic must exit Loop 1604 exit ramp to Lookout Road and follow detour signs.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from Union Pacific Railroad to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from Union Pacific Railroad and Nacogdoches Road for barrier work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from I-35 to Lookout Road for construction entrance and temporary pavement work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound bypass ramp of Loop 1604 from Lookout Road to Nacogdoches Road for barrier work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use next exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604 connector ramp from southbound I-35 to Lookout Road for striping work. Traffic should use next exit ramp.
I-10 – North West San Antonio/Bexar County
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604 interchange full closure for bridge construction. Nightly closures. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from eastbound IH-10 to eastbound Loop 1604 for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound Loop 1604 to eastbound IH-10 for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound IH-10 to westbound Loop 1604 for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill Selma Road to Valero Way overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp to the Lockhill Selma Road entrance ramp for overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Friday, June 2. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
- Tuesday, May 30 until Monday, June 5. 12 a.m. until 12 a.m. Loop 1604 eastbound frontage road right turn lane to IH-10 eastbound frontage road for utility construction.
I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County
- Current until Wednesday, August 2, long term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for soil nail wall, drill shaft, column, and cap work.
- Current until Monday, December 14 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
- Tuesday, May 30 until Saturday,
June 3. 9:00 p.m. to 5:00 a.m. Rolling closure project-wide for pothole repair.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Rolling closure project-wide for sweeping operations.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Roy Richard Drive to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next entrance ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Schertz Parkway to Corporate Drive for survey work. Traffic should use next exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound I-35 mainlanes from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary pavement, striping and barrier work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for bridge foundation, striping, barrier work, and temporary pavement work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Retama Parkway to Forum Parkway for striping work. Traffic should use next entrance ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Traffic shift to the left on eastbound Evans Road and alternating lane closures on southbound frontage road of I-35 at Evans Road for temporary pavement work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for striping, barrier, and temporary pavement work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for striping and barrier work. Traffic must use the Forum Parkway turnaround and follow detour signs to access southbound I-35.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Corporate Drive to Retama Parkway for striping, barrier, and temporary pavement work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and exit ramp closure of I-35 from Corporate Drive to Retama Parkway for striping, barrier, and temporary pavement work. Traffic should use prior exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for striping, barrier, and earthwork. Traffic must exit at westbound Loop 1604 and follow the detour signs to access eastbound Loop 1604.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic must use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for striping and barrier work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road and entrance ramp closure of I-35 from Shin Oak Drive to Pat Booker Road for pothole work. Traffic should use next entrance ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 from Shin Oak Drive to Pat Booker Road for pothole work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 Access Road from Pat Booker Road to Live Oak intersection for pothole work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Right shoulder closure on northbound collector of I-35 at Loop 1604 for pothole work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 from Forum Parkway to Agora Parkway for pothole work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for barrier work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road for striping and barrier work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound mainlanes of I-35 from Pat Booker Road to I-35 Access Road for bridge substructure work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, entrance ramp closure, and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign to the available ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, right lane closure on northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and westbound at the intersection of Judson Road and Randolph Boulevard and left lane closure on Randolph Boulevard at Judson Road for temporary pavement and signal works. Traffic should use the next exit ramp.
- Tuesday, May 30 until Saturday,
June 3. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound mainlanes of I-35, entrance ramp
closure, and alternating exit ramp closures from O’Connor Road to Toepperwein
Road for barrier setting and structures work. Traffic should follow the detour
signs to the available ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlanes, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road for tree removal work. Traffic should use next exit.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for earthwork, paving, striping, and barrier work. Traffic should use next entrance and exit ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Weidner Road at I-35 for barrier work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and entrance ramp closure from Weidner Road to Thousand Oaks Drive for earthwork and barrier work. Traffic should use prior entrance ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should use the next exit and entrance ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use the next exit and entrance ramps.
- Tuesday, May 30, 9:00 PM to 5:00 AM. Northbound to southbound I-35 turnaround closure at Thousand Oaks Drive for utilities work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for permanent widening, striping, and barrier work. Traffic should follow detour signs. Accommodations will be made for local traffic.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for permanent widening work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance ramp closure of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Exit ramp closure on northbound mainlanes and left lane closure on northbound frontage road of I-35 from Walzem Road to Crestwind Drive for drilled shaft work. Traffic should use prior exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance ramp closure of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to Walzem Road for drill shaft and column work. Traffic to use next entrance ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to Walzem Road for cap work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound mainlanes and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.
- Thursday, June 1. 9:00 p.m. to 5:00 a.m. Closure of Old Austin Road at southbound frontage road of I-35 for CCTV temporary pole installation. Traffic should follow detour signs.
- Sunday, June 4 until Saturday,
June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp
closure, and entrance ramp closure of I-35 from Roy Richard Drive to Schertz
Parkway for striping, barrier, and temporary pavement work. Traffic should use
next exit and entrance ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Roy Richard Drive to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next entrance ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Schertz Parkway to Corporate Drive for survey work. Traffic should use next exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound I-35 mainlanes from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary pavement, striping and barrier work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for bridge foundation, striping, barrier work, and temporary pavement work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for striping, barrier, and temporary pavement work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Retama Parkway to Forum Parkway for striping work. Traffic should use next entrance ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Traffic shift to the left on eastbound Evans Road and alternating lane closures on southbound frontage road of I-35 at Evans Road for temporary pavement work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Corporate Drive to Retama Parkway for striping, barrier, and temporary pavement work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and exit ramp closure of I-35 from Corporate Drive to Retama Parkway for striping, barrier, and temporary pavement work. Traffic should use prior exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, and exit ramp closure of I-35 from I-35 Access Road to Loop 1604 interchange for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road and exit ramp closure of I-35 from Loop 1604 to Forum Parkway for striping, barrier, and temporary pavement work. Traffic should use next exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and alternating entrance ramp closure of I-35 from I-35 Access Road to Forum Parkway for striping, barrier, and temporary pavement work. Traffic should use next prior exit ramp and next entrance ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for striping, barrier, and earthwork. Traffic must exit at westbound Loop 1604 and follow the detour signs to access eastbound Loop 1604.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic must use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for striping and barrier work. Traffic must use the Forum Parkway turnaround and follow detour signs to access southbound I-35.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for striping and barrier work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road for striping and barrier work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound mainlanes of I-35 from Pat Booker Road to I-35 Access Road for bridge substructure work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, entrance ramp closure, and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign to the available ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, right lane closure on northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and westbound at the intersection of Judson Road and Randolph Boulevard and left lane closure on Randolph Boulevard at Judson Road for temporary pavement and signal works. Traffic should use the next exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound mainlanes of I-35, entrance ramp closure, and alternating exit ramp closures from O’Connor Road to Toepperwein Road for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 mainlanes, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road for tree removal work. Traffic should use next exit.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for barrier work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for earthwork, paving, striping, and barrier work. Traffic should use next entrance and exit ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Weidner Road at I-35 for barrier work.
- Sunday, June 4 until Saturday,
June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and
entrance ramp closure from Weidner Road to Thousand Oaks Drive for earthwork
and barrier work. Traffic should use prior entrance ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should use the next exit and entrance ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use the next exit and entrance ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for permanent widening, striping, and barrier work. Traffic should follow detour signs. Accommodations will be made for local traffic.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for permanent widening work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Exit ramp closure on northbound mainlanes and left lane closure on northbound frontage road of I-35 from Walzem Road to Crestwind Drive for drilled shaft work. Traffic should use prior exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance ramp closure of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound mainlanes and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to Walzem Road for cap work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to Walzem Road for drilled shaft and column work. Traffic to use next entrance ramp.
- Sunday, June 18 until Saturday, June 24. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for substructure, temporary pavement, striping, and barrier work. Traffic should follow detour signs.
I-10 – East San Antonio/Bexar County
- Current until Saturday May 27. 8 p.m. to 6 a.m. Single westbound mainlane closure from Zuehl Rd. to Cibolo Creek for pavement operations.
- Continuing through Monday, June 26. Westbound I-10 frontage road left lane closure from Graytown Rd. to Loop 1604 until 3 p.m.
- Continuing through Thursday, June 1. DAYTIME westbound I-10 frontage road alternating lane closures at Ackerman Rd. from 9 a.m. to 4 p.m. for overpass work. (No closures on Sunday)
I-410 – North East San Antonio
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410 and entrance ramp closure from Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work. Traffic should follow detour signs
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and exit ramp closure of I-410 from Perrin Creek to Perrin Beitel for drilled shaft work. Traffic to use next exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on westbound mainlanes of I-410 from I-35 to Austin Highway (Loop 368) for cap work.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should use next exit ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
- Tuesday, May 30 until Saturday, June 3. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit ramps.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on westbound mainlanes of I-410 from I-35 to Austin Highway (Loop 368) for cap work.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should use next exit ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410 and entrance ramp closure from Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work. Traffic should follow detour signs.
- Sunday, June 4 until Saturday, June 10. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and exit ramp closure of I-410 from Perrin Creek to Perrin Beitel for drilled shaft work. Traffic to use next exit ramp.
I-410 – East San Antonio
- Continuing through Thursday, June 1. DAILY alternating northbound and southbound I-410 frontage road closures between I-10 and Rigsby Ave. from 9 a.m. to 4 p.m. for bridge and road work. (No closures on Sundays)
- Thursday, June 1 through Thursday, June 15. NIGHTLY alternating northbound and southbound I-410 mainlane closures from FM 78 (Old Seguin Rd.) to E. Houston St. from 8 p.m. to 5 a.m. Detour: Use next on-ramp.
SH 151 – West Bexar County
- Tuesday, May 30 until Thursday, June 1. Single lane closure on the westbound frontage road from Wiseman Blvd. to Loop 1604 for barrier installation.
FM 1535 – N.W. Military Highway
- Tuesday, May 30 until Friday, June 2. 7 a.m. to 6 p.m. Various lane closures, in both directions, from Loop 1604 to Huebner Rd for sidewalk construction.
PA 1502 – Wurzbach Parkway
- Current until Saturday, May 27. 9 p.m. to 5 a.m. Various lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for barrier movement.
US 90 – West San Antonio/Bexar
County/Medina County
- Tuesday, May 30 until Thursday, June 1. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes at Loop 410 for deck repairs.
- Tuesday, May 30 until Friday, June 2. 9 a.m. to 3 p.m. Single eastbound lane closure from FM 471 to Mechler Lane for cable barrier work.
LP 345 – Fredericksburg Road
- Monday, May 29 until Tuesday, June 6. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, from I-10 to Loop 410 for pavement operations.
SH 16 – Bandera Road
- Tuesday, May 30 until Friday, June 2. 9 a.m. to 3 p.m. Single lane closure at the FM 1560 intersection for utility work.
- Tuesday, May 30 until Friday, June 2. 9 a.m. to 3 p.m. Single lane closures, in both directions, from Loop 1604 to Circle A for sidewalk installation.