Loop 1604 – North West San Antonio/Bexar
County
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for
portable concrete traffic barrier installation. Nightly
alternating mainlane closures. One lane to remain open at all times. Excluding
weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for
portable concrete barrier installation. Nightly alternating mainlane closures.
One lane to remain open at all times. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane
to remain open at all times. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for portable concrete traffic barrier installation. Nightly alternating
frontage road closures. One lane to remain open at all times. Excluding
weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Westbound to eastbound turnaround closure at Loop 1604 and La Cantera
Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be
closed at a time on each direction. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions,
including turnarounds) for bridge construction – concrete rail demolition. Only
one intersection to be closed at a time. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Hausman Road full intersection closure (both directions,
including turnarounds) for bridge construction – concrete rail demolition. Only
one intersection to be closed at a time. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Loop 1604 and Kyle Seale Parkway full intersection closure (both directions,
including turnarounds) for bridge construction – concrete rail demolition. Only
one intersection to be closed at a time. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 8 p.m. until 5 a.m. Eastbound
frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to
IH-10 for eastbound direct connector bridge construction. Nightly frontage road
full closure. Only one full frontage lane closure to occur per direction. Excluding
weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 8 p.m. until 5 a.m.
Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La
Cantera Parkway for westbound collector distributor bridge construction.
Nightly frontage road full closure. Only one full frontage lane closure to
occur per direction. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m. IH-10
eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound
collector distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound
collector distributor bridge construction on the bridge at Leon Creek. Nightly
closure. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m.
Loop 1604 westbound new exit ramp to La Cantera Parkway closure for westbound
direct connector bridge construction. Nightly closure. Excluding weekends.
- Sunday, July 30 until Monday, Aug. 14. Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound new entrance ramp from IH-10 closure for westbound direct
connector bridge construction. Nightly closure. Excluding weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to
IH-10 for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures.
One lane to remain open at all times. Excluding weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH
16) for traffic barrier, sidewalk construction and beam placement/bridge
construction. Daily alternating frontage road closures. One lane to remain open
at all times. Excluding weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for
bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Eastbound to Westbound turnaround closure at Loop 1604 and Chase Hill
Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed
at a time. Excluding weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway
for bridge widening. Only one turnaround to be closed at a time. Excluding
weekends.
- Monday, July 31 until Monday, Aug. 14. Weekdays 9 a.m. until 3 p.m.
Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for
bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
- Friday, Aug. 4 at 9 p.m. until Monday, Aug. 7. at 5 a.m. FULL WEEKEND
CLOSURE. Westbound mainlane full closure from Kyle Seale Parkway exit ramp to Bandera
Road entrance ramp for concrete barrier relocation. Mainlane traffic will
detour to the frontage roads.
- Monday, July 31 until Monday, Aug. 14. 12 a.m. until 12 a.m. Eastbound
mainlane entrance ramp closure after La Cantera Parkway for eastbound direct
connector bridge construction. Weather permitting.
- Monday, July 31 until Monday, Aug. 14. 12 a.m. until 12 a.m. Eastbound
to westbound turnaround closure at Loop 1604 and Hausman Road for bridge
widening/retaining walls.Only one turnaround to be closed at a time.
- Monday, July 31 until Monday, Aug. 14. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge
widening/retaining walls.Only one turnaround to be closed at a time.
- Monday, July 31 until Monday, Aug. 14. 12 a.m. until 12 a.m. Eastbound
to westbound turnaround closure at Loop 1604 and Babcock Road for bridge
widening/retaining walls.Only one turnaround to be closed at a time.
- Monday, July 31 until Monday, Aug. 14. 12 a.m. until 12 a.m. Westbound
to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge
widening/retaining walls.Only one turnaround to be closed at a time.
Loop 1604 – North Central San Antonio/Bexar
County
- Sunday, July 30 until Friday, August 4. Nightly 9 p.m. until 5 a.m.
Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway
exit ramp for barrier setting and striping.
- Sunday, July 30 until Friday, August 4. Nightly 9 p.m. until 5 a.m. Alternating
westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road
for barrier setting and striping.
- Sunday, July 30 until Friday, August 4. Nightly 9 p.m. until 5 a.m.
Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway
exit ramp for barrier setting and striping.
- Sunday, July 30 until Friday, August 4. Nightly 9 p.m. until 5 a.m.
Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to
IH-10 for barrier setting and striping.
- Monday, July 31 until Friday August 4. Nightly 9 p.m. until 5 a.m. Westbound
mainlane right lane closure from the Lockhill Selma Road entrance ramp to the
IH-10 interchange exit ramps for setting bent caps.
- Monday, July 31 until Friday August 4. Nightly 9 p.m. until 5 a.m.
Westbound mainlane exit ramp to the frontage road / IH-10 intersection for
setting bent caps.
- Monday, July 31 until Friday August 4. Nightly 9 p.m. until 5 a.m.
Westbound mainlane entrance ramp closure from Lockhill Selma Road for setting
bent camps. Auxiliary lane will be closed.
- Wednesday, August 2 until Saturday, August 5. Nightly 9 p.m. until 5 a.m. Eastbound
mainlane right lane closure from the IH-10 interchange to Tradesman Road will
be closed for setting eastbound direct connector bent caps.
- Wednesday, August 2 until Saturday, August 5. Nightly 9 p.m. until 5 a.m. IH-10 westbound
mainlane exit ramp/direct connector to the Loop 1604 eastbound mainlanes will
be closed for setting eastbound direct connector bent caps.
- Wednesday, August 2 until Saturday, August 5. Nightly 9 p.m. until 5 a.m. IH-10 eastbound
cloverleaf exit ramp to Loop 1604 eastbound mainlanes will be closed for
setting eastbound direct connector bent caps.
- Wednesday, August 2 until Saturday, August 5. Nightly 9 p.m. until 5 a.m. Eastbound
collector distributor through / left lane to Loop 1604 eastbound mainlanes will
be closed for setting eastbound direct connector bent caps.
- Sunday, July 30 until Sunday, August 6. Daily/Nightly 12 a.m. until 12
p.m. Westbound to Eastbound turnaround long term closure at Loop 1604 and NW
Military Highway for bridge substructure. This closure will remain in place for
approximately 4 weeks.
- Friday, August 4 at 9 p.m. until Monday, August 8 at 5 a.m. FULL WEEKEND
CLOSURE. Westbound mainlane full closure from the Blanco Road exit ramp to the
Bitters Road entrance ramp for drainage crossing. Full lane closures will
remain in place for the entire duration. Mainlane traffic will detour to the
frontage roads.
Loop 1604 – North East San Antonio/Bexar
County
- Sunday, July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Exit
ramp closure on eastbound mainlanes of Loop 1604 from Lookout Road to
IKEA-RBFCU Parkway for striping work. Traffic should use prior exit ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on the eastbound Loop 1604
collector ramp at the I-35 interchange for striping work.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to
Lookout Road for striping work. Traffic should use prior exit ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and
entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for
striping work. Traffic should use next entrance ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604,
entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from
Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and
next entrance ramps.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604
from Nacogdoches Road to I-35 and exit ramp closure to Nacogdoches Road for
barrier work. Traffic should use next exit ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of
Loop 1604, right lane entrance ramp closure, and turnaround closure from
Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should
use Lookout Road intersection.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of
Loop 1604 from Lookout Road to I-35 for striping and barrier work.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from
Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work.
Traffic should use Lookout Road intersection.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at
Lookout Road for demolition work. Traffic should use Lookout Road intersection.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and
entrance ramp closure on westbound Loop 1604 from I-35 to Nacogdoches Road for
barrier work. Traffic should use prior exit and next entrance ramps.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at
Lookout Road for construction work. Traffic should use Lookout Road
intersection.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road,
exit ramp closure, and entrance ramp closure of Loop 1604 from Union Pacific
Railroad and Nacogdoches Road for barrier work. Traffic should use next
available ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of
Loop 1604 from I-35 to Lookout Road for construction entrance and temporary
pavement work.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to
Lookout Road for pavement and striping work. Traffic should use next exit ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604 connector ramp
from southbound I-35 to Lookout Road for striping work. Traffic should use next
exit ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from
Lookout Road to Union Pacific Railroad for retaining wall demolition work.
Traffic must use Nacogdoches Road turnaround.
I-10 – North West San Antonio/Bexar County
- Sunday, July 30 until Friday,
Aug. 11. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage
road closure from De Zavala Road to Camp Bullis Road for portable concrete
traffic barrier installation. Nightly alternating frontage closures. One lane
to remain open at all times. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De
Zavala Road for portable concrete traffic barrier installation. Nightly
alternating frontage closures. One lane to remain open at all times. Excluding
weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala
Road for portable concrete traffic barrier installation. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m. IH‑10
westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure
for portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m. IH‑10
westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera
Parkway (braided ramp) full closure for portable concrete traffic barrier installation.
Nightly closures. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m. IH‑10
westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete
traffic barrier installation. Nightly closures. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m. IH‑10
eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604 interchange
full closure for bridge construction. Nightly closures. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable
concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from Loop 1604 westbound to IH-10 eastbound for
portable concrete traffic barrier installation. Nightly closures. Excluding
weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Ramp/cloverleaf full closure from IH-10 westbound to Loop 1604 westbound for
portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill
Selma Road to Valero Way overhead sign bridge removal. Nightly alternating
mainlane closures. One lane to remain open at all times. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp
to the Lockhill Selma Road entrance ramp for overhead sign bridge removal.
Nightly alternating mainlane closures. One lane to remain open at all times.
Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
IH-10 westbound frontage road full closure from UTSA Boulevard to the Loop 1604
interchange for bridge construction. Nightly frontage road closure. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m. Loop
1604 westbound collector distributor from Vance Jackson Road to Valero Way and the
Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile
construction under the IH-10 and Loop 1605 interchange. Nightly closures.
Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m.
Loop 1604 eastbound collector distributor from Valero Way to Vance Jackson Road
closure for micropile construction under the IH-10 and Loop 1605 interchange.
Nightly closures. Excluding weekends.
- Sunday, July 30 until Friday, Aug. 11. Weeknights 9 p.m. until 5 a.m. IH-10
westbound entrance ramp between De Zavala Road and UTSA Boulevard full closure
for concrete barrier relocation. Nightly closures. Excluding weekends.
- Monday, July 31 until Friday, Aug. 11. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp
Bullis Road to set portable concrete barrier. Daily alternating frontage road
closures. One lane to remain open at all times. Excluding weekends.
- Monday, July 31 until Friday, Aug. 11. Weekdays 9 a.m. until 3 p.m.
Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to
De Zavala Road to set portable concrete barrier. Daily alternating frontage
road closures. One lane to remain open at all times. Excluding weekends.
US 281 – North San Antonio/Bexar County
- Saturday, July 29. 7 a.m. to 3 p.m. Exit
ramps to Stone Oak Parkway closed in both directions for sign installation.
- Monday, July 31 until Saturday, August 5. 9
a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both
directions, from Marshall Rd. to Borgfeld Rd. for concrete work.
- Monday, July 31 until Saturday, August 5. 9
a.m. to 3 p.m. 9 a.m. Alternating lane closures on the frontage roads, in both
directions, at Bulverde Rd. for paving operations.
- Monday, July 31 until Saturday, August 5. 9
a.m. to 3 p.m. Alternating lane and ramp closures on the northbound frontage
road from Overlook Parkway to Bulverde Rd. for asphalt work.
- Monday, July 31 until Saturday, August 5. 9
a.m. to 3 p.m. Alternating lane closures, in both directions, at Marshall Rd.
for paving operations.
I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County
- Current
until Wednesday, August 2, long-term closure (24/7). Left lane closure on
southbound frontage road of I-35 at Fratt Road for construction work.
- Current
until Wednesday, August 2, long term closure (24/7). Left lane closure on
southbound I-35 frontage road between Toepperwein Road and Judson Road for soil
nail wall, drill shaft, column, and cap work.
- Current
until Tuesday, August 15, long-term closure (24/7). Left lane closure on
southbound frontage road of I-35 from Old Austin Road to Forum Parkway for
temporary pavement, striping, barrier, column, and cap work. Traffic should
follow detour signs.
- Current
until Saturday, December 23 long-term closure (24/7). Alternating lane closures
on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind
Drive for roadway reconstruction and structural work.
- Sunday, July 30 until Saturday, August 5. 9:00 p.m.
to 5:00 a.m. Multiple lane closures (3) on northbound
mainlanes and entrance ramp closure of I-35 from Evans Road to Roy Richard
Drive for striping, barrier, and temporary pavement work. Traffic should use
next entrance ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Schertz Parkway to Roy Richard Drive for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Evans Road to Schertz Parkway for striping, barrier, and
temporary pavement work. Traffic should use next exit and entrance ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Schertz Parkway to Evans Road for striping, barrier, and
temporary pavement work. Traffic should follow signs to next available ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Roy Richard Drive to Schertz Parkway for striping,
barrier, and temporary pavement work. Traffic should use next exit and entrance
ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on southbound mainlanes and entrance ramp closure of I-35 from Roy Richard
Drive to Evans Road for striping, barrier, and temporary pavement work. Traffic
should use next entrance ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Southbound to
northbound I-35 turnaround closure at Corporate Drive for striping, barrier,
and temporary pavement work. Traffic should use Corporate Drive intersection.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road of I-35 at Forum Parkway for striping,
barrier, and temporary pavement work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to
Evans Road for striping, barrier, and temporary pavement work. Traffic should
use next exit ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Forum Parkway to Evans Road for striping, barrier, and
temporary pavement work. Traffic should use next exit and entrance ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, exit ramp closure, and entrance ramp
closure of I-35 from Forum Parkway to Evans Road for striping, barrier, and
temporary pavement work. Traffic should use next exit and entrance ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road of I-35 from Old Austin Road to Forum Parkway for
temporary pavement, striping, and barrier work. Traffic should follow detour signs.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 from Olympia Parkway to Gateway
Boulevard for bridge foundation, temporary pavement, striping and barrier work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway
for bridge foundation, striping, barrier work, and temporary pavement work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on southbound mainlanes and entrance ramp closure of I-35 from Retama
Parkway to Forum Parkway for striping work. Traffic should use next entrance
ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Traffic shift to the
left on eastbound Evans Road and alternating lane closures on southbound
frontage road of I-35 at Evans Road for temporary pavement work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Northbound to
southbound I-35 turnaround closure at Evans Road for striping, barrier, and
temporary pavement work. Traffic should use Evans Road intersection.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on southbound mainlanes, exit ramp closure, and entrance ramp closure of
I-35 from Corporate Drive to Olympia Parkway for striping, barrier, and
temporary pavement work. Traffic should use prior exit ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat
Booker Road for striping and barrier work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for
striping, barrier, and temporary pavement work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Southbound I-35
entrance ramp closure from Old Austin Road to Forum Parkway for striping and
barrier work. Traffic must use the Forum Parkway turnaround and follow detour
signs to access southbound I-35.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Full closure on
northbound I-35 collector ramp at the Loop 1604 interchange for striping,
barrier, and construction entrance work. Traffic should follow detour signs.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Northbound I-35 to
westbound Loop 1604 connector ramp closure for striping and barrier work.
Traffic should follow the detour signs.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to
northbound I-35 connector ramp closure for striping and barrier work. Traffic
should follow detour signs.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating ramp
closures on southbound I-35 connector ramp to Pat Booker Road for striping,
barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172)
and follow the detour signs to Pat Booker Road.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to
southbound I-35 connector ramp closure for striping and barrier work. Traffic
must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to
southbound I-35 connector ramp closure for earthwork. Traffic must exit at
Lookout Road and follow the detour signs to southbound I-35.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Southbound I-35 to
eastbound Loop 1604 connector ramp closure for striping, barrier, and
earthwork. Traffic must exit at westbound Loop 1604 and follow the detour signs
to access eastbound Loop 1604.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Southbound I-35
collector ramp closure at the Loop 1604 interchange for striping and barrier
work. Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and
follow detour signs.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Southbound I-35 to
westbound Loop 1604 connector ramp closure and alternating lane closures on
southbound mainlanes of I-35 at the exit to Loop 1604 for striping and barrier
work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and
follow the detour signs to Loop 1604.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(2) on northbound mainlanes of I-35, alternating exit ramp closures, and
entrance ramp closure from Toepperwein Road to Loop 1604 for barrier setting
and structures work. Traffic should follow the detour signs to the available
ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on northbound mainlanes of I-35 from I-35 Access Road to Forum Parkway for
striping, barrier, and temporary pavement work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, and flagging operation on I-35 Access
Road from I-35 Access Road to Loop 1604 interchange for striping, barrier, and
temporary pavement work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Full closure on northbound
frontage road of I-35 and entrance ramp closure from Shin Oak Road to Pat
Booker Road for striping, barrier, and temporary pavement work. Traffic should
follow detour signs.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Full closure of
northbound frontage road, exit ramp closure, and entrance ramp closure of I-35
from Pat Booker Road to Loop 1604 interchange for striping, barrier, and
temporary pavement work. Traffic should follow detour signs.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to
Toepperwein Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure
from Pat Booker Road to Judson Road for structures work. Traffic should use
next entrance and exit ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple right lane
closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp
closure, and left lane closures (2) on southbound frontage road of I-35 from
Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic
should use next entrance and exit ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping
work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on eastbound and westbound lanes of Pat Booker Road under I-35
mainlanes for restriping and barrier work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Right lane closure on
northbound frontage road of I-35 from O’Connor Road to Judson Road for pothole
work.
- Sunday,
July 30, until Saturday, August 5, 9:00 PM to 5:00 AM. Alternating lane
closures on northbound frontage road, entrance ramp closure, and alternating
exit ramp closures of I-35 from Judson Road to Shin Oak Drive for barrier work.
Traffic should follow the detour sign to the available ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on northbound frontage road, right lane closure on northbound
mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Gunn Road,
right lane closure on the eastbound and westbound at the intersection of Judson
Road and Randolph Boulevard and left lane closure on Randolph Boulevard at
Judson Road for temporary pavement and signal works. Traffic should use the
next exit ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple right lane
closures (2) on northbound mainlanes of I-35, entrance ramp closure, and
alternating exit ramp closures from O’Connor Road to Toepperwein Road for
barrier setting and structures work. Traffic should follow the detour signs to
the available ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 from Judson Road to O’Connor Road
for earthwork, paving, striping, and barrier work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Right lane closure on
southbound mainlanes of I-35, exit ramp closure, and left lane closure on
southbound frontage road of I-35 at O’Connor Road for barrier work. Traffic
should use next exit.
- Sunday,
July 30, until Saturday, August 5, 9:00 PM to 5:00 AM. Right lane closure on westbound
and eastbound of Toepperwein Road at I-35 for barrier work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on southbound mainlanes of I-35, exit ramp closure, and left lane closure
on southbound frontage road of I-35 from Toepperwein Road to Judson Road for
earthwork and barrier work. Traffic should use next exit ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on northbound mainlanes of I-35 from Thousand Oaks Drive to Weidner Road
for striping and barrier work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on northbound mainlanes of I-35 from Weidner Road to Bludau-Bishop Road for
striping and barrier work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(2) on northbound frontage road, entrance ramp closure, and exit ramp closures
of I-35 from Thousand Oaks Drive to Weidner Road for earthwork and striping.
Traffic should follow the detour signs to the available ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(2) on northbound frontage road, alternating entrance ramp closures, and exit
ramp closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and
striping. Traffic should follow the detour signs to the available ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35, entrance ramp closure, and exit
ramp closure from O’Connor Road to Weidner Road for drainage and barrier work.
Traffic should use next entrance and exit ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 and entrance ramp closure from
Weidner Road to Thousand Oaks Drive for earthwork, drainage and barrier work.
Traffic should use prior entrance ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(3) on southbound mainlanes, alternating entrance and exit ramp closures, and
alternating lane closures on southbound frontage road of I-35 from O’Connor
Road to Weidner Road for striping work. Traffic should use the next exit and
entrance ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(2) on southbound mainlanes, entrance ramp closure, exit ramp closure, and
alternating lane closures on southbound frontage road of I-35 from Weidner Road
to Thousand Oaks Drive for striping work. Traffic should use the next exit and
entrance ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(2) on northbound mainlanes of I-35 from Randolph Boulevard to Thousand Oaks
for barrier setting.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane
closures on southbound frontage road of I-35 and exit ramp closure from
Thousand Oaks Drive to Randolph Boulevard for permanent widening work. Traffic
should use prior exit ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604
collector to southbound I-35 connector ramp closure for barrier work. Traffic
should follow the detour signs.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Exit ramp closure on
northbound mainlanes and left lane closure on northbound frontage road of I-35
from Walzem Road to Crestwind Drive for drilled shaft work. Traffic should use
prior exit ramp.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Southbound to
northbound turnaround closure at Walzem Road, alternating lane closures on
northbound frontage road, and alternating entrance ramp closure of I-35 from
Walzem Road to Crestway Drive for striping and barrier work. Traffic should
follow detour signs for available ramps.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(2) on northbound and southbound of Interchange Parkway from Austin Highway
(Loop 368) to Walzem Road and multiple lane closures (2) on eastbound and
westbound of Fratt Road from I-35 southbound frontage road to Austin Highway
(Loop 368) for barrier work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph
Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour
signs.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Multiple lane closures
(2) on northbound mainlanes of I-35 and alternating lane closure on exit ramp
from Walzem Road to Randolph Boulevard for barrier setting.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Exit ramp closure on
southbound mainlanes and alternating lane closures on southbound frontage road
of I-35 from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft,
and column work. Traffic to use next exit ramp.
- Sunday, July 30 until Saturday, August 5. 9:00 p.m.
to 5:00 a.m. Right lane closure on southbound mainlanes of
I-35 from Randolph Boulevard to Walzem Road for cap work.
- Sunday,
July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Entrance ramp closure
on southbound frontage road of I-35 from Fratt Drive to Walzem Road for drilled
shaft and column work. Traffic to use next entrance ramp.
- Sunday, August 6 until Saturday, August 12. 9:00 pm.
to 5:00 a.m. Full closure of eastbound and westbound of Pat
Booker Road at I-35 for beam setting. Traffic should follow detour signs.
- Sunday,
August 6 until Saturday, August 12. 9:00 pm. to 5:00 a.m. Full closure on
southbound frontage road and northbound to southbound turnaround closure of
I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic
should follow detour signs. Accommodations will be made for local traffic.
- Sunday,
August 6 until Saturday, August 19. 9:00 p.m. to 5:00 a.m. Full closure on
southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to
Toepperwein Road for cap form erection work. Accommodations will be made for
local traffic. Southbound frontage road of I-35 traffic must follow detour.
- Monday,
August 7 until Wednesday, August 9. 9:00 p.m. to 5:00 a.m. Full closure
eastbound and westbound on I-35 Access Road near Shin Oak Drive for beam
setting. Traffic should follow detour sign.
- Monday,
August 7 until Saturday, August 12. 9:00 p.m. to 5:00 a.m. Multiple right lane
closures (3) and entrance ramp closure on southbound I-35 from Loop 1604 to
I-35 Access Road near Shin Oak Drive for beam setting.
I-10 – East San Antonio/Bexar County/Guadalupe
County
- Sunday,
July 30 until Friday, August 4. 9 p.m. to 6 a.m. Full westbound mainlane
closure from Scenic Loop to FM 1516 for overhead sign installation.
- Friday,
August 4 through Monday, August 7. FULL CLOSURE of I-10 and I-410 interchange
from 8 p.m. Friday (8/4) thru 5 a.m. Monday (8/7). All east and westbound I-10 traffic
diverted to frontage roads and other routes. Expect long delays. Seek alternate
routes.
I-410 – North East San Antonio
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of
I-410, entrance ramp closure, and eastbound to westbound turnaround closure
between Starcrest Drive and Perrin Beitel for striping and barrier work.
Traffic should use next entrance ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of
I-410, entrance ramp closure, and right mainlane closure from Perrin Beitel to
Austin Highway (Loop 368) for striping and barrier work. Traffic should follow
detour signs.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlanes of
I-410 from Starcrest Drive to Austin Highway (Loop 368) for barrier setting.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound I-410 connector
ramp to southbound I-35 for column work.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlane of
I-410 from Austin Highway (Loop 368) to Randolph Boulevard for barrier work.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and
exit ramp closure of I-410 from Perrin Creek to Perrin Beitel for drilled shaft
work. Traffic to use next exit ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on westbound I-410 mainlanes
from I-35 to Austin Highway (Loop 368) for cap and barrier work.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on westbound mainlanes and
exit ramp closure of I-410 from I-35 to Perrin Beitel for striping and barrier
work. Traffic should use next exit ramp.
- Sunday, July 30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound
frontage road of I-410 from Randolph Boulevard to Perrin Creek for drill shaft
mobilization.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Entrance ramp closure on westbound frontage road and
exit ramp closure of I-410 to Austin Highway (Loop 368) for barrier work.
Traffic should follow detour signs.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Entrance ramp closure on northbound Austin Highway (Loop
368) to eastbound I-410 for barrier work. Traffic should use next entrance
ramp.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway
(Loop 368) from Walzem Road to Interchange Parkway for barrier work.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway
(Loop 368) connector ramp to westbound I-410 for barrier work.
- Sunday, July 30 until Saturday, August 5.
9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp
closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry
Wurzbach Road for striping and barrier work. Traffic should use next entrance
ramp.
- Sunday, July
30 until Saturday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane closures
on eastbound frontage road of I-410, entrance ramp closure, and exit ramp
closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier
work. Traffic should use prior entrance and exit ramps.
I-410 – East San Antonio
- Friday, July 28 through Monday, July 31.
FULL WEEKEND CLOSURE. All southbound and northbound I-410 lanes closed at the I-10
interchange from 8 p.m. Friday (7/28) thru 5 a.m. Monday (7/31). Detour: Southbound
I-410 traffic will exit to westbound I-10, exit W.W. White, turn around at the intersection,
continue on the frontage road, and enter I-410 at the next ramp. Northbound
traffic will merge to the northbound I-410 connector and back to the I-410 mainlanes.
- Friday, August 4
through Monday, August 7. FULL WEEKEND CLOSURE. All eastbound and westbound
I-10 lanes and all northbound I-410 lanes at the I-10 interchange closed from 8
p.m. Friday (8/4) thru 5 a.m. Monday (8/7). All northbound I-410 traffic detoured
to Rigsby turnaround and back to northbound I-410. All east and westbound I-10
traffic detoured to the frontage roads and collectors. Southbound I‑410 lanes
will remain open. Expect long delays. Seek alternate routes.
PA 1502 – Wurzbach Parkway
- Current until Monday, July 31. 9
a.m. to 3 p.m. Alternating lane closures, in both directions from N.W. Military
Highway to Weidner Rd. for roadway improvements.
- Sunday, August 6 until Friday,
September 1. 8 p.m. to 5 a.m. Various lane closures, in both directions, from
N.W. Military Highway to Wetmore Rd. for paving operations.
FM 1535 – Northwest Military Highway
- Monday, July 31 until Friday, August 4. 7 a.m.
to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to
Huebner Rd. for sidewalk, ramp and curb installations.
SH 16 – Bandera Road
Monday, July 31 until Friday, August 4. 9 a.m. to 3 p.m. Single lane closures,
in both directions, from Loop 1604 to Circle A for curb and sidewalk
construction.
SH 151 – West San Antonio/Bexar County
- Wednesday, August 2 until Saturday, August 5. 9 a.m. to 3 p.m. Single
lane closure on the eastbound frontage road from Potranco Rd. to Ingram Rd. for
light installation.
- Thursday, August 3 until Saturday, August 5. Full eastbound mainlane closure
from Potranco Rd. to Loop 410 for striping operations.
I-10 Kendall County
- Saturday, July 29. 9 a.m. to 3 p.m. Rolling mainlane closures, in both
directions, from Scenic Loop to Fredericks Creek for vegetation work.
- Monday, July 31 until Tuesday, August 1. 9 a.m. to 3 p.m. Various
mainlane closures, in both directions, at Scenic Loop Rd. for maintenance work.
- Monday, July 31 until Friday, August 4. Westbound exit ramp 540 closed
for inlet work.
- Monday, July 31 until Friday, August 4. 9 a.m. to 3 p.m. Single lane
closures on the frontage roads, in both directions, from SH 46 to Scenic Loop
Rd. for sod placement.
SH 16 – Kerr County
- Monday, August 7 until Tuesday, August 8. 7 a.m. to 5 p.m. Various lane
closures, in both directions, at Draw Bridge for milling and paving.
- Wednesday, August 9 until Thursday, August 10. 7 a.m. to 5 pm. Various
lane closures, in both directions, at Rattlesnake Creek for milling and paving
operations.
- Friday, August 11 until Monday, August 14. 7 a.m. to 5 p.m. Various lane
closures, in both directions, at Wolf Creek Bridge for milling and paving
operations.