Friday, August 18

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 8 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 8 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound new exit ramp to La Cantera Parkway closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, Aug. 20 until Monday, Aug. 28. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound new entrance ramp from IH-10 closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Eastbound to Westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Aug. 21 until Monday, Aug. 28. 12 a.m. until 12 a.m. Eastbound mainlane entrance ramp closure after La Cantera Parkway for eastbound direct connector bridge construction. Weather permitting.
  • Monday, Aug. 21 until Monday, Aug. 28. 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, Aug. 21 until Monday, Aug. 28. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, Aug. 21 until Monday, Aug. 28. 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, Aug. 21 until Monday, Aug. 28. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Tuesday, Aug. 22 until Monday, Aug. 28. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, August 20 until Friday, August 25. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, August 20 until Friday, August 25. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, August 20 until Friday, August 25. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, August 20 until Friday, August 25. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.
  • Monday, August 21 until Wednesday, August 23. Nightly 9 p.m. until 5 a.m. Eastbound mainlanes from the NW Military Highway exit ramp to the NW Military Highway entrance ramp will be fully closed to set panels on the NW Military Highway bridge. Off-duty officers to direct traffic through intersections.
  • Monday, August 21 until Wednesday, August 23. Nightly 9 p.m. until 5 a.m. Westbound mainlanes from the NW Military Highway exit ramp to the NW Military Highway entrance ramp will be fully closed to set panels on the NW Military Highway bridge. Off-duty officers to direct traffic through intersections.
  • Monday, August 21 until Wednesday, August 23. Nightly 9 p.m. until 5 a.m. Loop 1604 at the NW Military Highway intersection will be fully closed, including turnarounds to set panels on the NW Military Highway bridge. Off-duty officers to direct traffic through intersections.
  • Sunday, August 20 until Sunday, August 27. Daily/Nightly 12 a.m. until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604 and NW Military Highway for bridge substructure. This closure will remain in place for approximately 4 weeks.
  • Sunday, August 20 until Sunday, August 27. Daily/Nightly 12 a.m. until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604 and Lockhill Selma Road for wall construction. This closure will remain in place for approximately 4 weeks.
  • Friday, August 18 at 9 p.m. until Monday, August 21 at 5 a.m. FULL WEEKEND CLOSURE. Westbound mainlane full closure from the Blanco Road exit ramp to the NW Military Highway entrance ramp for drainage crossing. Full lane closures will remain in place for the entire duration. Mainlane traffic will detour to the frontage roads. Off-duty officers to direct traffic through intersections
  • Friday, August 18 at 9 p.m. until Monday, August 21 at 5 a.m. FULL WEEKEND CLOSURE. Eastbound mainlanes from the NW Military Highway exit ramp to the NW Military Highway entrance ramp will be closed to set beams on the NW Military Highway bridge. Full lane closures will remain in place for the entire duration. Mainlane traffic will detour to the frontage roads. Off-duty officers to direct traffic through intersections.
  • Friday, August 18 at 9 p.m. until Monday, August 21 at 5 a.m. FULL WEEKEND CLOSURE. Westbound mainlanes from the NW Military Highway exit ramp to the NW Military Highway entrance ramp will be closed to set beams on the NW Military Highway bridge. Full lane closures will remain in place for the entire duration. Mainlane traffic will detour to the frontage roads. Off-duty officers to direct traffic through intersections.
  • Friday, August 18 at 9 p.m. until Monday, August 21 at 5 a.m. FULL WEEKEND CLOSURE. NW Military Highway northbound and southbound mainlanes at the Loop 1604 intersection will be closed, including turnarounds to set beams on the NW Military Highway bridge. Full lane closures will remain in place for the entire duration. Mainlane traffic will detour to the frontage roads. Off-duty officers to direct traffic through intersections. 

Loop 1604 – North East San Antonio/Bexar County

  • Current until Tuesday, August 22 (24/7). Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for utility work. Traffic must use Nacogdoches Road turnaround.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35 to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic should use Lookout Road intersection.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should use Lookout Road intersection.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for construction work. Traffic should use Lookout Road intersection.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to I-35 and exit ramp closure to Nacogdoches Road for barrier work. Traffic should use next exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic should use next entrance ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and next entrance ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for striping work. Traffic should use prior exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work. Traffic should use Lookout Road intersection.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road, exit ramp closure, and entrance ramp closure of Loop 1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic should use next available ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from I-35 to Lookout Road for construction entrance and temporary pavement work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use next exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604 connector ramp from southbound I-35 to Lookout Road for striping work. Traffic should use next exit ramp. 

Loop 1604 – West San Antonio/Bexar County

  • Wednesday, August 23 until Thursday, August 24. 9 p.m. to 5 a.m. Full closure of the northbound mainlanes at Culebra Rd. for sign repairs. 

I-10 – North West San Antonio/Bexar County

  • Monday, August 21 until Friday, August 25. 9 a.m. to 8 p.m. Single lane closure on the southbound frontage road at La Cantera Parkway for repairs.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604 interchange full closure for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from Loop 1604 westbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from IH-10 westbound to Loop 1604 westbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill Selma Road to Valero Way overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp to the Lockhill Selma Road entrance ramp for overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. IH-10 westbound frontage road full closure from UTSA Boulevard to the Loop 1604 interchange for bridge construction. Nightly frontage road closure. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound collector distributor from Vance Jackson Road to Valero Way and the Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile construction under the IH-10 and Loop 1605 interchange. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound collector distributor from Valero Way to Vance Jackson Road closure for micropile construction under the IH-10 and Loop 1605 interchange. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Friday, Aug. 25. Weeknights 9 p.m. until 5 a.m. IH-10 westbound entrance ramp between De Zavala Road and UTSA Boulevard full closure for concrete barrier relocation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Thursday, Aug. 24. Weeknights 11 p.m. until 5 a.m. IH-10 eastbound entrance ramp just after La Cantera Parkway full closure for pedestrian bridge installation. Nightly closures. Excluding weekends.
  • Sunday, Aug. 20 until Thursday, Aug. 24. Weeknights 11 p.m. until 5 a.m. IH-10 eastbound frontage road from the La Cantera Parkway intersection to the entrance ramp just after La Cantera Parkway full closure for pedestrian bridge installation. Nightly closures. Excluding weekends.
  • Monday, Aug. 21 until Friday, Aug. 25. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Aug. 21 until Friday, Aug. 25. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

US 281 – North San Antonio/Bexar County

  • Monday, August 21 until Friday, August 25. 9 a.m. to 4 p.m. Northbound exit ramp at Wilderness Oak closed for concrete work.
  • Monday, August 21 until Friday, August 25. 8 p.m. to 5 a.m. Northbound exit ramp at Wilderness Oak closed for concrete work.
  • Monday, August 21 until Friday, August 25. 8 p.m. to 5 a.m. Northbound exit ramp to Marshall Rd. closed for concrete work.
  • Monday, August 21 until Friday, August 25. 9 p.m. to 5 a.m. Northbound exit ramp north of Stone Oak Parkway closed for concrete work.
  • Monday, August 21 until Friday, August 25. 9 a.m. to 4 p.m. Northbound exit ramp to Bulverde Rd. closed for concrete work.
  • Monday, August 21 until Friday, August 25. 8 p.m. to 5 a.m. Northbound exit ramp to Bulverde Rd. closed for concrete work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Tuesday, August 15, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for temporary pavement, striping, barrier, column, and cap work. Traffic should follow detour signs.
  • Current until Saturday, October 7, long-term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for retaining wall, drilled shaft, column, and cap work.
  • Current until Saturday, December 23 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Current until Saturday, December 30, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Retama Parkway to Old Austin Road for temporary pavement, striping, barrier, column, and cap work.
  • Sunday, August 20 until Friday, August 25. 9:00 p.m. to 5:00 a.m. Full closure on southbound mainlanes and entrance ramp closure of I-35 from O’Connor Road to Weidner Road for overhead sign removal. Traffic should follow signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic should use next entrance ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for barrier work. Traffic should use next exit and entrance ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier work. Traffic should use next exit and entrance ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit and entrance ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure of northbound frontage road of I-35 from Loop 1604 to Forum Parkway for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and barrier work. Traffic should follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and barrier work. Traffic should use next exit and entrance ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Northbound to southbound I-35 turnaround closure at Evans Road for striping, barrier, and temporary pavement work. Traffic should use Evans Road intersection.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary pavement, striping and barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for bridge foundation, striping, barrier work, and temporary pavement work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road for striping and barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge superstructure work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Northbound I-35 to westbound Loop 1604 connector ramp closure for striping and barrier work. Traffic should follow the detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 collector ramp closure at I-35 interchange for barrier work. Traffic should follow the detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the eastbound Loop 1604 collector ramp at the I-35 interchange for striping work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary pavement work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road of I-35 and entrance ramp closure from Shin Oak Road to Pat Booker Road for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for barrier work. Traffic should follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, entrance ramp closure, and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign to the available ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, right lane closure on northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and westbound at the intersection of Judson Road and Randolph Boulevard and left lane closure on Randolph Boulevard at Judson Road for temporary pavement and signal work. Traffic should use the next exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp closure, and alternating exit ramp closures from O’Connor Road to Toepperwein Road for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure on southbound mainlanes of I-35 at O’Connor Road for overhead sign removal. Traffic should follow signs
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road for barrier work. Traffic should use next exit.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks Drive to Weidner Road for striping and barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to Bludau-Bishop Road for striping and barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, entrance ramp closure, and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage and barrier work. Traffic should use next entrance and exit ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and entrance ramp closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and barrier work. Traffic should use prior entrance ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph Boulevard to Thousand Oaks for barrier setting.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road of I-35 from Crestway Drive to Starlight Terrace for barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow detour signs. Accommodations will be made for local traffic.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and exit ramp closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening work. Traffic should use prior exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane closure on exit ramp from Walzem Road to Randolph Boulevard for barrier setting.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound mainlanes and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to Walzem Road for cap work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to Walzem Road for drilled shaft and column work. Traffic to use next entrance ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs.
  • Monday, August 21 until Wednesday, August 23. 9:00 p.m. to 5:00 a.m. Left lane closures (3) on northbound mainlanes of I-35 from Bludau-Bishop Road to Judson Road for utilities work.
  • Monday, August 21 until Friday, August 25. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound mainlanes of I-35 and left lane closure of I-35 from Weidner Road to Loop 1604 for utility work.
  • Monday, August 21 until Friday, August 25. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound and southbound mainlanes of I-35 from Fratt Road to Weidner Road for utility work.
  • Monday, August 21 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for beam staging.
  • Monday, August 21 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) and entrance ramp closure on southbound I-35 from Loop 1604 to I-35 Access Road near Shin Oak Drive.
  • Tuesday, August 22 until Wednesday, August 23. 9:00 p.m. to 5:00 a.m. Full closure on eastbound and westbound I-35 Access Road near Shin Oak Drive at I-35 for beam setting. Traffic should follow detour sign.
  • Tuesday, August 22 until Thursday, August 24. 9:00 p.m. to 5:00 a.m. Left lane closures (3) on northbound mainlanes of I-35 from Crestway Drive to Starlight Terrace for utilities work.
  • Friday, August 25 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound of Pat Booker Road and exit ramp closure to Pat Booker Road at I-35 for beam setting. Traffic should follow detour signs. 

I-410 – North East San Antonio

  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound I-410 for barrier work. Traffic should use next entrance ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem Road to Interchange Parkway for barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway (Loop 368) connector ramp to westbound I-410 for barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work. Traffic should follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on westbound frontage road and exit ramp closure of I-410 to Austin Highway (Loop 368) for barrier work. Traffic should follow detour signs.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway (Loop 368) to Randolph Boulevard for barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive to Austin Highway (Loop 368) for barrier setting.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and exit ramp closure of I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic to use next exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin Highway (Loop 368) for cap and barrier work.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should use next exit ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, August 20 until Saturday, August 26. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit ramps.
  • Monday, August 21 until Wednesday, August 23. 9:00 p.m. to 5:00 a.m. Left lane closure and entrance ramp closure on westbound frontage road of I-410 from Starcrest Drive to Harry Wurzbach Road for utilities work.
  • Tuesday, August 22 until Thursday, August 24. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on westbound frontage road of I-410 at Harry Wurzbach Road for utilities work. Traffic should use next entrance ramp.
  • Tuesday, August 22 until Thursday, August 24. 9:00 p.m. to 5:00 a.m. Left lane closure on eastbound frontage road of I-410 from Nacogdoches Road to Vandiver Road for utilities work.
  • Wednesday, August 23 until Friday, August 25. 9:00 p.m. to 5:00 a.m. Eastbound to westbound turnaround closure and entrance ramp closure on westbound frontage road of I-410 from Perrin Beitel to Starcrest Drive for utilities work. Traffic should use next entrance ramp. 

I-410 – West San Antonio

  • Monday, August 21 until Friday, August 25. 9 p.m. to 5 a.m. Single southbound mainlane closure from Medina Base Rd. to Old Pearsall Rd. for rail work.
  • Monday, August 21 until Tuesday, August 22. 9 p.m. to 5 a.m. Single southbound mainlane closure from Valley Hi to Medina Base Rd. for overhead sign work.
  • Sunday, August 20 until Thursday, August 24. 9 p.m. to 5 a.m. Single northbound mainlane closure from Medina Base Rd. to Old Pearsall Rd. for barrier removal.
  • Monday, August 21 until Friday, August 25. 9 p.m. to 5 a.m. Alternating lane closures on the northbound frontage road from Freedom Hill to Ray Ellison for paving operations.
  • Tuesday, August 22 until Wednesday, August 23. 9 p.m. to 5 a.m. Single southbound mainlane closure at Old Pearsall Rd for sign work. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, September 1. 8 p.m. to 5 a.m. Various lane closures, in both directions, from N.W. Military Highway to Wetmore Rd. for paving operations.
  • Current until Wednesday, August 30. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for barrier work.
  • Tuesday, September 5 until Friday, September 22. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, from N.W. Military Highway to Wetmore Rd. for milling and paving operations. 

FM 1535 – Northwest Military Highway

  • Monday, August 21 until Friday, August 25. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd. for curb and sidewalk installations. 

SH 151 – West San Antonio/Bexar County

  • Current until Friday, September 1. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road at W. Military Dr. for road work.
  • Monday, August 21 until Tuesday, August 29. 9 a.m. to 3 p.m. Alternating lane closures on the westbound frontage road from Potranco Rd. to Ingram Rd. for excavation. 

US 90 – West San Antonio/Bexar County

  • Sunday, August 20 until Friday, September 8. 8:30 p.m. to 5 a.m. Alternating eastbound mainlane closures from Springvale Dr. to Leon Creek bridge for paving operations.
  • Current until Friday, September 1. 9 a.m. to 3:30 p.m. Alternating eastbound mainlane closure from Enrique Barrera overpass to S. Callaghan Rd. for bridge repairs. 

SH 16 – Kerr County

  • Friday, August 18 until Monday, August 21. 7 a.m. to 5 p.m. Alternating lane closures, in both directions, at Wolf Creek Bridge for paving operations.