Friday, September 29

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 8 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 8 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector-distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound collector-distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound collector-distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound exit ramp to La Cantera Parkway closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, Oct. 1 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound entrance ramp from IH-10 closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Monday, Oct. 2 until Monday, Oct. 9. Daily/Nightly 24 hours a day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, Oct. 2 until Monday, Oct. 9. Daily/Nightly 24 hours a day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, Oct. 2 until Monday, Oct. 9. Daily/Nightly 24 hours a day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, October 1 until Friday, October 6. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, October 1 until Friday, October 6. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, October 1 until Friday, October 6. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, October 1 until Friday, October 6. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.
  • Wednesday, October 4 until Saturday, October 7. Nightly 9 p.m. until 5 a.m. Eastbound mainlane right lane closure from the IH-10 interchange to Tradesman Road will be closed for setting eastbound direct connector girders.
  • Wednesday, October 4 until Saturday, October 7. Nightly 9 p.m. until 5 a.m. IH-10 westbound mainlane exit ramp/direct connector to the Loop 1604 eastbound mainlanes will be closed for setting eastbound direct connector girders.
  • Wednesday, October 4 until Saturday, October 7. Nightly 9 p.m. until 5 a.m. IH-10 eastbound mainlanes cloverleaf exit ramp (southwest cloverleaf) to Loop 1604 eastbound mainlanes will be closed for setting eastbound direct connector girders.
  • Wednesday, October 4 until Saturday, October 7. Nightly 9 p.m. until 5 a.m. Eastbound collector-distributor through / left lane to Loop 1604 eastbound mainlanes will be closed for setting eastbound direct connector girders.
  • Friday, October 6 at 9 p.m. until Saturday, October 7 at 5 a.m. Weekend closure. Loop 1604 eastbound mainlanes from the Vance Jackson Road exit ramp to the Lockhill Selma entrance ramp will be fully closed for mill and fill / level up hot mix asphalt concrete.
  • Friday, October 6 at 9 p.m. until Saturday, October 7 at 5 a.m. Weekend closure. IH-10 westbound exit ramp / direct connector to the Loop 1604 eastbound mainlanes will be closed for mill and fill / level up hot mix asphalt concrete.
  • Friday, October 6 at 9 p.m. until Saturday, October 7 at 5 a.m. Weekend closure. IH-10 eastbound mainlane cloverleaf exit ramp (southwest cloverleaf) to the Loop 1604 eastbound mainlanes will be closed for mill and fill / level up hot mix asphalt concrete.
  • Friday, October 6 at 9 p.m. until Saturday, October 7 at 12 p.m. Weekend closure. Loop 1604 eastbound left and middle mainlanes from the Blanco Road entrance ramp to Stone Oak Parkway will be closed for Slip SSTR rail work.
  • Friday, October 6 at 9 p.m. until Monday, October 9 at 5 a.m. Full Weekend closure. Lockhill Selma Road intersection underneath Loop 1604 will be fully closed for storm sewer crossing work. Traffic control devices to remain in place for entire duration until crossing is complete. Off-duty officers will direct traffic thru intersections.
  • Friday, October 6 at 9 p.m. until Monday, October 9 at 5 a.m. Full Weekend closure. Loop 1604 westbound frontage road left lane at Lockhill Selma Road will be closed for storm sewer crossing work. Traffic control devices to remain in place for entire duration until crossing is complete. Off-duty officers will direct traffic thru intersections.
  • Sunday, October 1 until Sunday, October 8. Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long term closure at Loop 1604 and NW Military Highway for bridge substructure. This closure will remain in place for approximately 4 weeks.
  • Sunday, October 1 until Sunday, October 8. Daily/Nightly 24 hours a day. Westbound to Eastbound turnaround long term closure at Loop 1604 and Lockhill Selma Road for wall construction under bridge. This closure will remain in place for approximately 4 weeks.
  • Sunday, October 1 until Sunday, October 8. Daily/Nightly 24 hours a day. Eastbound to Westbound turnaround long term closure at Loop 1604 and Huebner Road for asphalt removal and installation of bore 9-ABCD-3. This closure will remain in place for approximately 2 weeks. 

Loop 1604 – North East San Antonio/Bexar County

  • Tuesday, October 3 until Wednesday, October 4. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes at Bulverde Rd. for bridge repairs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic should use Lookout Road intersection.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should use Lookout Road intersection.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for construction work. Traffic should use Lookout Road intersection.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 and alternating exit ramp closures from Nacogdoches Road to I-35 for barrier work. Traffic should use next exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic should use next entrance ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and next entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection and turnarounds at Loop 1604 for striping work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for striping work. Traffic should use prior exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the eastbound Loop 1604 collector ramp at the I-35 interchange for striping work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 and eastbound bypass closure from Nacogdoches Road to Lookout Road for striping work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for striping. Traffic should follow signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Pat Booker Road at I-35 for striping work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for setting caps. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road turnaround.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road, exit ramp closure, and entrance ramp closure of Loop 1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic should use next available ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and westbound bypass ramp of Loop 1604 from I-35 to Nacogdoches Road for construction entrance and temporary pavement work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use next exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on westbound mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for striping. Traffic should use next entrance ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35 to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work. Traffic should use Lookout Road intersection. 

I-10 – North West San Antonio/Bexar County

  • Sunday, Oct. 1 until Friday, Oct. 6. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604 interchange full closure for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from Loop 1604 westbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from IH-10 westbound to Loop 1604 westbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill Selma Road to Valero Way overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp to the Lockhill Selma Road entrance ramp for overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10 westbound frontage road full closure from UTSA Boulevard to the Loop 1604 interchange for bridge construction. Nightly frontage road closure. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound collector-distributor from Vance Jackson Road to Valero Way and the Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile construction under the IH-10 and Loop 1605 interchange. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound collector-distributor from Valero Way to Vance Jackson Road closure for micropile construction under the IH-10 and Loop 1605 interchange. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10 westbound entrance ramp between De Zavala Road and UTSA Boulevard full closure for concrete barrier relocation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 11 p.m. until 5 a.m. IH-10 eastbound entrance ramp just after La Cantera Parkway full closure for pedestrian bridge installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 11 p.m. until 5 a.m. IH-10 eastbound frontage road from the La Cantera Parkway intersection to the entrance ramp just after La Cantera Parkway full closure for pedestrian bridge installation. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road, directly under the Loop 1604 interchange full closure for bridge foundation construction. Nightly closures. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound exit ramp onto IH-10 eastbound full closure for removing column concrete forms. Nightly closure. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound frontage road at IH-10 interchange full closure for removing column concrete forms. Nightly closure. Excluding weekends.
  • Sunday, Oct. 1 until Friday, Oct. 6. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10 eastbound frontage road for bridge foundation construction. Nightly closures. Excluding weekends.
  • Monday, Oct. 2 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Oct. 2 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Oct. 2 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10 eastbound frontage road for bridge foundation construction. Daily closures. Excluding weekends.
  • Thursday, Sept. 28 until Friday, Oct. 6. Daily/Nightly 24 hours a day. Loop 1604 westbound frontage road right turn lane IH-10 westbound frontage road will be closed for utility construction. Closure will remain for the full duration.
  • Friday, Sept. 29 at 9 p.m. until Monday, Oct. 2 at 5 a.m. IH-10 eastbound to Loop 1604 eastbound cloverleaf exit ramp closure for construction on the direct connector.
  • Friday, Sept. 29 at 9 p.m. until Monday, Oct. 2 at 5 a.m. Loop 1604 eastbound to IH-10 westbound cloverleaf exit ramp closure for construction on the direct connector.
  • Friday, Sept. 29 at 9 p.m. until Monday, Oct. 2 at 5 a.m. IH-10 eastbound collector-distributor right lane only at the Loop 1604 interchange will be closed for construction on the direct connector.
  • Friday, Oct. 6 at 9 p.m. until Monday, Oct. 9 at 5 a.m. IH-10 eastbound frontage road, directly under the Loop 1604 interchange full closure for bridge foundation construction.
  • Friday, Oct. 6 at 9 p.m. until Monday, Oct. 9 at 5 a.m. Loop 1604 eastbound exit ramp onto IH-10 eastbound full closure for removing column concrete forms. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, October 1 until Tuesday, October 3. 9 p.m. to 5 a.m. Full closure of the southbound mainlanes at S. New Braunfels Ave. for bridge repairs.
  • Wednesday, October 4 until Thursday, October 5. 9 p.m. to 5 a.m. Full closure of the northbound mainlanes at AT&T Center Parkway for bridge repairs.
  • Current until Saturday, October 7, long-term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for retaining wall, drilled shaft, column, and cap work.
  • Current until Friday, December 15, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Fratt Road for construction work.
  • Current until Saturday, December 23 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Current until Saturday, December 30, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Retama Parkway to Old Austin Road for temporary pavement, striping, barrier, column, and cap work.
  • Current until Sunday, September 8, 2024, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard for construction.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic should use next entrance ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for barrier work. Traffic should use next exit and entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier work. Traffic should use next exit and entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge structure work. Traffic should use next entrance and exit ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Southbound to northbound I-35 turnaround closure at Corporate Drive for striping, barrier, and temporary pavement work. Traffic should use Corporate Drive intersection.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit and entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and barrier work. Traffic should use next exit and entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Northbound to southbound I-35 turnaround closure at Evans Road for striping, barrier, and temporary pavement work. Traffic should use Evans Road intersection.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures of northbound frontage road of I-35 from Loop 1604 to Forum Parkway for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to Forum Parkway for bridge structure work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary pavement, striping and barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road and entrance ramp and exit ramp closures of I-35 from Evans Road to Olympia Parkway for bridge foundation, striping, barrier work, and temporary pavement work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge structure work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for construction work. Traffic must use the Forum Parkway turnaround and follow detour signs to access southbound I-35.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Retama Parkway to Forum Parkway for striping work. Traffic should use next entrance ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and barrier work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 collector ramp closure at I-35 interchange for geotechnical work. Traffic should follow the detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary pavement work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for construction work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road of I-35 and entrance ramp closure from Shin Oak Road to Pat Booker Road for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road bridge from I-35 northbound frontage road to I-35 southbound frontage road, near Shin Oak Drive for construction work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure of northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound Pat Booker Road at I-35 for striping work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp closure, and alternating exit ramp closures from O’Connor Road to Toepperwein Road for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, entrance ramp closure, and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign to the available ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, right lane closure on northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and westbound at the intersection of Judson Road and Randolph Boulevard and left lane closure on Randolph Boulevard at Judson Road for temporary pavement and signal works. Traffic should use the next exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road for barrier work. Traffic should use next exit.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, entrance ramp closure, and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks Drive to Weidner Road for striping and barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to Bludau-Bishop Road for striping and barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on southbound mainlanes of I-35 at O’Connor Road for overhead sign removal.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and entrance ramp closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and barrier work. Traffic should use prior entrance ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage and barrier work. Traffic should use next entrance and exit ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road of I-35 from Crestway Drive to Starlight Terrace for barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph Boulevard to Thousand Oaks for barrier setting.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow detour signs. Accommodations will be made for local traffic.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and exit ramp closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening work. Traffic should use prior exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane closure on exit ramp from Walzem Road to Randolph Boulevard for barrier setting.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to Walzem Road for drilled shaft and column work. Traffic to use next entrance ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to Walzem Road for cap work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on exit ramp from I-410 to southbound mainlanes and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.
  • Sunday, October 8 until Saturday, October 14. 9:00 p.m. to 5:00 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp for drilling work. 

I-35 – South San Antonio/Bexar County

  • Current until October 20. 9 p.m. to 5 a.m. Alternating northbound mainlane closures from Kinney Rd. to Loop 410 for road repairs.

I-410 – North East San Antonio

  • Current until Friday, February 16, 2024, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive to Randolph Boulevard for barrier setting.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway (Loop 368) to Randolph Boulevard for barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and exit ramp closure of I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic to use next exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin Highway (Loop 368) for cap and barrier work.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should use next exit ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on westbound frontage road and exit ramp closure of I-410 to Austin Highway (Loop 368) for barrier work. Traffic should follow detour signs.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, October 1 until Saturday, October 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit ramps. 

I-410 – East San Antonio

  • Friday, September 29 through Monday, October 1. FULL WEEKEND CLOSURE. All eastbound and westbound I-10 lanes and all northbound I-410 lanes at the I-10 interchange closed from 8 p.m. Friday (9/29) thru 5 a.m. Monday (10/1). Detour:
  • Eastbound I-10 traffic detour to southbound I-410. Exit at Rigsby, turn around, re-enter northbound I-410, and take eastbound I-10 exit.
  • Westbound I-10 traffic detoured to northbound I-410. Exit at Rittiman, turn around, and take southbound I-410 back to westbound I-410.
  • Northbound I-410 traffic detoured to eastbound I-10. Exit at Foster and turn around back to I-410 north.
  • Southbound I‑410 lanes will remain open. 

US 90 – West San Antonio/Bexar County

  • Current until Friday, October 6. 8:30 p.m. to 5 a.m. Alternating westbound mainlane closures from 36th St. to Loop 410 for mill and overlay operations.
  • Monday, October 2 until Wednesday, October 4. 9 a.m. to 3 p.m. Single eastbound mainlane closure form W. Military Dr. to Leon Creek for mowstrip operations.
  • Sunday, October 1 until Friday, October 6. Alternating westbound mainlane closures from Cupples Rd. to Callaghan Rd. for metal beam guard fence repairs.
  • Sunday, October 1 until Friday, October 6. Alternating westbound mainlane closures from Callaghan Rd. to Loop 410 for mill and overlay operations. 

PA 1502 – Wurzbach Parkway

  • Sunday, October 1 until Tuesday, October 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for roadway construction. 

SH 151 – West San Antonio/Bexar County

  • Current until Friday, October 6. 9 a.m. to 3 p.m. Single lane closure on the westbound frontage road from Ingram Rd. to Potranco Rd. for ITS work.
  • Thursday, October 5 until Friday, October 6. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes from Ingram Rd. to Potranco Rd. of pole installation.
  • Thursday, October 5 until Friday, October 6. 9 p.m. to 5 a.m. Single lane closure on the eastbound frontage road from W. Military Dr. to Hunt Lane for pole installation.
  • Thursday, October 5 until Friday, October 13. 9 a.m. to 3 p.m. Single lane closure on the eastbound frontage road from W. Military Dr. to Hunt Lane for pole installation.

Friday, September 22

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 8 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 8 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound collector-distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound exit ramp to La Cantera Parkway closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound entrance ramp from IH-10 closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Monday, Sept. 25 until Monday, Oct. 9. 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, Sept. 25 until Monday, Oct. 9. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, Sept. 25 until Monday, Oct. 9. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, September 24 until Friday, September 29. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, September 24 until Friday, September 29. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, September 24 until Friday, September 29. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, September 24 until Friday, September 29. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.
  • Sunday, September 24 until Wednesday, September 27. Nightly 9 p.m. until 5 a.m. Eastbound mainlane right lane closure from the IH-10 interchange to Tradesman Road will be closed for setting eastbound direct connector bent caps.
  • Sunday, September 24 until Wednesday, September 27. Nightly 9 p.m. until 5 a.m. IH-10 westbound mainlane exit ramp/direct connector to the Loop 1604 eastbound mainlanes will be closed for setting eastbound direct connector bent caps.
  • Sunday, September 24 until Wednesday, September 27. Nightly 9 p.m. until 5 a.m. IH-10 eastbound cloverleaf exit ramp (southwest cloverleaf) to Loop 1604 eastbound mainlanes will be closed for setting eastbound direct connector bent caps.
  • Sunday, September 24 until Wednesday, September 27. Nightly 9 p.m. until 5 a.m. Eastbound collector distributor through / left lane to Loop 1604 eastbound mainlanes will be closed for setting eastbound direct connector bent caps.
  • Monday, September 25 until Friday, September 29. Nightly 9 p.m. until 5 a.m. Westbound mainlane from Lockhill Selma Road exit ramp to the IH-10 interchange will be fully closed to set deck panels on the westbound direct connector.
  • Friday, September 29 at 9 p.m. until Saturday, September 30 at 5 a.m. Weekend closure. Loop 1604 eastbound mainlanes from the Vance Jackson Road exit ramp to the Lockhill Selma entrance ramp will be fully closed for mill and fill / level up hot mix asphalt concrete.
  • Friday, September 29 at 9 p.m. until Saturday, September 30 at 5 a.m. Weekend closure. IH-10 westbound exit ramp / direct connector to the Loop 1604 eastbound mainlanes will be closed for mill and fill / level up hot mix asphalt concrete.
  • Friday, September 29 at 9 p.m. until Saturday, September 30 at 5 a.m. Weekend closure. IH-10 eastbound mainlane cloverleaf exit ramp (southwest cloverleaf) to the Loop 1604 eastbound mainlanes will be closed for mill and fill / level up hot mix asphalt concrete.
  • Friday, September 29 at 9 p.m. until Saturday, September 30 at 12 p.m. Weekend closure. Loop 1604 eastbound left and middle mainlanes from the Blanco Road entrance ramp to Stone Oak Parkway will be closed for Slip SSTR rail work.
  • Sunday, September 24 until Sunday, October 1. Daily/Nightly 12 a.m. until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604 and NW Military. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for striping.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic should use Lookout Road intersection.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should use Lookout Road intersection.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for construction work. Traffic should use Lookout Road intersection.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 and alternating exit ramp closures from Nacogdoches Road to I-35 for barrier work. Traffic should use next exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic should use next entrance ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and next entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for striping work. Traffic should use prior exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the eastbound Loop 1604 collector ramp at the I-35 interchange for striping work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on westbound mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for striping. Traffic should use next entrance ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work. Traffic should use Lookout Road intersection.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35 to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road, exit ramp closure, and entrance ramp closure of Loop 1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic should use next available ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and westbound bypass ramp of Loop 1604 from I-35 to Nacogdoches Road for construction entrance and temporary pavement work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use next exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604 connector ramp from southbound I-35 to Lookout Road for striping work. Traffic should use next exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road turnaround.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure of Lookout Road intersection and turnarounds at Loop 1604 for striping work. Traffic should follow detour signs.
  • Wednesday, September 27 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 and eastbound bypass closure from Nacogdoches Road to Lookout Road for striping work. 

I-10 – North West San Antonio/Bexar County

  • Sunday, Sept. 24 until Friday, Oct. 6. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604 interchange full closure for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from Loop 1604 westbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from IH-10 westbound to Loop 1604 westbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill Selma Road to Valero Way overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp to the Lockhill Selma Road entrance ramp for overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10 westbound frontage road full closure from UTSA Boulevard to the Loop 1604 interchange for bridge construction. Nightly frontage road closure. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound collector distributor from Vance Jackson Road to Valero Way and the Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile construction under the IH-10 and Loop 1605 interchange. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound collector distributor from Valero Way to Vance Jackson Road closure for micropile construction under the IH-10 and Loop 1605 interchange. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10 westbound entrance ramp between De Zavala Road and UTSA Boulevard full closure for concrete barrier relocation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 11 p.m. until 5 a.m. IH-10 eastbound entrance ramp just after La Cantera Parkway full closure for pedestrian bridge installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 11 p.m. until 5 a.m. IH-10 eastbound frontage road from the La Cantera Parkway intersection to the entrance ramp just after La Cantera Parkway full closure for pedestrian bridge installation. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6 Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road, directly under the Loop 1604 interchange full closure for bridge foundation construction. Nightly closures. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9 Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound exit ramp onto IH-10 eastbound lane full closure for removing column concrete forms. Nightly closure. Excluding weekends.
  • Sunday, Sept. 24 until Monday, Oct. 9 Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound frontage road at IH-10 interchange full closure for removing column concrete forms. Nightly closure. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10 eastbound frontage road for bridge foundation construction. Nightly closures. Excluding weekends.
  • Wednesday, Sept. 27 at 9 p.m. until Friday, Oct. 6 at 5 a.m. Loop 1604 westbound frontage road right turn lane IH-10 westbound frontage road will be closed for SAWS water line work. Excluding weekends. Closure will remain for the full duration.
  • Monday, Sept. 25 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, Sept. 25 until Friday, Oct. 6. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, Sept. 24 until Friday, Oct. 6. Weeknights 9 a.m. until 3 p.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10 eastbound frontage road for bridge foundation construction. Daily closures. Excluding weekends.
  • Friday, Sept. 22 at 9 p.m. until Monday, Sept. 25 at 5 a.m. IH-10 eastbound to Loop 1604 eastbound cloverleaf exit ramp closure for bridge construction.
  • Friday, Sept. 22 at 9 p.m. until Monday, Sept. 25 at 5 a.m. Loop 1604 eastbound to
  • IH-10 westbound cloverleaf exit ramp closure for bridge construction.
  • Friday, Sept. 22 at 9 p.m. until Monday, Sept. 25 at 5 a.m. IH-10 eastbound collector-distributor at the Loop interchange will be closed for bridge construction. 

I-10 – East San Antonio/Bexar County/Guadalupe County

  • Saturday, September 23. 4 a.m. to 9 a.m. Full closure of the westbound mainlanes from Pfeil Rd. to Scenic Loop Rd. for maintenance operations.
  • Sunday, September 24. 6 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at FM 1516 for utility work. Traffic will be stopped in 15-minute intervals throughout the day.
  • Monday, September 25 until Thursday, September 28. Alternating full mainlane closures, in both directions, at FM 1518 for bridge work.
  • Monday, September 25 until Thursday, November 30. Full closure of the westbound frontage road for roadway construction.  

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, September 24 until Tuesday, September 26. Full closure of the southbound mainlanes at S. New Braunfels Ave. for bridge repair.
  • Tuesday, September 26 until Thursday, September 28. Nightly 9 p.m. to 5 a.m. Full closure of the northbound mainlanes at AT&T Center Parkway for bridge repairs.
  • Current until Saturday, October 7, long-term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for retaining wall, drilled shaft, column, and cap work.
  • Current until Friday, December 15, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Fratt Road for construction work.
  • Current until Saturday, December 23 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Current until Saturday, December 30, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Retama Parkway to Old Austin Road for temporary pavement, striping, barrier, column, and cap work.
  • Current until Sunday, September 8, 2024, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard for construction.
  • Sunday, September 24 until Tuesday, September 26. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes and closure on northbound I-35 collector ramp from Pat Booker Road to Loop 1604 for utilities work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic should use next entrance ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to Roy Richard Drive for barrier work. Traffic should use next exit and entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Schertz Parkway for barrier work. Traffic should use next exit and entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge structure work. Traffic should use next entrance and exit ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Southbound to northbound I-35 turnaround closure at Corporate Drive for striping, barrier, and temporary pavement work. Traffic should use Corporate Drive intersection.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit and entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for drainage and barrier work. Traffic should use next exit and entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Northbound to southbound I-35 turnaround closure at Evans Road for striping, barrier, and temporary pavement work. Traffic should use Evans Road intersection.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures of northbound frontage road of I-35 from Loop 1604 to Forum Parkway for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to Forum Parkway for bridge structure work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary pavement, striping and barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road and entrance ramp and exit ramp closures of I-35 from Evans Road to Olympia Parkway for bridge foundation, striping, barrier work, and temporary pavement work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for construction work. Traffic must use the Forum Parkway turnaround and follow detour signs to access southbound I-35.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Retama Parkway to Forum Parkway for striping work. Traffic should use next entrance ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for setting caps. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and barrier work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 collector ramp closure at I-35 interchange for geotechnical work. Traffic should follow the detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for construction work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge structure work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound Pat Booker Road at I-35 for striping work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp closure, and alternating exit ramp closures from O’Connor Road to Toepperwein Road for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, right lane closure on northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and westbound at the intersection of Judson Road and Randolph Boulevard and left lane closure on Randolph Boulevard at Judson Road for temporary pavement and signal works. Traffic should use the next exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on southbound mainlanes of I-35 at O’Connor Road for overhead sign removal.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 at O’Connor Road for barrier work. Traffic should use next exit.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from Thousand Oaks Drive to Weidner Road for striping and barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound and southbound mainlanes of I-35 from Weidner Road to Loop 1604 for utility work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, entrance ramp closure, and exit ramp closures of I-35 from Thousand Oaks Drive to Weidner Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from Weidner Road to Bludau-Bishop Road for striping and barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for drainage and barrier work. Traffic should use next entrance and exit ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and entrance ramp closure from Weidner Road to Thousand Oaks Drive for earthwork, drainage and barrier work. Traffic should use prior entrance ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35 from Randolph Boulevard to Thousand Oaks for barrier setting.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road of I-35 from Crestway Drive to Starlight Terrace for barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow detour signs. Accommodations will be made for local traffic.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and exit ramp closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening work. Traffic should use prior exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound and southbound mainlanes of I-35 from Walzem Road to Weidner Road for utility work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35 and alternating lane closure on exit ramp from Walzem Road to Randolph Boulevard for barrier setting.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound mainlanes and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to Walzem Road for cap work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to Walzem Road for drilled shaft and column work. Traffic to use next entrance ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs. 

I-35 – South San Antonio/Bexar County

  • Current until October 20. 9 p.m. to 5 a.m. Alternating northbound mainlane closures from Kinney Rd. to Loop 410 for road repairs.

I-410 – North East San Antonio

  • Current until Friday, February 16, 2024, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on northbound Austin Highway (Loop 368) to eastbound I-410 for barrier work. Traffic should use next entrance ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem Road to Interchange Parkway for barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway (Loop 368) connector ramp to westbound I-410 for barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway (Loop 368) to Randolph Boulevard for barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlanes of I-410 from Starcrest Drive to Randolph Boulevard for barrier setting.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and exit ramp closure of I-410 from Randolph Boulevard to Perrin Beitel for drilled shaft work. Traffic to use next exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin Highway (Loop 368) for cap and barrier work.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should use next exit ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on westbound frontage road and exit ramp closure of I-410 to Austin Highway (Loop 368) for barrier work. Traffic should follow detour signs.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, September 24 until Saturday, September 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit ramps. 

US 90 – West San Antonio/Bexar County

  • Current until Friday, October 6. 8:30 p.m. to 5 a.m. Alternating westbound mainlane closures from 36th St. to Loop 410 for mill and overlay operations.
  • Sunday, September 24. 9 p.m. to 5 a.m. Full closure of the westbound mainlane from Enrique Barrera Parkway to Callaghan Rd. for barrier relocation.
  • Sunday, September 24 until Monday, September 25. 9 p.m. to 5 a.m. Double westbound mainlane closure from 36th St. to Military Dr. for mill and overlay operations

FM 1535 – N.W. Military Highway

  • Monday, September 25 until Friday, September 29. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd. for curb and sidewalk construction. 

PA 1502 – Wurzbach Parkway

  • Sunday, October 1 until Tuesday, October 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for roadway construction. 

SH 151 – West San Antonio/Bexar County

  • Current until Friday, October 6. 9 a.m. to 3 p.m. Single lane closure on the westbound frontage road from Ingram Rd. to Potranco Rd. for ITS work. 

SH 16 – Bandera Road

  • Monday, September 25 until Friday, September 29. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A for sidewalk and curb construction.