Friday, January 12

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlane exit ramp closure to Loop 1604 westbound for westbound collector-distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from IH-10 westbound to Loop 1604 westbound for westbound collector-distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 8 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 8 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector-distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound mainlane exit ramp to La Cantera Parkway closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound mainlane exit ramp to IH-10 eastbound closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound frontage road entrance ramp from IH-10 closure for westbound direct connector bridge construction. Nightly closure. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Babcock Road full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Chase Hill Boulevard full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Weeknights 9 p.m. until 5 a.m. Loop 1604 and La Cantera Parkway full intersection closure (both directions, including turnarounds) for demolition work/bridge construction. Only one intersection to be closed at a time. Excluding weekends.
  • Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 15 until Monday, January 22. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Sunday, January 14 until Monday, January 22. Daily/Nightly 24 hours a day. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Sunday, January 14 until Monday, January 22. Daily/Nightly 24 hours a day. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Sunday, January 14 until Monday, January 22. Daily/Nightly 24 hours a day. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction.
  • Sunday, January 14 until Monday, January 22. Daily/Nightly 24 hours a day. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge construction/retaining walls. Only one turnaround to be closed at a time on each direction. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, January 14 until Friday, January 19. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, January 14 until Friday, January 19. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, January 14 until Friday, January 19. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, January 14 until Friday, January 19. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.
  • Wednesday, January 17 through Friday, January 19. Nightly 9 p.m. until 5 a.m. Blanco Road northbound right lane closure from Blanco Bluffs to Talavera Parkway for CPS Energy gas line work under Talavera Parkway. Off-duty officers will be used to control the flow of traffic through the Talavera Parkway intersection.   
  • Saturday, January 20 at 9 p.m. until Sunday, January 21 at 12 p.m. Eastbound mainlane full closure from the Blanco Road exit ramp to the Stone Oak Parkway entrance ramp for Panther Springs Creek deck pour.
  • Friday, January 19 until Monday, January 22. Nightly 9 p.m. until at 5 a.m. Vance Jackson Road northbound lane full closure at the bridge over Loop 1604 for setting overhangs on the direct connector span over Vance Jackson Road.
  • Friday, January 19 until Monday, January 22. Nightly 9 p.m. until at 5 a.m. Vance Jackson Road southbound lane full closure at the bridge over Loop 1604 for setting overhangs on the direct connector span over Vance Jackson Road. 

Loop 1604 – North East San Antonio/Bexar County

I-10 – North West San Antonio/Bexar County

  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from IH-10 eastbound to Loop 1604 eastbound for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from Loop 1604 eastbound to IH-10 westbound for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road, at the Loop 1604 interchange full closure for drill shaft construction. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from the Loop 1604 interchange to the Camp Bullis Road exit ramp for striping. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound frontage road right turn lane full closure onto IH-10 eastbound frontage road for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound frontage road full closure from the Loop 1604 interchange and UTSA Boulevard for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. IH-10 eastbound mainlanes full closure from the La Cantera Parkway entrance ramp to the Loop 1604 Interchange for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. IH-10 westbound mainlanes full closure from the Loop 1604 Interchange to the La Cantera Parkway entrance ramp for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound mainlanes full closure at the IH-10 interchange for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, January 14 until Friday, January 19. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound mainlanes full closure at the IH-10 interchange for bridge construction. Nightly closures. Excluding weekends.
  • Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 westbound frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3 p.m. Alternating IH-10 eastbound frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3 p.m. Loop 1604 eastbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3 p.m. Loop 1604 westbound frontage road full closure at the IH-10 intersection for bridge construction. Excluding weekends.
  • Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3 p.m. Loop 1604 eastbound frontage road full closure from the IH-10 eastbound frontage road to the IH-10 westbound frontage road for bridge construction. Daily closures. Excluding weekends.
  • Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3 p.m. Loop 1604 westbound frontage road full closure from the IH-10 eastbound frontage road to the IH-10 westbound frontage road for bridge construction. Daily closures. Excluding weekends.
  • Monday, January 15 until Friday, January 19. Weekdays 9 a.m. until 3 p.m. IH-10 eastbound frontage road right turn lane full closure onto Loop 1604 westbound frontage road for temporary pavement construction. Daily closures.
  • Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full weekend closure. Loop 1604 westbound mainlane full closure at the IH-10 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full weekend closure. Loop 1604 eastbound frontage road full closure between the IH-10 eastbound and westbound frontage road for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full weekend closure. Loop 1604 westbound frontage road full closure between the IH-10 westbound and eastbound frontage road for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 12 at 9 p.m. until Monday, January 15 at 5 a.m. Full weekend closure. IH-10 westbound mainlane full closure at the Loop 1604 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full weekend closure. Loop 1604 eastbound mainlane full closure at the IH-10 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full weekend closure. Loop 1604 westbound mainlane full closure at the IH-10 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full weekend closure. Loop 1604 eastbound frontage road full closure between the IH-10 eastbound and westbound frontage road for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full weekend closure. Loop 1604 westbound frontage road full closure between the IH-10 westbound and eastbound frontage road for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full weekend closure. IH-10 eastbound mainlane full closure at the Loop 1604 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections.
  • Friday, January 19 at 9 p.m. until Monday, January 22 at 5 a.m. Full weekend closure. IH-10 westbound mainlane full closure at the Loop 1604 interchange for bridge construction. Lane closures to remain in place for the entire duration. Off-duty officers will direct traffic thru intersections. 

I-10 – East San Antonio

  • Current until Friday, January 26. 9 p.m. to 5 a.m. Alternating westbound mainlane closures at Loop 13/W.W. White Rd. for steal beam repairs. Traffic under the bridge will be closed as well.
  • Sunday, January 14 until Friday, January 26. Full closure of the westbound mainlanes at Loop 13/W.W.White Rd. for steal beam repairs. Traffic under the bridge will be closed as well.
  • Current until Saturday, January 13. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes at FM 1518 for bridge work.
  • Friday, January 19, 9 p.m. to Monday, January 22, 5 a.m. Full closure of the westbound mainlanes from FM 2538 to Loop 1604 for traffic switch.
  • Thursday, January 18 through March. The westbound I-10 entrance ramp from Ackerman will be closed from 9 a.m. January 18 through March. Detour: Westbound I-10 frontage road traffic to westbound I-10 mainlanes may turn around at Ackerman, continue on the eastbound frontage road, and use the Foster turnaround to access the westbound I-10 entrance ramp at Foster. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current through Monday, February 12, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Judson Road to Toepperwein Road for drainage, column, and cap work.
  • Current until Thursday, February 29, long-term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for retaining wall, drilled shaft, column, and cap work.
  • Current until Friday, March 8, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson Road for permanent widening and drainage work.
  • Current through Wednesday, April 24, long term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
  • Current through Monday, May 20, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Current until Sunday, September 8, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive for barrier work. Traffic should use next available ramps.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Roy Richard Drive to Schertz Parkway for bridge structure work. Traffic should use next entrance and exit ramps.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit ramp.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping, barrier, temporary pavement, and demolition works. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for bridge structure work.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Schertz Parkway to Forum Parkway for bridge structure work.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 and entrance ramp closure from Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 to eastbound Loop 1604 connector ramp for drilled shaft, columns, and caps. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop 1604 to northbound I-35 connector ramp for column and cap work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange and full closure on northbound I-35 to eastbound Loop 1604 connector ramp for striping and barrier work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping and barrier work. Traffic must use West Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound I-35 to westbound Loop 1604 connector ramp and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on westbound Loop 1604 to southbound I-35 connector ramp for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on eastbound Loop 1604 to southbound I-35 connector ramp closure for cap work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road of I-35 from Sandpiper Drive to Pat Booker Road for bridge structure work.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of I-35 Access Road bridge from I-35 northbound frontage road to I-35 southbound frontage road, near Shin Oak Drive for construction work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary pavement work.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for construction work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road and exit ramp of I-35 from Judson Road to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, entrance ramp closures, and exit ramp closure of I-35 from Weidner Road to O’Connor Road for structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound frontage road, alternating entrance ramp closures, and exit ramp closure of I-35 from Weidner Road to Bludau-Bishop Road for earthwork and striping. Traffic should follow the detour signs to the available ramps.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for drainage and structures work. Traffic should use the next exit and entrance ramps.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of Randolph Boulevard and southbound frontage road at I-35 for drainage work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Left lane closure southbound frontage road of I-35 to Randolph Boulevard for drainage work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow detour signs. Accommodations will be made for local traffic.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp for drilling work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs.
  • Sunday, January 14 until Saturday, January 20. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for barrier work.
  • Monday, January 15 until Wednesday, January 17. 9:00 a.m. to 3:00 p.m. Left lane closure on northbound mainlanes of I-35 from Corporate Drive to Roy Richard Drive for existing highway illumination repairs.
  • Monday, January 15 until Thursday, January 18. 12:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from FM 2252 to Cibolo Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for beam staging.
  • Thursday, January 18 until Friday, January 19. 9:00 a.m. to 3:00 p.m. Left lane closure on northbound mainlanes of I-35 from Walzem Road to Starlight Terrace for existing highway illumination repairs.
  • Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic should follow detour signs.
  • Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road and exit ramp of I-35 from Judson Road to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Northbound frontage road of I-35 traffic should follow detour signs.
  • Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour signs.
  • Sunday, January 21 until Saturday, January 27. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Corporate Drive to Evans Road and full closure of eastbound and westbound lanes of Evans Road for bridge substructure work. Traffic should follow detour signs. 

I-410 – North East San Antonio

FM 1535 – Northwest Military Highway

  • Monday, January 15 until Friday, January 19. 7 a.m. to 6 p.m. Alternating lane closures, in both directions, from Loop 1604 to Huebner Rd. for sidewalk and curb construction. 

PA 1502 – Wurzbach Parkway

  • Current until Wednesday, January 31. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for barrier work.
  • Current until Wednesday, January 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from N.W. Military Highway to Weidner Rd. for barrier work. 

SH 16 – Bandera Road

  • Current until Wednesday, January 31. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for curb and sidewalk construction.
  • Monday, January 15 until Friday, January 19. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A Trail for sidewalk and curb construction. 

US 90 – West San Antonio/Bexar County

  • Wednesday, January 10 until Friday, January 12. 9 a.m.to 3 p.m. Single eastbound mainlane closure from New Life Circle to Callaghan Rd. for sign work.
  • Sunday, January 14 until Friday, January 19. 8:30 p.m. to 5 a.m. Multiple alternating westbound mainlane closures from 36th St. to Loop 410 for guard rail upgrades. Alternating ramps will also be closed.
  • Monday, January 15 until Wednesday, January 17. 9 a.m. to 3 p.m. Alternating westbound mainlane closures from 36th St. to W. Military Dr. for mow strip installation. Alternating ramps will also be closed. 

SH 151 – West San Antonio/Bexar County

  • Current until Friday, January 12. 9 a.m. to 3 p.m. Single lane closure on the eastbound frontage road from Wiseman Rd. to Westover Hills.
  • Current until Friday, January 12. 9 a.m. to 3 p.m. Single lane closure on the eastbound frontage road from SH 151 to Wiseman.
  • Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane closures on the frontage roads, in both directions, at Hunt Lane for bore work.
  • Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane closures on the frontage roads, in both directions, Ingram Rd. for bore work.
  • Current until Wednesday, January 31. 9 a.m. to 3 p.m. Single lane closures on the frontage roads, in both directions, at Potranco Rd.
  • Monday, January 8 until Wednesday, January 10. 9 p.m. to 5 a.m. Single mainlane closures, in both directions, from Loop 1604 to Westover Hills for bridge work.
  • Monday, January 15 until Wednesday, January 17. 9 a.m. to 3 p.m. Westbound exit ramp to Westover Hills closed for drill shaft work.