Friday, September 6

Next week's construction-related road closures

Interstate 10
Friday-Saturday, September 5-6
10 a.m. until 3:30 p.m. daily
Westbound frontage road between Ramsgate and Huebner roads (northwest San Antonio)
The left lane will close while crews remove overhead highway sign legs.
 
Saturday, September 6
9 a.m. until 3 p.m.
Eastbound frontage road at Whataburger (northwest San Antonio)
The dedicated right-turn lane will close while crews fix a drain box. Traffic will turn right at the traffic signal. Expect delays.
 
Monday-Friday, September 9-13
9 a.m. until 3 p.m.
Eastbound frontage road between UTSA Boulevard and DeZavala Road (Northwest San Antonio)
The left lane will be closed to allow trucks to haul dirt. Expect delays.
 
Monday-Friday, September 9-13
9 p.m. until 5:30 a.m. nightly
Westbound main lanes between Wurzbach Road and DeZavala Road (northwest San Antonio)
Alternating lanes will close while crews set and move concrete barrier. Expect delays.
 
Monday-Friday, September 9-13
9 p.m. until 5:30 a.m. nightly
Eastbound main lanes between UTSA Boulevard and Fredericksburg Road (northwest San Antonio)
Alternating lanes will close while crews set drain boxes and move concrete barrier. This closure includes the exit ramps to DeZavala Road and to Fredericksburg Road and the entrance ramp from UTSA Boulevard. Traffic will use the Huebner Road exit and turnaround to exit, or next available entrance ramp. Expect delays.
 
Tuesday-Wednesday, September 10-11
10 p.m. until 2 a.m.
Eastbound entrance ramp from DeZavala and exit to Frontage Road (northwest San Antonio)
The entrance ramp from DeZavala and the exit to Frontage Road (the exit to USAA) will close overnight while crews remove overhead highway signs. Traffic will use the next exit and turnaround. Expect delays.
 
Interstate 35
Saturday-Sunday, September 7-8
12:01 a.m. until 10 a.m. nightly (early morning hours only)
Southbound I-35 between Powell Street and Malone (downtown)
Alternating lanes will close while crews repave the road. Expect delays.
 
Sunday-Friday, September 8-13
10 p.m. until 5:30 a.m. nightly
Northbound I-35 between Powell Street and Malone (downtown)
Alternating lanes will close while crews repave the road. This closure will include the exit and entrance ramps from west-bound U.S. Highway 90 and the entrance ramp from eastbound U.S. Highway 90. Traffic will follow posted routes. Expect delays.
 
Sunday-Friday, September 8-13
9 p.m. until 5:30 a.m. nightly
Main lanes, both directions, between Olympia Parkway and Schertz Parkway (Selma-Schertz)
The two inside lanes will close in each direction while crews construct the center median barrier. Expect delays.
 
Wednesday-Thursday, September 11-12
8 a.m. until 4 p.m. daily
Northbound main lanes between Loop 1604 and Fisher Road (south Bexar County)
Alternating lanes will close while crews switch existing traffic patterns. Expect delays.
 
Interstate 37
Saturday-Friday, September 7-13
6 p.m. until 6 a.m. nightly
Southbound main lanes between U.S. Highway 181 and the Atascosa River (south Bexar County)
Alternating lanes will close while crews repave the roadway. Expect delays.
 
Interstate 410
Monday, September 9
9 a.m. until 2:30 p.m.
Southbound exit ramp between Old Pearsall Road and the UPRR bridge (southwest San Antonio)
The exit ramp will close while crews make adjustments to the ramp. Traffic will use next available ramp and turnaround.
 
Loop 1604
Sunday, September 8
9 p.m.
Exit ramps – both directions – to northbound I-35
The ramps from both directions of Loop 1604 to northbound I-35 will close until mid-October while crews construct a bridge support structure for the northbound I-35 exit ramp to Forum Parkway. Traffic will exit Pat Booker Road and follow the Loop 1604 and I-35 frontage roads through Forum Parkway to reach northbound I-35. Expect long delays and consider alternate routes, such as FM 2252 or FM 78.
 
Monday-Thursday, September 9-12
9 a.m. until 3:30 p.m. daily
Northbound lanes between Marbach Road and Emory Peak
Alternating lanes will close while crews construct curbs and widen the road. Expect delays.
 
U.S. Highway 90
No closures schedule.
 
U.S. Highway 281
Monday-Friday, September 9-13
10 p.m. until 5:30 a.m. nightly
Southbound main lanes between Interpark and North Park Drive (near the Airport)
The right lane will close while crews form and pour bridge support structures related to the Wurzbach Parkway project. This will impact traffic entering the highway from Bitters Road and exiting to Nakoma Drive. Expect delays.
 
Monday-Friday, September 9-13
10 p.m. until 5:30 a.m. nightly
Southbound frontage road between Interpark and North Park Drive (near the Airport)
The two left lanes will close while crews form and pour bridge support structures related to the Wurzbach Parkway project. Expect delays.
 
Other roads
Monday, September 9
1 a.m.
Business 46 (Seguin Avenue) at UPRR Railroad (New Braunfels)
All lanes will close six months while crews widen the road and rebuild the railroad overpass. Traffic will detour to Faust Street, Comal Street and back to Seguin Avenue. Expect delays.
 
All planned lane closures are pending weather.