Monday, June 16

This week's construction-related closures

Interstate 10

Monday-FridayJune 16-20

9 a.m. until 3:30 p.m. daily

Frontage road, both directions, between Loop 1604 and Huebner Road (northwest San Antonio)

Alternating lanes will close while crews move barrier, place asphalt, lay pipe and build storm drain. This closure may include temporary closures of turnarounds, highway entrance or exit ramps, as needed. Expect delays.

 

Monday-FridayJune 16-20

9 p.m. until 5:30 a.m. nightly

Frontage road, both directions, between Loop 1604 and Huebner Road (northwest San Antonio)

Alternating lanes will close while crews move barrier, place asphalt, lay pipe and build storm drain. This closure may include temporary closures of turnarounds, highway entrance or exit ramps, as needed. Expect delays.

 

Monday-ThursdayJune 16-19

9 p.m. until 5:30 a.m. nightly

Westbound main lanes between Huebner Road and UTSA Boulevard (northwest San Antonio)

Alternating lanes will close while crews move and reset barrier or place asphalt. This closure includes the occasional closure of the UTSA exit ramp, the DeZavala exit ramp and the entrance ramp from DeZavala. Expect delays.


Monday-FridayJune 16-19

8:30 p.m. until midnight nightly

Eastbound main lanes between DeZavala Road and Huebner Road (northwest San Antonio)

Alternating lanes will close, two at a time, while crews place asphalt. This closure includes the ramp to Fredericksburg Road. Traffic will exit Huebner Road to reach Fredericksburg Road. Expect delays.

 

Tuesday-SaturdayJune 17-21

Midnight until 5:30 a.m. nightly

Eastbound main lanes between DeZavala Road and Huebner Road (northwest San Antonio)

All lanes will close while crews place asphalt. Traffic will exit onto the frontage road and reenter the highway. Expect long delays.

*Note the preceding two eastbound main lane closures are nightly, and are progressive. Crews will begin by closing two lanes down each night at 8:30 p.m. and, at midnight, will close all lanes of eastbound I-10. This includes Friday night into Saturday morning. All lanes will be reopened by5:30 each morning.

 

Interstate 35

Monday-FridayJune 15-20

9 p.m. until 5:30 a.m. nightly

Southbound main lanes between Evans Road and Judson Road (northeast San Antonio)

Alternating lanes will close while crews pave the road. Expect delays.

 

Monday-FridayJune 15-20

9 p.m. until 5:30 a.m. nightly

Northbound main lanes between Highway 218 and Evans Road (northeast San Antonio)

Alternating lanes will close while crews pave the road. Expect delays.

 

Interstate 37

No closures scheduled.

 

Interstate 410

No closures scheduled.

 

Loop 1604

Monday-FridayJune 16-20

9 p.m. until 5 a.m. nightly

Main lanes, both directions, between Big Mesa and Emory Peak (far west Bexar County)

The left lane will close in each direction while crews mill and repave the road. Expect delays.

 

Monday-ThursdayJune 16-19

9 a.m. until 3 p.m. daily

Main lanes, both directions, between Big Mesa and Emory Peak (far west Bexar County)

The left lane will close in each direction while crews widen the road and build sidewalk. Expect delays.

 

U.S. Highway 90

No closures scheduled.

 

U.S. Highway 281

No closures scheduled.

 

Other roads

Sunday-FridayJune 15-20

8 p.m. until 5 a.m. nightly

Fredericksburg Road, both directions, between Louis Pasteur and Data Point (Medical Center)

Alternating lanes will close while crews install storm drain lines and build bridge support structures. Expect delays.

 

Sunday-FridayJune 15-20

8 p.m. until 5 a.m. nightly

Medical Drive, both directions, a Spyglass Hill Condominiums (Medical Center)

Alternating lanes will close while crews form and pour sidewalk and move barrier. Expect delays.

 

All planned lane closures are pending weather.