- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work. DETOUR: Turn left at the US 281 intersection then turn left again onto the westbound Loop 1604 frontage road.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full westbound frontage road closure from the US 281 southbound frontage road to the Stone Oak Parkway exit ramp. DETOUR: Take the turnaround at US 281, continue east using the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
- Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
- Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
- Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work.
Loop 1604 – Northeast San Antonio
- Saturday, February 16 until Friday, February 21. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 (as well as entrance/exit ramps in between) for guard rail and mow strip work.
- Monday, February 10 until Friday, February 14. Daily 9 a.m. until 3 p.m. One mainlane in both directions between Green Mountain Road and I-35 (as well as entrance/exit ramps in between) for mow strip work.
- Monday, February 17 until Thursday, February 20. Nightly 9 p.m. until 5 a.m. One eastbound mainlane and one frontage road lane between Redland Road and Bulverde Road for barrier resetting and ramp work.
- Monday, February 17 until Wednesday, February 19. Nightly 9 p.m. until 5 a.m. Two frontage road lanes in both directions at Bulverde Road (including intersection under the highway) for pavement repair work.
- Monday, February 17 until Wednesday, February 19. Nightly 9 p.m. until 5 a.m. Two eastbound frontage road lanes at O’Connor Road (including intersection under the highway) for pavement repair work.
- Monday, February 17 until Friday, February 21. Daily 9 a.m. until 3 p.m. One mainlane in both directions between Green Mountain Road and I-35 for mow strip work.
- Wednesday, February 19 until Monday, February 24. Nightly 8 p.m. until 5 a.m. Southbound ramp to I-35 (including I-35 northbound shoulder) for rail work and retaining wall repair work.
- Monday, February 17 until Friday, February 21. Daily 9 a.m. until 4 p.m. Eastbound left frontage road lane between Bandera Road and FM 1560 (Hausman Road) for asphalt work.
- Friday, February 14 until Saturday, February 15. 9 p.m. until 5 p.m. Right southbound mainlane closure from Stone Oak/Tournament Players Club (TPC) Parkway to Evans Road for miscellaneous concrete work.
- Friday, February 14 until Saturday, February 15. 9 p.m. until 5 p.m. Right southbound frontage road closure from Sonterra Boulevard to Loop 1604 for miscellaneous concrete work.
- Saturday, February 15 until Sunday, February 16. 2 a.m. until 2 p.m. Left northbound mainlane closure from Encino Commons to Stone Oak/Tournament Players Club (TPC) Parkway for beam setting work.
- Saturday, February 15 until Sunday, February 16. 2 a.m. until 2 p.m. Left southbound mainlane closure from Marshall Road to Stone Oak/Tournament Players Club (TPC) Parkway for beam setting work.
- Saturday, February 15 until Sunday, February 16. 2 a.m. until 2 p.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for beam setting work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
- Saturday, February 15 until Sunday, February 16. 2 a.m. until 2 p.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for beam setting work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full northbound mainlane ramp closure of the north- to eastbound direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road and turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for direct connector work. DETOUR: Turn left on the southbound frontage road, use the turnaround at Donella Drive and take the Donella Drive entrance ramp.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the south- to northbound turnaround at Loop 1604 for direct connector work. DETOUR: Turn left at the intersection then turn left again.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Northbound mainlane ramp closure of the north- to westbound Loop 1604 direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road, and continue on to the entrance ramp.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for paving and bridge work.
- Monday, February 17 until Friday, February 21. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for paving and bridge work.
- Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
- Saturday, February 22 until Monday, February 24. Full weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
- Saturday, February 22 until Monday, February 24. 3 a.m. until 5 a.m. Northbound Redland Road bypass ramp mainlane closure from Sonterra Boulevard to Encino Rio for ramp work.
- Current until 5 p.m. Saturday, February 15. Alternating mainlanes in both directions at FM 1937 for mill and overlay work.
- Current until Friday, February 28. Daily 9 a.m. until 3 p.m. Westbound left frontage road lane between Dominion Drive and Boerne Stage Road for retaining wall work.
- Current until Friday, February 28. Daily 9 a.m. until 3 p.m. One westbound frontage road lane between Camp Bullis Road and Boerne Stage Road for rip rap work.
- Monday, February 17 until Wednesday, February 19. Nightly 9 p.m. until 5 a.m. Westbound right mainlane between Dominion Drive and Boerne Stage Road for junction box installation work.
- Monday, February 17 until Friday, February 21. Daily 9 a.m. until 4 p.m. Frontage road intersection at SH 46 in both directions (including dedicated right-turn lane from SH 46 to the frontage road) for traffic island removal and asphalt work.
- Tuesday, February 18 until Thursday, February 20. Daily 9 a.m. until 5 p.m. Westbound right mainlane at Cibolo Creek (Boerne) for bridge maintenance work.
- Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
- Sunday, February 16 until Friday, February 21. Nightly 9 p.m. to 5 a.m. One right mainlane in both directions between Loop 1604 and Pfeil Road for barrier and crash cushion installation.
- Wednesday, February 19. 9 a.m. to 3 p.m. The east to westbound turnaround will be closed at Foster Road to pour foundation for a signal pole. DETOUR: Eastbound frontage road traffic needing to use the turnaround will turn left on Foster Road and then left on the westbound frontage road.
- Thursday, February 20 until Friday, February 21. 8 p.m. to 5 a.m. Woodlake Parkway in both directions under I-10 for bridge construction activities. DETOUR: Northbound Woodlake Parkway traffic will take the eastbound I-10 frontage road and turn around at FM 1516. Southbound Woodlake Parkway traffic will take the westbound I-10 frontage road and turn around at Foster Road.
- Saturday, February 22. 5 a.m. to 9 p.m. One right mainlane in both directions between Loop 1604 and Pfeil Road for barrier and crash cushion installation.
- None scheduled.
- Monday, February 17 until Friday, February 21. Daily 8:30 a.m. until 4 p.m. Northbound right frontage road lane at Rittiman Road (including dedicated right-turn lane from Rittiman to frontage road) for sidewalk and curb installation work.
- Monday, February 17 until Friday, February 21. Daily 8:30 a.m. until 4 p.m. Northbound right frontage road lane at Eisenhauer Road (including dedicated right-turn lane from Eisenhauer to frontage road) for sidewalk and curb installation work.
- Friday, February 14 until Saturday, February 15. Nightly 10 p.m. to 5 a.m. The southbound to westbound connector to US 90 for illumination pole work. DETOUR: Traffic will be detoured to the frontage road.
- Friday, February 14 until Saturday, February 15. Nightly 10 p.m. to 5 a.m. The left southbound frontage road between Demya Drive to Bertetti for illumination pole work.
- Friday, February 14 until Monday, February 17. Weekend 8 p.m. to 5 a.m. All mainlanes in both directions between the exit ramp to Marbach Road and the entrance ramp past Marbach Road for overhead sign bridge column and striping work. DETOUR: Traffic will be detoured to the frontage road and re-enter at the next entrance.
- Sunday, February 16 until Friday, February 21. Nightly 8 p.m. to 5 a.m. All westbound frontage road lanes at the exit ramp to Hunt Lane and the exit ramp for rail work. DETOUR: Traffic will take the south and eastbound cloverleafs and turnaround at W. Military Drive.
- Sunday, February 16 until Friday, February 21. Nightly 8 p.m. to 5 a.m. The right westbound mainlane between the new US 90 exit to Hunt Lane for concrete barrier and striping work.
- None scheduled.
- None scheduled.
- Monday, February 17 until Tuesday, February 19. 9 p.m. until 3 a.m. Eastbound right lane between FM 2696 (Blanco Road) and West Avenue for geotechnical work.
- City of San Antonio/TCI closure for Hardberger Park Landbridge project. Monday, February 17 until Friday, February 21. 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
- City of San Antonio/TCI closure for Hardberger Park Landbridge project. Saturday, February 22. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- Monday, February 17 until Monday, March 2. Daily 9 a.m. until 4 p.m. Alternating lanes in both directions between Rigsby Avenue and I-10 for paving, sod placement and sign installation work.
- Monday, February 17 until Monday, March 2. Nightly 9 p.m. until 5 a.m. Southbound lanes between Rigsby Avenue and I-10 for milling work.
- None scheduled.
- Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
- None scheduled.
- Current until Thursday, February 20. Daily 7 a.m. until 5 p.m. All lanes of Meadowland Drive at Loop 1604 southbound for grading and paving work.
- Saturday, February 15. 7 a.m. until 3 p.m. Full closure of Wilderness Oak between Summer Glen and US 281 for a traffic switch.
- Monday, February 17 until Thursday, February 20. Daily 9 a.m. until 3 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge concrete panel installation work. DETOUR: Westbound traffic diverted to the Old Fredericksburg Road turnaround; eastbound traffic diverted to the Dominion Drive turnaround.
- Saturday, February 15 until Sunday, February 16. 7 a.m. until 6 p.m. Eastbound lane (flagging operations) between Sattler Road and Island View Road for milling and inlay work.
- Monday, February 17 until Friday, February 21. 7 a.m. until 6 p.m. Eastbound lane (flagging operations) between Island View Drive and River Road for milling and inlay work.
- Monday, February 17 until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders in both directions between I-10 and SH 123 for topsoil work.
FM 78 – Guadalupe County
- Monday, February 17 until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders between ½-mile west of FM 725 and 1 mile east of FM 1620 for paving work.
- Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Right lane in both directions between Main Street and Oak Street for driveway, curb and sidewalk work.
- Monday, February 17 until Friday, February 28. Daily 7 a.m. until 5:30 p.m. One lane in both directions between Main Street and Oak Street for sidewalk, curb and driveway installation work.
- Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Right lane in both directions between SH 123 and FM 466 for driveway, curb and sidewalk work.
- Monday, February 17 until Friday, February 28. Daily 7 a.m. until 5:30 p.m. Alternating lanes in both directions between SH 123 and FM 466 for sidewalk, curb and driveway installation work.
- Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Southbound right lane at FM 466 for driveway, curb and sidewalk work.
- Monday, February 17 until Friday, February 28. Daily 7 a.m. until 5:30 p.m. One lane in both directions between FM 466 and Joe Carrillo for driveway, curb and sidewalk installation work.
- Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Alternating lanes in both directions between Tor Drive and FM 725 for driveway, curb and sidewalk work.
- Monday, February 17 until Friday, February 28. Daily 7 a.m. until 5:30 p.m. Alternating lanes in both directions (flagging operations) between Tor Drive and Spring Street for sidewalk, curb and driveway installation work.
- None scheduled.
- Current until Monday, February 24. Daily 8 a.m. until 5:30 p.m. Right lane in both directions at SH 97 for driveway, curb and sidewalk work.
- None scheduled.
- Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
- Current until 7 p.m. Saturday, February 15. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions between US 87 and Wasp Creek for culvert work.
- Monday, February 17 until Saturday, February 22. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions between North School Street and Wasp Creek Road for culvert work.
- Current until Friday, May 1. Full closure (all day) in both directions at Atascosa River (between FM 476 and SH 173) for culvert removal and replacement work.
- Current until Saturday, March 21. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions (flagging operations) between SH 16 and La Parita Creek for paving work.
- Monday, February 17 until Friday, February 21. Daily 7 a.m. until 6 p.m. Alternating lanes in both directions between Ben Franklin Road and McMullen/Duval County line for paving work.