- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full westbound frontage road closure from the US 281 southbound frontage road to the Stone Oak Parkway exit ramp. DETOUR: Take the turnaround at US 281, continue east using the turnaround at Redland Road, take the Redland Road entrance ramp and use the Stone Oak Parkway exit ramp.
- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work. DETOUR: Turn left at the US 281 intersection then turn left again onto the westbound Loop 1604 frontage road.
- Saturday, March 7 until Monday, March 9. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
- Saturday, March 7 until Monday, March 9. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
- Saturday, March 7 until Monday, March 9. Full weekend closure 3 a.m. until 5 a.m. Full eastbound frontage road closure of the east- to westbound turnaround at US 281 for direct connector work.
- Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Eastbound right mainlane between Redland Road and Bulverde Road for ramp work.
- Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for milling and paving work.
- Sunday, March 1 until Monday, March 2. Nightly 8 p.m. until 5 a.m. Southbound ramp to I-35 (including I-35 northbound shoulder) for rail work and retaining wall repair work.
- Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for guard rail and mow strip work.
- Wednesday, March 4. 9 a.m. until 5 p.m. Eastbound frontage road and turnaround at FM 2252 (Nacagdoches Road) for bridge repair work.
- Saturday, February 29. 9 a.m. until 4 p.m. Eastbound left frontage road lane between Bandera Road and FM 1560 (Hausman Road) for laying asphalt work.
- Saturday, February 29. 7 a.m. until 5 p.m. Southbound right mainlane between Bulverde Road and Marshall Road for barrier setting work.
- Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
- Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Stone Oak/Tournament Players Club (TPC) Parkway.
- Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for paving and bridge work.
- Sunday, March 1 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for paving and bridge work.
- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for direct connector work. DETOUR: Turn left on the southbound frontage road, use the turnaround at Donella Drive and take the Donella Drive entrance ramp.
- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full northbound mainlane ramp closure of the north- to eastbound direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Northbound mainlane ramp closure of the north- to westbound Loop 1604 direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road, and continue on the US 281 entrance ramp.
- Monday, March 2 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the south- to northbound turnaround at Loop 1604 for direct connector work. DETOUR: Turn left at the intersection then turn left again.
- Saturday, March 7 until Monday, March 9. Weekend full closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Saturday, March 7 until Monday, March 9. Weekend full closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
- Saturday, March 7 until Monday, March 9. Full weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
- Saturday, March 7 until Monday, March 9. Continuous 3 a.m. until 5 a.m. Northbound Redland Road bypass ramp mainlane closure from Sonterra Boulevard to Encino Rio for ramp work.
- None scheduled.
- Sunday, March 1 until Monday, March 2. 9 p.m. until 5 a.m. Eastbound left mainlane between Fair Oaks Parkway and Balcones Creek (Bexar/Kendall county line) for barrier removal work.
- Tuesday, March 3 until Thursday, April 9. Daily 7 a.m. until 7 p.m. Westbound right mainlane and shoulder between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
- Tuesday, March 10 until Thursday, April 9. Daily 7 a.m. until 7 p.m. Eastbound right mainlane and shoulder between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
- Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
- Monday, March 2. Beginning at 5 a.m. Frontage road configuration conversion between Graytown Road to Pfeil Road from two-way traffic to one-way traffic in both directions. DETOUR: Drivers wishing to access westbound I-10 will continue traveling east to Pfeil Road and turn around. Drivers wishing to access the eastbound I-10 mainlanes will continue east to the next entrance ramp; drivers wishing to access eastbound I-10 will continue traveling west to Loop 1604 and turn around. Drivers wishing to access the westbound I-10 mainlanes will continue west to the next entrance ramp.
- Friday, March 6 until Monday, March 9. Full weekend 9 p.m. to 5 a.m. One alternating eastbound mainlane will be closed from Foster Road to Loop 1604 as crews implement a traffic switch. Intermittent closures of the eastbound entrance ramp from Foster Road will also be required. Following the traffic switch, the existing eastbound entrance ramp from Foster Road will be closed and a new entrance ramp will open just east of Woodlake Parkway. DETOURS: During the intermittent ramp closures, drivers needing to access the I-10 mainlanes from Foster Road must continue eastbound on the frontage road and enter the mainlanes after the Loop 1604 intersection. Following the traffic switch, drivers needing to access the I-10 mainlanes from Foster Road must continue eastbound on the frontage road and enter the mainlanes after Woodlake Parkway.
- None scheduled.
- Sunday, March 1 until Wednesday, March 4. Nightly 9 p.m. until 5 a.m. Two northbound mainlanes at Weidner Road for milling and inlay work.
- Monday, March 2 until Wednesday, March 6. Daily 9 a.m. until 3 p.m. Northbound right mainlane between SH 46 entrance ramp and Business 35 exit ramp for guard rail installation work.
- Monday, March 2 until Saturday, March 7. Daily 8:30 a.m. until 5:30 p.m. Northbound frontage road between Schwab Road and Hubertus Road for sidewalk work.
- Wednesday, March 4 until Friday, March 6. Nightly 9 p.m. until 5 a.m. Two northbound mainlanes between O’Connor Road and Judson Road for milling and inlay work.
- Sunday, March 1 until Wednesday, March 4. Nightly 8 p.m. until 5 a.m. Southbound right mainlane between Florida/Carolina exit and Drexel Avenue overpass for new guard rail installation work.
- Wednesday, March 4 until Friday March 6. Nightly 8 p.m. until 5 a.m. Southbound right mainlane between Cesar Chavez Avenue and Florida/Carolina exit for new guard rail installation work.
- Current until Monday, March 9. Full weekend closure 8 p.m. to 5 a.m. Two left mainlanes in both directions between the exit ramp to Marbach Road and the entrance ramp past Marbach Road for concrete barrier work.
- Monday, March 2 until Saturday, March 14. Daily 9 a.m. to 3 p.m. One frontage road in both directions between SH 151 to FM 471 (Culebra Road) and the turnarounds at West Military Drive for electrical service work. DETOUR: Traffic will need to use the SH 151 and FM 471 (Culebra Road) turnarounds.
- Monday, March 2 until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both directions between US 90 bridge to SH 151 for mill and inlay work.
US 90 – West San Antonio
- Monday, March 2 until Friday, March 27. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes between Ray Ellison Drive to US 90 bridge (eastbound) and Tomar Drive to Hunt Lane bridge (westbound) for staging equipment and rock placement.
- Monday, March 2 until Thursday, March 5. Nightly 8 p.m. to 5 a.m. The right eastbound mainlane between Springvale Drive to Hunt Lane for single slope traffic rail work.
- Thursday, March 5 until Saturday, March 7. Nightly 8 p.m. to 5 a.m. The right westbound mainlane between Springvale Drive to Hunt Lane for single slope traffic rail work.
- None scheduled.
FM 3351 – Ralph Fair Road
- None scheduled.
- City of San Antonio/TCI closure for Hardberger Park Landbridge project. Monday, March 2 until Friday, March 6. 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
- City of San Antonio/TCI closure for Hardberger Park Landbridge project. Saturday, March 7. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
- None scheduled.
- None scheduled.
- None scheduled.
Spur 371 – General Hudnell Drive
- Sunday, March 1 until Friday, March 6. Nightly 9 p.m. to 5 a.m. One lane in each direction between Billy Mitchell to US 90 for mill and paving work.
- Current until Saturday, March 7. Daily 9 a.m. until 4 p.m. Alternating lanes in both directions between Rigsby Avenue and Super 8 for paving, sod placement, manhole and sign installation work.
- Sunday, March 1 until Monday, March 2. 9 p.m. until 5 a.m. One lane in both directions between Rigsby Avenue and I-10 for striping work.
Spur 421 – Bandera Road
- None scheduled.
- Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
- None scheduled.
- Friday, March 6. 2 a.m. until 5 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge deck pour work. DETOUR: Westbound traffic diverted to the FM 3351 (Ralph Fair Road) turnaround; eastbound traffic diverted to the Dominion Drive turnaround.
- Monday, March 9. 2 a.m. until 5 p.m. Full closure of Boerne Stage Road in both directions at I-10 for bridge deck pour work. DETOUR: Westbound traffic diverted to the FM 3351 (Ralph Fair Road) turnaround; eastbound traffic diverted to the Dominion Drive turnaround.
- None scheduled.
- Sunday, March 1 until Friday, March 6. Daily 9 a.m. until 4 p.m. One lane in both directions between Evans Road and Judson Road for milling and paving work.
- Current until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders in both directions between I-10 and SH 123 for topsoil work.
- Current until Friday, March 6. Daily 7 a.m. until 5:30 p.m. Alternating lanes/shoulders between ½-mile west of FM 725 and 1 mile east of FM 1620 for paving work.
- None scheduled.
- None scheduled.
SH 123 – Seguin/Guadalupe County
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
SH 46 – Boerne/Kendall County
- Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
- Saturday, March 7 until Sunday, March 15. Full time all-day closure. All lanes in both directions at Wasp Creek Road for road reconstruction work. DETOUR: Roadway open to local traffic but drivers wishing to travel between Boerne and Sisterdale will be diverted to FM 474 and FM 473.
- Current until Friday, May 1. Full closure (all day) in both directions at Atascosa River (between FM 476 and SH 173) for culvert removal and replacement work.
- Current until Saturday, March 21. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions (flagging operations) between SH 16 and La Parita Creek for paving work.
- Monday, March 2 until Friday, March 6. Daily 7 a.m. until 6 p.m. Alternating lanes in both directions between Ben Franklin Road and McMullen/Duval County line for paving work.