- Sunday, May 10 until Friday, May 15. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
- Monday, May 11 until Friday, May 15. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
- Monday, May 11 until Friday, May 15. Nightly 9 p.m. until 5 a.m. Left lane westbound frontage road closure from the US 281 north exit ramp to the northbound US 281 frontage road.
- Saturday, May 16 until Monday, May 18. Full weekend closure 2 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
- Saturday, May 16 until Monday, May 18. Full weekend closure 2 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
- Sunday, May 10 until Thursday, May 14. Nightly 6 p.m. until 6 a.m. Full mainlane closure in both directions between Redland Road and Green Mountain Road for milling and overlay work. DETOUR: Traffic will be diverted to the frontage road.
- Sunday, May 10 until Thursday, May 14. Daily 6 a.m. to 6 p.m. One westbound frontage road lane between Bulverde Road and Redland Road for removing concrete barrier.
- Monday, May 11 until Friday, May 15. Nightly 8 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for mill/paving, guardrail and mow strip work.
- Monday, May 11 until Wednesday, May 13. Daily 7 a.m. to 5 p.m. The left eastbound frontage road lane between Quincy Lee and Hausman Road for concrete traffic barrier work.
- Wednesday, May 13 until Friday, May 15. Daily 8 a.m. to 4 p.m. The right eastbound and left westbound mainlane between SH 16 (Bandera Road) and Hausman Road for concrete traffic barrier work.
- None scheduled.
- None scheduled.
- None scheduled.
- Saturday, May 9. Day 5 a.m. to 5 p.m. The left southbound mainlane between 2600ft north of Overlook Parkway to Summer Glen for traffic switch.
- Saturday, May 9 until Monday, May 11. Weekend closure 2 a.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
- Saturday, May 9 until Monday, May 11. Weekend closure 2 a.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Encino Rio.
- Saturday, May 9 until Monday, May 11. Weekend closure 2 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
- Saturday, May 9 until Monday, May 11. Weekend closure 2 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the next turnaround at Encino Rio.
- Saturday, May 9 until Monday, May 11. Weekend closure 2 a.m. until 5 a.m. Left lane northbound mainlane closure from Sonterra Boulevard to Encino Rio for concrete paving.
- Monday, May 11 until Friday, May 15. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
- Monday, May 11 until Friday, May 15. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Monday, May 11 until Friday, May 15. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure of the north- to westbound Loop 1604 direct connector ramp for bridge work. DETOUR: Take the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road and use the US 281 entrance ramp.
- Monday, May 11 until Friday, May 15. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
- Monday, May 11 until Friday, May 15. Nightly 9 p.m. until 5 a.m. Right/center lane southbound mainlane closure from Evans Road to Encino Rio.
- Monday, May 11 until Friday May 15. Nightly 9 p.m. until 5 a.m. Right lane southbound mainlane closure from Stone Oak Parkway to Encino Commons for concrete paving.
- Monday, May 11 until Friday May 15. Nightly 9 p.m. until 5 a.m. Left lane southbound frontage road closure from Sonterra Boulevard to Loop 1604 for concrete paving.
- Thursday, May 14 until Friday, May 15. Nightly 9 p.m. to 5 a.m. The right southbound lane between Overlook Parkway to Summer Glen for barrier work.
- Saturday, May 16 until Monday, May 18. Full weekend closure 2 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
- Saturday, May 16 until Monday, May 18. Full weekend closure 2 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Saturday, May 16 until Monday, May 18. Weekend closure 2 a.m. until 5 p.m. Left lane northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving.
- Saturday, May 16 until Monday, May 18. Weekend closure 2 a.m. until 5 p.m. Left lane southbound frontage road closure from Sonterra Boulevard to Loop 1604 for concrete paving.
- Saturday, May 16 until Monday, May 18. Weekend closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for bridge work and safety enhancements.
- Monday, May 11 until Friday, May 15. Daily 9 a.m. to 4 p.m. The right southbound lane at FM 1937 for mill, seal coat and overlay work.
- Saturday, May 9. Weekend 7 a.m. to 3 p.m. Two left southbound mainlanes between Camp Bullis and La Cantera Parkway for concrete traffic barrier work.
- Current until Saturday, May 16. Daily 9 a.m. to 3 p.m. The left westbound frontage road between FM 3351 (Ralph Fair Road) and Old Fredericksburg Road for drainage work.
- Sunday, May 10 until Friday, May 15. Nightly 8 p.m. to 6 a.m. All westbound mainlanes between Dominion Drive and FM 3351 (Ralph Fair Road) for repairing the right shoulder. DETOUR: Traffic will exit 551 to Boerne Stage Road/Leon Springs; proceed west on the frontage road through Leon Springs and the Boerne Stage Road intersection; re-enter highway after FM 3351 (Ralph Fair Road).
- Thursday, May 14. Daily 7 a.m. to 7 p.m. All eastbound mainlanes between Midway exit ramp to Midway entrance ramp for pavement repair work. DETOUR: Traffic will exit Midway and re-enter at the next entrance ramp.
- Friday, May 8 until Saturday, May 9. Nightly 9 a.m. to 5 a.m. Eastbound right lane closed from FM 1516 to LP 1604 to remove road buttons.
- Friday, May 8 until Sunday, May 10. Weekend 7 p.m. to 5 a.m. Eastbound alternating lane closures from Ackerman to Woodlake Parkway for striping and to remove barrier.
- Friday, May 8 until Monday, May 11. Nightly 7 p.m. to 5 a.m. Eastbound right lane closed from Ackerman Road to Foster Road for ramp reversal. DETOURS: Eastbound I-10 mainlane drivers wishing to access Foster Road will use a temporary exit ramp. Eastbound frontage road drivers wishing to enter the I-10 mainlanes will use a new permanent entrance ramp from Ackerman Road.
- Wednesday, May 13 to Friday, May 15. Nightly from 9 p.m. to 5 a.m. each night. East and westbound left lane closed between Graytown Road and Pfeil Road for median work.
- Thursday, May 14 until Friday, May 15. Nightly 7 p.m. to 5 a.m. FM 1516 will be closed under I-10 to set beams for new overpass. DETOURS: FM 1516 traffic will use the frontage roads and the turnarounds at Loop 1604 or Woodlake Parkway to cross I-10.
- Saturday, May 16. Daywork 5 a.m. to 9 p.m. East and westbound left lane closed between Graytown Road and Pfeil Road for median work.
- Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
- Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
- Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.
- None scheduled.
- Sunday, May 10 until Wednesday, May 13. Nightly 7 p.m. to 6 a.m. Alternating northbound mainlanes between FM 2252 to Schwab Road for restriping work.
- Monday, May 11 until Tuesday, May 12. Nightly 7 p.m. to 5 a.m. The entrance ramp to Loop 1604 southbound and southbound exit from Loop 1604 for barrier and striping work. DETOUR: Follow detour signs.
- Wednesday, May 13 until Saturday, May 16. Nightly 7 p.m. to 6 a.m. Two northbound mainlanes between FM 2252 to Schwab Road for concrete traffic barrier work.
- Tuesday, May 12. Daily 8 a.m. to 4 p.m. The right southbound mainlane and shoulder between Carolina/Florida exit to the I-10 eastbound entrance ramp for guardrail, mowstrip and riprap work.
- Wednesday, May 13. Daily 8 a.m. to 4 p.m. The right northbound mainlane and shoulder between the I-10 entrance ramp to the Carolina/Florida entrance ramp for guardrail removal.
- Thursday, May 14. Daily 8 a.m. to 3 p.m. The northbound exit ramp at I-10 eastbound for illumination pole removal.
- Friday, May 8 until Saturday, May 9. Weekend 8 p.m. to 5 p.m. Alternating full closure in both directions between US 90 to Valley Hi Drive for mill and inlay, and striping operations. NORTHBOUND DETOUR: Traffic will be detoured to take the exit to US 90, continue on the northbound frontage road through the Marbach Road intersection, and utilize the entrance ramp past Marbach Road to access the mainlanes. SOUTHBOUND DETOUR: Traffic traveling south will be detoured to take the exit ramp to Marbach Road, continue on the southbound frontage road through the Marbach Road intersection, and use the entrance ramp before Valley Hi Drive to access the mainlanes. Several ramps within the limits will also be closed.
- Current until Monday, May 11. Daily 9 a.m. to 3 p.m. The left mainlane in both directions between Marbach Road and W. Military Drive for asphalt and removing concrete traffic barrier work.
- Monday, May 11 until Monday, May 18. Daily 9 a.m. to 3 p.m. One southbound frontage road lane between NW Crossroads and W. Military Drive for concrete riprap removal. DETOUR: Traffic will continue straight through the W. Military Drive intersection.
- Tuesday, May 12 until Saturday, May 16. Nightly 8 p.m. to 5 a.m. All southbound mainlanes between W. Military Drive and Marbach Road for barrier work. DETOUR: Traffic will take the W. Military Drive exit to the frontage road; go through SH 151 and re-enter at the next entrance ramp.
- Wednesday, May 13 until Friday, May 15. Daily 9 a.m. to 3 p.m. Alternating southbound frontage road between Ingram Road and Culebra Road for underground pipe work. DETOUR: Culebra Road traffic will drive to W. Military Drive turnaround; stay on the frontage road to access Culebra Road.
- Current until Monday, May 18. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both directions between Marbach Road and Ingram Road for retention wall and underground storm drain work.
- Current until Friday, May 18. Nightly 8 p.m. to 5 a.m. Alternating full closure in both directions between US 90 to Valley Hi Drive for mill and inlay operations. NORTHBOUND DETOUR: Traffic will be detoured to take the exit to US 90, continue on the northbound frontage road through the Marbach Road intersection, and utilize the entrance ramp past Marbach Road to access the mainlanes. SOUTHBOUND DETOUR: Traffic traveling south will be detoured to take the exit ramp to Marbach Road, continue on the southbound frontage road through the Marbach Road intersection, and use the entrance ramp before Valley Hi Drive to access the mainlanes. Several ramps within the limits will also be closed.
- Current until Friday, May 29. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both direction between SH 151 to US 90 for staging equipment and trucks.
- Current until Friday, May 29. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes between Ray Ellison Drive to US 90 bridge (eastbound) and Tomar Drive to Hunt Lane bridge (westbound) for staging equipment, trucks and ground rock.
- Thursday, May 14 until Saturday, May 16. Nightly 8 p.m. to 5 a.m. The left lane in each direction between I-410 to Ingram Road for barrier work.
- Monday, May 11. Daily 9 a.m. to 5 p.m. The right southbound lane between Circle A Trail to FM 1560 for pavement failure work.
- None scheduled.
- City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, May 8 until Monday, May 11. Weekend closure 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, May 11 until Friday, May 15. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for construction truck and equipment access.
- City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, May 11 until Friday, May 15. Nightly 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, May 15 until Monday, May 18. Weekend closure 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, May 18 until Friday, May 22. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for construction truck and equipment access.
- City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, May 18 until Friday, May 22. Nightly 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, May 29 until Monday, June 1. Weekend closure 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- Monday, May 11 until Friday, May 15. Daily 9 a. m. to 5 p.m. One lane in both directions between FM 2536 (Old Pearsall Road) to Rockgate Drive for guardrail and signal work.
- Monday, May 11 until Friday, May 15. Nightly 7 p. m. to 5 a.m. One lane in both directions between FM 2536 (Old Pearsall Road) to Rockgate Drive for paving work.
- None scheduled.
- Exit ramp from Loop 1604 eastbound closed for approximately two months starting Monday, March 16.
- None scheduled.
- Monday, May 11 until Friday, May 15. Daily 7 a.m. to 5 p.m. One lane in both directions between Cupples Road to Frio City Road for concrete rail and guardrail improvements.
- None scheduled.
- None scheduled.
- Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
- Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
- None scheduled.
- None scheduled.
None scheduled.
Loop 337 – New Braunfels/Comal County
None scheduled.
TX 46/FM 311 – Comal County
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
- Monday, May 11 until Saturday, May 16. Daily 7 a.m. until 7 p.m. Various locations in both directions between North School Street and ½-mile north of Wasp Creek Road for culvert work.
- None scheduled.
- None scheduled.
- None scheduled.