Friday, June 26

Upcoming Scheduled Construction Closures

Loop 1604 – North Central San Antonio

  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. to 5 a.m. Alternating westbound frontage road closure from US-281 north exit ramp to the northbound US-281 frontage road.

 

Loop 1604 – Northeast San Antonio

  • Friday, June 26 until Saturday, June 27. 9 p.m. to 12 p.m. Single northbound mainlane closure from Pat Booker Rd. bridge approach to Pat Brooker Rd. bridge departure for the demolition of the existing bridge.
  • Friday, June 26 until Monday, June 29. 7 p.m. to 5 a.m. Full street closure of Pat Booker Rd. from Loop 1604 southbound frontage road to Loop 1604 northbound frontage road for the demolition of the existing bridge.
  • Friday, June 26 until Thursday, June 2. 9 a.m. to 5 a.m. Closure of Pat Booker Rd. southbound turnaround from northbound Loop 1604 turnaround entrance to southbound Loop 1604 turnaround exit to allow for equipment staging during bridge demolition.
  • Sunday, June 28 until Friday, July 3. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Green Mountain Road to I-35 cloverleaf ramps for pavement and concrete work.
  • Monday, June 29 until Thursday, July 2. 9 a.m. to 4 p.m. Westbound exit ramp at O’Connor Rd. for guardrail installation.
  • Monday, June 29 until Thursday, July 2. 9 a.m. to 4 p.m. Westbound exit ramp closure at Green Mountain Rd. for guardrail installation.
  • Monday, June 29 until Thursday, July 2. 9 a.m. to 4 p.m. Westbound entrance ramp closure at O’Connor Rd. for guardrail installation.
  • Monday, June 29 until Thursday, July 2. 11 a.m. to 2 p.m. Single eastbound frontage road lane closure from Redland Rd. to Bulverde Rd. for curb pouring.
  • Monday, June 29 until Friday, July 3. 10 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Green Mountain Road to I-35 cloverleaf ramps for guardrail improvements.

 

Loop 1604 – Northwest San Antonio

  • Wednesday, July 1 until Friday, July 3. 9 p.m. to 5 a.m. Alternating eastbound frontage road lane closures from Bandera Rd. to Champions Gate for concrete traffic barrier removal.

 

Loop 1604 – West San Antonio

  • None scheduled.

 

Loop 1604 – Far East San Antonio

  • None scheduled.

 

Loop 1604 – South San Antonio

  • None scheduled.

 

US 281 – North Central San Antonio/Bexar County

  • Friday, June 26 until Monday, June 29. Full weekend closure 9 p.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Friday, June 26 until Monday, June 29. Weekend closure 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for a traffic switch.
  • Saturday, June 27 until Sunday, June 28. 3 a.m. to 6 p.m. Full closure of Borgfield Rd., in both directions, from US-281 to Bulverde Rd. for road repairs.
  • Saturday, June 27 until Monday, June 29. Weekend closure 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for concrete paving.
  • Monday, June 29 until Wednesday, July 1. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for drainage work. DETOUR: Turn left on the southbound frontage road, take the turnaround at Donella Drive and use the Donella Drive entrance ramp.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Redland Road for bridge work. DETOUR: Use the next turnaround at Loop 1604. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the detour turnaround closures.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Evans Road.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for bridge work and safety enhancements.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for concrete paving.
  • Monday, June 29 until Thursday, July 2. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Sonterra Boulevard to Loop 1604 for concrete paving.

 

Encino Rio – North Central San Antonio

  • None scheduled.

 

US 281 – South San Antonio

  • None scheduled.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Sunday, June 28. 7 a.m. to 12 p.m. Full mainlane and frontage road closure at Heuerman Rd. to allow for CPS to transfer overhead lines to new poles.
  • Sunday, June 28. 7 a.m. to 12 p.m. Westbound mainlane frontage road lane closure from 0.5 miles west of Camp Bullis Rd. to 0.8 miles west of Camp Bullis Rd. for pole placement.
  • Sunday, June 28 until Friday, June 3. 9 p.m. to 5 a.m. Westbound mainlane closure from La Cantera Parkway to Ralph Fair Rd (FM 3351) for the removal of portable concrete traffic barrier.
  • Monday, June 29 until Thursday, July 2. 7 a.m. to 7 p.m. Alternating mainlane and shoulder closures, in both directions, from 1.2 miles east of Kerr/Kimble County Line to 0.5 miles east of Kerr/Kimble County Line for mow strip installation.
  • Monday, June 29 until Friday, July 31. 7 a.m. to 7 p.m. Alternating mainlane and shoulder closures, from SH-16 to Kerr/Kendall County Line for pavement work.  
  • Monday, July 5 until Friday, July 17. 9 a.m. to 5 p.m. Eastbound mainlane closure from Ralph Fair Rd. (FM 3351) to La Cantera Parkway for the removal of portable concrete traffic barrier.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, June 27. Eastbound and westbound right lane closed between FM 1516 and Graytown Road from 5 a.m. to 9 p.m.
  • Current until mid-September. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
    • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
    • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-10 – Central San Antonio

  • None scheduled.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, June 27. 9 a.m. to 5 p.m. Single lane closure of northbound frontage road from Schwab Rd. to FM 2252 (Hubertus Rd.) for barrier work.
  • Sunday, June 28 until Friday, July 3. 9 p.m. to 5 a.m. Mainlane and shoulder closures, in both directions, from Guadalupe River bridge to FM 306 bridge for guardrail replacement.
  • Monday, June 29 until Tuesday, June 30. 9 p.m. to 5 a.m. Northbound mainlane closures from FM 306 to Conrad/Kohelerberg bridge for work zone striping maintenance.

 

I-37 – Central/South San Antonio

  • None scheduled.

 

I-410 – West San Antonio

  • Current until Sunday, June 28. 8 p.m. to 5 a.m. Single mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for concrete traffic barrier installation.
  • Current until Sunday, June 28. 8 p.m. to 5 a.m. Single frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work. DETOUR: Traffic will continue to the Loop 410/SH-151 intersection and take two left turns.
  • Current until Sunday, June 28. 9 a.m. to 3 p.m. Single southbound frontage road lane closure from N.W. Crossroads to Military Dr. for concrete ramp removal. DETOUR: Traffic will continue straight through the Military Dr. intersection.
  • Current until Sunday, June 28. 9 a.m. to 3 p.m. Single frontage road lane and turnaround closures, in both directions, from Marbach Rd. to Ingram Rd. for storm drain work.
  • Current until Sunday, June 28. 8 p.m. to 5 a.m. Full westbound mainlane closure, from Loop 410 to Ingram Rd. for bent work. DETOUR: Traffic will travel on frontage road through the Loop 410/SH-151 intersection and take the entrance ramp to SH-151 westbound.
  • Sunday, June 28 until Monday, July 20. 8 p.m. to 5 a.m. Alternating northbound frontage road closures from SH-151 to Marbach Rd. for equipment staging.
  • Sunday, June 28 until Monday, July 20. 8 p.m. to 5 a.m. Alternating southbound frontage road lane and shoulder closures from SH-151 to Marbach Rd.
  • Current until Thursday, July 2. 8 p.m. to 5 a.m. Alternating mainlane closures at Marbach Rd. bridge for equipment staging and the removal of concrete islands.
  • Monday, July 6 until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from SH-151 to 3 p.m. for equipment staging.

 

US 90 – West San Antonio

  • Monday, June 29 until Thursday, July 2. 9 a.m. to 3 p.m. Single frontage road lane closures, in both directions, from W. Military Dr. to SW 36th St. for guardrail and concrete improvements.
  • Current until Friday, July 3. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Hunt Lane to US-90 bridge to allow for equipment staging. DETOUR: Traffic traveling on US-90E will exit Military Dr. and take the turnaround.
  • Monday, July 6 until Friday, July 31. 9 a.m. to 3 p.m. Single frontage road lane closure, in both directions, from Hunt Lane to US-90 to allow for equipment staging.
  • Monday, July 6 until Friday, July 31. 9 a.m. to 3 p.m. Single lane closures of Marbach Rd., in both directions, for equipment staging.

 

SH 151 – West San Antonio

 

SH 16 – Bandera Road

  • Monday, June 29 until Tuesday, June 30. 9 a.m. to 5 p.m. Entrance ramp closure to eastbound I-10 for construction work.
  • Monday, June 29 until July 3. 9:30 a.m. to 3:30 p.m. Single mainlane closures, in both directions, from Bresnahan St. to Braun Rd. for pole and utility installation.

 

FM 471 – Culebra Road

  • None scheduled.

 

FM 3351 – Ralph Fair Road

  • None scheduled.

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Saturday, June 27 until Sunday, June 28. 9 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W. Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) for construction haul trucks entering roadway.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, June 29 until Friday, June 3. 9 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from N.W. Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, June 29 until Friday, July 3. 9 a.m. to 4 p.m. Single mainlane closure, in both directions, from 0.5 miles from N.W. Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) for construction haul trucks entering roadway.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 3 until Sunday July 5. 9 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from N.W. Military Rd. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.

 

Loop 13 – S.W. Military Drive

  • Sunday, June 28 until Friday, July 3. 7 p.m. to 5 a.m. Single lane closures, in both directions, from Old Pearsall Rd. to Rockgate Dr. for asphalt and pavement work.  

 

FM 2252 – Nacogdoches Road

  • None scheduled.

 

FM 1560 – Hausman Road

  • Exit ramp from Loop 1604 eastbound closed until further notice starting Monday, March 16.

 

SH 218 – Pat Booker Road

  • None scheduled.

 

Spur 371 – General Hudnell Drive

 

FM 78 – Bexar County

  • None scheduled.

 

US 87 – Roland Avenue

  • None scheduled.

 

Spur 421 – Bandera Road

  • None scheduled.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

Loop 353 – New Laredo Highway

  • None scheduled.

 

SS 371 – General Hudnell Drive

  • None scheduled.

 

Other Roads – Bexar County

  • Monday, June 28. 7 a.m. to 4 p.m. Northbound right lane closure of Blanco Rd. from Patricia Rd. to West Ave. for pole placements.
  • Current until Tuesday, June 30. 9 a.m. to 3 p.m. Single lane closure of Boerne Stage Road, in both directions, from eastbound I-10 frontage road to westbound I-10 frontage road for pipe installation.
  • Wednesday, June 29 until Wednesday, July 1. 9 a.m. to 4 p.m. Eastbound right lane closure of Huebner Rd. from 1,000 feet before Loop 345 to Loop 345 for conduit repairs.

 

FM 306 – New Braunfels/Comal County

None scheduled.

 

Loop 337 – New Braunfels/Comal County

  • None scheduled.

 

TX 46/FM 311 – Comal County

  • None scheduled.

 

FM 1863 – Comal County

  • None scheduled.

 

FM 2673 – Canyon Lake/Comal County

  • None scheduled.

 

FM 1516 – South Seguin Road/Converse

  • None scheduled.

 

FM 2252 – Comal County

  • None scheduled.

 

SH 46 – Guadalupe County

  • None scheduled.

 

FM 78 – Guadalupe County

  • None scheduled.

 

FM 1518 – Schertz/Cibolo Guadalupe County

  • None scheduled.

 

US 90A – Seguin/Guadalupe County

  • None scheduled.

 

SH 123 – Seguin/Guadalupe County

  • None scheduled.

 

Business 123 – South Austin Street/Seguin/Guadalupe County

  • None scheduled.

 

I-35 – Atascosa County/Frio County

  • None scheduled.

 

US 181 – Floresville/Wilson County

  • None scheduled.

 

US 87 – Wilson County

  • None scheduled.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • Tuesday, June 29 until Friday, July 3. 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway reconstruction.

 

RM 474 – Blanco Road/Kendall County

  • None scheduled

 

FM 1333 – Atascosa County

  • None scheduled.

 

FM 140 – Atascosa County

  • None scheduled.

 

SH 16 – McMullen County

  • None scheduled.

 

FM 3009 – Comal County

  • Sunday, June 28 until Friday, July 3. 6 p.m. to 6 a.m. Alternating mainlane closure, in both directions, from I-35 to FM 78 for pavement work at intersections and driveways.

 

I-10 – Kerr County

  • Current until Saturday, June 27. Daylight to Dusk. Single, alternating mainlane and shoulder closures, in both directions, from Gillespie/Kerr County Line to 2 miles west of Midway Rd.to complete hot mix overlay.
  • Current until Friday, July 3. 7 a.m. to 7 p.m. Single, alternating mainlane and shoulder closures from 2.5 miles west of Kerr/Gillespie County Line to 3.5 west of Kerr/Gillespie County Line for metal beam guard fence installation.
  • Monday, June 29 until Wednesday, July 8. Daylight to Dusk. Single mainlane closure, in both directions, from approximately one (1) mile west of Midway Road to Kerr/Kimble County Line to complete hot mix overlay.

 

FM 1044 – Comal County

  • Monday, June 29 until Friday, July 3. 7 a.m. to 7 p.m. Single southbound lane closure from just north of Loma Verde Dr. to just south of Lou Ann Dr. for base repairs and roadway replacement.  


Northbound US 281 Mainlanes and Sonterra Blvd. Exit Ramp Opening This Weekend


Good news for motorists traveling on US 281. Two new northbound US 281 mainlanes, from Loop 1604 to south of Evans Road, are scheduled to open the evening of Saturday, June 27. With the new mainlanes, we will also open the northbound US 281 frontage road exit ramp to Sonterra Boulevard.

Motorists traveling on northbound US 281 headed to Redland Road or Encino Rio will now need to use the newly-opened exit ramp to Sonterra Boulevard, as the new northbound US 281 mainlanes will give drivers an express route past Encino Rio without additional exits.  South of Evans Road, after Encino Rio, the northbound US 281 mainlanes will then merge back with the frontage road as shown in the graphic below. If drivers miss the Sonterra Boulevard exit ramp, they can also use the north- to southbound turnaround at Evans Road as an alternate detour to Encino Rio or back to Redland Road.


More openings are planned within the next two months. During July, the southbound US 281 flyover ramps to east- and westbound Loop 1604 are scheduled to open, followed by the opening of the signalized Redland Road intersection in August.

Construction activities are subject to change due to weather or other unforeseen circumstances.

You can stay informed of lane closures by receiving alerts to your e-mail by registering here or by following us on our Twitter feed.



Friday, June 19

Upcoming Scheduled Construction Closures

Loop 1604 – North Central San Antonio

  • Saturday, June 20 until Monday, June 22. Full weekend closure 3 a.m. until 5 a.m.  Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, June 20 until Monday, June 22. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Monday, June 22 until Friday, June 26. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from the US 281 north exit ramp to the northbound US 281 frontage road.
  • Tuesday, June 23 until Friday, June 26. 11 a.m. to 2 p.m. Single eastbound frontage road lane closure from Bulverde Rd. to Redland Rd. for curb repairs. 

 

Loop 1604 – Northeast San Antonio

  • Monday, June 22 until Friday, June 26. 8 p.m. to 5 a.m. Single mainlane closures, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramps for pavement and concrete work.
  • Monday, June 22 until Friday, June 26. 10 a.m. to 3 p.m. Single mainlane closures, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramps for guardrail and concrete improvements.
  • Friday, June 26 until Saturday, June 27. 9 p.m. to 12 p.m. Single northbound mainlane closure from Pat Booker Rd. bridge approach to Pat Brooker Rd. bridge departure for the demolition of the existing bridge.
  • Friday, June 26 until Monday, June 29. 7 p.m. to 5 a.m. Full street closure of Pat Booker Rd. from Loop 1604 southbound frontage road to Loop 1604 northbound frontage road for the demolition of the existing bridge.
  • Friday, June 26 until Thursday, June 2. 9 a.m. to 5 a.m. Closure of Pat Booker Rd. southbound turnaround from northbound Loop 1604 turnaround entrance to southbound Loop 1604 turnaround exit to allow for equipment staging during bridge demolition.

 

Loop 1604 – Northwest San Antonio

  • None scheduled.

 

Loop 1604 – West San Antonio

  • Tuesday, June 23 until Friday, June 26. 9 a.m. to 4 p.m. Single eastbound frontage road lane closure from Quincy Lee to Hausman Rd. for seed and soil placement.

 

Loop 1604 – Far East San Antonio

  • Tuesday, June 23 until Friday, June 26. 9 a.m. to 3 p.m. Single southbound frontage road lane closure from just north of Meadland Dr. to just south of Meadowland Dr. for asphalt and curb improvements.

 

Loop 1604 – South San Antonio

  • None scheduled.

 

US 281 – North Central San Antonio/Bexar County

  • Saturday, June 20. 6 a.m. to 5 p.m. Southbound mainlane closure from Cibolo Creek to 1,200 feet north of Cibolo Creek for barrier work.
  • Saturday, June 20. Weekend closure 2 a.m. until 5 p.m. Left lane northbound mainlane closure at Redland Road for concrete paving.
  • Saturday, June 20. Weekend closure 5 a.m. until 5 p.m. Right lane southbound mainlane closure from Stone Oak/Tournament Players Club (TPC) Parkway to Evans Road for concrete paving.
  • Saturday, June 20 until Monday, June 22. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Saturday, June 20 until Monday, June 22. Weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
  • Saturday, June 20 until Monday, June 22. Weekend closure 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for bridge work and safety enhancements.
  • Sunday, June 21 until Friday, June 26. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for bridge work and safety enhancements.
  • Monday, June 22 until Friday, June 26. 9 p.m. to 5 a.m. Full closure of Overlook Parkway, in both directions, from 500 feet west of US-281 to US-281 for various construction work to the concrete barrier, earth, pavement, and roadway. 
  • Monday, June 22 until Friday, June 26. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for drainage work. DETOUR: Turn left on the southbound frontage road, take the turnaround at Donella Drive and use the Donella Drive entrance ramp.
  • Monday, June 22 until Friday, June 26. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, June 22 until Friday, June 26. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Redland Road for bridge work. DETOUR: Use the next turnaround at Loop 1604.
  • Monday, June 22 until Friday, June 26. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, June 22 until Friday, June 26. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Evans Road.
  • Monday, June 22 until Friday, June 26. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for bridge work and safety enhancements.
  • Monday, June 22 until Friday, June 26. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Sonterra Boulevard to Loop 1604 for concrete paving.
  • Friday, June 26 until Monday, June 29. Full weekend closure 9 p.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Friday, June 26 until Monday, June 29. Weekend closure 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for a traffic switch.
  • Saturday, June 27 until Monday, June 29. Weekend closure 3 a.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for concrete paving.

 

Encino Rio – North Central San Antonio

  • None scheduled.

 

US 281 – South San Antonio

  • None scheduled.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Current until Friday, June 26. Nightly 9 p.m. to 5 a.m. Full southbound mainlane closure from Ralph Fair Rd. to La Cantera Parkway for outside shoulder repair. DETOUR: Traffic take Exit 550 Ralph Fair Rd./Boerne Stage Rd. onto the eastbound frontage road through Ralph Fair Rd. intersection, pass Boerne Stage Rd. intersection, and re-enter the eastbound mainlanes one mile east of Camp Bullis Rd.
  • Sunday, June 21 until Friday, June 26. 9 p.m. to 5 a.m. Single mainlane closures, in both directions, from Kendall/Bexar County Line to Fair Oaks Parkway for bridge repair work.
  • Sunday, June 28. 7 a.m. to 12 p.m. Full mainlane and frontage road closure at Heuremann Rd. to allow for CPS to transfer overhead lines to new poles.
  • Sunday, June 28. 7 a.m. to 12 p.m. Westbound mainlane frontage road lane closure from 0.5 miles west of Camp Bullis Rd. to 0.8 miles west of Camp Bullis Rd. for pole placement.
  • Sunday, June 28 until Friday, June 3. 9 p.m. to 5 a.m. Westbound mainlane closure from La Cantera Parkway to Ralph Fair Rd (FM 3351) for the removal of portable concrete traffic barrier.
  • Monday, July 5 until Friday, July 17. 9 a.m. to 5 p.m. Eastbound mainlane closure from Ralph Fair Rd. (FM 3351) to La Cantera Parkway for the removal of portable concrete traffic barrier.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, June 19. Westbound mainlane closure from Woodlake Parkway to Ackerman Road from noon to 8 p.m. for traffic switch. Traffic will be reduced to one lane.
  • Friday, June 19 thru Saturday, June 20. Westbound I-10 exit ramps to Ackerman Road and I-410 closed from 8 p.m. Friday to 4 p.m. Saturday. DETOUR: Use W.W. White, turn left at overpass, and take eastbound I-10 to access north and southbound I-410.
  • Friday, June 19 thru Monday, June 22. Weekend closure of westbound I-10 entrance ramp from Foster Road from 9 p.m. Friday to 5 a.m. Monday for traffic switch. DETOUR: Continue on westbound frontage road and enter mainlanes west of Ackerman Road.
  • Beginning Monday, June 22 at 5 a.m. Westbound I-10 entrance ramp from Ackerman Road will close for approximately three months. DETOURS:
  • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Monday, June 22 thru Wednesday June 24. Eastbound and westbound alternating lane closures between FM 1516 and Graytown Road from 7 p.m. to 5 a.m. each night.
  • Wednesday, June 24. Ackerman Road closed under I-10 from 9 p.m. to 5 a.m. DETOUR: Southbound Ackerman Road traffic can take the westbound I-10/northbound I-410 frontage road to Sequin Road, turn left at Sequin Road, and take southbound I-410 back to the I-10 interchange.
  • Saturday, June 27. Eastbound and westbound right lane closed between FM 1516 and Graytown Road from 5 a.m. to 9 p.m.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-10 – Central San Antonio

  • None scheduled.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, June 20. 7:30 a.m. to 5:30 p.m. Single right lane closure of northbound frontage road from Schwab Rd. to Hubertus Rd. for site work.
  • Sunday, June 21 until Friday, June 26. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Guadalupe River to FM 306 for guardrail replacement.  
  • Current until Saturday, June 27. 9 a.m. to 5 p.m. Single lane closure of northbound frontage road from Schwab Rd. to FM 2252 (Hubertus Rd.) for barrier work.

 

I-37 – Central/South San Antonio

  • None scheduled.

 

I-410 – West San Antonio

  • Current until Monday, June 22. 9 a.m. to 4 p.m. Northbound frontage road single lane closure from Meadow Bend Dr. to Tom Slick Park for transfer of communication lines on existing poles.
  • Current until Friday, June 26. Nightly, 8 p.m. to 5 a.m. Multiple closures from US-90 to SH 151 to stage equipment: southbound frontage road from US-90 to Marbach Rd.; southbound mainlane off-ramp to Marbach Rd.; and southbound frontage road on-ramp from US-90. DETOUR: Traffic heading to SH 151 coming from Loop 410 northbound mainlanes will detour to exit 7 (Marbach Rd.) and continue on Loop 410 northbound frontage road to SH 151.
  • Current until Friday, June 26. Nightly 8 p.m. to 5 a.m. Multiple closures from US-90 to Marbach Rd. for equipment staging: southbound frontage road from Marbach Rd. to US-90; southbound mainlane off-ramp to east US-90; and southbound frontage road on-ramp from Marbach Rd. DETOUR: Traffic coming from Loop 410 southbound mainlanes will detour to Valley-Hi off-ramp and continue on Loop 410 southbount frontage road to take the turnaround to Loop 410 northbound frontage road and continue on Loop 410 frontage road to US-90 or Marbach Rd.
  • Current until Friday, June 26. Nightly 8 p.m. to 5 a.m. Multiple closures from SH 151 to Marbach Rd. for equipment staging: southbound frontage road from SH 151 to Marbach Rd.; southbound mainlane off-ramp to Marbach Rd.; and southbound frontage road on-ramp from SH 151. DETOUR: Traffic coming from Loop 410 southbound mainlanes will detour to US-90 off-ramp, continue to Loop 410 southbound frontage roads and take the SB/EB cloverleaf and continue on Loop 410 northbound frontage road to Marbach Rd.
  • Current until Friday, June 26. Nightly 8 p.m. to 5 a.m. Multiple lane closures from SH 151 to Marbach Rd. for equipment staging: southbound frontage road from US-90 to Marbach Rd.; southbound mainlane off-ramp to Marbach Rd.; southbound frontage road on-ramp from US-90. DETOUR: Traffic traveling to SH 151 coming from Loop 410 northbound mainlanes will detour to exit 7 (Marbach Rd.) and continue to Loop 410 northbound frontage road to SH 151.
  • Sunday, June 21 until Sunday, June 28. 8 p.m. to 5 a.m. Single mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for concrete traffic barrier installation.
  • Sunday, June 21 until Sunday, June 28. 8 p.m. to 5 a.m. Single frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work. DETOUR: Traffic will continue to the Loop 410/SH-151 intersection and take two left turns.
  • Sunday, June 21 until Sunday, June 28. 9 a.m. to 3 p.m. Single southbound frontage road lane closure from N.W. Crossroads to Military Dr. for concrete ramp removal. DETOUR: Traffic will continue straight through the Military Dr. intersection.
  • Sunday, June 21 until Sunday, June 28. 9 a.m. to 3 p.m. Single frontage road lane and turnaround closures, in both directions, from Marbach Rd. to Ingram Rd. for storm drain work.
  • Monday, June 22 until Sunday, June 28. 8 p.m. to 5 a.m. Full westbound mainlane closure, from Loop 410 to Ingram Rd. for bent work. DETOUR: Traffic will travel on frontage road through the Loop 410/SH-151 intersection and take the entrance ramp to SH-151 westbound.
  • Current until Thursday, July 2. 8 p.m. to 5 a.m. Alternating mainlane closures at Marbach Rd. bridge for equipment staging and the removal of concrete islands.

 

US 90 – West San Antonio

  • Sunday, June 21 until Friday, July 3. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Hunt Lane to US-90 bridge to allow for equipment staging. DETOUR: Traffic traveling on US-90E will exit Military Dr. and take the turnaround.
  • Monday, June 22 until Friday, June 26. 9 a.m. to 3 p.m. Single frontage road lane closure, in both directions, from W. Military Dr. to SW 36th St. for guardrail and concrete improvements.

 

SH 151 – West San Antonio

 

SH 16 – Bandera Road

  • None scheduled.

 

FM 471 – Culebra Road

  • Monday, June 22 until Thursday, June 25. 9 a.m. to 4 p.m. Left lane closure, in both directions, from 1,000 feet south of FM 1560 to Rolt Rd. for island reconfiguration.

 

FM 3351 – Ralph Fair Road

  • None scheduled.

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, June 19 until Sunday, June 21. Nightly 9 p.m. to 5 a.m. Full mainlane closure, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic will utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Saturday, June 27 until Sunday, June 28. 9 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W. Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) for construction haul trucks entering roadway.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, June 29 until Friday, June 3. 9 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from N.W. Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, June 29 until Friday, July 3. 9 a.m. to 4 p.m. Single mainlane closure, in both directions, from 0.5 miles from N.W. Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) for construction haul trucks entering roadway.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 3 until Sunday July 5. 9 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from N.W. Military Rd. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.

 

Loop 13 – S.W. Military Drive

  • Monday, June 22 until Friday, June 26. 7 p.m. to 5 a.m. Single lane closure, in both directions, from Old Pearsall Rd. to Rockgate Dr. for asphalt work.

 

FM 2252 – Nacogdoches Road

  • None scheduled.

 

FM 1560 – Hausman Road

  • Exit ramp from Loop 1604 eastbound closed until further notice starting Monday, March 16.

 

SH 218 – Pat Booker Road

  • See Loop 1604 - Far East.
     

Spur 371 – General Hudnell Drive

 

FM 78 – Bexar County

  • None scheduled.

 

US 87 – Roland Avenue

  • None scheduled.

 

Spur 421 – Bandera Road

  • Monday, June 22 until Friday, June 26. 9:30 a.m. to 3:30 p.m. Single lane closure, in both directions, from Bresnahan St. to Braun Rd.for pole and utility installation. 
  • Monday, June 29 until Friday, July 3. 9:30 a.m. to 3:30 p.m. Single lane closure, in both directions, from Bresnahan St. to Braun Rd. for pole and utility installation. 

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

Loop 353 – New Laredo Highway

  • None scheduled.

  

Other Roads – Bexar County

  • None scheduled.

 

FM 306 – New Braunfels/Comal County

  • None scheduled.

 

Loop 337 – New Braunfels/Comal County

  • None scheduled.

 

TX 46/FM 311 – Comal County

  • None scheduled.

 

FM 1863 – Comal County

  • None scheduled.

 

FM 2673 – Canyon Lake/Comal County

  • None scheduled.

 

FM 1516 – South Seguin Road/Converse

  • None scheduled.

 

FM 2252 – Comal County

  • None scheduled.

 

SH 46 – Guadalupe County

  • None scheduled.

 

FM 78 – Guadalupe County

  • None scheduled.

 

FM 1518 – Schertz/Cibolo Guadalupe County

  • None scheduled.

 

US 90A – Seguin/Guadalupe County

  • None scheduled.

 

SH 123 – Seguin/Guadalupe County

  • None scheduled.

 

Business 123 – South Austin Street/Seguin/Guadalupe County

  • None scheduled.

 

I-35 – Atascosa County/Frio County

  • None scheduled.

 

US 181 – Floresville/Wilson County

  • None scheduled.

 

US 87 – Wilson County

  • None scheduled.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • Current until Saturday, June 20. 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway reconstruction.

 

RM 474 – Blanco Road/Kendall County

  • None scheduled

 

FM 1333 – Atascosa County

  • None scheduled.

 

FM 140 – Atascosa County

  • None scheduled.

 

SH 16 – McMullen County

  • None scheduled.

 

FM 3009 – Comal County

  • Monday, June 22 until Friday, June 26. 6 p.m. to 6 a.m. Single lane closure, in both directions, from I-35 to FM 78 for pavement repairs.

 

I-10 – Kerr County

  • Current until Wednesday, June 24. Daylight to Dusk. Single, alternating mainlane and shoulder closures, in both directions, from 1.2 miles east of Kerr/Kimble County Line to 0.5 miles east of Kerr/Kimble County Line for metal beam guard fence upgrades.
  • Current until Saturday, June 27. Daylight to Dusk. Single, alternating mainlane and shoulder closures, in both directions, from Gillespie/Kerr County Line to 2 iles west of Midway Rd.to complete hot mix overlay.
  • Monday, June 22 until Friday, July 3. 7 a.m. to 7 p.m. Single, alternating mainlane and shoulder closures from 2.5 miles west of Kerr/Gillespie County Line to 3.5 west of Kerr/Gillespie County Line for metal beam guard fence installation.
  • Monday, June 29 until Wednesday, July 8. Daylight to Dusk. Single mainlane closure, in both directions, from approximately one (1) mile west of Midway Road to Kerr/Kimble County Line to complete hot mix overlay.

 I-10 - Kendall County

  • Wednesday, June 24 until Thursday, June 25. 9 p.m. to 11 p.m. Single westbound mainlane closure from Balcones Creek to Scenic Loop turnaround to move barrier. 

FM 1044 – Comal County

  • Monday, June 22 until Friday, June 26. 7 a.m. to 7 p.m. Mainlane closure, in both directions, from I-35 frontage road and FM 1044 intersection to County Line and FM 1044 intersection for pavement repairs.