US 281 –
North Central San Antonio/Bexar County
Monday, January 4 until Friday, January 8. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from Evans Road to the Redland Road exit ramp for drainage work. DETOUR: Take the southbound US 281 mainlanes and use the turnaround at Redland Road.
- Monday, January 4 until Friday, January 8. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Take the northbound US 281 frontage road exit ramp, go through the intersection at Loop 1604 and use the northbound US 281 frontage road.
- Monday, January 4 until Friday, January 8. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
- Monday, January 4 until Friday, January 8. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Monday, January 4 until Friday, January 8. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
- Saturday, January 9 until Monday, January 11. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for striping work. DETOUR: Take the Sonterra Boulevard exit ramp and continue on the northbound US 281 frontage road.
- Saturday, January 9 until Monday, January 11. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
- Saturday, January 9 until Monday, January 11. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Saturday, January 9 until Monday, January 11. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
- Saturday, January 9. 5 a.m. to 6 p.mm. Alternating lane closures from TPC Parkway to Marshall Rd. for traffic switch.
- Saturday, January 9. 6 a.m. to 6 p.m. Full closure of Borgfeld Rd. from US 281 to Bulverde Rd. for sidewalk pouring.
- Monday, January 4 until Friday, January 8. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the northbound US 281 exit ramp and turn right on the southbound US 281 frontage road.
- Monday, January 4 until Friday, January 8. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure of the west- to southbound direct connector ramp to US 281 for overhead signage work. DETOUR: Take the Gold Canyon Road/Redland Road exit ramp, continue on the westbound Loop 1604 frontage road through the Gold Canyon Road/Redland Road intersections, turn left on the southbound US 281 frontage road and use the Donella Drive entrance ramp.
- Friday, January 8 until Monday, January 11. Weekend closure 9 p.m. until 5 a.m. Full westbound mainlane closure of the west- to southbound direct connector ramp to US 281 for overhead signage work. DETOUR: Take the Gold Canyon Road/Redland Road exit ramp, continue on the westbound Loop 1604 frontage road through the Gold Canyon Road/Redland Road intersections, turn left on the southbound US 281 frontage road and use the Donella Drive entrance ramp.
- Monday, January 4 until Friday, January 8. Nightly 9 p.m. until 5 a.m. Full westbound crossing closure of Encino Commons Boulevard at US 281 for drainage work. DETOUR: Turn right on the driveway before the northbound US 281 frontage road and turn left on Tournament Players Club (TPC) Parkway.
I-10 – North West San Antonio/Bexar County/Kendall County
- Monday, January 4 until Friday, January 8. Daily 9 a.m. to 3 p.m. Westbound HOV lane and inside shoulder closed at various locations from La Cantera Parkway to Ralph Fair Rd. for inlet cleaning.
- Monday, January 4 until Friday, January 8. Daily 9 a.m. to 3 p.m. Eastbound HOV Lane and inside shoulder closures at various locations from Ralph Fair Rd. to La Cantera Parkway for inlet cleaning.
- Monday, January 4 until Friday, January 8. Daily 9 a.m. to 3 p.m. Eastbound outside mainlane closure, including shoulder, at various locations from Ralph Fair Rd. to La Cantera Parkway for inlet cleaning.
- Monday, January 4 until Friday, January 8. Daily 9 a.m. to 3 p.m. Westbound outside mainlane closures, including shoulder, at various locations from La Cantera Parkway to Ralph Fair Rd. for inlet cleaning.
- Monday, January 4 until Tuesday, January 5. Daily 9 a.m. to 3 p.m. Westbound entrance ramp closed just before Boerne Stage Rd. including the left lane of the frontage road for drainage work.
- Monday, January 4 until Tuesday, January 5. Daily 9 a.m. to 3 p.m. Westbound mainlane closed near the entrance ramp before Boerne Stage Rd. for drainage work.
- Monday, January 11 until Friday, January 15. Daily 9 a.m. to 3 p.m. Westbound outside mainlane closure, including shoulder, at various locations from La Cantera Parkway to Ralph Fair Rd. for inlet cleaning.
- Monday, January 11 until Friday, January 15. Daily 9 a.m. to 3 p.m. Eastbound outside mainlane closure, including shoulder, at various locations from Ralph Fair Rd. to La Cantera Parkway for inlet cleaning.
- Sunday, January 3 until Monday, January 4. 9 p.m. to 5 a.m. Alternating eastbound lane closures from Steves Ave. to Martin Luther King Dr. for overhead sign replacements.
- Monday, January 4 until Tuesday, January 5. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from S. New Braunfels Ave. to I-37 interchange for overhead sign replacements. DETOUR: Traffic will be directed to use Exit 574 to continue on I-37. Traffic to westbound I-10 will be directed to northbound I-37 and use Florida St. to turnaround, re-enter I-37 and take ramp to westbound I-10.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
- Current until further notice. East and westbound I-10 frontage road traffic have right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
- Current until late November: Westbound I-10 exit ramp to Foster Road closed. DETOUR: Use Woodlake Parkway exit ramp.
- Current until early December: Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
- Southbound Ackerman traffic can travel south under the I-10
overpass, use the eastbound frontage road to Foster Road, turn left on Foster,
and take the westbound frontage road to the westbound entrance ramp just west
of Foster.
- Northbound Ackerman traffic can use the eastbound frontage
road to Foster Road, turn left on Foster, and take the westbound frontage road
to the westbound entrance ramp just west of Foster.
- Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
- Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.
- Tuesday, January 5 until Wednesday, January 6. 9 p.m. to 5 a.m. Full closure of southbound mainlanes from Loop 410 to Fisher Rd. for overhead sign replacement. DETOUR: Traffic will be detoured to frontage roads.
- Wednesday, January 6 until Friday, January 8. Nightly 9 p.m. to 5 a.m. Double northbound mainlane closure from Jourdanton Freeway to S. Zarzamora St. for overhead sign replacement.
I-410 – West San Antonio
- Monday, January 4 until Monday, January 11. Daily 9 a.m. to 3 p.m. Single right mainlane closures, in both directions, from Military Dr. to Ingram Rd. for bridge demolition.
- Monday, January 4 until Monday, January 11. Daily 9 a.m. to 3 p.m. Single lane and turnaround closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
- Monday, January 4 until Friday, January 8. Nightly 8 p.m. to 5 a.m. Full closure of southbound mainlanes from Marbach Rd. to Military Dr. for concrete beam setting.
- Monday, January 4 until Monday, January 11. Daily 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from N.W. Crossroads to Military Dr. for work to traffic rail.
- Monday, January 4 until Monday, January 11. Nightly 8 p.m. to 5 a.m. Full closure of intersection, in both directions, at Military Dr. for bridge work and beam setting.
- Monday, January 4 until Monday, January 11. Nightly 8 p.m. to 5 a.m. Alternating full closure of mainlanes, in both directions, from Ingram Rd. to Loop 410 for continued construction of flyover ramps.
- Monday, January 4 until Monday, January 11. Daily 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Loop 410 to Ingram Rd. for continued construction of flyover ramps.
- Monday, January 4 until Saturday, January 16. Daily 7 a.m. to 7 p.m. Alternating single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for paving operations and guardrail improvements.
FM 1976 – Walzem Road/Gibbs Sprawl Road
- Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
- Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
- Tuesday, January 5. 7 a.m. to 5 p.m. Alternating lane and shoulder closures from Gillespie/Kerr County Line to FM 479 for pavement repairs.
- Current until March 2021. Full closure of bridge at Mill Creek for bridge replacement.