Loop 1604 – North Central San Antonio/Bexar County

  • Saturday, August 14 until Sunday, August 15. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for painting operations.
  • Saturday, August 14 until Sunday, August 15. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for painting operations.
  • Monday, August 16 until Friday, August 20. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, August 16 until Friday, August 20. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Saturday, August 21 until Sunday, August 22. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, August 21 until Sunday, August 22. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North West San Antonio/Bexar County

US 281 – North Central San Antonio/Bexar County

  • Saturday, August 14 until Saturday, August 21. 7 a.m. to 6 p.m. Right lane closed, in both directions, from Borgfeld Rd. to Cibolo Creek for sidewalk improvements.
  • Sunday, August 15 until Thursday, August 19. 9:30 p.m. to 5 a.m. Northbound mainlanes reduced to one lane at Basse Rd. for bridge repairs.
  • Saturday, August 14 until Sunday, August 15. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, August 14 until Sunday, August 15. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, August 14 until Sunday, August 15. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, August 14 until Sunday, August 15. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, August 16 until Friday, August 20. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, August 16 until Friday, August 20. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, August 21 until Sunday, August 22. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, August 21 until Sunday, August 22. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, August 21 until Sunday, August 22. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, August 21 until Sunday, August 22. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Current until Tuesday, August 31. Right lane closure on northbound frontage road from Northern Blvd. to S. Terminal Dr. for roadway repairs.
  • Monday, August 16 until Saturday, August 21. 9 p.m. to 5 a.m. Alternating southbound lane closures from Overlook Parkway to Marshall Rd. for signal work. 

I-10 – Northwest San Antonio/Bexar County/Kendall County 

  • Sunday, August 15 until Friday, August 20. 9 p.m. to 5 a.m. Double westbound mainlane closure from UTSA Blvd. to Loop 1604 exit ramp for striping operations. Exit ramps to Loop 1604 will be closed. Detour: Use exit 555 and turnaround.
  • Friday, August 20 8 p.m. to Monday, August 23 5 a.m. Full closure of mainlanes, in both directions, from SH 46 to Scenic Loop Rd. for demolition of the US 87 bridge. 

I-10 –East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, August 21. Single lane closures on the frontage roads, in both directions, from FM 2252 to FM 1103 for material haul-off.
  • Current until Saturday, August 21. 9 a.m. to 5:30 p.m. Right lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for curb demolition and material haul-off.
  • Monday, August 16 until Thursday, August 19. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, from Watson Ln. to Parkway for access work under Parkway bridge and drainage operations.
  • Friday, August 20 until Saturday, August 21. 9 p.m. to 8 a.m. Double mainlane closures, in both directions, from FM 306 to Conrads Ln. for setting barrier and striping work. The Watson and Conrads Ln. ramps will also be closed.
  • Sunday, August 22 until Monday, August 23. 9 p.m. to 5 a.m. Double mainlane closures, in both directions, from FM 306 to Conrads Ln. for setting barrier and striping work. The Watson and Conrads Ln. ramps will also be closed.
  • Wednesday, August 25 until Thursday, August 26. 8 p.m. to 5 a.m. Double mainlane closures, in both directions, from Watson Ln. to Conrads Ln. for bridge demolition.
  • Thursday, August 26 until Friday, August 27. 9 p.m. to 5 a.m. Full closure of the northbound mainlanes from Watson Ln. to Conrads Ln. for bridge demolition.
  • Friday, August 27 until Saturday, August 28. 9 p.m. to 9 a.m. Full closure of the southbound mainlanes from Watson Ln. to Conrads Ln. for bridge demolition.
  • Saturday, August 28 until Sunday, August 29. 9 p.m. to 9 a.m. Double southbound mainlane closure from Watson Ln. to Conrad Ln. for bridge demolition.
  • Sunday, August 29 until Monday, August 30. 9 p.m. to 5 a.m. Double northbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. 

I-410 – East San Antonio

  • Current until August 20. Southbound frontage road left lane closed from I-10 to E. Houston St. for reconstruction.  

I-410 – West San Antonio

  • Current until Saturday, August 14. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Current until Saturday, August 14. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Current until Saturday, August 14. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Saturday, August 14. 8 p.m. to 5 a.m. Alternating mainlane closures, from Marbach Rd. to Ingram Rd. for bridge work.
  • Sunday, August 15 until Sunday, August 29. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Sunday, August 15 until Sunday, August 29. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Sunday, August 15 until Sunday, August 29. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, on the frontage roads from Marbach Rd. to Bandera Rd. for bridge work.
  • Sunday, August 15 until Sunday, August 29. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Monday, August 16 until Sunday, August 29. 8 a.m. to 4 p.m. Southbound bypass lane at W. Military Dr. closed for concrete work.

I-410 – Southwest San Antonio

  • Sunday, August 15 until Wednesday, August 18. 9 p.m. to 5 a.m. Single northbound mainlane closure from Old Pearsall Rd. to Ray Ellison Blvd. for barrier setting. 

SH 151 – West San Antonio

  • Current until Saturday, August 14. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Current until Saturday, August 14. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Sunday, August 15 until Sunday, August 29. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Sunday, August 15 until Sunday, August 29. 8 p.mm. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Sunday, August 15 until Monday, August 23. 8 p.m. to 5 a.m. Eastbound flyover ramp to northbound Loop 410 closed for rail work. DETOUR: Traffic will exit SH 151 at Cable Ranch Rd., turn left at Loop 410 intersection and enter Loop 410 at W. Military Dr. entrance ramp. 

SL 13 – Military Dr.

  • Current until Tuesday, August 31. 8 a.m. to 4 p.m. Single westbound lane closure from Bardwell Dr. to Alsbrook Dr. for sidewalk improvements.
  • Current until Tuesday, August 31. 8 a.m. to 4 p.m. Single westbound lane closure from New Laredo Hwy. to Somerset Rd. for sidewalk improvements. 

SH 211 – Bexar County

  • Monday, August 16 until Wednesday, August 18. 8 a.m. to 6 p.m. Single lane closure, in both directions, from Briggs Ranch to US 90 for roadway replacement. 

FM 1502 – Wurzbach Parkway

  • Tuesday, August 17. 8 a.m. to 5 p.m. Double westbound lane closure from West Ave. to FM 2696 for roadway repairs. 

FM 1560 – Hausman Road

  • Monday, August 16 until Friday, August 20. 9 a.m. to 5 p.m. Alternating lane closures from SH 16 to Loop 1604 for paving operations. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

FM 345 – Fredericksburg Rd.

  • Current until Tuesday, August 31. 8 a.m. to 4 p.m. Single eastbound lane closure from Loop 410 to Hillcrest Dr. for sidewalk improvements.  

US 87 – Rigsby Road

  • Current until Tuesday, August 31. 8 a.m. to 4 p.m. Single eastbound lane closure from Pecan Valley Rd. to Ancel Rd. for sidewalk improvements. 

SH 46 – Kendall County

  • Current until September 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed. 

SH 123 – Guadalupe County

  • Wednesday, August 18 until Friday, August 27. 8 a.m. to 7 p.m. Full closure in both directions from 3 miles north of FM 1681 to Zion Hill Rd. for roadway repairs.