Friday, September 10

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 

 

Loop 1604 – North East San Antonio/Bexar County

  • Current until Saturday, September 11. 9 a.m. to 5 p.m. Right eastbound shoulder from FM 2252 (Nacogdoches Rd.) to I-35 for surveying work.
  • Sunday, September 12 until Monday, September 13. 8 p.m. to 6 a.m. Single southbound mainlane closure from I-35 to Pat Booker Rd. for barrier removal.
  • Monday, September 13 until Wednesday, September 15. 8 p.m. to 6 a.m. Single southbound mainlane closure from Pat Booker Rd. to Kitty Hawk Rd. for barrier removal.
  • Wednesday, September 15 until Thursday, September 16. 8 p.m. to 6 a.m. Single southbound mainlane closure from Kitty Hawk Rd. to Meadowland Dr. for barrier removal.
  • Thursday, September 16 until Friday, September 17. 8 p.m. to 6 a.m. Single northbound mainlane closure from Meadowland Dr. to Kitty Hawk Rd. for barrier removal.
  • Monday, September 13 until Wednesday, September 15. 9 a.m. to 3 p.m. Single lane closure on the southbound frontage road from Converse Rd. to Kitty Hawk Rd. for curb improvements.
  • Monday, September 13 until Sunday, September 19. 9 a.m. to 5 p.m. Right westbound shoulder from I-35 to FM 2252 (Nacogdoches Rd.) for surveying work. 

Loop 1604 – Far East San Antonio/Bexar County

  • Sunday, September 12 until Thursday, September 16. 9 p.m. to 5 a.m. Full closure, in both directions, at the I-10 intersection for bridge repairs. Traffic will be detoured through frontage roads. 

Loop 1604 – North Central San Antonio/Bexar County

  • Saturday, September 11 until Sunday, September 12. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, September 11 until Sunday, September 12. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Monday, September 13 until Friday, September 17. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation. 

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, September 12 until Saturday, September 25. 9 p.m. to 5 a.m. Alternating mainlane closures from SH 16 (Bandera Rd.) to I-10 for barrier installation. One lane to remain open at all times.
  • Sunday, September 12 until Saturday, September 25. 9 p.m. to 5 a.m. Alternating lane closures on frontage roads, in both directions, from SH 16 (Bandera Rd.) to I-10 for barrier installations. One lane to remain open at all times.
  • Monday, September 13 until Friday, September 30. Right turn lane on eastbound frontage road closed from Brenen Ave to Peace Blvd. for utility work. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, September 11 until Sunday, September 12. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 11 until Sunday, September 12. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, September 11 until Sunday, September 12. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 11 until Sunday, September 12. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, September 13 until Friday, September 17. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, September 13 until Friday, September 17. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, September 18 until Sunday, September 19. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

I-10 – Central San Antonio/Bexar County

  • Monday, September 13 until Thursday, September 16. 8 p.m. to 5 a.m. Eastbound exit ramp to northbound I-35 for lighting installation.
  • Monday, September 13 until Thursday, September 16. 8 p.m. to 5 a.m. Westbound exit ramp to southbound I-35 for lighting installation. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, September 10 until Monday, September 13. 9 p.m. to 5 a.m. Single westbound mainlane closure from Ackerman Rd. to Loop 410 for bridge repairs.
  • Saturday, September 11. 5 a.m. to 9 p.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Zuehl Rd. for barrier movement and asphalt operations.
  • Saturday, September 11. 5 a.m. to 9 p.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Zuehl Rd. for asphalt operations.
  • Sunday, September 12 until Friday, September 17. Nightly 8:30 p.m. to 5:30 a.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Zuehl Rd. for barrier movement and asphalt operations.
  • Friday, September 17 until Monday, September 20. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes from Foster Rd. to Woodlake Parkway for pavement repairs. The entrance ramp to Foster Rd. and the exit ramp to Woodlake Parkway will also be closed.
  • Friday, September 17 9 p.m. until Sunday, September 19 7 p.m.. Full closure of the mainlanes, in both directions, at FM 2538 for bridge demolition.
  • Friday, September 17 until further notice. Full closure of FM 2538 over I-10 for bridge work.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, September 11. 9 a.m. to 5:30 p.m. Single lane closure on the frontage road, in both directions, from FM 2252 to Hubertus Road for import and material haul-off.
  • Current until Saturday September 11. 9 a.m. to 5:30 p.m. Right lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for curb demolition and material haul-off.
  • Current until Sunday, September 12. 9 a.m. to 5 p.m. Right northbound frontage road shoulder from Crestway Dr. to Loop 1604 for surveying work.
  • Wednesday, September 15 until Thursday, September 16. 8 p.m. to 5 a.m. Double mainlane closure, in both directions, from Watson Ln. to Conrads Ln. for bridge demolition.
  • Thursday, September 16 until Friday, September 17. 8 p.m. to 5 a.m. Full northbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Kohlenberg Rd. exit and enter the highway from Watson Ln.
  • Friday, September 17 until Saturday, September 18. 8 p.m. to 5 a.m. Full southbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Conrads Ln. exit.
  • Saturday, September 18 until Sunday, September 19. 8 p.m. to 5 a.m. Double southbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will use Conrads Ln. or Goodwin Ln.
  • Sunday, September 19 until Monday, September 20. 8 p.m. to 5 a.m. Double northbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will use the Kohlenberg Rd. entrance ramp.
  • Sunday, September 12 until Friday, September 17. 7 a.m. to 7 p.m. Various southbound frontage road shoulders from Thousand Oaks to FM 1976 (Walzem Road) for geotechnical and drilling work.
  • Sunday, September 12 until Friday, September 17. 9 a.m. to 4 p.m. Single southbound frontage road lane from Thousand Oaks to FM 1976 (Walzem Road) for geotechnical and drilling work.
  • Sunday, September 12 until Friday, September 17. 9 a.m. to 4 p.m. Single southbound frontage road from Whirlwind Drive to I-410 for geotechnical and drilling work.
  • Sunday, September 12 until Friday, September 17. 9 p.m. to 5 a.m. Various southbound exit ramps from Weidner Road to Whirlwind Drive for geotechnical and drilling work.
  • Sunday, September 12 until Friday, September 17. 9 p.m. to 5 a.m. Single southbound mainlane from Weidner Road to I-410 for geotechnical and drilling work.
  • Sunday, September 12 until Friday, September 17. 9 p.m. to 5 a.m. Double southbound frontage road from Whirlwind Drive to I-410 for geotechnical and drilling work.
  • Sunday, September 12 until Friday, September 17. 9 p.m. to 5 a.m. Southbound exit and entrance ramps from O’Connor Rd. to Weidner Rd. for geotechnical and drilling work.
  • Sunday, September 12 until Friday, September 17. 9 p.m. to 5 a.m. Left southbound mainlane from Crownpoint Dr. to O’Connor Rd. for geotechnical and drilling work.
  • Sunday, September 12 until Friday, September 17. 9 p.m. to 5 a.m. Double mainlane closure, in both directions, from FM 2252 to FM 1103 (Hubertus Road) for paving work.
  • Sunday, September 12 until Friday, September 17. 9 p.m. to 5 a.m. Double northbound mainlane closure from S. Guadalupe River to FM 306 for milling and paving work.
  • Monday, September 13 until Sunday, September 19. 9 a.m. to 5 p.m. Right northbound frontage road shoulder from Crestway Dr. to Loop 1604 for surveying work.
  • Monday, September 13 until Sunday, September 19. 9 a.m. to 5 p.m. Right northbound frontage road shoulder from Loop 1604 to FM 3009 (Roy Richards Dr.) for surveying work.
  • Monday, September 13 until Sunday, September 19. 9 a.m. to 5 p.m. Right frontage road shoulder, in both directions, from Loop 1604 to FM 3009 (Roy Richards Dr.) for surveying work.
  • Monday, September 13 until Sunday, September 19. 9 a.m. to 5 p.m. Right southbound frontage road from Loop 1604 to I-410 for surveying work.
  • Monday, September 13 until Saturday, September 18. 9 a.m. to 5:30 p.m. Single lane closure on the frontage road, in both directions, from FM 2252 to FM 1103 (Hubertus Road) for import and material haul-off.
  • Monday, September 13 until Saturday, September 18. 9 a.m. to 5:30 p.m. Right lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for curb demolition and material haul-off.
  • Wednesday, September 15 until Thursday, September 16. 8 p.m. to 5 a.m. Double mainlane closure, in both directions, from Watson Ln. to Conrads Ln. for bridge demolition.
  • Thursday, September 16 until Friday, September 17. 8 p.m. to 5 a.m. Full northbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Kohlenberg Rd. exit and enter the highway from Watson Ln.
  • Friday, September 17 until Saturday, September 18. 8 p.m. to 5 a.m. Full southbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Conrads Ln. exit.
  • Saturday, September 18 until Sunday, September 19. 8 p.m. to 5 a.m. Double southbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will use Conrads Ln. or Goodwin Ln.
  • Sunday, September 19 until Monday, September 20. 8 p.m. to 5 a.m. Double northbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will use the Kohlenberg Rd. entrance ramp. 

I-410 – North East San Antonio

  • Current until Sunday, September 12. 9 a.m. to 5 p.m. Right westbound mainlane shoulder from I-35 to Harry Wurzbach Rd. for surveying work.
  • Current until Sunday, September 12. 9 a.m. to 5 p.m. Right eastbound mainlane shoulder from Nacogdoches Rd. to I-35 for surveying work.
  • Current until Sunday, September 12. 9 a.m. to 5 p.m. Right eastbound frontage road shoulder from Haskin Dr. to Quail Creek for surveying work.
  • Current until Sunday, September 12. 9 a.m. to 5 p.m. Right westbound frontage road shoulder from I-35 to Harry Wurzbach Rd. for surveying work.
  • Monday, September 13 until Sunday, September 19. 9 a.m. to 5 p.m. Right eastbound frontage road shoulder from Haskin Dr. to Quail Creek for surveying work.
  • Monday, September 13 until Sunday, September 19. 9 a.m. to 5 p.m. Right westbound mainlane shoulder from I-35 to Harry Wurzbach Rd. for surveying work. 

I-410 – East San Antonio

  • Current until Saturday, September 11. Nightly 7 p.m. to 5 a.m. Southbound exit ramp to Rigsby Rd. closed, including the left lane on the southbound frontage to Rigsby Rd. for road widening. DETOUR: Traffic will use the E. Houston St. exit and continue on the southbound frontage road to Rigsby Rd.
  • Sunday, September 12 until Wednesday, September 15. 9 p.m. to 5 a.m. Single northbound mainlane closure at Houston St., including the exit ramp, for barrier placement.
  • Sunday, September 12 until Wednesday, September 15. 9 p.m. to 5 a.m. Alternating southbound mainlane closures from I-10 to Houston St., including the Houston St. exit ramp, for barrier installation.
  • Monday, September 13 until Friday, September 17. 9 p.m. to 5 a.m. Alternating southbound mainlane closures, from Binz-Engleman Rd. to I-10 for pavement work. 

I-410 – West San Antonio

  • Current until Monday, September 13. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, September 13. 9 a.m. to 3 p.m. Alternating lane closure on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Current until Monday, September 13. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, September 13. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Sunday, September 12 until Monday, September 27. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Sunday, September 12 until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Sunday, September 12 until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Sunday, September 12 until Monday, September 27. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work. 

I-410 – Southwest San Antonio

  • Sunday, September 12 until Friday, September 17. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Brookshire Dr. to Valley Hi Dr. for barrier setting.
  • Sunday, September 19 until Tuesday, September 21. 9 p.m. to 5 a.m. Single northbound mainlane closure from Brookshire Dr. to Valley Hi Dr. for barrier setting.
  • Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Current until Monday, September 13. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
  • Current until Monday, September 13. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at the Loop 410 intersection for bridge work.
  • Saturday, September 11. 5 a.m. to 8 a.m. Full closure of the eastbound mainlanes from Cable Ranch Rd. to Ingram Rd.
  • Sunday, September 12 until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Monday, September 13 until Monday, September 27. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, at Loop 410 for bridge work. DETOUR: Traffic will be detoured to frontage roads.
  • Sunday, September 12 until Monday, September 27. 8 p.m.t o 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.   

Alamo Ranch Parkway

  • Tuesday, September 7 until Wednesday, September 8. 9 p.m. to 5 a.m. Full closure of the Westwood Loop intersection for bridge work.
  • Wednesday, September 8 until Thursday, September 9. 9 p.m. to 5 a.m. Full closure of the Westwood Loop intersection for bridge work.
  • Monday, September 20 until Tuesday, September 21. 9 p.m. to 5 a.m. Full closure of the intersection at Westwood Loop for bridge work.
  • Tuesday, September 21 until Wednesday, September 22. 9 p.m. to 5 a.m. Full closure of the intersection at Westwood Loop for bridge work.

SH 16 – Bandera Road

  • Current until Friday, September 17. 9 a.m. to 4 p.m. Single eastbound lane closure from Braun Rd. to Loop 410 for sidewalk and driveway improvements. 

PA 1502 – Wurzbach Parkway

  • Monday, September 13 until Friday, September 17. 9 a.m. to 4 p.m. Single westbound lane closure at the N.W. Military Highway intersection for curb placement. 

FM 1535 – N.W. Military Highway

  • Monday, September 13 until Friday, September 17. 9 a.m. to 4 p.m. Single northbound lane closure at the Wurzbach Parkway intersection for material haul-out. 
  • Monday, September 13 until Friday, September 17. 9 a.m. to 5 p.m. Single lane closures, in both directions, from Loop 1604 to Huebner Rd. for utility work. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

US 87 – Rigsby Road

  • Current until Saturday, September 18. 7 a.m. to 7 p.m. Double lane closure, in both directions, from Roland Ave. to Loop 410 for roadway repairs. 

US 181 – Bexar County

  • Current until Saturday, September 18. 7 a.m. to 7 p.m. Right shoulder closures, in both directions, from Richter Rd. to the CPS Plant for ditch work. 

SH 46 – Kendall County

  • Current until October 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed.