Friday, October 1

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio/Bexar County

  • Monday, October 4 until Thursday, October 7. 9 p.m. to 5 a.m. Full closure of the eastbound and westbound flyover ramps to southbound US 281 for bridge repairs at Donella Dr. DETOUR: Traffic will be detoured to the frontage roads.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Monday, October 4 until Friday, October 8. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for fence installation.
  • Monday, October 4 until Friday, October 8. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for fence installation.
  • Saturday, October 9 until Sunday, October 10. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, October 9 until Sunday, October 10. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North West San Antonio/Bexar County

  • Current until Saturday, October 9. Weeknights 9 p.m. to 5 a.m. Alternating mainlane closures from SH 16 (Bandera Rd.) to I-10 for barrier installation. One lane to remain open at all times.
  • Current until Saturday, October 9. 9 p.m. to 5 a.m. Alternating lane closures on frontage roads, in both directions, from SH 16 (Bandera Rd.) to I-10 for barrier installations. One lane to remain open at all times.
W. Hausman Road - Bexar County
  • Monday, October 4 until Monday, October 18. Full closure of the eastbound lanes from Loop 1604 to Kyle Seale Parkway for utility work. DETOUR: Traffic will utilize Kyle Seale Parkway to access the W. Hausman Rd.  

US 281 – North Central San Antonio/Bexar County

  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 2 until Sunday, October 3. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, October 4 until Friday, October 8. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, October 4 until Friday, October 8. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Tuesday, October 5. Daily 9 a.m. until 4 p.m. Left northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for illumination inspection.
  • Saturday, October 9 until Sunday, October 10. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 9 until Sunday, October 10. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, October 9 until Sunday, October 10. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, October 9 until Sunday, October 10. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Sunday, October 3. 9 p.m. to 5 a.m. Single westbound mainlane closure from Graytown Rd. to Loop 1604 for bridge work.
  • Friday, October 8 8:30 p.m. until Sunday, October 10 5:30 a.m. Alternating mainlane closures from FM 2538 to Zuehl Rd. for barrier installation and asphalt operations.
  • Sunday, October 10 until Thursday, ,October 14. 8:30 p.m. to 5:30 p.m. Alternating mainlane closures, in both directions, from Graytown Rd. to Zuehl Rd. for asphalt operations.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, October 3 until Monday, October 4. 9 p.m. to 5 a.m. Single southbound closure to I-10 westbound at Finesilver for bridge joint rail work.
  • Sunday, October 3 until Wednesday, October 6. 9 p.m. to 5 a.m. Various southbound frontage road shoulders closure from Thousand Oaks to FM 1976 (Walzem Road) for geotechnical and drilling work.
  • Sunday, October 3 until Wednesday, October 6. 9 p.m. to 5 a.m. Various southbound exit ramps closure from Weidner Road to Whirlwind Drive for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Single southbound frontage road closure from Weidner Road to I-410 for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Single southbound frontage road closure from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Single southbound exit ramp closure to O’Connor Road for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Single southbound mainlane closure from Crownpoint Drive to O’Connor Road for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Double southbound frontage road closure from Whirlwind Drive to I-410 for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Single southbound mainlane closure from FM 3009 (Roy Richard Drive) to Retama Parkway for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Single southbound mainlane closure from Mid Cities Parkway to Pawlin Drive for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Turnarounds both north and southbound at FM 3009 (Roy Richard Drive), Corporate Drive and Evans Road for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Single southbound frontage road closure from Mid Cities Parkway to N. Evans Road for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Single southbound frontage road closure from Pawlin Drive to Retama Parkway for geotechnical and drilling work.
  • Sunday, October 3 until Friday, October 8. 9 p.m. to 5 a.m. Single southbound frontage road closure at Schertz Parkway for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single southbound frontage road closure from Crownpoint Dr. to Judson Road for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single southbound frontage road closure and mainlane shoulder closure from Judson Road to Toepperwein Road for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 a.m. Single southbound frontage road and mainlane shoulder closure from Toepperwein Road to Shin Oak Drive for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single southbound mainlane shoulder closure from Shin Oak Drive to SH 218 (Pat Booker Road) for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single southbound frontage road closure from SH 218 (Pat Booker Road) to Loop 1604 for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single southbound frontage road closure from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 7 p.m. Various southbound frontage road shoulders closure from Thousand Oaks to FM 1976 (Walzem Road) for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single southbound frontage road closure from Thousand Oaks to FM 1976 (Walzem Road) for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single southbound frontage road closure from Weidner Road to I-410 for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single southbound frontage road closure from Mid Cities Parkway to N. Evans Road for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single southbound frontage road closure from Pawlin Drive to Retama Parkway for geotechnical and drilling work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 7 p.m. Single southbound frontage road lane closure from Schertz Parkway to Retama Parkway for geotechnical and drilling work.
  • Monday, October 4 until Saturday, October 9. 9 a.m. to 5:30 p.m. Single lane closure on the frontage road, in both directions, from FM 2252 to FM 1103 (Hubertus Road) for import and material haul-off.
  • Monday, October 4 until Saturday, October 9. 9 a.m. to 5:30 p.m. Single lane closure on the northbound frontage road from FM 1103 to Schwab Rd. for curb demolition and material haul-off.
  • Wednesday, October 6 until Thursday, October 7. 8 p.m. to 5 a.m. Double mainlane closure, in both directions, from Watson Ln. to Conrads Ln. for bridge demolition.
  • Thursday, October 7 until Friday, October 8. 8 p.m. to 5 a.m. Full southbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Conrads Ln. exit.
  • Friday, October 8 until Saturday, October 9. 8 p.m. to 5 a.m. Double southbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Watson off-ramp.
  • Saturday, October 9 until Sunday, October 10. 8 p.m. to 5 a.m. Full northbound mainlane closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will take the Kohlenberg Rd. exit and enter the highway from Watson Ln.
  • Sunday, October 10 until Monday, October 11. 8 p.m. to 5 a.m. Double northbound mainlane and single frontage road closure from Watson Ln. to Conrads Ln. for bridge demolition. DETOUR: Traffic will use the Kohlenberg Rd. entrance ramp. 

I-410 – East San Antonio

  • Saturday, October 2. 9 a.m. to 5 p.m. Single southbound lane closure from Houston St. to Rigsby Ave. for guardrail repairs. 

I-410 – West San Antonio

  • Sunday, October 3. 5 a.m. to 8 p.m. Southbound ramp to westbound SH 151 closed for bridge and striping work.
  • Sunday, October 3 5 a.m. to 8 p.m. Full closure of the northbound mainlanes at SH 151 for bridge and striping work. 

I-410 – Southwest San Antonio

  • Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 16 – Bandera Road

  • Monday, October 4 until Friday, October 15. 9 a.m. to 4 p.m. Single eastbound lane closure from Huebner Rd. to El Verde Rd. for sidewalk and driveway improvements.

Alamo Ranch Parkway – Bexar County

  • Sunday, October 3 until Monday, October 4. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes from Loop 1604 to Lone Star Parkway for bridge work. 

FM 1535 – N.W. Military Highway

  • Monday, October 4 until Friday, October 8. 9 a.m. to 5 p.m. Single lane closures, in both directions, from Loop 1604 to Huebner Rd. for utility work.
  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Northbound right lane closure at the Wurzbach Parkway intersection for material and equipment haul-out.
  • Tuesday, October 5 until Saturday, October 16. Single northbound lane closure at the Wurzbach Parkway intersection for utility work. 

PA 1502 – Wurzbach Parkway

  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Single westbound lane closure at the N.W. Military Highway intersection for sidewalk improvements. 

FM 2252 – Nacogdoches Road

  • Thursday, October 7 until Friday, October 8. 7 p.m. to 7 a.m. Full closure of the intersection at Evans Rd. for bridge work. DETOUR: Traffic will be detoured to FM 3009 to access I-35 and Evans Rd. and Lookout Rd. to access other routes. 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work. 

US 181 – Bexar County

  • Current until Saturday, October 30. 7 a.m. to 7 p.m. Single lane closures, in both directions, from I-37 to Spur 122 for guardrail and mowstrip repairs.  

Loop 337 – Comal County

  • Monday, October 4 until Friday, October 8. 9 a.m. to 4 p.m. Alternating mainlane closures, in both directions, at the River Rd. intersection for traffic switch and barrier setting. 

SH 46 – Kendall County

  • Current until October 2021. Roadway at I-10 intersection reduced to two-lanes, with the closure of the inbound right turn lane and Whataburger driveway. Traffic will be shifted onto temporary pavement as new roadway is constructed. 

I-10 – Kendall County

  • Current until October 2021. Full closure of the eastbound frontage road at I-10. DETOUR: Traffic will be detoured on SH 46.