Friday, November 5

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North Central San Antonio/Bexar County

  • Thursday, November 4 until Tuesday, November 9. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Huebner Road to Blanco Road for barrier setting and striping.
  • Thursday, November 4 until Tuesday, November 9. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from Blanco Road to Huebner Road for barrier setting and striping.
  • Sunday, November 7 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Huebner Road to Stone Oak Parkway for mill and overlay, barrier setting and striping.
  • Sunday, November 7 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak Parkway to Huebner Road for mill and overlay, barrier setting and striping.
  • Sunday, November 7 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Lockhill Selma Road to NW Military Highway for mill and overlay, barrier setting and striping.
  • Sunday, November 7 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from NW Military Highway to Lockhill Selma Road for mill and overlay, barrier setting and striping.
  • Thursday, November 4 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure from Talavera Parkway to Madera Parkway for existing median removal.
  • Thursday, November 4 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road closure from Madera Parkway to Talavera Parkway for existing median removal.
  • Saturday, November 6 until Sunday, November 7. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Lockhill Selma Road to NW Military Highway for barrier setting.
  • Saturday, November 6 until Sunday, November 7. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from NW Military Highway to Lockhill Selma Road for barrier setting.
  • Saturday, November 6 until Sunday, November 7. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Huebner Road to Stone Oak Parkway for mill and overlay.
  • Monday, November 8 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Tradesman Drive to NW Military Highway for barrier setting.
  • Tuesday, November 9 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from Huebner Road to Tradesman Drive for barrier setting and striping.
  • Wednesday, November 10 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Blanco Road to NW Military Highway for barrier setting and striping.
  • Wednesday, November 10 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from NW Military Highway to Blanco Road for barrier setting and striping.
  • Saturday, November 6 until Sunday, November 7. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, November 6 until Sunday, November 7. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Monday, November 8 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Monday, November 8 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation.
  • Saturday, November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating eastbound mainlane closure from Stone Oak Parkway to US 281 for signage installation.
  • Saturday, November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating westbound mainlane closure from US 281 to Stone Oak Parkway for signage installation. 

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, November 7 until Saturday, November 20. Weeknights 9 p.m. to 5 a.m. Alternating lane closure on the frontage roads, in both directions, from SH 16 (Bandera Rd.) to I-10 for barrier installation.
  • Sunday, November 7 until Saturday, November 20. Weeknights 9 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from SH 16 (Bandera Rd.) to I-10 for barrier installation.
  • Current until Sunday, November 30. 9 a.m. to 3 p.m. Alternating full closure of the turnarounds at Kyle Seale Parkway, in both directions, for bridge widening construction.  
  • Tuesday, November 9 until Tuesday, November 16. Weekdays 9 a.m. until 3 p.m. eastbound frontage road lane closure from the entrance ramp from Bandera Road (SH 16) to Hausman Road for storm drain trenching.
  • Tuesday, November 9 until Tuesday, November 23. Weekdays 9 a.m. until 4 p.m. westbound frontage road lane closure from Hausman Road entrance ramp to Bandera Road exit ramp for high mast illumination installation. 

Loop 1604 – Far East San Antonio/Bexar County

  • Tuesday, November 9 until Thursday, November 11. 9 p.m. to 5 a.m. Full closure of the eastbound lanes at the I-10 intersection for bridge repairs. Eastbound I-10 exit ramp to Loop 1604 will also be closed. 

US 281 – North Central San Antonio/Bexar County

  • Saturday, November 6 until Sunday, November 7. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, November 6 until Sunday, November 7. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, November 6 until Sunday, November 7. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, November 6 until Sunday, November 7. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Monday, November 8 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation.
  • Monday, November 8 until Friday, November 12. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation.
  • Saturday, November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving.
  • Saturday, November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
  • Saturday, November 13 until Sunday, November 14. Continuous 9 a.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving. 

I-10 – Northwest San Antonio/Bexar County  

  • Wednesday, November 10 until Thursday, November 11. 9 p.m. to 5 a.m. Double lane closures on the eastbound frontage road from Vance Jackson to Fresno St. for crack seal work. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Monday, November 8 until Friday, November 10. Nightly 8:30 p.m. to 5:30 a.m. Full closure of the westbound mainlanes at FM 2538 for bridge work.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Wednesday, November 10 until Thursday, November 11. 9 p.m. to 5 a.m. Single lane closures in both directions, including exit ramps, from McCullough Ave. to Brooklyn Ave. for crack seal work.
  • Wednesday, November 10 until Thursday, November 11. 9 p.m. to 5 a.m. Single lane closures, in both directions, at Shin Oak r. for crack seal work.
  • Sunday, November 7 until Friday, November 12. 8 a.m. to 7 p.m. Various southbound frontage road shoulder closures from Schertz Parkway to Retama Parkway for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 8 a.m. to 7 p.m. Various lane closures from the median between Loop 1604 eastbound to I-35 southbound mainlanes and frontage road, from Gateway Blvd. to McMorris Blvd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 8 a.m. to 7 p.m. Various lane closures from southbound I-35 frontage road to Loop 1604 frontage road westbound from Gateway Blvd. to Old Austin Rd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 8 a.m. to 7 p.m. Various lane closures from the median between Loop 1604 eastbound to I-35 southbound mainlanes and frontage road, from Gateway Blvd. to McMorris Blvd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 8 a.m. to 7 p.m. Northbound shoulder closure on Austin Highway from Fratt Road to Ellis Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 8 a.m. to 7 p.m. Single I-410 eastbound frontage road closure from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 8 a.m. to 7 p.m. Single I-410 eastbound frontage road shoulder closure from Vicar Drive to the I-410 Loop interchange with I-35 for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Various southbound frontage road closures from Mid Cities Parkway to N. Evans Rd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Various southbound frontage road closures from Pawlin Drive to Retama Parkway for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Single median closure from I-35 southbound frontage road to Loop 1604 westbound frontage road, between Gateway Pl. to I-35 Junction for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Various lane closures from southbound I-35 frontage road to Loop 1604 frontage road westbound from Forum Pkwy to Old Austin Rd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Various lane closures from Loop 1604 eastbound frontage road ramp to I-35 frontage road southbound from Gateway Blvd. to McMorris Blvd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Single lane closure from southbound I-35 frontage road to Loop 1604 frontage road westbound from Forum Pkwy to Old Austin Rd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Various lane closures from Loop 1604 eastbound frontage road to I-35 southbound frontage road from IKEA-RBFCU Parkway to McMorris Blvd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Shoulder closure of eastbound I-410 frontage road from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Single lane closure on I-410 eastbound frontage road from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Southbound and northbound turnaround closures at FM 3009 (Roy Richard Dr.), northbound turnaround closure at Corporate Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various southbound frontage road shoulder closures from Schertz Parkway to Retama Parkway for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various southbound frontage road closures from Mid Cities Parkway to N. Evans Rd. for geotechnical and drilling work.  
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various southbound frontage road shoulder closures from Schertz Parkway to Retama Parkway for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various lane closures from the eastbound Loop 1604 exit ramp to I-35 southbound from Gateway Pl. to Gateway Blvd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single southbound mainlane and cloverleaf ramp closure from I-35 southbound to Loop 1604 eastbound for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various lane closures including the entire cloverleaf ramp from Loop 1604 westbound to I-35 southbound for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various lane closures from Loop 1604 eastbound to I-35 northbound from IKEA-RBFCU Parkway to I-35 northbound for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single mainlane I-410 eastbound closure from N New Braunfels to Nacogdoches Rd. for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various lane closures from the I-410 entrance ramp to single lane on I-410 eastbound from Cripple Creek Street to Ira Lee Road for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Ira Lee Road to Silverstar Street for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single lane closure eastbound on I-410 from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various I-410 eastbound frontage road closures (including entrance ramp to I-410), from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single lane closure on I-410 eastbound from Fratt Road to Interchange Parkway for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Entrance ramp to I-410 eastbound and frontage road closures from Quail Creek Drive to Perrin Beitel Rd for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Turnaround closure from I-410 eastbound to westbound frontage road between Quail Creek Drive and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Turnaround closure from I-410 westbound to eastbound frontage road between Perrin Beitel Road and Vicar Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various I-410 eastbound frontage road closures (including I-410 entrance ramp), from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various eastbound ramp closures connecting eastbound I-410 to southbound Austin Highway from the I-410 Loop Interchange to Austin Highway for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various I-410 westbound ramp closures connecting northbound Austin Hwy to westbound I-410 from Cross Creek Drive to Vicar Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Various I-410 eastbound ramp closures connecting northbound Austin Hwy to eastbound I-410 from Cross Creek Drive to Fratt Road for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single northbound lane closure on Austin Highway from Cross Creek Drive to Fratt Road for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Single southbound frontage road lane closure from Walzem Road to Crestwind Drive for geotechnical and drilling work.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single I-410 westbound lane closure from Starcrest to Nacogdoches Road for drilling and pavement coring.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m.  Single I-410 eastbound lane closure from Nacogdoches Road to Starcrest for drilling and pavement coring.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m.  Single I-410 eastbound frontage road closure from Haskin Drive to N Vandriver for drilling and pavement coring.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m.  Single I-410 eastbound frontage road closure from Goldstar Drive to Quail Creek for drilling and pavement coring.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m.  Single I-410 westbound lane closure from I-35 to Perrin Beitel Road for drilling and pavement coring.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m.  Single northbound lane closure from Walzem Road to I-410 for drilling and pavement coring.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m.  Single southbound lane closure from I-410 to Walzem Road for drilling and pavement coring.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m.  Single southbound lane closure from Weidner Road to I-410 for drilling and pavement coring.
  • Sunday, November 7 until Friday, November 12. 9 p.m. to 5 a.m.  Single northbound lane closure from I-410 to Weider Road for drilling and pavement coring.
  • Sunday, November 7 until Saturday, November 13. 8 p.m. to 5 a.m. Double northbound mainlane and ramps (as needed) closure from FM 2252 to FM 1103 (Hubertus Rd.) for milling and asphalt work.
  • Sunday, November 7 until Saturday, November 13. 8 p.m. to 5 a.m. Double southbound mainlane and ramp closure from FM 1103 (Hubertus Rd.) to FM 2252 for milling and asphalt work.
  • Sunday, November 7 until Monday, November 8. 9 p.m. to 5 p.m. Double southbound mainlane and ramp closure from Business 35 to FM 306 for pavement marking work.
  • Monday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single southbound mainlane closure from Crownpoint Drive to Judson Road for geotechnical and drilling work.
  • Monday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single southbound mainlane closure from Judson Road to Toepperwein Road for geotechnical and drilling work.
  • Monday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single southbound mainlane closure from Toepperwein Road to the I-35 Frontage Road for geotechnical and drilling work.
  • Monday, November 7 until Friday, November 12. 9 p.m. to 5 a.m. Single southbound closure from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Monday, November 7 until Friday, November 12. 9 a.m. to 4 p.m. Single southbound shoulder closure from Loop 1604 to Forum Parkway for geotechnical and drilling work.
  • Monday, November 7 through Friday, November 12. 9 a.m. to 4 p.m. Single southbound frontage road closure from Loop 1604 to Forum Parkway for geotechnical and drilling work.
  • Monday, November 7 through Friday, November 12. 9 a.m. to 4 p.m. Single southbound frontage road closure from Forum Parkway to Utopia Boulevard for geotechnical and drilling work.
  • Monday, November 7 through Friday, November 12. 9 a.m. to 4 p.m. Single southbound frontage road closure from Utopia Boulevard to Retama Parkway for geotechnical and drilling work.
  • Monday, November 7 through Friday, November 12. 9 a.m. to 4 p.m. Single southbound frontage road closure from Retama Parkway to N Evans Road for geotechnical and drilling work.
  • Monday, November 8 until Friday, November 12. 9 p.m. to 5 a.m. Triple southbound mainlane and ramps (as needed) closure from south of Business 35 to S. Guadalupe River for milling, paving mainlanes, shoulders and ramps.
  • Monday, November 8 until Saturday, November 13. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road from FM 2252 to FM 1103 (Hubertus Rd.) for cleaning and landscape work.
  • Monday, November 8 until Saturday, November 13. 9 a.m. to 5:30 p.m. Single northbound lane closure on the frontage road from FM 2252 to Schwab Rd. for cleaning, landscape, striping, sidewalk and driveway work.
  • Monday, November 8 until Saturday, November 13. 9 a.m. to 5:30 p.m. Single southbound frontage road from FM 1103 (Hubertus Rd.) to FM 2252 for cleaning and landscape work.  

I-410– East San Antonio/Bexar County

  • Friday, November 5, from 9 p.m. thru 5 a.m., Wednesday, November 10. NIGHT WORK. Northbound I-410 right lane closure before exit to I-10 for barrier work. I-10 exit ramp also closed. Detour: Northbound I-410 to westbound I-10 drivers may take the East Houston Street exit, continue on frontage road, turn around at Ackerman Road, and enter westbound I-10. Northbound I-410 to eastbound I-10 may take the East Houston Street exit, continue on frontage road, and enter eastbound I-10 at Ackerman Road.
  • Friday, November 5, from 7 p.m. thru 5 a.m., Monday, November 8. CONTINUOUS CLOSURE. Northbound I-410 right lane closure starting at FM 78/Seguin Street for pavement work. FM 78 entrance and exit ramps also closed. Detour: NB I-410 traffic to FM 78 may take Rittiman exit ramp and turn around at the intersection. Traffic entering NB I-410 will continue on the northbound frontage road and use Rittiman Road entrance ramp.
  • Sunday November 7, from 5 a.m. to 4 p.m. Temporary traffic stop every fifteen minutes on northbound and southbound I-410 mainlanes between FM 78 and I-10 to remove overhead utility lines. 

I-410 – West San Antonio

  • Friday, November 5 until Saturday, November 6. 9 p.m. to 5 a.m. Full closure of the northbound to southbound turnaround at SH 151 intersection of bridge work.
  • Monday, November 8 until Monday, November 15. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Saturday, November 6. 7 a.m. to 4 p.m. Full closure of the southbound exit ramp to Ingram Rd. for retaining wall work. DETOUR: Traffic will be directed to exit Culebra Rd. and take the turnaround.
  • Monday, November 8 until Tuesday, November 9. 9 p.m. to 5 a.m. Double lane closure on the northbound frontage road from SH 151 to Marbach Rd. for bridge work.
  • Monday, November 8 until Monday, November 15. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
  • Monday, November 8 until Monday, November 15. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Monday, November 8 until Monday, November 15. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work. 

I-410 – Southwest San Antonio

  • Sunday, November 7 until Thursday, November 11. Northbound frontage road entrance and exit to Bright Valley Dr. and Freedom Hills will be closed for barrier setting.
  • Sunday, November 7 until Monday, November 8. 9 p.m. to 5 a.m. Single northbound mainlane closure from Old Pearsall Rd. to Ray Ellison Blvd. for barrier setting.
  • Current until Friday, December 31. Left lane closure on the northbound frontage road from Ray Ellison Blvd. to Medina Base Rd. for roadway rehabilitation.
  • Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Monday, November 8 until Monday, November 15. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
  • Monday, November 8 until Monday, November 15. 8 p.m. to 5 a.m. Full alternating closure of the mainlanes, in both directions, at SH 151 for bridge work.
  • Monday, November 8 until Monday, November 15. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

Alamo Ranch Parkway – Bexar County

  • Monday, November 8 until Friday, November 12. 9 a.m. to 3 p.m. Single westbound lane closure at Westwood Loop for road work. 

FM 1502 – Wurzbach Parkway

  • Monday, November 8 until Monday, November 12. 9 a.m. to 4 p.m. Single westbound lane closure at the N.W. Military Highway intersection for curb and sidewalk improvements. 

FM 1535 – N.W. Military Highway

  • Monday, November 8 until Friday, November 12. 9 a.m. to 5 p.m. Single lane closures, in both directions, from Loop 1604 to Huebner Rd. for utility work.
  • Monday, November 8 until Friday, November 12. 9 a.m. to 4 p.m. Single northbound lane closure at the Wurzbach Parkway intersection for material haul-off. 

US 181 – Bexar County

  • Current until Tuesday, November 23. 7 a.m. to 7 p.m. Single lane closures, in both directions, from Wilson County Line to I-37 for road repairs. 

FM 2252 – Nacogdoches Rd.

  • Wednesday, November 10 until Thursday, November 11. 9 p.m. to 5 a.m. Single lane closures, in both directions, from Loop 410 to Evans Rd. for crack seal work. 

I-10 – Kendall County

  • Monday, November 8 until Monday, December 6. Full closure of the eastbound exit 540 ramp to SH 46/Bandera Rd. for roadway construction. DETOUR: Traffic will be diverted to the US-87 exit ramp and use the Scenic Loop Rd. turnaround. 

SH 123 – Guadalupe County

  • Monday, November 8 until Friday, November 12. 7 a.m. to 5 p.m. Single lane closures, in both directions, at the Wilson County Line for striping and barrier removal.   

Loop 337 – Comal County

  • Monday, November 8 until Friday, November 19. 8 a.m. to 5 p.m. Single lane closures, in both directions, at River Rd. for bridge work.