Loop 1604
– North Central San Antonio/Bexar County
- Sunday, November 28 until Friday, December 3. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from IH-10 to Blanco Road for barrier setting and striping.
- Sunday, November 28 until Friday, December 3. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Blanco Road to IH-10 for barrier setting and striping.
- Sunday, November 28 until Friday, December 3. Nightly 9 p.m. until 5 a.m. westbound mainlane exit ramp to IH-10 / 1604 intersection closure for barrier setting and striping.
- Sunday, November 28 until
Friday, December 3. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure
from Country Club Lane to Huebner Road for barrier setting and temporary
pavement.
- Sunday, November 28 until
Friday, December 3. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco
Road closure from Huebner Road to Country Club Lane for barrier setting and
temporary pavement.
- Monday, November 29 until Friday, December 3. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound frontage road lane closure from the Blanco Road exit ramp to the Blanco Road intersection for RW372 Phase 1.
- Monday, November 29 until Friday, December 3. Nightly 11 p.m. until 5 a.m. Periodic short term westbound frontage road lane closure from the Blanco Road exit ramp to the Blanco Road intersection for RW372 Phase 1.
- Monday, November 29 until Friday, December 3. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound mainlane closure from the Blanco Road exit ramp to the Blanco Road intersection for RW372 Phase 1.
- Monday, November 29 until Friday, December 3. Nightly 11 p.m. until 5 a.m. Periodic short term westbound mainlane closure from the Blanco Road exit ramp to the Blanco Road intersection for RW372 Phase 1.
- Monday, November 29 until Friday, December 3. Nightly 11 p.m. until 5 a.m. Periodic short term northbound Blanco Road closure at the Loop 1604 intersection for RW372 Phase 1.
- Monday, November 29 until Friday, December 3. Nightly 11 p.m. until 5
a.m. Periodic short term southbound Blanco Road closure at the Loop 1604
intersection for RW372 Phase 1.
Loop 1604 – North West San Antonio/Bexar
County
- Sunday, November 21 until Saturday, December 4. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
- Sunday, November 21 until Saturday, December 4. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
- Sunday, November 21 until Saturday, December 4. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
- Sunday, November 21 until Saturday, December 4. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
- Monday, October 18 until Tuesday, November 30. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening.
- Monday, October 18 until Tuesday, November 30. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening.
- Thursday, November 18 until Monday, December 6. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening.
- Thursday, November 18 until Monday, December 6. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening.
Loop 1604 – North East San Antonio/Bexar
County
- Monday, November 29 until Friday, December 3. 8 a.m. to 7 p.m. Various lane closures from the median between Loop 1604 eastbound mainlanes ramp to I-35 southbound mainlanes and frontage road, from Gateway Boulevard to McMorris Boulevard for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Various
lane closures including the entire cloverleaf ramp from Loop 1604 westbound to
I-35 southbound for geotechnical and drilling work.
I-10 – East San Antonio/Bexar
County/Seguin/Guadalupe County
- Current until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on the westbound frontage road from Foster Rd. to FM 1516 for utility work.
- Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
I-35 – Central San Antonio/Northeast San
Antonio/New Braunfels/Comal County
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Forum Parkway to Utopia Boulevard for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Forum Parkway to Utopia Boulevard for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Utopia Boulevard to Retama Parkway for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Utopia Boulevard to Retama Parkway for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Retama Parkway to N Evans Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single median closure of the southbound frontage road and the Loop 1604 westbound frontage road, between Gateway Boulevard and I-35 Junction for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single southbound frontage road lane closure from Walzem Road to Crestwind Drive for geotechnical and drilling work.
I-410 – Northeast
San Antonio
- Monday, November 29 until Friday, December 3. 8 a.m. to 7 p.m. Shoulder closure on the westbound frontage road from the I-410 Loop Interchange to Perrin Beitel Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Shoulder closure eastbound frontage road from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure eastbound frontage road from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Shoulder closure on eastbound frontage road from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Shoulder closure on eastbound frontage road from Vicar Drive to the I-410 Loop interchange with Austin Highway for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Various westbound median closures between the I-410 frontage road and I-410, between the I-410 Loop Interchange and Perrin Beitel Road entrance ramp for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on the westbound frontage road between the I-410 Interchange and I-410 for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Shoulder closure on the westbound frontage road from Austin Highway to the I-410 frontage road before joining the I-410 Loop for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single westbound frontage road closure from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Whirlwind Drive to Walzem Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Single lane closure on the westbound frontage road from Brookhaven Drive to Sage Brush Lane for geotechnical and drilling work.
- Monday, November 29 until Wednesday, December 3. 9 p.m. to 5 a.m. Single lane closure eastbound from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single lane closure eastbound from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Various eastbound frontage road closures (including entrance ramp to I-410) from Goldstar Drive to Perrin Beitel Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Westbound shoulder closure from Fratt Road to Ellis Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single mainlane eastbound closure from N New Braunfels Avenue to Nacogdoches Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Entrance ramp closure to I-410 eastbound and single lane closure eastbound from Cripple Creek Street to Ira Lee Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single lane closure eastbound from Ira Lee Road to Silverstar Street for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single lane closure eastbound from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single eastbound lane closure from Fratt Road to Interchange Parkway for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Eastbound entrance ramp closure and frontage road shoulder closure from Quail Creek Drive to Perrin Beitel Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Eastbound turnaround closure to westbound frontage road between Quail Creek Drive and Perrin Beitel Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Westbound turnaround closure to eastbound frontage road between Perrin Beitel Road and Vicar Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Various eastbound frontage road lane closures (including I-410 entrance ramp) from Perrin Beitel Road to Vicar Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Exit ramp closure connecting eastbound I-410 to southbound Austin Highway, as well as shoulder closures on both sides of the ramp for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single lane closure on the entrance ramp that connects Austin Highway to the I-410 westbound frontage road between Cross Creek Drive and Vicar Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Entrance ramp closure connecting Austin Highway to I-410 eastbound between Cross Creek Drive and Fratt Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single northbound lane closure on Austin Highway to I-410 eastbound frontage road from Cross Creek Drive to Fratt Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single closure on the eastbound frontage road from Silverstar Drive to Starcrest Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single closure on the eastbound frontage road from Goldstar Drive to Quail Creek Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single lane closure on the westbound from Perrin Beitel Road to Starcrest Drive for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 a.m. to 4 p.m. Various median closures westbound between the I-410 frontage road and the I-410 exit ramp, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Various median closures westbound between the I-410 frontage road and the I-410 exit ramp, between the I-410 Loop Interchange and Perrin Beitel Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Westbound frontage road ramp closure from Perrin Creek Road to Perrin Beitel Road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Mandatory left turn lane closure on Austin Highway to westbound I-410 frontage road for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single lane closure on the westbound mainlanes from Brookhaven Drive to Sage Brush Lane for geotechnical and drilling work.
- Monday, November 29 until Friday, December 3. 9 p.m. to 5 a.m. Single
lane closure on the westbound mainlanes from Post Oak Road to Norwich Drive for
geotechnical and drilling work.
I-410 – West
San Antonio
- Current until Monday, November 29. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
- Current until Monday, November 29. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
- Current until Monday, November 29. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
- Current until Monday, November 29. 8 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
- Current until Monday, December 6. 8 p.m. to 5 a.m. Full closure of the Culebra Rd. intersection at Loop 410 for bridge work.
- Monday, November 29 until Monday, December 6. 8 p.m. to 5 a.m. Full mainlane closures, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
- Monday, November 29 until Monday, December 6. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
- Monday, November 29 until Monday, December 6. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
- Monday, November 29 until Monday, December 6. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for bridge work.
I-410 – Southwest
San Antonio
- Current until Friday, December 31. Left lane closure on the northbound frontage road from Ray Ellison Blvd. to Medina Base Rd. for roadway rehabilitation.
- Current until December 2021. Left lane closed on the southbound frontage road at Valley Hi.
- Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd.
SH 151 – West
San Antonio
- Monday, November 29 until Monday, December 6. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work.
- Monday, November 29 until Monday, December 6. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for bridge work.
- Monday, November 29
until Monday, December 6. 8 p.m. to 5 a.m. Alternating full closures on the
mainlanes, in both directions, at Loop 410 for bridge work.
PA 1502 – Wurzbach
Parkway
- Sunday, November 28 9
p.m. until Friday, December 3 4 p.m. Single westbound right lane closure from
Elm Creek to Lockhill Selma for barrier shifting.
I-10 – Kendall County
- Current until December 2021. Full closure of the eastbound exit 540 ramp to SH 46/Bandera Rd. for roadway construction. DETOUR: Traffic will be diverted to the US-87 exit ramp and use the Scenic Loop Rd. turnaround.
SH 123 – Guadalupe County
- Monday, December 6 until Friday, December 10. 8 a.m. to 5:30 p.m. Alternating lane closures, in both directions, near Big Oaks Rd. for striping work.