Friday, February 4

UPCOMING SCHEUDLED CONSTRUCTION CLOSURES

 


Loop 1604 – North West San Antonio/Bexar County

  • Monday, February 7 until Friday, February 18. 9 a.m. to 4 p.m. Single right lane closure on the westbound frontage road from Old Fredericksburg Rd. to Agave Pass for utility work.
  • Sunday, January 30 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, January 30 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, January 30 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, January 30 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, January 31 until Saturday, February 12. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road outside lane closure from Hausman Road to John Peace Boulevard /La Cantera Parkway for sidewalk construction.
  • Sunday, February 6 until Monday, February 21. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Sunday, February 6 until Monday, February 21. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Kyle Seale Parkway to Bandera Road (SH 16) for bridge construction: caps, beams and rail demo.
  • Sunday, February 6 until Monday, February 21. Weeknights 9 p.m. until 5 a.m. Northbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps, beams and rail demo.
  • Sunday, February 6 until Monday, February 21. Weeknights 9 p.m. until 5 a.m. Southbound Hausman Road full closure at the Loop 1604 intersection for bridge construction: caps & beams.
  • Sunday, February 6 until Monday, February 21. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps & beams.
  • Sunday, February 6 until Monday, February 21. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and Hausman Road for bridge construction: caps & beams.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, January 31 until Saturday, February 12. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, February 6 until Friday, February 11. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, February 6 until Friday, February 11. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, February 6 until Friday, February 11. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound frontage road lane closure from the Bitters Road exit ramp to the Blanco Road exit ramp for excavation.
  • Sunday, February 6 until Friday, February 11. Nightly 11 p.m. until 5 a.m. Periodic short term westbound frontage road lane closure from the Blanco Road exit ramp to the Bitters Road exit ramp for excavation.
  • Sunday, February 6 until Friday, February 11. Nightly 11 p.m. until 5 a.m. Periodic short term eastbound mainlane closure from the Bitters Road exit ramp to the Blanco Road exit ramp for excavation.
  • Sunday, February 6 until Friday, February 11. Nightly 11 p.m. until 5 a.m. Westbound mainlane full closure from the Blanco Road exit ramp to the Bitters Road exit ramp for excavation.
  • Sunday, February 6 until Friday, February 11. Nightly 11 p.m. until 5 a.m. Periodic short term northbound Huebner Road closure at the Loop 1604 intersection for excavation.
  • Sunday, February 6 until Friday, February 11. Nightly 11 p.m. until 5 a.m. Periodic short term southbound Huebner Road closure at the Loop 1604 intersection for excavation.
  • Sunday, February 6 until Friday, February 11. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure from Country Club Lane/West Blanco Road to Huebner Road for barrier setting and striping.
  • Sunday, February 6 until Friday, February 11. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road closure from Huebner Road to Country Club Lane/West Blanco Road for barrier setting and striping. 

US 281 – North San Antonio/Bexar County

  • Saturday, February 12 until Sunday, February 20. Full closure of the Marshall Rd. intersection for turnaround construction and striping operations.
  • Saturday, February 5 until Monday, February 7. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Saturday, February 5 until Monday, February 7. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Sunday, February 6 until Thursday, February 10. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, February 6 until Thursday, February 10. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Monday, February 7 until Friday, February 11. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Monday, February 7 until Friday, February 11. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Saturday, February 12 until Monday, February 14. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Saturday, February 12 until Monday, February 14. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 signage installation and lane striping.
  • Sunday, February 13 until Thursday, February 17. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Sunday, February 13 until Thursday, February 17. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping. 

I-10 – North West San Antonio/Bexar County 

  • Current until Friday, February 11. Surface ramp from westbound frontage road to eastbound Loop 1604 will be closed for utility work.
  • Monday, February 7 until Friday, February 18. 9 a.m. to 4 p.m. Single right lane closure on the eastbound frontage road at UTSA Blvd. for utility work.
  • Monday, February 7 until Friday, February 18. 9 a.m. to 4 p.m. Single right lane closure on the westbound frontage road at De Zavala Rd. for utility work. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, February 6 until Monday, February 7. 8 p.m. to 5 a.m. Double northbound mainlane closure from north of the Watson bridge to south of the Conrads bridge for installing barriers and striping for traffic switch on the Conrads bridge.
  • Sunday, February 6 until Friday, February 11. 9 p.m. to 5 a.m. Single northbound mainlane closure on North Weidner exit ramp (168) and single lane closure on the frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work. Traffic should use the O’Connor Road exit ramp. Follow the detour signs. 
  • Sunday, February 6 until Friday, February 11. 9 p.m. to 5 a.m. Turnaround closure from the northbound to southbound frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work.
  • Sunday, February 6 until Friday, February 11. 9 p.m. to 5 a.m. Turnaround closure from the southbound to northbound frontage road from North Weidner Road to Bomar Lane for geotechnical and drilling work.
  • Sunday, February 6 until Friday, February 11. 9 p.m. to 5 a.m. Northbound entrance ramp closure from O’Connor Road and single lane closure on the frontage road from O’Connor Road to Bladau Bishop for geotechnical and drilling work. Traffic should use the Toepperwein Road entrance ramp. Follow the detour signs.
  • Sunday, February 6 until Friday, February 11. 9 p.m. to 5 a.m.  Alternating northbound exit ramp closures to Toepperwein Road (170B) and Pat Booker Road (171) and single lane closure on the northbound frontage road from Judson Road to Shin Oak Drive for geotechnical and drilling work. Drivers may use the exit prior to the closed exit. Follow the detour signs.
  • Sunday, February 6 until Friday, February 11. 9 p.m. to 5 a.m. Single southbound mainlane and shoulder closure between Olympia Parkway and Forum Parkway for geotechnical and drilling work.
  • Sunday, February 6 until Wednesday, February 9. 9 p.m. to 5 a.m. Single northbound mainlane closure from Thousand Oaks Drive and O’Connor Road for survey work.
  • Sunday, February 6 until Wednesday, February 9. 9 p.m. to 5 a.m. Single northbound mainlane closure from Forum Parkway and Loop 1604 for survey work.
  • Monday, February 7 until Wednesday, February 9. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Randolph Boulevard to Walzem Road for repair work on box culvert.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from North Weidner Road to O’Connor Road for geotechnical and drilling work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Joe Lee Street to North Weidner Road for geotechnical and drilling work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Wayland Way to O’Connor Road for geotechnical and drilling work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from O’Connor Road to Bladau Bishop for geotechnical and drilling work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from O’Connor Road to Bladau Bishop for geotechnical and drilling work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from O’Connor Road to Judson Road for geotechnical and drilling work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road from Judson Road to Toepperwein Road for geotechnical and drilling work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road from Forum Parkway to Forum Access for geotechnical and drilling work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road from Sandpiper Drive to Shin Oak Drive for geotechnical and drilling work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single lane closure on northbound frontage road from Shin Oak Drive to Pat Booker Road for geotechnical and drilling work.
  • Monday, February 7 until Wednesday, February 9. 9 a.m. to 4 p.m. Single northbound lane and shoulder closure on the frontage road from Judson Road exit ramp to Toepperwein Road exit ramp for wall investigation work.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 5:30 p.m. Single northbound frontage road lane from FM 2252 to Schwab Rd. for sidewalk, headwall and rail work.
  • Wednesday, February 9 until Friday, February 11. 9 a.m. to 4 p.m. Single southbound lane and shoulder closure on the frontage road from Judson Road exit ramp to Judson Road entrance ramp for wall investigation work. 

I-410 – North East San Antonio

  • Sunday, February 6 until Friday, February 11. 9 p.m. to 5 a.m. Eastbound turnaround closure to westbound frontage road between Quail Creek Drive and Perrin Beitel Road for geotechnical and drilling work.
  • Sunday, February 6 until Friday, February 11. 9 p.m. to 5 a.m. Westbound turnaround closure to eastbound frontage road between Perrin Beitel Road and Vicar Drive for geotechnical and drilling work.
  • Sunday, February 6 until Friday, February 11. 9 p.m. to 5 a.m. Mandatory left turn lane closure on Austin Highway to westbound I-410 frontage road between I-35 frontage road for geotechnical and drilling work. Traffic should detour south on Austin Highway to Perrin Creek Road. 
  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Shoulder closure of the turnaround lane from the eastbound frontage road to westbound frontage road between Quail Creek Drive and Perrin Beitel Road for geotechnical and drilling work. 

I-410 – West San Antonio

  • Saturday, February 5. 8 a.m. to 5 p.m. Full closure of the northbound entrance ramp to Marbach Rd. for lighting installation.
  • Current until Sunday, February 6. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd. for concrete work.
  • Current until Monday, February 7. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd. for concrete work.
  • Current until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the southbound exit ramp to Ingram Rd. for traffic switch.
  • Current until Monday, February 7. 9 a.m. to 5 p.m. Full closure of the southbound bypass ramp to W. Military Dr. for concrete work.
  • Current until Monday, February 7. 8 p.m. to 5 a.m. Double lane closure on the northbound mainlanes from Ingram Rd. to Culebra Rd. for column work.
  • Current until Monday, February 7. 9 p.m. to 5 a.m. Southbound exit ramp to Marbach Rd. closed for painting operations.
  • Current until Monday, February 7. 9 a.m. to 3 p.m. Single southbound mainlane closure from W. Military Dr. to SH 151 for concrete work.
  • Current until Monday, February 7. Full closure of the turnarounds, in both directions, at Ingram Rd. for traffic switch.
  • Current until Monday, February 7. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Bandera Rd. for bridge work.
  • Current until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from W. Military Dr. to Marbach Rd. for bridge work.
  • Current until Monday, February 7. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
  • Current until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the northbound mainlanes from Meadow Breeze Dr. to SH 151 bridge work. 

I-410 – Southwest San Antonio

  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Current until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, at Loop 410 for bridge work.
  • Current until Monday, February 7. 8 p.m. to 5 a.m. Full closure of the eastbound frontage road from Cable Ranch Rd. to Loop 410 for bridge work. 

PA 1502 – Wurzbach Parkway

  • Current until Tuesday, February 8. 9 a.m. to 3 p.m. Single lane closures, in both directions, from N.W. Military Highway to Blanco Rd. for striping operations.
  • Monday, February 7 until Friday, February 11. 9 a.m. to 3 p.m. Single lane closures, in both directions, from N.W. Military Highway to Blanco Rd. for traffic shift.
  • Monday, February 7 until Tuesday, February 8. 9 p.m. to 2 a.m. Alternating lane closures, in both directions, from N.W. Military Highway to Blanco Rd. for sign work.

FM 1535 – N.W. Military Highway

  • Monday, February 7 until Friday, February 11. 9 a.m. to 4 p.m. Single northbound lane closure at Wurzbach Parkway intersection for equipment and material haul-off. 

I-10 – Kendall County

  • Current until Spring 2022. Full closure of the eastbound frontage road from Menger Springs to US 87 (Main St.) for road construction.