Loop 1604 – North West San Antonio/Bexar County

  • Monday, January 2 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road full intersection closure for bridge construction/formwork removal. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for eastbound direct connector bridge construction. Nightly frontage road full closure. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane entrance ramp after La Cantera Parkway for eastbound direct connector bridge construction. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Friday, January 6 at 9:00 p.m. until Monday, January 9 at 5 a.m. Weekend only. Westbound mainlane closure between Kyle Seale Parkway and Bandera Road for relocation of concrete traffic barrier. Only one full mainlane closure to occur per direction.
  • Monday, January 2 until Monday, January 16. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Long term turnaround closure. Only one turnaround to be closed at a time on each direction. 

Loop 1604 – North Central San Antonio/Bexar County

  • Monday, January 2 until Friday, January 6. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Monday, January 2 until Friday, January 6. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Monday, January 2 until Friday, January 6. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Monday, January 2 until Friday, January 6. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Monday, January 2 until Friday, January 6. Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure from Blanco Road exit ramp to Bitters Road entrance ramp for rock haul off.
  • Monday, January 2 until Friday, January 6. Nightly 9 p.m. until 5 a.m. Westbound frontage road short term/periodic, full closure from Salado Creek to Huebner Road for rock haul off.
  • Monday, January 2 until Friday, January 6. Nightly 9 p.m. until 5 a.m. Eastbound middle and right mainlanes closure from IH-10 collector distributor entrance ramp to Lockhill Selma Road exit ramp for rock haul off and barrier setting.
  • Monday, January 2 until Friday, January 6. Nightly 9 p.m. until 5 a.m. Eastbound frontage road entrance ramp closure just east of IH-10 for rock haul off and barrier setting.
  • Monday, January 2 until Friday, January 6. Nightly 9 p.m. until 5 a.m. Eastbound Lockhill Selma Road exit ramp closure for rock haul off and barrier setting.
  • Tuesday, January 3 until Sunday, January 8. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Lockhill Selma for drainage installation and pavement installation. 

Loop 1604 – North East San Antonio/Bexar County

I-10 – North West San Antonio/Bexar County

  • Monday, January 2 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Friday, January 13.  Weeknights 9 p.m. until 5 a.m. Ramp/Cloverleaf full closure from IH-10 eastbound to SL 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Ramp full closure from SL 1604 westbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Ramp/Cloverleaf full closure from IH-10 westbound to SL 1604 westbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 2 until Friday, January 13. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Sunday, February 5. Long term closure (24/7). Left lane closure on southbound I-35 frontage road between Pat Booker Road and Toepperwein Road for drill shaft, column, and cap work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Left lane closure of eastbound I-410 connector ramp to northbound I-35 mainlane for drilling work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Right shoulder closure on westbound frontage road of I-410 between Randolph Boulevard and I-35 for drilling work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Right shoulder closure on northbound frontage road of I-35 connector ramp from Windcrest Drive to Tradewind Drive for drilling work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 frontage road and right shoulder closure on exit ramp between Walzem Road and Crestwind Drive for drilling work.
  • Monday, January 2. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 mainlane between Walzem Road and Crestwind Drive for drilling work.
  • Monday, January 2 until Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound I-410 mainlane between I-35 and Perrin Beitel for drilling work.
  • Monday, January 2 until Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound Fratt Road between frontage road of I-35 and Interchange Parkway for drilling work.
  • Monday, January 2 until Friday, January 6. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 between Starlight Terrace and Weidner Road for drilling work.
  • Monday, January 2 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 between Crestway Drive and Starlight Terrace for drilling work.
  • Tuesday, January 3. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 mainlane from Walzem Road to Crestwind Drive for drilling work.
  • Tuesday, January 3. 9:00 p.m. to 5:00 a.m. Left lane closure of northbound I-35 frontage road between Windcrest Drive and Tradewind Drive for drilling work.
  • Tuesday, January 3 until Thursday, January 5. 9:00 p.m. to 5:00 a.m. Left lane closure on eastbound I-410 connector ramp to northbound I-35 mainlane for drilling work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes between Toepperwein Road and Judson Road for illumination work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on southbound I-35 mainlanes between Toepperwein Road and Judson Road for illumination work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlane, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Judson Road to O’Connor Road for tree removal and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes and left lane closure on northbound frontage of I-35 from O’Connor Road to Judson Road for tree removal.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earth work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Left lane closure (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for drill shaft and drainage work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Alternating lane closure on southbound mainline of I-35 connector ramp to westbound I-410 for striping and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for drill shaft preparation work.
  • Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 connector ramp to westbound I-410 for drilling work.
  • Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right shoulder closure of northbound I-35 mainlane between Crestwind Drive and Windcrest Drive for drilling work. 

I-10 – East San Antonio/Bexar County

  • Continuing through Friday, January 13. Eastbound I-10 ramp to southbound I-410 closed continuously until 4 p.m. January 13. Detour: Eastbound I-10 traffic to southbound I-10 may exit at W.W. White and stay on frontage road to E. Houston Street on-ramp.
  • Tuesday, January 3 through Friday, January 6. DAYTIME. Southbound Loop 1604 two left lanes closed at I-10 overpass from 9 a.m. to 3 p.m. for overpass work
  • Tuesday, January 3 through Monday, January 16. DAYTIME westbound I-10 frontage road alternating lane closure between Ackerman Road and I-10 on-ramp from 9 a.m. to 4 a.m. for overpass work. I-10 on-ramp will remain open. 
  • Monday, January 2 through Monday, January 16. NIGHTTIME westbound I-10 frontage road closure between Ackerman Road and Cornerway Boulevard from 9 p.m. to 5 a.m. for overpass work. (No closures Friday or Saturday nights) I-10 on-ramp will also be closed.
  • Monday, January 2 through Monday, January 16. NIGHTTIME I-10 eastbound exit to Ackerman closed from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights) Detour: Eastbound I-10 traffic can exit at Foster Road, turn around at the intersection, and use the westbound frontage road back to Ackerman.  

I-410 – North East San Antonio

  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on eastbound frontage road of I-410 and eastbound I-410 entrance ramp closure from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) and entrance ramp closure on eastbound I-410 frontage road from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on westbound I-410 mainlines and exit ramp closure between I-35 and Perrin Beitel for striping and barrier work. Traffic should use prior exit.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway to westbound I-410 frontage road for striping and barrier work.
  • Tuesday, January 3 until Saturday, January 7. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel for striping and barrier work.
  • Wednesday, January 4. 9:00 p.m. to 5:00 a.m. Right shoulder closure on eastbound I-410 mainlane between Perrin Beitel and Interchange Parkway for drilling work. 

I-410 – East San Antonio

  • Monday, January 2 through Monday, January 16. NIGHTTIME. Northbound I-410 ramp to eastbound I-10 closed from 8 p.m. to 5 a.m. for ramp work. Detour: Traffic will take the northbound I-410 to the westbound I-10 cloverleaf ramp, then the westbound I-10 to southbound I-410 cloverleaf ramp, and finally to the I-410 southbound to I-10 eastbound cloverleaf ramp.
  • Tuesday, January 3 through Monday, January 16. DAYTIME alternating northbound and southbound I-410 frontage road lane closures between I-10 and East Houston Street from 9 a.m. to 4 p.m. for bridge and road work.  
  • Monday, January 2 through Monday, January 16. NIGHTTIME alternating northbound and southbound I-410 full mainlane closures between I-10 exit ramp and I-10 bridge from 9 p.m. to 5 a.m. (No closures during northbound  frontage road closures or on Friday and Saturday nights.) Detour NB &SB I-410 traffic take exit towards I-10 collector ramp and continue straight to get back on I-410.
  • Monday, January 2 through Monday, January 2. NIGHTTIME northbound I-410 frontage road closure from East Houston Street on-ramp to Eastgate Street on-ramp from 9 p.m. to 5 a.m. Peggy Drive will remain open for local traffic. (No closures during full northbound mainlane closures, or on Friday and Saturday nights.) Detour: Northbound I-410 traffic to Ackerman Road may take northbound I-410 to I-10 eastbound exit ramp, turn around at Foster Road, and take I-10 westbound frontage road to Ackerman.   

I-410 – West San Antonio

  • Monday, January 2 until Monday, January 16. 8 pm. To 5 a.m. Alternating closures of the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for asphalt operations.
  • Monday, January 2 until Monday, January 16. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from Bandera Rd. to SH 151 for bridge and sign work.
  • Monday, January 2 until Monday, January 16. Southbound exit ramp to Ingram Rd. closed for rail work. 

PA 1502 – Wurzbach Parkway

  • Current until Saturday, December 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Blanco Rd. to Thousand Oaks Dr. for road work. 

FM 2252 – Nacogdoches Road

  • Thursday, January 5 until Friday, January 6. 9 p.m. to 5 a.m. Full closure of lanes, in both directions, at Evans Rd. intersection for bridge work. 

SH 46 – Comal County

  • Tuesday, January 3 until Friday, January 13. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from Bentwood Dr. to Fairhills Dr. for signal work.