Friday, January 6

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road full intersection closure for bridge construction/formwork removal. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for eastbound direct connector bridge construction. Nightly frontage road full closure. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane entrance ramp after La Cantera Parkway for eastbound direct connector bridge construction. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Eastbound I-10 mainlane exit ramp closure to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, January 8 until Monday, January 16. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from westbound IH-10 to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Friday, January 13 at 9:00 p.m. until Monday, January 16 at 5 a.m. Weekend only. Eastbound mainlane closure between Babcock Road and John Peace Boulevard/La Cantera Parkway for relocation of concrete traffic barrier. Only one full mainlane closure to occur per direction.
  • Monday, January 9 until Monday, January 16. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Long term turnaround closure. Only one turnaround to be closed at a time on each direction. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, January 8 until Friday, January 13. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, January 8 until Friday, January 13. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, January 8 until Friday, January 13. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, January 8 until Friday, January 13. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Sunday, January 8 until Friday, January 13. Nightly 9 p.m. until 5 a.m. Westbound mainlane full closure from Blanco Road exit ramp to Bitters Road entrance ramp for rock haul off.
  • Sunday, January 8 until Friday, January 13. Nightly 9 p.m. until 5 a.m. Westbound frontage road short term/periodic, full closure from Salado Creek to Huebner Road for rock haul off.
  • Sunday, January 8 until Friday, January 13. Nightly 9 p.m. until 5 a.m. Eastbound middle and right mainlanes closure from IH-10 collector distributor entrance ramp to Lockhill Selma Road exit ramp for rock haul off and barrier setting.
  • Sunday, January 8 until Friday, January 13. Nightly 9 p.m. until 5 a.m. Eastbound frontage road entrance ramp closure just east of IH-10 for rock haul off and barrier setting.
  • Sunday, January 8 until Friday, January 13. Nightly 9 p.m. until 5 a.m. Eastbound Lockhill Selma Road exit ramp closure for rock haul off and barrier setting.
  • Sunday, January 8 until Sunday, January 15. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and Lockhill Selma for drainage installation and pavement installation. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures and exit ramp closure on eastbound Loop 1604 frontage road from Lookout Road to I-35 for striping work. Traffic would have to use the Lookout Road exit to get to IKEA-RBFCU Parkway.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound mainlane of Loop 1604 from Nacogdoches Road to I-35 for striping and barrier work.
  • Sunday, January 22 until Wednesday, January 25. 9:00 p.m. to 5:00 a.m. Full closure on Lookout Road and turnarounds at the intersection of Loop 1604 for bridge and barrier work. All traffic on Lookout Road and turnarounds must follow detour signs. 
  • Sunday, January 22 through Friday, February 17 long term closure (24/7). Eastbound to westbound Loop 1604 turnaround closure at Lookout Road frontage for demolition work.
  • Sunday, January 22 through Friday, February 17 long term closure (24/7). Westbound to eastbound Loop 1604 turnaround closure at Lookout Road frontage for demolition work. 

I-10 – North West San Antonio/Bexar County

  • Sunday, January 8 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 8 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 8 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 8 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, January 8 until Friday, January 13.  Weeknights 9 p.m. until 5 a.m. Ramp/Cloverleaf full closure from IH-10 eastbound to SL 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, January 8 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Ramp full closure from SL 1604 westbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, January 8 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. Ramp/Cloverleaf full closure from IH-10 westbound to SL 1604 westbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, January 8 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, January 8 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, January 8 until Friday, January 13. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Monday, January 9 until Friday, January 13. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, January 9 until Friday, January 13. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current through Sunday, February 5 long term closure (24/7). Left lane closure on southbound I-35 frontage road between Pat Booker Road and Toepperwein Road for drill shaft, column, and cap work.
  • Sunday, January 8 until Wednesday, January 11. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 between Crestway Drive and Starlight Terrace for drilling work.
  • Sunday, January 8 until Wednesday, January 11. 9:00 p.m. to 5:00 a.m. Left lane closure on eastbound I-410 connector ramp to northbound I-35 mainlane for drilling work.
  • Sunday, January 8 until Wednesday, January 11. 9:00 p.m. to 5:00 a.m. Right shoulder closure on westbound frontage road of I-410 between Fourwinds Drive and I-35 for drilling work.
  • Sunday, January 8 until Wednesday, January 11. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 mainlane from Walzem Road to Crestwind Drive for drilling work.
  • Sunday, January 8 until Thursday, January 12. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound Fratt Road between frontage road of I-35 and Interchange Parkway for drilling work.
  • Sunday, January 8 until Friday, January 13. 9:00 p.m. to 5:00 a.m. Left lane closure of southbound I-35 frontage road at Judson Road and right turn lane closure on southbound I-35 frontage road at Judson Road for illumination work.
  • Sunday, January 8 until Friday, January 13. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road on I-35 from Starlight Terrace to Weidner Road for drilling work.
  • Sunday, January 8 until Friday, January 13. 9:00 p.m. to 5:00 a.m. Left lane closure of northbound I-35 frontage road between Windcrest Drive and Tradewind Drive for drilling work.
  • Sunday, January 8 until Friday, January 13. 9:00 p.m. to 5:00 a.m. Right shoulder closure of northbound I-35 mainlane between Crestwind Drive and Windcrest Drive for drilling work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple right lane (3) closures on southbound I-35 from Evans Road to Olympia Parkway, entrance ramp closure between Retama Parkway and southbound I-35 (use next entrance) and exit ramp closure at Evans Road (use prior exit) for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple left lane (3) closures on southbound I-35 mainlanes from Evans Road to Olympia Parkway for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple left lane (3) closures on southbound I-35 mainlanes from Forum Parkway to McMorris Boulevard for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures of Retama Parkway in both directions from Lookout Road to I-35 southbound frontage road for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlanes between Toepperwein Road and Judson Road for illumination work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on southbound I-35 mainlanes between Toepperwein Road and Judson Road for illumination work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlane, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Judson Road to O’Connor Road for tree removal and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earth work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Right lane closures (2) on southbound frontage road of I-35 from Pat Booker Road to O’Connor Rd for earth, barrier, and striping work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Left lane closures (2) on southbound frontage road of I-35 from Pat Booker Road to O’Connor Road and exit ramp closure on southbound I-35 mainlane to Judson Road for earth, barrier, and striping work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlane from Judson Road to Crownpoint Drive for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound I-35 mainlane from Judson Road to Crownpoint Drive, including the closure of the entrance ramp for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (3) on southbound I-35 mainlane from O’Connor Road to Weidner Road for striping and barrier work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, entrance ramp closure and exit ramp closure on southbound I-35 from O’Connor Road to Weidner Road for striping work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Left lane closure (2) on southbound frontage road of I-35 from Thousand Oaks Drive to Randolph Boulevard for drill shaft and drainage work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Southbound to northbound I-35 turnaround closure at Thousand Oaks Drive for drilling work.
  • Sunday, January 8 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Left lane closure on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for drill shaft preparation work.
  • Monday, January 9 until Wednesday, January 11. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlanes from O’Connor road to Bladau Bishop for pothole work.
  • Monday, January 9 until Wednesday, January 11. 9:00 p.m. to 5:00 a.m. Right shoulder closure on northbound frontage road of I-35 connector ramp between Windcrest Drive to Tradewind Drive for drilling work.
  • Monday, January 9 until Thursday, January 12. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 mainlane from Walzem Road to Crestwind Drive for drilling work.
  • Monday, January 9 until Friday January,13. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound I-35 frontage road and right shoulder closure on exit ramp between Walzem Road and Crestwind Drive for drilling work.
  • Monday, January 9 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound mainlane of I-35 connector ramp to westbound I-410 for striping and barrier work.
  • Tuesday, January 10 until Friday, January 13. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 frontage road from FM 1518 to Chelsea Place for pothole work.
  • Tuesday, January 10 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple left lane (2) closures on northbound I-35 from Starlight Terrace to Weidner Road for TxDOT pavement inspection.
  • Tuesday, January 10 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple left lane (2) closures on northbound I-35 from Windcrest Drive to Starlight Terrace for TxDOT pavement inspection.
  • Wednesday, January 11 until Friday, January 13. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 connector ramp to westbound I-410 for drilling work.
  • Sunday, February 12 through Wednesday, April 12 long term closure (24/7). Exit ramp closure of southbound I-35 to Randolph Boulevard. Traffic to use temporary ramp.
  • Sunday, February 12 through Sunday, October 29 long term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work. 

I-10 – East San Antonio/Bexar County

  • Sunday, January 8 until Tuesday, January 10. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes at Pfeil Rd. for bridge work.
  • Tuesday, January 10 until Thursday, January 12. 9 p.m. to 5 a.m. Full closure of the westbound mainlanes at Pfeil Rd. for bridge work.
  • Tuesday, January 10. 8 a.m. to 5 p.m. Full closure of eastbound frontage road from Cibolo Creek to Zuehl Rd. for girder installation.
  • Tuesday, January 10. 8 a.m. to 5 p.m. Full closure of the eastbound exit ramp to Zuehl Rd. for girder installation.
  • Continuing through Friday, January 13. Eastbound I-10 ramp to southbound I-410 closed continuously until 4 p.m. January 13. Detour: Eastbound I-10 traffic to southbound I-10 may exit at W.W. White and stay on frontage road to E. Houston Street on-ramp.
  • Tuesday, January 3 through Monday, January 16. DAYTIME westbound I-10 frontage road alternating lane closure between Ackerman Road and I-10 on-ramp from 9 a.m. to 4 a.m. for overpass work. I-10 on-ramp will remain open. 
  • Monday, January 2 through Monday, January 16. NIGHTTIME westbound I-10 frontage road closure between Ackerman Road and Cornerway Boulevard from 9 p.m. to 5 a.m. for overpass work. (No closures Friday or Saturday nights) I-10 on-ramp will also be closed.
  • Monday, January 2 through Monday, January 16. NIGHTTIME I-10 eastbound exit to Ackerman closed from 9 p.m. to 5 a.m. (No closures Friday and Saturday nights) Detour: Eastbound I-10 traffic can exit at Foster Road, turn around at the intersection, and use the westbound frontage road back to Ackerman. 
  • Tuesday, January 10. NIGHTTIME westbound I-10 full mainlanes closure between Loop 1604 and Lincoln Drive from 1:30 a.m. to 5 a.m. for overpass work. Detour: Westbound traffic will take the Loop 1604 exit, take I-10 westbound frontage road, and re-enter westbound I-10 at next on-ramp. 

I-410 – North East San Antonio

  • Sunday, January 8 until Friday, January 13. 9:00 p.m. to 05:00 a.m. Right lane closure on westbound I-410 mainlane between I-35 and Perrin Beitel for drilling work.
  • Monday, January 9 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple right mainlane closures (2) and exit ramp closure on westbound I-410 between I-35 and Perrin Beitel for striping and barrier work. Traffic should use next exit.
  • Monday, January 9 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem Road to westbound I-410 frontage road for striping and barrier work.
  • Monday, January 9 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel for striping and barrier work.
  • Monday, January 9 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Monday, January 9 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) on eastbound I-410 mainlanes from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Monday, January 9 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Monday, January 9 until Saturday, January 14. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) and entrance ramp closure on eastbound I-410 frontage road from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work.
  • Wednesday, January 11 until Friday, January 13. 9:00 p.m. to 5:00 a.m. Right shoulder closure on eastbound I-410 mainlane between Perrin Beitel and Interchange Parkway for drilling work. 

I-410 – East San Antonio

  • Continuing through Monday, January 16. NIGHTTIME. Northbound I-410 ramp to eastbound I-10 closed from 8 p.m. to 5 a.m. for ramp work. Detour: Traffic will take the northbound I-410 to the westbound I-10 cloverleaf ramp, then the westbound I-10 to southbound I-410 cloverleaf ramp, and finally to the I-410 southbound to I-10 eastbound cloverleaf ramp.
  • Continuing through Monday, January 16. DAYTIME alternating northbound and southbound I-410 frontage road lane closures between I-10 and East Houston Street from 9 a.m. to 4 p.m. for bridge and road work.  
  • Continuing through Monday, January 16. NIGHTTIME alternating northbound and southbound I-410 full mainlane closures between I-10 exit ramp and I-10 bridge from 9 p.m. to 5 a.m. (No closures during northbound  frontage road closures or on Friday and Saturday nights.) Detour NB &SB I-410 traffic take exit towards I-10 collector ramp and continue straight to get back on I-410.
  • Continuing through Monday, January 16. NIGHTTIME northbound I-410 frontage road closure from East Houston Street on-ramp to Eastgate Street on-ramp from 9 p.m. to 5 a.m. Peggy Drive will remain open for local traffic. (No closures during full northbound mainlane closures, or on Friday and Saturday nights.) Detour:  
  • Northbound I-410 traffic wanting to access Ackerman Road may take northbound I-410 to I-10 eastbound exit ramp, turn around at Foster Road, and take I-10 westbound frontage road to Ackerman. 
  • Continuing through Wednesday, February 1. NIGHTTIME northbound I-410 frontage road closure from Eastgate Street to Ackerman Road from 8 p.m. to 5 a.m.
  • Northbound I-410 frontage traffic wanting to access Ackerman Road may take northbound I-410 to I-10 eastbound exit ramp, turn around at Foster Road, and take I-10 westbound frontage road to Ackerman.   

I-410 – West San Antonio

  • Current until Monday, January 16. 8 pm. To 5 a.m. Alternating closures of the frontage roads, in both directions, from Bandera Rd. to Marbach Rd. for asphalt operations.
  • Current until Monday, January 16. 8 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, from Bandera Rd. to SH 151 for bridge and sign work.
  • Current until Monday, January 16. Southbound exit ramp to Ingram Rd. closed for rail work. 

PA 1502 – Wurzbach Parkway

  • Monday, January 9 until Tuesday, January 31. 9 a.m. to 3 p.m. Alternating lane and ramps closures, in both directions from Blanco Rd. to Thousand Oaks for roadway improvements. 

FM 1535 – N.W. Military Highway

  • Monday, January 9 until Friday, January 13. 7 a.m. to 6 p.m. Single lane closures, in both directions, from Loop 1604 to Huebner Rd. for utility work.   

SH 16 – Bandera Road

Monday, January 9 until Friday, January 13. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604 to Diamond K Trail, for utility work.  

SH 46 – Comal County

  • Current until Friday, January 13. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from Bentwood Dr. to Fairhills Dr. for signal work. 

I-10 – Kendall County

  • Sunday, January 8 until Thursday, January 12. 9 a.m. to 3 p.m. Various lane closures on the frontage road from Scenic Loop to Johns Rd. for paving operations.
  • Monday, January 9. 9 a.m. to 3 p.m. Single eastbound mainlane closure from SH 46 to US 87 for barrier setting.