Friday, September 20

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Sunday, September 22 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure between US 281 north exit ramp and the Gold Canyon Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Sunday, September 22 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure between the US 281 north exit ramp and US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Sunday, September 29 until Monday, September 30. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure between the US 281 north exit ramp and the Gold Canyon Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Sunday, September 29 until Monday, September 30. Full weekend full closure 3 a.m. until 5 a.m. Full westbound mainlane closure between the US 281 north exit ramp and the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
Loop 1604 – Northeast San Antonio
  • Current until Saturday, September 28 (except Sundays). Daily 8 a.m. until 4 p.m. Westbound left frontage road lane between Redland Road and Bulverde Road for truck/material access.
  • Current until Saturday, September 28 (except Sundays). Daily 8 a.m. until 4 p.m. Eastbound left frontage road lane at Redland Road for concrete work.
  • Friday, September 20 until Saturday, September 21. 10 p.m. until 5 a.m. Full eastbound mainlane closure at FM 2252 (Nacagdoches Road) for overhang removal work.
  • Sunday, September 22 until Monday, September 23. 9 p.m. until 5 a.m. Full westbound mainlane closure at FM 2252 (Nacagdoches Road) for barrier and overhang removal work and guard fence installation work.
  • Sunday, September 22 until Tuesday, September 24. Nightly 9 p.m. until 5 a.m. Eastbound right mainlane between Redland Road and Bulverde Road (including Bulverde exit ramp) for barrier work.
  • Monday, September 23 until Wednesday, September 25. Nightly 9 p.m. until 5 a.m. Westbound right mainlane between Redland Road and Bulverde Road (including Bulverde entrance ramp) for barrier work.
  • Monday, September 30 until Wednesday, October 2. Nightly 8 p.m. until 5 a.m. All northbound mainlanes at SH 218 (Pat Booker Road) for girder installation work.
  • Monday, September 30 until Wednesday, October 2. Nightly 8 p.m. until 5 a.m. Turnarounds in both directions at SH 218 (Pat Booker Road) for girder installation work.
Loop 1604 – Northwest San Antonio
  • Sunday, September 22 until Monday, September 23. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road lanes at Bitters Road/Roger’s Ranch Road for milling and paving work.
  • Monday, September 23 until Tuesday, September 24. 9 p.m. until 5 a.m. Alternating eastbound frontage road lanes at Huebner Road for milling and paving work.
US 281 – North Central San Antonio
  • Friday, September 20 until Saturday, September 21. 9 p.m. until 3 a.m. Northbound two mainlanes between the Frontage Road exit ramp to the Sonterra Boulevard exit ramp for direct connector work.
  • Friday, September 20 until Monday, September 23. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlanes between Encino Rio and Evans Road for traffic phasing.
  • Friday, September 20 until Monday, September 23. Nightly 9 p.m. until 5 a.m. Southbound left mainlane at Evans road for traffic phasing.
  • Saturday, September 21 until Sunday, September 22. Full weekend closure 3 a.m. until 12 a.m. Full northbound mainlane closure between the Frontage Road exit ramp and the Sonterra Boulevard exit ramp for direct connector work. DETOUR: Take the frontage road exit ramp, go through the Loop 1604 intersection and use the Sonterra Boulevard entrance ramp.
  • Saturday, September 21. 3 a.m. until 7 p.m. Right northbound mainlane between Sonterra Boulevard and Redland Road for sidewalk work.
  • Sunday, September 22 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure between the Sonterra Boulevard exit ramp and the Donella Drive entrance ramp for girder work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Sunday, September 22 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure between the Loop 1604 westbound frontage road and Sonterra Boulevard for direct connector and overhang work. DETOUR: On the Loop 1604 westbound frontage road, turn left on the US 281 southbound frontage road, take the turnaround at Donella Drive and use the US 281 Donella Drive entrance ramp.
  • Sunday, September 22 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure between Loop 1604 and Marshall Road for sidewalk, bridge work and safety enhancements.
  • Monday, September 23 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the Frontage road exit ramp to the Sonterra Boulevard exit ramp for direct connector work. DETOUR: Take the frontage road exit ramp, go through the Loop 1604 intersection and use the Sonterra Boulevard entrance ramp.
  • Monday, September 23 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure at the northbound to westbound direct connector ramp for direct connector and safety work. DETOUR: Take the frontage road exit ramp, take a left at the Loop 1604 westbound frontage road and use the US 281 entrance ramp.
  • Monday, September 23 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure between Marshall Road and Loop 1604 for bridge, soundwall work and safety enhancements.
  • Sunday, September 29 until Monday, September 30. Full weekend closure 3 a.m. until 5 a.m. Full southbound mainlane closure betweeb the Sonterra Boulevard exit ramp and the Donella Drive entrance ramp for girder work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Sunday, September 29 until Friday, September 30. Full weekend closure 3 a.m. until 5 a.m. Full southbound mainlane closure betwen the Sonterra Boulevard exit ramp and the Donella Drive entrance ramp for girder work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Sunday, September 29 until Monday, September 30. Full weekend full closure 3 a.m. until 5 a.m. Full northbound frontage road closure between the Loop 1604 westbound frontage road and Sonterra Boulevard for direct connector and overhang work. DETOUR: On the Loop 1604 westbound frontage road, turn left on the US 281 southbound frontage road, take the turnaround at Donella Drive and use the US 281 Donella Drive entrance ramp.
  • Sunday, September 29 until Monday, September 30. Full weekend closure 3 a.m. until 5 a.m. Northbound ramp mainlane closure at the northbound to westbound direct connector ramp for direct connector and safety work. DETOUR: Take the frontage road exit ramp, take a left at the Loop 1604 westbound frontage road and use the US 281 entrance ramp.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Sunday, September 22 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Camp Bullis Road and La Cantera Parkway for moving barrier work.
  • Sunday, September 22 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Scenic Loop Road and SH 46 for work on the US 87 bridge/overpass.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound Ackerman Road exit ramp through the fall. DETOUR: Eastbound I-10 and southbound I-410 traffic needing to access Ackerman Road must take southbound I-410, exit at FM 1346/E. Houston St., turn around, and take the northbound frontage road to Ackerman Road.
  • Current until Monday, September 30. 5 a.m. Lincolnwood Drive at the I-10 westbound frontage road. DETOUR: Traffic on the westbound I-10 frontage road will continue to FM 1516, turn right, then will turn right on Weichold Road and then take a right on Diversey Drive to access Lincolnwood Drive.
  • Monday, September 23 until Thursday, September 26. Daily 7:30 a.m. until 7 p.m. Alternating mainlanes in both directions between SH 130 and US 183 for asphalt and guard fence work.
I-35 – Northeast San Antonio/Comal County/Frio County
  • Current until 5 a.m. Saturday, September 21. Southbound right mainlane between FM 1103 and Schwab Road for milling work.
  • Sunday, September 22 until Saturday, September 28. Nightly 9 p.m. until 5 a.m. Southbound left mainlane between FM 1103 and Schwab Road for asphalt work.
  • Monday, September 23. 9 a.m. until 3 p.m. Alternating southbound frontage road lanes between Kowald Lane and Post Road for temporary pavement marking work.
  • Monday, September 23 until Friday, September 27. Daily 7 a.m. until 8 p.m. Northbound exit to US 57 (Exit 111) for frontage road and ramp reconstruction work.
I-410 – West San Antonio
  • Sunday, September 22 until Sunday, October 6. 24 hour closure. The right westbound frontage road lane at Marbach Road to stage a crane.
  • Sunday, September 22 until Friday, September 27. Nightly 8 p.m. to 5 a.m. All southbound mainlanes between the US 90 exit ramp to the US 90 bridge for removing single slope concrete barrier. DETOUR: Traffic will exit to the frontage road and re-enter the highway.
  • Monday, September 23 until Friday, September 27. Daily 9 a.m. to 3 p.m. The right eastbound frontage road lane at Marbach Road for staging equipment and trucks.
  • Monday, September 23 until Friday, September 27. Daily 9 a.m. to 3 p.m. The left southbound frontage road lane between Demya Drive to Pilar Drive for widening the frontage road.
US 90 – West San Antonio
  • Monday, September 23 until Friday, September 27. Daily 9 a.m. to 3 p.m. Alternating eastbound frontage road lanes for staging equipment and trucks.
  • Monday, September 23 until Friday, September 27. Daily 9 a.m. to 3 p.m. Alternating eastbound frontage road lanes for staging equipment and trucks.
  • Monday, September 23 until Saturday, September 28. Daily 9 a.m. to 3 p.m. The right eastbound frontage road lane between Springvale Drive to W. Military Drive for sidewalk and driveway work.
  • Monday, September 23 until Saturday, September 28. Daily 9 a.m. to 3 p.m. The right westbound frontage road lane between W. Military Drive to Colt Drive for sidewalk and driveway work.
I-37 – Central & South San Antonio
  • Monday, September 23 until Friday, September 27. Daily 9 a.m. until 3 p.m. Northbound right mainlane at I-10 for guard fence installation work.
  • Monday, September 23 until Friday, September 27. Nightly 9 p.m. until 4 a.m. Two mainlanes in both directions at Pecan Valley for bridge joint repair work.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, September 23 until Friday, September 27. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, September 28. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
Spur 371 – General Hudnell Drive
  • Friday, September 20 until Friday, September 27. All-day closure. The southbound left lane at Frio City Road for concrete barrier work.
  • Monday, September 23 until Friday, September 27. Daily 7 a.m. to 3 p.m. The northbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
  • Monday, September 23 until Friday, September 27. Daily 9 a.m. to 5 p.m. The southbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
FM 1976 – Walzem Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
SH 16 – Bandera Road
  • Sunday, September 22 until Friday, September 27. Nightly 9 p.m. until 5 a.m. Southbound right lane between Diamond K Trail and Legend Trail for asphalt work.
SH 218 – Pat Booker Road
  • Monday, September 30 until Wednesday, October 2. Nightly 8 p.m. until 5 a.m. Full closure in both directions at Loop 1604 for girder installation work.
Other Roads – Bexar County
  • Current until Friday, September 27. 5 p.m. Woodlake Parkway at the I-10 westbound frontage road. DETOUR: Traffic wishing to access the Horizon Pointe subdivision will continue traveling on the westbound frontage road, turn right on Foster Road, and take another right on Sierra Sunset to return to Woodlake Parkway.
  • Current until Monday, September 30. Daily 9 a.m. until 3 p.m. All lanes in both directions of West Byrd Lane at Loop 1604 for frontage road work.
  • Friday, September 20 until Monday, September 23. Weekend closure 9 p.m. until 5 a.m. Alternating eastbound lanes of Evans Road east of US 281 for traffic phasing.
  • Friday, September 20 until Monday, September 23. Weekend closure 9 p.m. until 5 a.m. Alternating westbound lanes of Evans Road east of US 281 for traffic phasing.
  • Saturday, September 21 until Monday, September 23. Full weekend closure 3 a.m. until 5 a.m. Full westbound lanes of Encino Rio Road approaching the US 281 intersection for column and cap work. DETOUR: Take a right on the US 281 northbound frontage road, use the northbound to southbound turnaround after Evans Road.
  • Friday, September 20 until Monday, September 23. Weekend closure 9 p.m. until 5 a.m. Alternating eastbound and westbound lanes of Evans Road at US 281 for traffic phasing.
  • Monday, September 23 until Friday, September 27. Nightly closure 9 p.m. until 5 a.m. Full westbound closure of Encino Rio Road at US 281 for column and cap work. DETOUR: Take a right on the US 281 northbound frontage road and use the northbound to southbound turnaround after Evans Road.
  • Sunday, September 29 until Monday, September 30. Weekend full closure 3 a.m. until 5 a.m. Full westbound closure of Encino Rio Road at US 281 intersection for column and cap work. DETOUR: Take a right on the US 281 northbound frontage road, use the northbound to southbound turnaround after Evans Road.
Loop 337 – New Braunfels/Comal County
  • Monday, September 23 until Friday, September 27. Daily 7 a.m. until 5 p.m. Northbound intersection with California Boulevard for reconstruction work.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
FM 474 – Blanco Road/Boerne/Kendall County
  • Monday, September 23 until Friday, September 27. Daily 8:30 a.m. until 3:30 p.m. Alternating lanes in both directions at intersections with Business 87, Main Street and Esser/Bentwood Road for traffic light work.
  • Monday, September 23 until Friday, September 27. Daily 8:30 a.m. until 3:30 p.m. Right lane in both directions between Business 7 and Stonegate Road for culvert cleaning and bridge rail work.
RM 1376 – Sisterdale Road/Kendall County
  • Wednesday, September 25 until Friday, September 27. Daily 9 a.m. until 5 p.m. Alternating lanes in both directions between Wasp Creek and Walnut Road for temporary pavement work.
SH 16 – McMullen County
  • Monday, September 23 until Friday, September 27. Alternating southbound lanes from FM 1962 to McMullen/Duval county line (mile markers 686-700) for barrier and excavation work.