Friday, September 27

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Saturday, October 5 until Monday, October 7. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • saturday, October 5 until Monday, October 7. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp
Loop 1604 – Northeast San Antonio
  • Monday, September 30 until Saturday, October 12 (except Sundays). Nightly 9 p.m. until 5 a.m. Left frontage road lane in both directions between Redland Road and Bulverde Road for truck/material access.
  • Current until 4 p.m. Saturday, September 28 (except Sundays). Eastbound left frontage road lane at Redland Road for concrete work.
  • Monday, September 30 until Wednesday, October 2. Daily 9 a.m. until 3 p.m. Alternating frontage road lanes in both directions at FM 2252 (Nacagdoches Road) including the intersection for traffic signal work.
  • Monday, September 30 until Wednesday, October 2. Nightly 8 p.m. until 5 a.m. All northbound mainlanes at SH 218 (Pat Booker Road) for girder installation work.
  • Monday, September 30 until Wednesday, October 2. Nightly 8 p.m. until 5 a.m. Turnarounds in both directions at SH 218 (Pat Booker Road) for girder installation work.
Loop 1604 – West San Antonio
  • Monday, September 30. 3 a.m. to 9 a.m. The right northbound frontage road between FM 1957 (Potranco Road) to Military Drive for driveway work.
  • Monday, September 30 until Friday, October 4. Daily 9 a.m. to 5 p.m. Alternating lanes in both directions at FM 1957 (Potranco Road), Military Drive, and Wiseman Boulevard for sign work.
  • Monday, September 30 until Friday, October 4. Daily 9 a.m. to 7 p.m. Alternating southbound frontage road lanes between SH 151 to south of FM 1957 (Potranco Road) for driveway and sign work.
  • Monday, September 30 until Friday, October 4. Daily 9 a.m. to 7 p.m. Alternating northbound frontage road lanes between south of FM 1957 (Potranco Road) to SH 151 for driveway and sign work.
US 281 – North Central San Antonio
  • Saturday, September 28. 6 a.m. until 8 p.m. The left lane of the northbound mainlanes between Redland Road and Encino Rio for safety enhancements.
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard exit ramp for direct connector work. DETOUR: Take the frontage road exit ramp, go through the Loop 1604 intersection and use the Sonterra Boulevard entrance ramp.
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for girder work and safety enhancements. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from the Loop 1604 westbound frontage road to Sonterra Boulevard for direct connector and overhang work. DETOUR: On the Loop 1604 westbound frontage road, turn left on the US 281 southbound frontage road, take the turnaround at Donella Drive and use the US 281 Donella Drive entrance ramp.
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for sidewalk and bridge work plus safety enhancements.
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for bridge and soundwall work plus safety enhancements.
  • Saturday, October 5 until Monday, October 7. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the Frontage Road exit ramp to the Sonterra Boulevard exit ramp for direct connector work. DETOUR: Take the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, use the turnaround at Gold Canyon Road, head west on the Loop 1604 westbound frontage road and turn right on the US 281 northbound frontage road.
  • Saturday, October 5 until Monday, October 7. Full weekend closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for girder work and safety enhancements.
  • Saturday, October 5 until Monday, October 7. Full weekend closure 3 a.m. until 5 a.m. Full northbound frontage road closure from the Loop 1604 westbound frontage road to Sonterra Boulevard for direct connector and overhang work. DETOUR: On the Loop 1604 westbound frontage road, turn left on the US 281 southbound frontage road, take the turnaround at Donella Drive and use the US 281 Donella Drive entrance ramp.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Scenic Loop Road and SH 46 for work on the US 87 bridge/overpass.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound Ackerman Road exit ramp will be closed through the fall. DETOUR: Eastbound I-10 and southbound I-410 traffic needing to access Ackerman Road must take southbound I-410, exit at FM 1346/E. Houston St., turn around, and take the northbound frontage road to Ackerman Road.
  • Current until 5 a.m. Monday, September 30. Lincolnwood Drive at the I-10 westbound frontage road. DETOUR: Traffic on the westbound I-10 frontage road will continue to FM 1516, turn right, then will turn right on Weichold Road and then take a right on Diversey Drive to access Lincolnwood Drive.
  • Sunday, September 29 until Friday, October 4. Nightly 7 p.m. to 5 a.m. One left eastbound frontage road lane from Ackerman Road to Foster Road for truck access.
I-35 – Northeast San Antonio & Comal County
  • Current until 5 a.m. Saturday, September 21. Southbound right mainlane between FM 1103 and Schwab Road for milling work.
  • Sunday, September 29 until Saturday, October 5. Nightly 9 p.m. until 5 a.m. Southbound left mainlane between FM 1103 and Schwab Road for asphalt work.
  • Tuesday, October 1 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Northbound right mainlane and shoulder from Business 35 to FM 306 for elimination of current striping and installation of work zone striping.
I-410 – West San Antonio
  • Sunday, September 29 until Friday, October 4. Nightly 8 p.m. to 5 a.m. All southbound mainlanes between Lakeside and Marbach Road for sign work. Follow posted detours.
  • Sunday, September 29 until Friday, October 4. Nightly 8 p.m. to 5 a.m. The right mainlane and left frontage road between US 90 exit ramp and Pilar Drive for staging equipment and widening on frontage road. The exit ramp will be closed. Follow posted detours.
  • Monday, September 30 until Friday, October 4. Daily 9 a.m. to 3 p.m. The left northbound frontage road lane between Bronco Lane and Marbach Road for staging equipment and trucks.
  • Monday, September 30 until Friday, October 4. Daily 9 a.m. to 3 p.m. The left southbound frontage road lane between Waters Edge to Marbach Road and Demya Drive to Pilar Drive for staging equipment and truck access.
US 90 – West San Antonio
  • Current until 3 p.m. Saturday, September 28. The right eastbound frontage road lane between Springvale Drive and W. Military Drive for sidewalk and driveway work.
  • Current until 3 p.m. Saturday, September 28. The right westbound frontage road lane between W. Military Drive and Colt Drive for sidewalk and driveway work.
  • Monday, September 30 until Friday, October 4. Daily 9 a.m. to 3 p.m. The left frontage road lane between I-410 and Hunt Lane for staging equipment and trucks.
  • Monday, September 30 until Saturday, October 5. Daily 9 a.m. to 3 p.m. The right eastbound frontage road lane between Springvale Drive and W. Military Drive for sidewalk and driveway work.
  • Monday, September 30 until Saturday, October 5. Daily 9 a.m. to 3 p.m. The right westbound frontage road lane between W. Military Drive and Colt Drive for sidewalk and driveway work.
I-37 – Central & South San Antonio
  • Monday, September 30 until Friday, October 4. Daily 9 a.m. until 3 p.m. Right mainlane and shoulder in both directions at Carolina/Florida entrance/exit ramps for guard fence installation work.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, September 30 until Friday, October 4. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, October 5. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
Spur 371 – General Hudnell Drive
  • Monday, September 30 until Friday, October 4. Full-day closure. The southbound left lane at Frio City Road for concrete barrier work.
  • Monday, September 30 until Friday, October 4. Daily 7 a.m. to 3 p.m. Northbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
  • Monday, September 30 until Friday, October 4. Daily 9 a.m. to 5 p.m. Southbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
FM 1976 – Walzem Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes from Woodlake Parkway until Gibbs Sprawl Road for barrier work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
SH 16 – Bandera Road
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Southbound right lane between Diamond K Trail and Legend Trail for overlay and striping work.
  • Monday, September 30 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Alternating lanes in both directions between Quincy Lee and Legend Trail for traffic signal work.
SH 218 – Pat Booker Road
  • Monday, September 30 until Wednesday, October 2. Nightly 8 p.m. until 5 a.m. Full closure in both directions at Loop 1604 for girder installation work.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
FM 474 – Blanco Road/Boerne/Kendall County
  • Monday, September 30 until Friday, October 4. Daily 8:30 a.m. until 3:30 p.m. Right lane in both directions between Saunders and Chaparral for culvert cleaning and bridge rail work.
  • Monday, September 30 until Friday, October 4. Daily 8:30 a.m. until 3:30 p.m. Alternating lanes in both directions between Fawn Valley Drive to Deer Creek Drive for pedestrian rail repair work.
RM 1376 – Sisterdale Road/Kendall County
  • Monday, September 30 until Saturday, October 5. Daily 9 a.m. until 5 p.m. Alternating lanes in both directions between Wasp Creek and SH 87 for temporary pavement widening work.
SH 16 – McMullen County
  • Monday, September 30 until Friday, October 4. Alternating southbound lanes from FM 1962 to McMullen/Duval county line (mile markers 686-700) for barrier and excavation work.
Other Roads – Bexar County
  • Current until 3 p.m. Monday, September 30. Daily All lanes in both directions of West Byrd Lane at Loop 1604 for frontage road work.
  • Saturday, September 28 until Monday, September 30. Full weekend closure 3 a.m. until 5 a.m. of westbound of Encino Rio approaching the US 281 intersection for column and cap work. DETOUR: Take a right on the US 281 northbound frontage road, use the northbound to southbound turnaround after Evans Road.
  • Sunday, September 29 until Friday, October 4. Nightly 9 p.m. until 5 a.m. Full westbound closure of Encino Rio approaching the US 281 intersection for column and cap work. DETOUR: Take a right on the US 281 northbound frontage road, use the northbound to southbound turnaround after Evans Road.
  • Saturday, October 5 until Monday, October 7. Full weekend closure 3 a.m. until 5 a.m. of westbound of Encino Rio approaching the US 281 intersection for column and cap work. DETOUR: Take a right on the US 281 northbound frontage road, use the northbound to southbound turnaround after Evans Road.