- Saturday, April 18 until Monday, April 20. Weekend closure 2 a.m. until 5 a.m. Right lane eastbound mainlane closure from the Blanco Road exit ramp to the Stone Oak/Voigt Drive exit ramp.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Left lane westbound frontage road closure from the north US 281 exit ramp to the northbound US 281 frontage road.
- Sunday, April 19 until Thursday, April 23. Nightly 6 p.m. until 6 a.m. Full mainlane closure in both directions between Redland Road and Green Mountain Road for milling and overlay work.
- Monday, April 20 until Tuesday, April 21. Daily 9 a.m. to 3 p.m. The right southbound mainlane between Kitty Hawk and Meadowland for barrier and striping work.
- Monday, April 20 until Friday, April 24. Nightly 8 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for guardrail and mow strip work.
- Tuesday, April 21 until Thursday, April 23. Nightly 6 p.m. to 6 a.m. The right southbound mainlane between I-35 and SH 218 (Pat Booker Road) exit ramp for milling and pavement operations.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- Saturday, April 18 until Monday, April 20. Full weekend closure 2 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
- Saturday, April 18 until Monday, April 20. Weekend closure 2 a.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
- Saturday, April 18 until Monday, April 20. Weekend closure 2 a.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Encino Rio.
- Saturday, April 18 until Monday, April 20. Weekend closure 2 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
- Saturday, April 18 until Monday, April 20. Weekend closure 2 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the next turnaround at Encino Rio.
- Saturday, April 18 until Monday, April 20. Weekend closure 2 a.m. until 5 a.m. Left lane southbound mainlane closure at Evans Road for bridge work.
- Monday, April 20 until Friday, April 24. Daily 8 a.m. to 4 p.m. The south to northbound turnaround north of Cibolo Creek for overhead sign work.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Full northbound mainlane ramp closure of the north- to westbound Loop 1604 direct connector ramp for bridge work. DETOUR: Use the frontage road exit ramp, turn left on the Loop 1604 westbound frontage road, and continue on the US 281 entrance ramp.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for bridge work. DETOUR: Turn left on the southbound US 281 frontage road, take the turnaround at Donella Drive and use the Donella Drive entrance ramp.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the next turnaround at Encino Rio.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Encino Rio both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Evans Road.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Encino Rio both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Encino Rio.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the next turnaround at Stone Oak/Tournament Players Club (TPC) Parkway.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the next turnaround at Encino Rio.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for bridge work and safety enhancements.
- Monday, April 20 until Friday, April 24. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for bridge work and safety enhancements.
- Saturday, April 25 until Monday, April 27. Full weekend closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, proceed on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Saturday, April 25 until Monday, April 27. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp. DETOUR: Use the frontage road exit ramp, turn right on the Loop 1604 eastbound frontage road, if heading north, take the turnaround at Gold Canyon Road, turn right on the northbound frontage road and use the Stone Oak Parkway exit ramp.
- Saturday, April 25 until Monday, April 27. Full weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure at Loop 1604 for direct connector work. DETOUR: Turn right on the westbound frontage road, take the turnaround at Stone Oak Parkway and turn right on the southbound frontage road.
- Saturday, April 25 until Monday, April 27. Weekend closure 3 a.m. until 5 a.m. Northbound Redland Road bypass ramp mainlane closure from Sonterra Boulevard to Encino Rio for ramp work.
- Saturday, April 25 until Monday, April 27. Weekend closure 3 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Evans Road.
- Saturday, April 25 until Monday, April 27. Weekend closure 3 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround south of Evans Road.
- None scheduled.
- Current until Friday, April 17. Daily 9 a.m. until 3 p.m. Westbound left frontage road lane between Dominion Drive and Boerne Stage Road for retaining wall work.
- Saturday, April 18. 6:30 a.m. until 5 p.m. Eastbound right mainlane between Scenic Loop Road and Balcones Creek (Bexar/Kendall county line) including turnaround for beam setting work on Balcones Creek bridge.
- Sunday, April 19 until Monday, April 19 until Sunday, April 26. Nightly 9 p.m. to 5 a.m. Alternating mainlanes in each direction between SH 46 and Scenic Loop for moving concrete barrier and pavement markings.
- Monday, April 20 until Friday, April 24. Daily 7 a.m. until 5 p.m. Westbound left mainlane between La Cantera Parkway and FM 3351 (Ralph Fair Road) for barrier removal work.
- Current until Saturday, May 2. Daily 7 a.m. until 7 p.m. One mainlane in both directions between Kerr/Gillespie county line and Kerr/Kimble county line for paving work.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
- Friday, April 17 from 9 p.m. until 5 a.m. Monday, April 20. Alternating westbound mainlanes from Foster Road to WW White for westbound traffic switch between Ackerman Road and I-410.
- Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
- Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.
I-10 – Central San Antonio
- Friday, April 24. Daily 8 a.m. to 5 p.m. The westbound exit ramp at I-35 northbound for guardrail work.
- Monday, April 20 until Thursday, April 23. Nightly 8 p.m. to 6 a.m. Two southbound mainlanes between FM 1106 to Conrads Lane/Kohlenberg Road for striping and barrier work.
- Monday, April 20 until Friday, April 24. Daily 9 a.m. to 4:30 p.m. Alternating frontage road lanes between Emerald Drive and the entrance ramp at Bucee’s for paving and sidewalk work. The entrance ramp will also be closed for paving work.
- Wednesday, April 22 until Saturday, April 25. Nightly 8 p.m. to 6 a.m. Two northbound mainlanes between FM 1106 to Conrads Lane/Kohlenberg Road for striping and barrier work.
- Thursday, April 23. Daily 8 a.m. to 5 p.m. Daily 8 a.m. to 5 p.m. The northbound exit ramp at I-10 westbound for guardrail work.
- Thursday, April 23. Daily 8 a.m. to 5 p.m. The northbound exit ramp at I-10 eastbound for guardrail work.
- Current until Monday, April 20. Daily 9 a.m. to 3 p.m. Alternating lanes in both directions between Marbach Road and Ingram Road for underground pipe work.
- Current until Monday, April 20. Daily 9 a.m. to 3 p.m. The left lane in both directions between W. Military Drive and Marbach Road for column work.
- Current until Monday, April 20. Nightly 8 p.m. to 6 a.m. The left lane in both directions between Marbach Road and Ingram Road for column work.
- Monday, April 20 until Friday, April 24. Nightly 8 p.m. to 5 a.m. All northbound mainlanes between US 90 to Marbach Road for setting signs. DETOUR: Traffic will exit at US 90 and continue on the frontage road through Marbach Road and access the mainlanes at the next entrance ramp.
- Thursday, April 23 until Friday, May 1. Nightly 8 p.m. to 5 a.m. Alternating full closure in both directions between US 90 to Valley Hi Drive for mill and inlay operations. NORTHBOUND DETOUR: Traffic will be detoured to take the exit to US 90, continue on the northbound frontage road through the Marbach Road intersection, and utilize the entrance ramp past Marbach Road to access the mainlanes. SOUTHBOUND DETOUR: Traffic traveling south will be detoured to take the exit ramp to Marbach Road, continue on the southbound frontage road through the Marbach Road intersection, and use the entrance ramp before Valley Hi Drive to access the mainlanes.
- Current until Friday, May 1. Nightly 8 p.m. to 5 a.m. Alternating mainlanes in both directions between US 90 to Valley Hi Drive for mill and inlay operations.
- Current until Friday, May 1. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both direction between SH 151 to US 90 for staging equipment and trucks.
- Monday, April 20 until Friday, April 24. Nightly 8 p.m. until 5 a.m. All westbound mainlanes between the exit to Hunt Lane to the Hunt Lane bridge for mill and inlay work. DETOUR: Traffic will exit at Hunt Lane and use the next available entrance ramp.
- Current until Friday, May 1. Daily 9 a.m. to 3 p.m. Alternating frontage road lanes in both direction between Hunt Lane bridge to US 90 bridge for staging equipment, trucks and ground rock.
- None scheduled.
- None scheduled.
- City of San Antonio/PWD closure for Hardberger Park Landbridge project. Monday, April 20 until Friday, April 24. 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for construction truck and equipment access.
- City of San Antonio/PWD closure for Hardberger Park Landbridge project. Friday, April 24 until Monday, April 27. 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- City of San Antonio/PWD closure for Hardberger Park Landbridge project. Monday, April 27 until Friday, May 1. 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- City of San Antonio/PWD closure for Hardberger Park Landbridge project. Friday, May 1 until Monday, May 4. 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- City of San Antonio/PWD closure for Hardberger Park Landbridge project. Monday, May 4 until Friday, May 8. 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- City of San Antonio/PWD closure for Hardberger Park Landbridge project. Friday, May 8 until Monday, May 11. 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- City of San Antonio/PWD closure for Hardberger Park Landbridge project. Friday, May 15 until Monday, May 18. 9 p.m. until 5 a.m. All lanes in both directions from FM 1535 (NW Military Hwy) to FM 2696 (Blanco Road) for bridge work. DETOUR: Traffic will need to use West Avenue and Lockhill Selma Road.
- Monday, April 20 until Friday, April 24. Daily 9 a. m. to 5 p.m. One lane in both directions between Old Pearsall Road to Rockgate Drive for guardrail and signal improvements.
- None scheduled.
- Exit ramp from Loop 1604 eastbound closed for approximately two months starting Monday, March 16.
- None scheduled.
- None scheduled.
- None scheduled.
- Sunday, April 19 until Saturday, April 25. Nightly 7 p.m. to 7 a.m. One lane in both directions between I-410 to Cheryl Drive for milling and paving work.
- Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
- Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
- None scheduled.
- Current until Friday, May 8. Daily 7 a.m. until 5:30 p.m. Full closure of Borgfeld Drive in both directions at US 281 for intersection roadway work.
- None scheduled.
- Monday, April 20 until Friday, May 1. Daily 7 a.m. to 5 p.m. Alternating lanes in each direction for signal and lighting work.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- Current until Friday, April 24. Nightly 8 p.m. until 6 a.m. One lane in both directions between Wiederstein Road and First Street for milling and paving work.
- None scheduled.
- None scheduled
- None scheduled.
- None scheduled.
- None scheduled.
- None scheduled.
- Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
- Current until Friday, April 24. Daily 7 a.m. to 6 p.m. One lane in each direction at FM 311 for seal coat, level up and overlay.
- Monday, April 20 until Friday, May 1. Daily 7 a.m. to 5 p.m. Alternating lanes in each direction at FM 3351 (Ralph Fair Road) for signal and lighting work.
- Current until Saturday, April 18. Daily 8:30 a.m. until 7 p.m. Various locations in both directions between North School Street and ½-mile north of Wasp Creek Road for culvert work.
- Current until Friday, May 1. Full closure (all day) in both directions at Atascosa River (between FM 476 and SH 173) for culvert removal and replacement work.
- None scheduled.
- None scheduled.