Friday, July 31

Upcoming Scheduled Construction Closures



Loop 1604 – North Central San Antonio

  • Monday, August 3 until Friday, August 7. Daily 9:00 a.m. to 3:00 p.m. Single eastbound mainlane closure from Redland Rd. to Bulverde Rd. for foundation pour.
  • Monday, August 3 until Friday, August 7. Daily 11:00 a.m. to 2:00 p.m. Single lane closure on eastbound frontage road from Redland Rd. to Bulverde Rd. for curb pouring.

 

Loop 1604 – Northeast San Antonio

  • Sunday, August 2 until Friday, August 7. Nightly 8:00 p.m. to 5:00 a.m. Single mainlane and shoulder closures, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramps for guardrail improvements.
  • Monday, August 3. 9:00 a.m. to 4:00 p.m. Westbound exit ramp to O’Conner Rd. closed for guardrail repair.
  • Monday, August 3. 9:00 a.m. to 4:00 p.m. Single eastbound mainlane closure from Bulverde Rd. to O’Connor Rd. for metal beam guardrail fence repair.

 

US 281 – North Central San Antonio/Bexar County

  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 2 a.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for concrete paving. DETOUR: Take the frontage road exit ramp and continue through the Loop 1604 intersection.
  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 2 a.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 2 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Encino Rio to the Evans Road exit ramp for concrete paving.
  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 7 a.m. until 4 p.m. Alternating northbound frontage road closure from Loop 1604 to Sonterra Boulevard for lighting work.
  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 7 a.m. until 4 p.m. Alternating southbound frontage road closure from Sonterra Boulevard to Loop 1604 for lighting work.
  • Saturday, August 1 until Monday, August 3. Weekend nightly closure 9 p.m. until 5 a.m. Left/center lane southbound mainlane closure from Redland Road to the Donella Drive exit ramp for drainage work.
  • Monday, August 3 until Tuesday, August 4. 9:00 p.m. to 5:00 a.m. Single northbound lane closure at Wilderness Oak.
  • Monday, August 3 until Wednesday, August 5. Nightly 9:00 p.m. to 5:00 a.m. Alternating northbound lane closures from Wilderness Oak to just south of Bulverde Rd. for barrier setting and movement
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving. DETOUR: Turn left on the southbound US 281 frontage road, use the turnaround at Donella Drive and use the Donella Drive entrance ramp.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Evans Road entrance ramp to Encino Rio for soundwall work. DETOUR: Take the southbound US 281 mainlane entrance ramp and use the Redland Road exit ramp.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for concrete paving. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Left/center lane northbound mainlane closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Monday, August 3 until Friday, August 7. Nightly 9 p.m. until 5 a.m. Right/center lane southbound mainlane closure from Redland Road to the Donella Drive exit ramp for drainage work.
  • Saturday, August 8. 5:00 a.m. to 6:00 p.m. Alternating southbound lane closures from Cibolo Creek to Bulverde Rd. for traffic switch.
  • Saturday, August 8 until Monday, August 10. Weekend continuous closure 2 a.m. until 5 a.m. Left/center lane northbound mainlane closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Saturday, August 8 until Monday, August 10. Weekend continuous closure 2 a.m. until 5 a.m. Left/center lane southbound mainlane closure from Sonterra Boulevard to Loop 1604 for concrete paving.
  • Saturday, August 8 until Monday, August 10. Full weekend continuous closure 7 a.m. until 4 p.m. Full southbound frontage road closure from Sonterra Boulevard to Loop 1604 for lighting work. DETOUR: Take the Donella Drive exit ramp, use the south- to northbound turnaround at Donella Drive, continue on the northbound US 281 frontage road, turn right on the Sonterra Boulevard Access Road, head west on Sonterra Boulevard, turn right on the Sonterra Boulevard Access Road and turn right on the southbound US 281 frontage road.
  • Saturday, August 8 until Monday, August 10. Weekend continuous closure 9 p.m. until 5 a.m. Left lane northbound mainlane closure from Sonterra Boulevard to the Redland Road bypass ramp.
  • Saturday, August 8. 5:00 a.m. to 6:00 p.m. Alternating southbound lane closures at Cibolo Creek for barrier setting and striping.
  • Saturday, August 8. 5:00 a.m. to 6:00 p.m. Alternating southbound lane closures at Bulverde Rd. for barrier setting and striping.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Friday, July 31 until Saturday, August 1. 10:00 p.m. to 8:00 a.m. Full closure of westbound mainlanes from Ralph Fair Rd. (FM 3351) to Old Fredericksburg Rd. for milling and overlay work. DETOUR: All traffic take exit 550 onto the westbound frontage road and re-enter westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Current until Saturday, August 1. Daily 7:00 a.m. to 7:00 p.m. Alternating lane and shoulder closures, in both directions, from Kerr/Gillespie County line to Kerr/Kimble County line for rumble strip installation.
  • Sunday, August 2 until Friday, August 7. Nightly 9:00 p.m. to 5:00 a.m. Alternating lane closures, in both directions, from Scenic Loop Rd. to Fair Oaks Parkway for paving and concrete traffic barrier removal.
  • Sunday, August 2 until Monday, August 3. 8:00 p.m. to 6:00 a.m. Full closure of westbound mainlanes from Ralph Fair Rd. (FM 3351) to Old Fredericksburg Rd. for milling and overlay work. 
  • Sunday, August 2 until Monday, August 3. 8:00 p.m. to 6:00 a.m. Full closure of eastbound mainlanes from Old Fredericksburg Rd. to Ralph Fair Rd. (FM 3351) for removal of concrete traffic barrier. 
  • Monday, August 3 until Tuesday, August 4. 8:00 p.m. to 6:00 a.m. Full closure of eastbound mainlanes from Old Fredericksburg Rd. to Ralph Fair Rd. (FM 3351) for milling and paving work. 
  • Monday, August  3 until Tuesday, August 4. 8:00 p.m. to 6:00 a.m. Full closure of westbound mainlanes from Ralph Fair Rd. (FM 3351) to Old Fredericksburg Rd. for removal of concrete traffic barrier. 
  • Current until Tuesday, August 4. Daily 9:00 a.m. to 4:00 p.m. Alternating westbound frontage road lane closures from 1,000 feet before Huebner Rd. to Huebner Rd. for utility work.
  • Monday, August 3 until Tuesday, August 4. Daily 7:00 a.m. to 7:00 p.m. Single lane closures, in both directions, at the FM 479 bridge for bridge joint replacements.
  • Tuesday, August 4 until Thursday, August 6. Nightly, 8:00 p.m. to 6:00 a.m. Full closure of eastbound mainlanes from Ralph Fair Rd. to Old Fredericksburg Rd. for removal of concrete traffic barrier. 
  • Thursday, August 6 until Friday, August 7. 9:00 p.m. to 5:00 a.m. Single westbound mainlane closure from Balcones Creek to Scenic Loop turnaround for coss installation.
  • Friday, August 7 until Saturday, AUgust 8. 10:00 p.m. to 8:00 a.m. Full closure of eastbound mainlanes from Camp Bullis Rd. to La Cantera Parkway for installation of overhead sign structures. 
  • Current until Friday, August 7. Daily 8:00 a.m. to 5:00 p.m. Alternating lane and shoulder closures, in both directions, from Cibolo Creek to SH-46 for hotmix overlay.
  • Current until Tuesday, August 11. Daily 7:00 a.m. to 7:00 p.m. Alternating lane and shoulder closures, in both directions, from 1.3 miles east of Gillespie/Kerr County line to Gillespie/Kerr County Line for hotmix overlay.  
  • Current until Friday, August 28. Sunday through Thursday nights, 8:00 p.m. to 6:00 a.m. Alternating mainlane closures, in both directions, from Ralph Fair Rd. (FM 3351) to La Cantera Parkway for overlay and pavement markings.
  • Current until Friday, August 28, Every Friday 10:00 p.m. to 8:00 a.m.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, July 31 until Sunday, August 2. Nightly 9:00 p.m. to 5:00 a.m. Alternating westbound mainlane closures from FM 1516 to Woodlake Parkway for striping and barrier improvements.
  • Monday, August 3 until Tuesday, August 4. Daily 9:00 a.m. to 5:00 p.m. Single westbound lane at Salado Creek for concrete bridge deck and rail improvements.
  • Friday, July 31 until Monday, August 3. Weekend closure 7 p.m. to 5 a.m. ALL eastbound lanes closed at Loop 1604 for overpass work. DETOUR: I-10 traffic can exit at Loop 1604, stay on the frontage road through the intersection, and reenter eastbound I-10 after Loop 1604.
  • Friday, July 31 until Monday, August 3. Weekend closure 7 p.m. to 5 a.m. Loop 1604 closed under I-10 for overpass work. DETOURS: Northbound Loop 1604 traffic can take the I-10 eastbound frontage road and turn around at Pfiel Rd. Southbound Loop 1604 traffic can take the I-10 westbound frontage road and turn around at FM 1516.
  • Friday, July 31 until Sunday, August 2. Continuous closure 9 p.m to 5 a.m. One alternating westbound lane closed from FM 1516 to Woodlake Parkway for striping and barrier work.
  • Friday, August 7 until Sunday, August 9. Continuous closure 9 p.m to 5 a.m. One alternating westbound lane closed from FM 1516 to Woodlake Parkway for striping and barrier work. DETOURS:
    • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
    • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Saturday, August 1 until Sunday, August 2. 9:00 p.m. to 5:00 a.m. Double lane closure on northbound mainlanes from FM 1106 bridge to Conrad and Kohelenberg Bridge for barrier installation.
  • Saturday, August 1 until Sunday, August 2. 8:00 p.m. to 5:00 a.m. Double northbound lane closures from Watson Lane bridge to Conrad/Kohelenberg bridge for work zone striping and barrier installation.

 

I-410 – West San Antonio

  • Sunday, August 2. 7:00 a.m. to 12:00 p.m. Right lane closure on southbound frontage road from Military Dr. to SH-151 for work on communication lines.
  • Sunday, August 2. 7:00 a.m. to 12:00 p.m. Right lane closure on northbound frontage road from SH-151 to Military Dr. for work on communication lines.
  • Current until Monday, August 10. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall and underground pipes.
  • Current until Monday, August 10. Nightly 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.
  • Current until Monday August 10. Daily 9:00 a.m. to 3:00 p.m. Full closure of southbound frontage road from N.W. Crossroads to Military Dr. for removal of concrete riprap.
  • Current until Monday August 10. Daily 9:00 a.m. to 3:00 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation. 
  • Current until Friday, August 10. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.

 

US 90 – West San Antonio

  • Monday, August 3 until Friday, August 7. Daily 9:00 a.m. to 3:00 p.m. Single lane closure on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete mowstrip improvements.

 

SH 151 – West San Antonio

  • Current until Monday, August 10. Daily 9:00 a.m. to 3:00 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Current until Monday, August 10. Nightly 8:00 p.m. to 5:00 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for bridge rail demolition.
  • Current until Monday, August 10. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Sunday, August 2. 7:00 a.m. to 12:00 p.m. Ramp closure at northbound Loop 410 exit to Military Dr. for work on communication lines.

 

FM 3351 – Ralph Fair Road

  • Current until Friday, August 7. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from westbound I-10 frontage road to Bexar/Comal County Line for milling and inlay work.

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 31 until Sunday, August 2. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, August 1 until Sunday, August 2. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.

 

Loop 13 – S.W. Military Drive

  • Sunday, August 2 until Friday, August 7. Nightly 7:00 p.m. to 5:00 a.m. Single lane and shoulder closures, in both directions, from Old Pearsall Rd. to Rockgate Dr. for milling and pavement work.
  • Monday, August 3 until Friday, August 7. Daily 9:00 a.m. to 5:00 p.m. Single lane and shoulder closures, in both directions, from Old Pearsall Rd. to Rockgate Dr. for pavement marking work.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

Other Roads – Bexar County

  • Weichold Rd. Current until Saturday, August 1. 7 a.m. to 5 p.m. Full road closure, in both directions, at I-10 frontage road for asphalt placement. DETOUR: Traffic will travel to Lincolnwood Dr.
  • Bulverde Rd. Current until Saturday, August 1. 7 a.m. to 10 p.m. Full closure, in both directions, from 300 feet west of US-281 to US-281 for water main work.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • Monday, August 3 until Saturday, August 8. Daily 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway reconstruction.

 

FM 3009 – Comal County

  • Sunday, August 2 until Wednesday, August 5. Nightly 6:00 p.m. to 6:00 a.m. Alternating lane closures, in both directions, from FM 78 to FM 2252 for pavement improvements.

 

FM 1863 – Comal County

  • Thursday, August 6 until Friday, August 7. 7:00 a.m. to 7:00 p.m. Alternating lane closures, in both directions, from FM 46 to FM 3009 for asphalt work.

 

Sunday, July 26

Changes Coming to I-10 Frontage Roads in Boerne


Work on the I-10 Kendall Expansion Project is progressing into the next phase of construction. This phase will include the permanent conversion of existing frontage roads from two-way traffic to one-way traffic operations along eastbound I-10 near Boerne. 

The frontage road conversion aims to improve safety, as well as reduce traffic congestion and delays. According to the Texas Transportation Institute, the conversion of frontage roads into one-way traffic operations can improve safety by up to 86%.

On Monday, July 27, drivers will see changes along the I-10 eastbound frontage road from US-87 to SH-46. 

1. The eastbound frontage road will be converted from two-way traffic to one-way         traffic operations between Upper Balcones Road and US-87. 

2. Traffic traveling west on the eastbound frontage road will be detoured over US-87 and through town to SH-46. 

3. The new westbound frontage road between US-87 and Christus Parkway will not be operational during this time. 

4. The eastbound frontage road will remain as two-way traffic operations from US-87 to Scenic Loop Road. 

5. Two-way traffic operations will be maintained between SH-46 and Upper Balcones Road. 


More changes will be implemented Monday, August 10 along the I-10 frontage roads from Fair Oaks Parkway to Balcones Creek Road.

1. The eastbound frontage road will be converted from two-way traffic to one-way traffic operations from Balcones Creek Road.  to Fair Oaks Parkway.
 
2. Turnaround at Fair Oaks Parkway will be open to traffic. 
 
3. The westbound frontage road will converted from two-way traffic to one-way traffic operations from Fair Oaks Parkway to Balcones Creek Road. 
 
4. The underpass at Balcones Creek Road will be open to traffic. 
 

This work is part of TxDOT’s effort to accommodate for future growth and deliver improvements designed to enhance safety and traffic operations along the I-10 corridor from SH-46 to Fair Oaks Parkway in Kendall County. You can learn more about this project here

Stay connected on TxDOT San Antonio’s Twitter feed for ongoing construction and traffic updates. 


Friday, July 24

Upcoming Scheduled Construction Closures



Loop 1604 – North Central San Antonio

  • Monday, July 27 until Friday, July 31. Daily 9:00 a.m. to 3:00 p.m. Single eastbound mainlane closure from Redland Rd. to Bulverde Rd. to perform rail foundation.
  • Monday, July 27 until Friday, July 31. Daily 9:00 a.m. to 3:00 p.m. Single lane closure on eastbound frontage road from Redland Rd. to Bulverde Rd. for curb pouring.

 

Loop 1604 – Northeast San Antonio

  • Sunday, July 26 until Friday, July 31. Nightly 8:00 p.m. to 5 a.m. Single lane and ramp closures, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramps for guardrail, striping and sign improvements.
  • Sunday, July 26 until Thursday, July 30. Nightly 9:00 p.m. to 6:00 a.m. Single lane closure on northbound frontage road from Palisades to Pat Booker Rd. for barrier movement. 
  • Sunday, July 26 until Wednesday, July 29. Nightly 9:00 p.m. to 6:00 a.m. Single lane closure on northbound frontage road from Byrd Rd. to FM 1976 for barrier movement. 
  • Sunday, July 26 until Thursday, July 30. Nightly 7:00 p.m. to 6:00 a.m. Single lane closures on southbound frontage road from Pat Booker to Kitty Hawk for barrier movement. 
  • Sunday, July 26 until Friday, July 31. Nightly 7:00 p.m. to 6:00 a.m. Single lane closure of southbound frontage road from Mathom to FM 1976 for barrier movement. 

 

US 281 – North Central San Antonio/Bexar County

  • Tuesday, July 28 until Wednesday, July 29. 9:00 a.m. to 4:00 p.m. Right lane closure on southbound frontage road from Loop 1604 to Henderson Pass for communication line work.
  • Friday, July 24 until Saturday, July 25. Weekend overnight closure 9 p.m. until 5 a.m. Northbound mainlane closure of the Sonterra Boulevard exit ramp for concrete paving. DETOUR: Take the frontage road exit ramp and continue through the Loop 1604 intersection.
  • Saturday, July 25 until Monday, July 27. Weekend continuous closure 2 a.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, July 25 until Monday, July 27. Weekend continuous closure 2 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, July 25 until Monday, July 27. Weekend continuous closure 2 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for concrete work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the otherr turnaround closures in the same direction.
  • Saturday, July 25 until Monday, July 27. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Encino Rio to the Evans Road exit ramp for concrete paving.
  • Saturday, July 25. Weekend continuous closure 7 a.m. until 4 p.m. Alternating northbound frontage road closure from Loop 1604 to Sonterra Boulevard for lighting work.
  • Saturday, July 25. Weekend continuous closure 7 a.m. until 4 p.m. Alternating southbound frontage road closure from Sonterra Boulevard to Loop 1604 for lighting work.
  • Monday, July 27 until Tuesday, July 28. Overnight closure 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for concrete work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, July 27 until Tuesday, July 28. Overnight closure 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Evans Road entrance ramp to Encino Rio for soundwall work. DETOUR: Take the southbound US 281 mainlane entrance ramp and use the Redland Road exit ramp.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for concrete paving. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure of the Sonterra Boulevard entrance ramp for safety enhancements. DETOUR: Continue along the southbound frontage road through the Loop 1604 intersection and take the Donella Drive entrance ramp.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the other turnaround closures in the same direction.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Left/center lane northbound mainlane closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Right/center lane southbound mainlane closure from the Sonterra Boulevard entrance ramp to Loop 1604 for drainage work.
  • Monday, July 27 until Friday, July 31. Nightly 9 p.m. until 5 a.m. Right lane northbound frontage road closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Friday, July 31 until Monday, August 3. Weekend continuous closure 9 p.m. until 5 a.m. Left lane northbound mainlane closure from Sonterra Boulevard to the Redland Road bypass ramp.
  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 2 a.m. until 5 a.m. Left/center lane northbound mainlane closure from Loop 1604 to Sonterra Boulevard for concrete paving.
  • Saturday, August 1 until Monday, August 3. Weekend continuous closure 2 a.m. until 5 a.m. Left/center lane southbound mainlane closure from Sonterra Boulevard to Loop 1604 for concrete paving.
  • Saturday, August 1. Full weekend continuous closure 7 a.m. until 4 p.m. Full southbound frontage road closure from Sonterra Boulevard to Loop 1604 for lighting work. DETOUR: Take the Donella Drive exit ramp, use the south- to northbound turnaround at Donella Drive, continue on the northbound US 281 frontage road, turn right on the Sonterra Boulevard Access Road, head west on Sonterra Boulevard, turn right on the Sonterra Boulevard Access Road and turn right on the southbound US 281 frontage road.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Current until Friday, July 31. 7 a.m. to 7 p.m. Alternating mainlane and shoulder closures, from SH-16 to Kerr/Kendall County Line for pavement work.
  • Friday, July 24 until Saturday July 25. 10:00 p.m. to 8 a.m. Full closure of westbound mainlanes from La Cantera Parkway and Camp Bullis Rd. for milling and overlay. DETOUR: All traffic take exit 555 onto the westbound frontage road, through La Cantera Parkway intersection, past La Cantera Parkway and re-enter the westbound mainlanes at 1 ¼ mile west of La Cantera Parkway.
  • Sunday, July 26 until Monday, July 27. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from La Cantera Parkway to Camp Bullis Road for milling and overlay. DETOUR: All traffic take exit 555 onto the westbound frontage road through La Cantera Parkway intersection, past La Cantera Parkway, re-enter the westbound mainlanes at 1 ¼ mile west of La Cantera Parkway.
  • Sunday, July 26 until Friday, July 31. Nightly 9:00 p.m. to 5:00 a.m. Single lane closure, in both directions, from Scenic Loop Rd. to Fair Oaks Parkway for the removal of concrete traffic barrier.
  • Monday, July 27 until Tuesday, July 28. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Camp Bullis Rd. to Dominion Dr. for milling and overlay. DETOUR: All traffic take exit 552 onto the westbound frontage road through Dominion Dr. intersection, re-enter the westbound mainlanes at ¾ of a mile west of Dominion Dr.
  • Tuesday, July 28 until Wednesday, July 29. 8 p.m. to 6 a.m. Full closure of westbound mainlanes between Dominion Dr. and Boerne Stage Rd. for milling and overlay. DETOUR: All traffic take exit 551 onto the westbound frontage road through Leon Springs and the Boerne Stage Rd. intersection, past Ralph Fair Rd. re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Tuesday, July 28 until Friday, July 31. Nightly 9:00 p.m. to 5:00 a.m. Full frontage road closure, in both directions at Balcones Creek Road turnaround for bridge repairs.
  • Wednesday, July 29 until Thursday, July 30. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Boerne Stage Rd. and Ralph Fair Rd. for milling and overlay. DETOUR: All traffic take exit 551 onto the westbound frontage road through Leon Springs and the Boerne Stage Road intersection, past Ralph Fair Rd. intersection re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Thursday, July 30 until Friday, July 31. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Ralph Fair Rd. to Old Fredericksburg Rd. for milling and overlay. DETOUR: All traffic take exit 550 onto the westbound frontage road through Ralph Fair Rd. intersection, re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Friday, July 24. Nightwork from 7 p.m. to 5 a.m. East and westbound left lanes closed between FM 1516 and Graytown Road to move traffic barriers.
  • Monday, July 27 until Friday, July 31. Nightly 9:00 p.m. to 5:00 a.m. Eastbound right lane closed at various locations between Loop 410 and FM 1516 to paint retaining walls at Ackerman Road, Rosillo Creek, and Martinez Creek.
  • Monday, July 27 until Friday, July 31. Nightly 9:00 p.m. to 5:00 a.m. Westbound right lane closed between Loop 410 and W.W. White Road for striping and traffic shift of westbound mainlanes closer to median.
  • Friday, July 31 until Monday, August 3. Weekend closure 7 p.m. to 5 a.m. ALL eastbound lanes closed at Loop 1604 for overpass work. DETOUR: I-10 traffic can exit at Loop 1604, stay on the frontage road through the intersection, and reenter eastbound I-10 after Loop 1604. (Originally scheduled for June 24-27 but postponed due to pending weather)
  • Friday, July 31 until Monday, August 3. Weekend closure 7 p.m. to 5 a.m. Loop 1604 closed under I-10 for overpass work. DETOURS: Northbound Loop 1604 traffic can take the I-10 eastbound frontage road and turn around at Pfiel Rd. Southbound Loop 1604 traffic can take the I-10 westbound frontage road and turn around at FM 1516. (Originally scheduled for June 24-27 but postponed due to pending weather)
  • Current until mid-September. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
    • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
    • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Saturday, August 1 until Sunday, August 2. 9:00 p.m. to 5:00 a.m. Double lane closure on northbound mainlanes from FM 1106 bridge to Conrad and Kohelenberg Bridge for barrier installation.

 

I-410 – West San Antonio

  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from SH-151 to US-90 for equipment staging.
  • Current until Monday, August 3. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall and underground pipes.
  • Current until Monday, August 3. Nightly 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions from SH-151 to US-90 for equipment staging.
  • Monday, July 27 until Monday August 3. Daily 9:00 a.m. to 3:00 p.m. Full closure of southbound frontage road from N.W. Crossroads to Military Dr. for removal of concrete riprap.
  • Monday, July 27 until Monday August 3. Daily 9:00 a.m. to 3:00 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.  
  • Monday, July 27 until Friday, August 3. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
  • Sunday, August 2. 7:00 a.m. to 12:00 p.m. Right lane closure on southbound frontage road from Military Dr. to SH-151 for work on communication lines.
  • Sunday, August 2. 7:00 a.m. to 12:00 p.m. Right lane closure on northbound frontage road from SH-151 to Military Dr. for work on communication lines.

 

I-410 – Northwest San Antonio

  • Tuesday, July 28. 9:00 a.m. to 4:00 p.m. Right turn lane closure at Loop 345 (Fredericksburg Rd.) for utility work.

 

US 90 – West San Antonio

  • Sunday, July 26 until Monday, July 27. 9 p.m. to 5 a.m. Full rolling closure of westbound mainlanes at 36th St. for column and sign installations.
  • Monday, July 27 until Tuesday, July 28. 9 p.m. to 5 a.m. Closure of westbound exit ramp and frontage road at General McMullen Dr. for overhead sign bridge installation. DETOUR: Traffic will continue US-90 westbound mainlanes, take the 36th St. exit ramp, continue on the westbound frontage road up to the 36th St. turnaround, take US-90 eastbound mainlanes and use the eastbound to northbound cloverleaf at General McMullen Dr.
  • Monday, July 27 until Friday, July 31. Daily 9:00 a.m. to 3:00 p.m. Alternating frontage road lane closures, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete mowstrip improvements.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Hunt Lane to US-90 to allow for equipment staging.

 

SH 151 – West San Antonio

  • Monday, July 27 until Monday, August 3. Daily 9:00 a.m. to 3:00 p.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Monday, July 27 until Monday, August 3. Nightly 8:00 p.m. to 5:00 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for bridge rail demolition.
  • Monday, July 27 until Monday, August 3. Nightly 8:00 p.m. to 5:00 a.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work.
  • Sunday, August 2. 7:00 a.m. to 12:00 p.m. Ramp closure at northbound Loop 410 exit to Military Dr. for work on communication lines.

 

FM 1957 – Potranco Rd.

  • Monday, July 27. 9:00 a.m. to 4:00 p.m. Single northbound lane closure from Emerald Glade to Tibury Parkway for work on communication lines.

 

FM 3351 – Ralph Fair Road

  • Current until August 7. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from westbound I-10 frontage road to Bexar/Comal County Line for milling and inlay work.

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 24 until Sunday, July 26. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, July 25 until Sunday, July 25. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Monday, July 27 until Friday, July 31. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 27 until Friday, July 31. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 31 until Sunday, August 2. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, August 1 until Sunday, August 2. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.

 

Loop 13 – S.W. Military Drive

  • Sunday, July 26 until Friday, July 31. Nightly 7:00 p.m. to 5 a.m. Single lane closure, in both directions, from Old Pearsall Rd. to Rockgate Dr. for asphalt milling and paving.

 

Spur 371 – General Hudnell Drive

  • Monday, July 27 until Friday, July 31. Daily 7:00 a.m. to 5:00 p.m. Single lane closure, in both directions, from Billy Mitchell Blvd. to US-90 for guardrail work.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Monday, July 27 until Wednesday, July 29. Nightly 9:00 p.m. to 6:00 a.m. Ramp closure from right lane of southbound Loop 1604 to Meadowland for duct bank work. 
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

SH 218 - Pat Booker Rd.

  • Sunday, July 26 until Friday, July 31. Nightly 9:00 p.m. to 6:00 a.m. Single eastbound lane closure from Village Oak to Loop 1604 for barrier movement. 


Loop 345 – Fredericksburg Rd.

  • Tuesday, July 28. 9:00 a.m. to 4:00 p.m. Single southbound lane closure from Loop 410 to Hillcrest for utility work.

 

Other Roads – Bexar County

  • Marbach Rd. Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Marbach Rd. and Loop 410 intersection for equipment staging.
  • Weichold Rd. Current until Saturday, August 1. 7 a.m. to 5 p.m. Full road closure, in both directions, at I-10 frontage road for asphalt placement. DETOUR: Traffic will travel to Lincolnwood Dr.
  • Bulverde Rd. Monday, July 27 until Saturday, August 1. 7 a.m. to 10 p.m. Full closure, in both directions, from 300 feet west of US-281 to US-281 for water main work.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • Current until Saturday August 1. Weekdays 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway reconstruction.


FM 3009 - Comal County 

  • Sunday, July 26 until Friday, July 31. Nightly 6:00 p.m. to 6:00 a.m. Single eastbound lane closure from FM 78 to FM 2252 for asphalt work. 


FM 1044 – Comal County

  • Sunday, July 26 until Friday, July 31. Nightly 9:00 p.m. to 5 a.m. Single southbound lane closure from just south of Loma Verde Dr. to just south of Lou Ann Dr. for pavement repairs.


Wednesday, July 22

Long-Term Northbound I-35 Watson Lane Exit Ramp Closure



The northbound Interstate 35 (I-35) Watson Lane exit ramp will close long-term beginning 9 p.m. Saturday, August 1. Scheduled to reopen Summer 2021, the closure will continue our phasing for construction of the new Parkway intersection. The intersection will add dedicated turnarounds to the frontage roads between Kohlenberg Road/Conrads Lane and Watson Lane.

During this time, traffic will be detoured to the northbound I-35 Kohlenberg Road/Conrads Lane exit ramp before the Watson Lane exit ramp.

Want to keep up with the latest on this project? Continue to check here for blog updates, as well as follow us on Twitter. Additionally, you can sign up for email updates by subscribing here http://eepurl.com/gRtrwn.

Friday, July 17

Upcoming Scheduled Construction Closures


Loop 1604 – North Central San Antonio

  • Saturday, July 18 until Monday, July 20. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US-281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US-281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, July 18 until Monday, July 20. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.

 

Loop 1604 – Northeast San Antonio

  • Current until Saturday July 18. 9 p.m. to 12 p.m. Single northbound mainlane closure at Pat Booker Rd. bridge to prevent debris from getting into traffic.  
  • Sunday, July 19 until Friday, July 24. 8 p.m. to 5 a.m. Single lane closures, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramps for guardrail improvements.
  • Tuesday, July 21. 9 a.m. to 5 p.m. Northbound exit ramp to Lookout Rd. closed for concrete barrier setting.
  • Tuesday, July 21. 9 a.m. to 5 p.m. Lookout Rd. entrance ramp at northbound frontage road closed for concrete barrier setting.

 

Loop 1604 – Northwest San Antonio

  • Sunday, July 19 until Friday, July 24. 9 p.m. to 5 a.m. Single eastbound mainlane closure from Bandera Rd. to Hausman Rd. to place pavement markings.
  • Sunday, July 19 until Friday, July 24. 9 p.m. to 5 a.m. Single lane closure on eastbound frontage road from Bandera Rd. to Hausman Rd. to place pavement markings.
  • Tuesday, July 21 until Wednesday, July 22. 7 p.m. to 5 a.m. Single eastbound mainlane closure from FM 1560 to SH-16 for concrete barrier installation.

 

Loop 1604 – West San Antonio

  • None scheduled.

 

Loop 1604 – Far East San Antonio

  • Saturday, July 18. 7 a.m. to 5 p.m. Single northbound mainlane closure from FM 1976 to Kitty Hawk Rd. for barrier removal.

 

Loop 1604 – South San Antonio

  • None scheduled.

 

US 281 – North Central San Antonio/Bexar County

  • Friday, July 17 until Saturday, July 18. Weekend closure 9 p.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for concrete paving. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Saturday, July 18. 7 a.m. to 3 p.m. Alternating southbound lane closures from 500 feet north of Marshall Rd. to 500 feet south of Marshall Rd. for traffic signal improvements.
  • Saturday, July 18. 7 a.m. to 3 p.m. Alternating northbound lane closures, in both directions, from 500 feet north of Wilderness Oak to 500 feet south of Wilderness Oak for placement of coping.
  • Saturday, July 18 until Sunday, July 19. Weekend closure 3 a.m. until 5 a.m. Full southbound frontage road closure from the Evans Road entrance ramp to Encino Rio for sound wall work.
  • Saturday, July 18 until Monday, July 20. Weekend continuous closure 4 a.m. until 5 a.m. Right lane southbound frontage road closure from Encino Rio to Sonterra Boulevard.
  • Saturday, July 18 until Sunday, July 19. Weekend continuous closure 7 a.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Saturday, July 18 until Sunday, July 19. Weekend continuous closure 7 a.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the detour turnaround closure.
  • Saturday, July 18 until Monday, July 20. Weekend continuous closure 7 a.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Saturday, July 18 until Monday, July 20. Weekend continuous closure 7 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Saturday, July 18 until Monday, July 20. Weekend continuous closure 7 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Full southbound frontage road closure from the Evans Road entrance ramp to Encino Rio for sound wall work. DETOUR: Take the southbound US 281 mainlanes and use the Redland Road exit ramp.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure of the exit ramp to the Sonterra Boulevard Access Road for concrete paving. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure from the north- to southbound turnaround at Encino Rio for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Encino Rio for bridge work. DETOUR: Use the turnaround at Loop 1604. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Redland Road for concrete paving. DETOUR: Use the turnaround at Loop 1604. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for concrete paving. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for concrete paving. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Right turn lane northbound frontage road closure at Redland Road for concrete paving.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Left turn lane northbound frontage road closure at Encino Rio both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Right/center lane northbound frontage road closure from Redland Road to Encino Rio for lighting work.
  • Sunday, July 19 until Friday, July 24. Nightly 9 p.m. until 5 a.m. Two right lanes southbound frontage road closure from Redland Road to Loop 1604 for drainage and grading work.

 

Encino Rio – North Central San Antonio

  • None scheduled.

 

US 281 – South San Antonio

  • None scheduled.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Current until Friday, July 31. 7 a.m. to 7 p.m. Alternating mainlane and shoulder closures, from SH-16 to Kerr/Kendall County Line for pavement work.
  • Friday, July 17, until Saturday, July 18. 10 p.m. to 8 a.m. Full closure of eastbound mainlanes from Camp Bullis Rd. to La Cantera Parkway for milling and overlay. DETOUR: All traffic take exit 555 onto eastbound frontage road through La Cantera Parkway intersection, past La Cantera Parkway re-enter the eastbound mainlanes at ¼ mile east of La Cantera Parkway.
  • Sunday, July 19 until Monday, July 20. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Old Fredericksburg Rd. to Ralph Fair Rd. (FM 3351) for milling and overlay. DETOUR: All traffic take exit 550 onto the eastbound frontage road through Ralph Fair Road (FM 3351) intersection, re-enter the eastbound main lanes a 1/4 of a mile east of Ralph Fair Road (FM 3351).
  • Sunday, July 19 until Friday, July 24. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Scenic Loop Rd. to Fair Oaks Parkway for paving and removal of concrete traffic barrier.
  • Monday, July 20 until Tuesday, July 21. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Ralph Fair Rd. (FM 3351) to Dominion Dr. for milling and overlay. DETOUR: All traffic take exit 550 onto the eastbound frontage road through Ralph Fair Road (FM 3351) intersection, re-enter the eastbound main lanes a 1/2 of a mile east of Boerne Stage Road.
  • Monday, July 20 until Friday, July 24. 9 a.m. to 4 p.m. Single lane closure on westbound frontage road from 1,000 feet before Huebner Rd. to Huebner Rd. for utility work.
  • Tuesday, July 21 until Wednesday, July 22. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes from Boerne Stage Rd. to Dominion Dr. for milling and overlay. DETOUR: All traffic take exit 552 onto the eastbound frontage road through Dominion Dr. intersection, past Dominion Dr. re-enter the eastbound mainlanes at 1 ½ of a mile east of Dominion Dr.
  • Wednesday, July 22 until Friday, July 24. 8 p.m. to 6 a.m. Full closure of eastbound mainlanes between Dominion Dr. and La Cantera Parkway for milling and overlay. DETOUR: All traffic take exit 554 onto the eastbound frontage road through Camp Bullis Rd. intersection, past Camp Bullis Rd. re-enter the eastbound mainlanes at 1 mile east of Camp Bullis Rd.
  • Sunday, July 26 until Monday, July 27. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from La Cantera Parkway to Camp Bullis Road for milling and overlay. DETOUR: All traffic take exit 555 onto the westbound frontage road through La Cantera Parkway intersection, past La Cantera Parkway, re-enter the westbound mainlanes at 1 ¼ mile west of La Cantera Parkway.
  • Monday, July 27 until Tuesday, July 28. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Camp Bullis Rd. to Dominion Dr. for milling and overlay. DETOUR: All traffic take exit 552 onto the westbound frontage road through Dominion Dr. intersection, re-enter the westbound mainlanes at ¾ of a mile west of Dominion Dr.
  • Tuesday, July 28 until Wednesday, July 29. 8 p.m. to 6 a.m. Full closure of westbound mainlanes between Dominion Dr. and Boerne Stage Rd. for milling and overlay. DETOUR: All traffic take exit 551 onto the westbound frontage road through Leon Springs and the Boerne Stage Rd. intersection, past Ralph Fair Rd. re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Wednesday, July 29 until Thursday, July 30. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Boerne Stage Rd. and Ralph Fair Rd. for milling and overlay. DETOUR: All traffic take exit 551 onto the westbound frontage road through Leon Springs and the Boerne Stage Road intersection, past Ralph Fair Rd. intersection re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Thursday, July 30 until Friday, July 31. 8 p.m. to 6 a.m. Full closure of westbound mainlanes from Ralph Fair Rd. to Old Fredericksburg Rd. for milling and overlay. DETOUR: All traffic take exit 550 onto the westbound frontage road through Ralph Fair Rd. intersection, re-enter the westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Monday, July 20 until Friday, July 24. Nightly 7 p.m. to 5 a.m. East and westbound left lanes closed between FM 1516 and Graytown Rd. to move traffic barriers.
  • Friday, July 24 until Monday, July 27. Weekend closure 7 p.m. to 5 a.m. All eastbound mainlanes closed at Loop 1604 for overpass work. DETOUR: I-10 traffic can exit at Loop 1604, stay on the frontage road through the intersection, and reenter eastbound I-10 after Loop 1604.
  • Friday, July 24 until Monday, July 27. Weekend closure 7 p.m. to 5 a.m. Loop 1604 closed under I-10 for overpass work. DETOURS: Northbound Loop 1604 traffic can take the I-10 eastbound frontage road and turn around at Pfiel Rd. Southbound Loop 1604 traffic can take the I-10 westbound frontage road and turn around at FM 1516.
  • Current until mid-September. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
  • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-10 – Central San Antonio

  • None scheduled.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
  • Sunday, July 19 until Monday, July 20. 9 p.m. to 4 a.m. Single northbound mainlane closure at Eisenhauer Rd. for steel beam rocker repair.

 

I-37 – Central/South San Antonio

  • None scheduled.

 

I-410 – West San Antonio

  • Current until Monday, July 20. 9 a.m. to 3 p.m. Single lane closure of the southbound frontage road from N.W. Crossroads to Military Dr. to remove concrete riprap.
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Marbach Rd. to Culebra Rd. for barrier installations.
  • Current until Monday, July 20. 9 a.m. to 3p.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Marbach Rd. to Ingram Rd. for wall and drainage work.  
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating northbound frontage road closures from SH-151 to Marbach Rd. for equipment staging.
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating southbound frontage road lane and shoulder closures, including ramps, from SH-151 to Marbach Rd.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from SH-151 to 3 p.m. for equipment staging.
  • Current until Monday, July 13. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall and underground pipes.
  • Current until Monday, July 13. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions from SH-151 to US-90 for equipment staging.

 

US 90 – West San Antonio

  • Current until Friday, July 24. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from ½ mile before 36th St. to past the 36th St. exit for concrete traffic barrier work.
  • Monday, July 20 until Friday, July 24. 9 a.m. to 3 p.m. Single lane closures, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete improvements.
  • Tuesday, July 21 until Wednesday, July 22. 7 p.m. to 5 a.m. Mainlane closures, in both directions, at 36th St. for barrier removal.
  • Wednesday, July 22. 9 a.m. to 3 p.m. Westbound mainlane, shoulder and exit closures at 36th St. for unloading overhead signs. DETOUR: Traffic will be detoured to the Acme Rd. exit ramp to continue the frontage road and utilize the turnaround.
  • Sunday, July 26 until Monday, July 27. 9 p.m. to 5 a.m. Full rolling closure of westbound mainlanes at 36th St. for column and sign installations.
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Hunt Lane to US-90 to allow for equipment staging.

 

SH 151 – West San Antonio

  • Current until Monday, July 20. 8 p.m. to 5 a.m. Full closure of westbound mainlanes from Loop 410 to Ingram Rd for bridge work. DETOUR: Traffic will travel on SH-151 westbound frontage road, continue through Loop 410 and SH-151 intersection, and take the next entrance ramp to SH-151 westbound mainlanes.
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Ingram Rd. to Loop 410 for bridge work. DETOUR: East to west turnaround traffic will detour to the Loop 410 and SH-151 intersection to take two left turns.
  • Current until Monday, July 20. 9 a.m. to 3 p.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Loop 410 and Ingram Rd for bridge work. DETOUR: East to west turnaround traffic will detour to the Loop 410 and SH-151 intersection to take two left turns.

 

SH 16 – Bandera Road

  • None scheduled.

 

FM 471 – Culebra Road

  • None scheduled.

 

FM 3351 – Ralph Fair Road

  • Current until August 7. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from westbound I-10 frontage road to Bexar/Comal County Line for pavement repairs.

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 17 until Sunday, July 19. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Friday, July 17 until Sunday, July 19. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from NW Military Rd. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow for construction trucks entering roadway.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, July 18 until Sunday, July 19. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from NW Military Rd. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow for construction trucks entering roadway.
  • Monday, July 20. 10 a.m. to 12 p.m. Full closure, in both directions, from Lockhill Selma Rd. to 500 feet west of Lockhill Selma Rd. for utility work.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Monday, July 20 until Friday, July 24. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 20 until Friday, July 24. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 24 until Sunday, July 26. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, July 25 until Sunday, July 25. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Monday, July 27 until Friday, July 31. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 27 until Friday, July 31. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 31 until Sunday, August 2. 8 p.m. to 6 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, August 1 until Sunday, August 2. 7 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from N.W Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow entry for construction trucks.
 

Loop 13 – S.W. Military Drive

  • Sunday, July 19 until Friday, July 24. 7 p.m. to 5 a.m. Alternating lane closures, in both directions, from Old Pearsall Rd. to Rockgate Dr. for asphalt milling and paving.

 

FM 2252 – Nacogdoches Road

  • None scheduled.

 

FM 1560 – Hausman Road

  • Exit ramp from Loop 1604 eastbound closed until further notice starting Monday, March 16.

 

SH 218 – Pat Booker Road

  • Friday, July 17 until Monday, July 20. 8 p.m. to 5 a.m. Full closure, in both directions, at Loop 1604 intersection for bridge demolition.
  • Friday, July 17 until Monday, July 20. 9 a.m. to 5 a.m. Full closure of southbound to northbound turnaround at Loop 1604 for equipment staging and bridge demolition.

 

Spur 371 – General Hudnell Drive

  • None scheduled.

 

FM 78 – Bexar County

  • None scheduled.

 

US 87 – Roland Avenue

  • None scheduled.

 

Spur 421 – Bandera Road

  • None scheduled.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

Loop 353 – New Laredo Highway

  • None scheduled.

 

SS 371 – General Hudnell Drive

  • None scheduled.

 

Other Roads – Bexar County

  • Marbach Rd. Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Marbach Rd. and Loop 410 intersection for equipment staging.
  • Marbach Rd. Current until Saturday, July 18. 8 p.m. to 5 a.m. Alternating lane closures, in both directions at Marbach Rd and Loop 410 intersection for equipment staging.
  • Weichold Rd. Monday, July 20 until Saturday, August 1. 7 a.m. to 5 p.m. Full road closure, in both directions, at I-10 frontage road for asphalt placement. DETOUR: Traffic will travel to Lincolnwood Dr.
  • Borgfeld Rd. Sunday, July 19 until Monday, July 20. 6 p.m. to 5 a.m. Full closure, in both directions, from US-281 to Bulverde for placement of coping.
  • Bulverde Rd. Monday, July 27 until Saturday, August 1. 7 a.m. to 10 p.m. Full closure, in both directions, from 300 feet west of US-281 to US-281 for water main work.

 

FM 306 – New Braunfels/Comal County

  • None scheduled.

 

Loop 337 – New Braunfels/Comal County

  • None scheduled.

 

TX 46/FM 311 – Comal County

  • None scheduled.

 

FM 1863 – Comal County

  • None scheduled.

 

FM 2673 – Canyon Lake/Comal County

  • None scheduled.

 

FM 1516 – South Seguin Road/Converse

  • None scheduled.

 

FM 2252 – Comal County

  • None scheduled.

 

SH 46 – Guadalupe County

  • None scheduled.

 

FM 78 – Guadalupe County

  • None scheduled.

 

FM 1518 – Schertz/Cibolo Guadalupe County

  • None scheduled.

 

US 90A – Seguin/Guadalupe County

  • None scheduled.

 

SH 123 – Seguin/Guadalupe County

  • None scheduled.

 

Business 123 – South Austin Street/Seguin/Guadalupe County

  • None scheduled.

 

I-35 – Atascosa County/Frio County

  • None scheduled.

 

US 181 – Floresville/Wilson County

  • None scheduled.

 

US 87 – Wilson County

  • None scheduled.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • Current until Saturday, July 18. 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway construction.
  • Monday, July 20 until Saturday, July 25. 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work.

 

RM 474 – Blanco Road/Kendall County

  • None scheduled

 

FM 1333 – Atascosa County

  • None scheduled.

 

FM 140 – Atascosa County

  • None scheduled.

 

SH 16 – McMullen County

  • None scheduled.

 

FM 3009 – Comal County

  • Sunday, July 19 until Friday, July 24. 6 p.m. to 6 a.m. Single eastbound lane closure from FM 78 to FM 2252 to allow for laying asphalt.

 

I-10 – Kerr County

  • None scheduled.

 

FM 1044 – Comal County

  • None scheduled.