Friday, July 10

Upcoming Scheduled Construction Closures



Loop 1604 – North Central San Antonio

  • Saturday, July 18 until Monday, July 20. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure of the US-281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US-281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, July 18 until Monday, July 20. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.


Loop 1604 – Northeast San Antonio

  • Friday, July 10 until Sunday, July 12. 9 p.m. to 12 p.m. Single northbound mainlane closure from Pat Booker bridge approach to Pat Booker bridge departure for safety precautions due to construction work. 
  • Sunday, July 12 until Friday, July 13. 8 p.m. to 5 a.m. Alternating lane closures, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramp for road improvements. 
  • Monday, July 13 until Thursday, July 16. 10 a.m. to 3 p.m. Alternating lane and shoulder closures, in both directions, from Green Mountain Rd. to I-35 cloverleaf ramps to allow for sign replacement. 


Loop 1604 – Northwest San Antonio

  • Saturday, July 11. 7 a.m. to 7 p.m. Eastbound single mainlane and ramp closures from Bandera Rd. to Hausman Rd. for removal of concrete traffic barrier. 
  • Friday, July 10 until Sunday, July 12. 9 p.m. to 5 a.m. Left lane and shoulder closures, in both directions, from FM 1560 to SH-16 for removal of concrete barrier. 
  • Sunday, July 12 until Thursday, July 16. 9 p.m. to 5 a.m. Single lane and shoulder closures on eastbound mainlanes from Bandera Rd. Hausmann Rd. for hotmix surface placement. 
  • Thursday, July 16 until Friday, July 17. Full closure of eastbound mainlanes from 9 p.m. to 5 a.m. between Bandera Rd. and Hausmann Rd. for overhead sign bridge placement. DETOUR: Traffic should take Bandera Rd. exit and continue through Bandera Rd. intersection, befor re-entering eastbound mainlanes on the new entrance ramp. 


Loop 1604 – West San Antonio

  • None scheduled. 


Loop 1604 – Far East San Antonio

  • None scheduled.


Loop 1604 – South San Antonio

  • None scheduled.


US 281 – North Central San Antonio/Bexar County

  • Saturday, July 11 until Monday, July 13. Weekend closure 7 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for concrete paving.
  • Saturday, July 11 until Monday, July 13. Weekend closure 7 a.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for concrete paving.
  • Monday, July 13 until Friday, July 17. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from Loop 1604 to Sonterra Boulevard for concrete paving. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Monday, July 13 until Friday, July 17. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, July 13 until Friday, July 17. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. 
  • Monday, July 13 until Friday, July 17. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the detour turnaround closure.
  • Monday, July 13 until Friday, July 17. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, July 13 until Friday, July 17. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for bridge work and safety enhancements.
  • Monday, July 13 until Friday, July 17. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for concrete paving.
  • Saturday, July 18 until Monday, July 20. Full weekend closure 3 a.m. until 5 a.m. Northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp for direct connector work. DETOUR: Take the frontage road exit ramp and use the Sonterra Boulevard entrance ramp.
  • Saturday, July 18 until Monday, July 20. Full weekend closure 3 a.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp and use the Donella Drive entrance ramp.
  • Saturday, July 18 until Monday, July 20. Weekend closure 7 a.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio. 
  • Saturday, July 18 until Monday, July 20. Weekend closure 7 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Saturday, July 18 until Monday, July 20. Weekend closure 7 a.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio.
  • Saturday, July 18 until Monday, July 20. Weekend closure 7 a.m. until 5 a.m. Alternating southbound frontage road closure from Sonterra Boulevard to Loop 1604 for concrete paving.


Encino Rio – North Central San Antonio

  • Saturday, July 11. Full weekend closure 7 a.m. to 5 p.m. Full westbound crossing closure under the US-281 mainlanes for concrete paving. DETOUR: Head right on the northbound US-281 frontage road and take the north-to-southbound turnaround at Evans Rd. 


US 281 – South San Antonio

  • None scheduled.


I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Current until Friday, July 31. 7 a.m. to 7 p.m. Alternating mainlane and shoulder closures, from SH-16 to Kerr/Kendall County Line for pavement work.  
  • Current until Friday, July 17. 9 a.m. to 5 p.m. Eastbound mainlane closure from Ralph Fair Rd. (FM 3351) to La Cantera Parkway for the removal of portable concrete traffic barrier. 
  • Sunday, July 12 until Monday, July 13. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from La Cantera Parkway to Camp Bullis Rd. for milling and overlay work. DETOUR: Take Exit 555, travel on the westbound frontage road and re-enter westbound mainlanes at 1 ¼ of a mile west of La Cantera Parkway. 
  • Sunday, July 12 until Wednesday, July 15. 7 p.m. to 5 a.m. Full closure of eastbound frontage road from Kendall/Bexar County Line to 200 yards north of Balcones Creek Rd. for asphalt structural repairs. DETOUR: Use Fair Oaks Parkway to westbound frontage road. 
  • Monday, July 13 until Thursday, July 16. 9 a.m. to 3 p.m. Left lane closure of the eastbound frontage road from Oak Dr. to Camp Bullis Rd. for conduit work. 
  • Monday, July 13 until Tuesday, July 14. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Camp Bullis to Dominion Dr. for milling overlay work. DETOUR: Take Exit 552, travel on the westbound frontage road and re-enter westbound mainlanes at ¾ of a mile west of Dominion Dr.
  • Monday, July 13 until Wednesday, August 5. 7 a.m. to 7 p.m. Alternating lane and shoulder closures, in both directions, at bridge locations from Mudge Creek Draw to West Dry Branch to allow for bridge joint replacements.  
  • Tuesday, July 14 until Wednesday, July 15. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Dominion Dr. to Boerne Stage Rd for milling and overlay work. DETOUR: Take Exit 551, travel on the westbound frontage road and re-enter westbound mainlanes at ¾ mile west of Ralph Fair Rd.
  • Tuesday, July 14 until Friday, July 17. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Kendall/Bexar County Line to Fair Oaks Parkway for removal of concrete traffic barrier. 
  • Wednesday, July 15 until Thursday, July 16. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Boerne Stage Rd. to Ralph Fair Rd (FM 3351) for milling and overlay work. DETOUR: Take Exit 551, travel on the westbound frontage road and re-enter westbound mainlanes at ¾ of a mile west of Ralph Fair Rd. 
  • Thursday, July 16 until Friday, July 17. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Ralph Fair Rd (FM 3351) to Old Fredericksburg Rd. for milling and overlay work. DETOUR: Take Exit 550, travel on the westbound frontage road and re-enter westbound mainlanes at ¾ mile west of Ralph Fair Rd.  


I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Saturday, July 11. 5 a.m. to 9 p.m. One westbound mainlane closed from FM 1516 to Loop 1604 for traffic switch. 
  • Saturday, July 11. 5 a.m. to 9 p.m. Westbound exit ramp to FM 1516 temporarily closed for restriping. DETOUR: Use Loop 1604 exit, turn left at intersection, and take eastbound frontage road back to FM 1516. 
  • Current until mid-September. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
  • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster. 
  • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster. 
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.


I-10 – Central San Antonio

  • None scheduled. 


I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Monday, July 13 until Saturday, July 18. 7:30 a.m. to 5:30 p.m. Alternating lane closures of northbound frontage road from FM 1003 to Schwab Rd. for work on traffic rails. 
  • Monday, July 13 until Saturday, July 18. 7:30 a.m. to 5:30 p.m. Single lane closures of northbound frontage road from FM 1003 to Schwab Rd. for site work and concrete sidewalk forming. 
  • Monday, July 13 until Thursday, July 17. 12 a.m. to 5:30 p.m. Single lane closure on northbound frontage road from FM 1003 to Schwab Rd. for concrete sidewalk pour. 
  • Monday, July 13 until Thursday, July 17. 9 p.m. to 5 a.m. Single lane closure on southbound frontage road from Schwab Rd. to Cypress Point for barrier placement. 
  • Monday, July 13 until Thursday, July 17. 9 p.m. to 7 a.m. Single lane closure on northbound frontage road from Schwab Rd. to Cypress Point for barrier placement. 
  • Wednesday, July 15 until Thursday, July 16. 9 p.m. to 5 a.m. Full closure of southbound mainlanes, including inside northbound mainlane, from FM 306 bridge to BUS-35 bridge for removal of overhead sign bridge. DETOUR: Southbound traffic will exit at Post Rd. and travel through BUS-35 intersection. 


I-37 – Central/South San Antonio

  • None scheduled. 


I-410 – West San Antonio

  • Current until Monday, July 13. 9 a.m. to 3 p.m. Southbound frontage road closure from NW Crossroads to Military Dr. for removal of concrete riprap. 
  • Monday, July 13 until Friday, July 17. 9 a.m. to 4 p.m. Single lane closure of northbound frontage road from Meadow Bend Dr. to Timber Creek Dr. for the transfer of communication lines. 
  • Monday, July 13 until Monday, July 20. 9 a.m. to 3 p.m. Single lane closure of the southbound frontage road from N.W. Crossroads to Military Dr. to remove concrete riprap.
  • Monday, July 13 until Monday, July 20. 8 p.m. to 5 a.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Marbach Rd. to Culebra Rd. for barrier installations. 
  • Monday, July 13 until Monday, July 20. 9 a.m. to 3p.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Marbach Rd. to Ingram Rd. for wall and drainage work.  
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating northbound frontage road closures from SH-151 to Marbach Rd. for equipment staging. 
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating southbound frontage road lane and shoulder closures, including ramps, from SH-151 to Marbach Rd. 
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from SH-151 to 3 p.m. for equipment staging. 
  • Current until Monday, July 13. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall and underground pipes. 
  • Current until Monday, July 13. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation. 
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions from SH-151 to US-90 for equipment staging. 


US 90 – West San Antonio

  • Current until Friday, July 10. 9 a.m. to 3 p.m. Alternating lane and shoulder closures, in both directions, from W. Military Dr. to SW 36th St. for guardrail and concrete improvements. 
  • Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Hunt Lane to US-90 to allow for equipment staging. 
  • Friday, July 10 until Friday, July 24. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from ½ mile before 36th St. to past the 36th St. exit for concrete traffic barrier work. 
  • Saturday, July 11. 7 a.m. to 3 p.m. Westbound lane and shoulder closure from ½ mile before 36th St. to just past the 36th St. exit for guard rail work. 
  • Monday, July 13 until Friday, July 17. 9 a.m. to 3 p.m. Alternating lane closures on frontage road, in both directions, from W. Military Dr. to SW 36th St. for guardrail and concrete improvements. 


SH 151 – West San Antonio

  • Current until Monday, July 13. 8 p.m. to 5 a.m. Alternating frontage road lane closures, in both directions, from Loop 410 to Ingram Rd. for bent work. Turnarounds in both directions will be closed 24 hours. DETOUR: Eastbound and westbound turnaround traffic will travel to the 410/151 intersection and take two left turns. 
  • Current until Monday July 13. 8 p.m. to 5 a.m. Full closure of westbound mainlanes from Loop 410 to Ingram Rd. for bent work. DETOUR: Use the frontage road to travel to 410/151 intersection and take next entrance ramp. 
  • Monday, July 13 until Monday, July 20. 8 p.m. to 5 a.m. Full closure of westbound mainlanes from Loop 410 to Ingram Rd for bridge work. DETOUR: Traffic will travel on SH-151 westbound frontage road, continue through Loop 410 and SH-151 intersection, and take the next entrance ramp to SH-151 westbound mainlanes. 
  • Monday, July 13 until Monday, July 20. 8 p.m. to 5 a.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Ingram Rd. to Loop 410 for bridge work. DETOUR: East to west turnaround traffic will detour to the Loop 410 and SH-151 intersection to take two left turns. 
  • Monday, July 13 until Monday, July 20. 9 a.m. to 3 p.m. Alternating lane closures of frontage road and turnarounds, in both directions, from Loop 410 and Ingram Rd for bridge work. DETOUR: East to west turnaround traffic will detour to the Loop 410 and SH-151 intersection to take two left turns. 


SH 16 – Bandera Road

  • None scheduled. 


FM 471 – Culebra Road

  • Tuesday, July 14. 9 a.m. to 4 p.m. Single southbound lane closure from Bridleback Rd. to just south of Bridleback Rd. for utility pole repair. 


FM 3351 – Ralph Fair Road

  • Sunday, July 12 until Friday, July 17. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from westbound I-10 frontage road to Bexar/Comal County Line for mill and inlay work. 
  • Current until August 7. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from westbound I-10 frontage road to Bexar/Comal County Line for pavement repairs.


PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 13 until Friday, July 17. 9 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from NW Military Rd. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd. 
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 13 until Friday, July 17. 9 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from NW Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow for construction trucks entering roadway. 
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 17 until Sunday, July 19. 9 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd. 
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, July 17 until Sunday, July 19. Single lane closure, in both directions, from 0.5 miles from NW Military Rd. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow for construction trucks entering roadway. 


Loop 13 – S.W. Military Drive

  • Sunday, July 12 until Friday, July 17. 7 p.m. to 5 a.m. Double lane closures, in both directions, from Old Pearsall Rd. to Rockgate Dr. for placement of asphalt. 


FM 2252 – Nacogdoches Road

  • None scheduled.


FM 1560 – Hausman Road

  • Exit ramp from Loop 1604 eastbound closed until further notice starting Monday, March 16.
  • Monday, July 13. 9 a.m. to 5 p.m. Single westbound lane closure, from SH-16 to Riggs Rd. for barrier setting. 


SH 218 – Pat Booker Road

  • Friday, July 10 until Monday, July 13. 9 a.m. to 3 p.m. Westbound single lane closure at Pat Book Rd. bridge to allow for construction work. 
  • Friday, July 10 until Monday, July 13. 7 p.m. to 5 a.m. Full street and turnaround closures, in both directions, from Loop 1604 southbound frontage road to Loop 1604 northbound frontage road for bridge demolition. 
  • Friday, July 10 to Wednesday, July 15. 9 a.m. to 5 a.m. Full closure of south to north turnaround at Loop 1604 for bridge demolition and equipment staging. 
  • Friday, July 10 until Thursday, July 16. 9 a.m. to 5 a.m. Full closure of north to southbound turnaround at Loop 1604 for bridge demolition and equipment staging.
  • Tuesday, July 14 until Wednesday, July 15. 9 am. to 3 p.m. Closure of southbound to northbound turnaround lane at Pat Booker Bridge to allow for construction work. 


Spur 371 – General Hudnell Drive

  • None scheduled.


FM 78 – Bexar County

  • None scheduled.


US 87 – Roland Avenue

  • None scheduled.


Spur 421 – Bandera Road

  • None scheduled.


FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.


Loop 353 – New Laredo Highway

  • None scheduled.


SS 371 – General Hudnell Drive 

  • None scheduled. 


Other Roads – Bexar County

  • Marbach Rd. Current until Friday, July 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Marbach Rd. and Loop 410 intersection for equipment staging. 
  • Marbach Rd. Current until Saturday, July 18. 8 p.m. to 5 a.m. Alternating lane closures, in both directions at Marbach Rd and Loop 410 intersection for equipment staging. 
  • Borgfeld Rd. Current until Thursday, July 16. 9 p.m. to 5 a.m. Full street closure of Borgfeld Rd., in both directions, from US-281 to Bulverde Rd for construction work. 
  • Fredericksburg Rd. Monday, July 13. 9 a.m. to 4 p.m. Single northbound lane closure from Donore Pl. to 500 feet north of Louis Pasteur for placement of communication lines. 
  • Weichold Rd. Monday, July 20 until Saturday, August 1. 7 a.m. to 5 p.m. Full road closure, in both directions, at I-10 frontage road for asphalt placement. DETOUR: Traffic will travel to Lincolnwood Dr. 
  • FM 1535 - NW Military Dr. Alternating southbound lane closures from Elm Spring Lane to DeZavala Rd. for work on communication lines. 


FM 306 – New Braunfels/Comal County

  • None scheduled. 


Loop 337 – New Braunfels/Comal County

  • None scheduled.


TX 46/FM 311 – Comal County

  • None scheduled.


FM 1863 – Comal County

  • None scheduled.


FM 2673 – Canyon Lake/Comal County

  • None scheduled.


FM 1516 – South Seguin Road/Converse

  • None scheduled.


FM 2252 – Comal County

  • None scheduled.


SH 46 – Guadalupe County

  • None scheduled.


FM 78 – Guadalupe County

  • None scheduled.


FM 1518 – Schertz/Cibolo Guadalupe County

  • None scheduled.


US 90A – Seguin/Guadalupe County

  • None scheduled.


SH 123 – Seguin/Guadalupe County

  • None scheduled. 


Business 123 – South Austin Street/Seguin/Guadalupe County

  • None scheduled.


I-35 – Atascosa County/Frio County

  • None scheduled.


US 181 – Floresville/Wilson County

  • None scheduled.


US 87 – Wilson County

  • None scheduled.


SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).


RM/FM 1376 – Kendall County

  • Monday, July 13 until Saturday, July 18. 7 a.m. to 7 p.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway construction. 
  • Monday, July 13 until Wednesday, July 15. 7 p.m. to 5 a.m. Single lane closure, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for pavement repairs. 


RM 474 – Blanco Road/Kendall County

  • None scheduled


FM 1333 – Atascosa County

  • None scheduled.


FM 140 – Atascosa County

  • None scheduled.


SH 16 – McMullen County

  • None scheduled.


FM 3009 – Comal County 

  • Sunday, July 12 until Friday, July 17. 6 p.m. to 6 a.m. Single eastbound lane closure from I-35 to FM 78 for asphalt placement. 


I-10 – Kerr County

  • None scheduled.


FM 1044 – Comal County 

  • Monday, July 13 until Friday, July 17. 7 a.m. to 7 p.m. Single southbound lane closure from just north of County Line Rd. to FM 78 for roadway repairs.