Friday, July 3

Upcoming Scheduled Construction Closures

Loop 1604 – North Central San Antonio

  • None scheduled.

 

Loop 1604 – Northeast San Antonio

  • None scheduled.

 

Loop 1604 – Northwest San Antonio

  • Saturday, July 11. 7 a.m. to 7 p.m. Eastbound single mainlane and ramp closures from Bandera Rd. to Hausman Rd. for removal of concrete traffic barrier.
  • Monday, July 6 until Friday, July 10. 9 p.m. to 5 a.m. Eastbound alternating frontage road closures from Bandera Rd. to Champions Gate for removal of concrete traffic barrier.
  • Friday, July 10 until Sunday, July 12. 9 p.m. to 5 a.m. Left lane and shoulder closures, in both directions, from FM 1560 to SH-16 for removal of concrete barrier.


Loop 1604 – West San Antonio

  • None scheduled.

 

Loop 1604 – Far East San Antonio

  • None scheduled.

 

Loop 1604 – South San Antonio

  • None scheduled.

 

US 281 – North Central San Antonio/Bexar County

  • Sunday, July 5. 9 p.m. to 5 a.m. Single southbound lane closure just north of Cibolo Creek for construction material relocation.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from Encino Rio to Sonterra Boulevard for bridge work. DETOUR: For Sonterra Boulevard traffic, head north on US 281, take the turnaround south of Encino Rio, stay on the southbound US 281 mainlanes and follow steps for the next detour. For southbound US 281 mainlane traffic, take the Donella Drive exit ramp, use the turnaround at Donella Drive and continue on the northbound US 281 frontage road.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Northbound mainlane closure from the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Southbound mainlane closure from the south- to northbound turnaround at Evans Road for bridge work. DETOUR: Use the turnaround at Encino Rio.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure from the south- to northbound turnaround at Redland Road for bridge work. DETOUR: Use the next turnaround at Loop 1604.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Evans Road both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround at Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with the detour turnaround closure.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Left turn lane northbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both north- to westbound turn lanes for bridge work. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Stone Oak/Tournament Players Club (TPC) Parkway both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Evans Road. Closure will not happen concurrently with the detour turnaround closure.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Left turn lane southbound mainlane closure at Evans Road both south- to eastbound turn lanes for bridge work. DETOUR: Use the turnaround at Encino Rio.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Right lane northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard entrance ramp for concrete paving.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Right lane northbound frontage road closure from Encino Rio to Evans Road for concrete paving.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for bridge work and safety enhancements.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for concrete paving.
  • Monday, July 6 until Friday, July 10. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Sonterra Boulevard to Loop 1604 for concrete paving. 


US 281 – South San Antonio

  • None scheduled.

 

I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County

  • Current until Friday, July 31. 7 a.m. to 7 p.m. Alternating mainlane and shoulder closures, from SH-16 to Kerr/Kendall County Line for pavement work.  
  • Sunday, July 5 until Friday, July 17. 9 a.m. to 5 p.m. Eastbound mainlane closure from Ralph Fair Rd. (FM 3351) to La Cantera Parkway for the removal of portable concrete traffic barrier.
  • Monday, July 6 until Tuesday, July 7. 9 p.m. to 5 a.m. Full closure of eastbound mainlanes from Old Fredericksburg Rd. to Ralph Fair Rd. (FM 3351) for milling and overlay work. DETOUR: Take Exit 550, travel on the eastbound frontage road and re-enter eastbound mainlanes at ¼ of a mile east of Ralph Fair Rd.
  • Monday, July 6 until Friday, July 10. 9 p.m. to 5 a.m. Eastbound mainlane closure from Kendall/Bexar County Line to Fair Oaks Parkway for removal of concrete traffic barrier.
  • Tuesday, July 7 until Wednesday, July 8. 9 p.m. to 5 a.m. Full closure of eastbound mainlanes from Ralph Fair Rd (FM 3351) to Dominion Dr. for milling and overlay work. DETOUR: Take Exit 550, travel on the eastbound frontage road and re-enter eastbound mainlanes at ½ of a mile east of Boerne Stage Rd.
  • Wednesday, July 8 until Thursday, July 9. 9 p.m. to 5 a.m. Full closure of eastbound mainlanes from Boerne Stage Rd. to Dominion Dr. for milling and overlay work. DETOUR: Take Exit 552, travel on the eastbound frontage road and re-enter eastbound mainlanes at 1 ½ mile east of Dominion Dr.
  • Sunday, July 12 until Monday, July 13. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from La Cantera Parkway to Camp Bullis Rd. for milling and overlay work. DETOUR: Take Exit 555, travel on the westbound frontage road and re-enter westbound mainlanes at 1 ¼ of a mile west of La Cantera Parkway.
  • Thursday, July 9 until Friday, July 10. 9 p.m. to 5 a.m. Full closure of eastbound mainlanes from Dominion Dr. to La Cantera Parkway for milling and overlay work. DETOUR: Take Exit 554, travel on eastbound frontage road and re-enter eastbound mainlanes at 1 mile east of Camp Bullis Rd.
  • Monday, July 13 until Tuesday, July 14. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Camp Bullis to Dominion Dr. for milling overlay work. DETOUR: Take Exit 552, travel on the westbound frontage road and re-enter westbound mainlanes at ¾ of a mile west of Dominion Dr.
  • Tuesday, July 14 until Wednesday, July 15. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Dominion Dr. to Boerne Stage Rd for milling and overlay work. DETOUR: Take Exit 551, travel on the westbound frontage road and re-enter westbound mainlanes at ¾ mile west of Ralph Fair Rd.
  • Wednesday, July 15 until Thursday, July 16. 9 p.m to 5 a.m. Full closure of westbound mainlanes from Boerne Stage Rd. to Ralph Fair Rd (FM 3351) for milling and overlay work. DETOUR: Take Exit 551, travel on the westbound frontage road and re-enter westbound mainlanes at ¾ of a mile west of Ralph Fair Rd.
  • Thursday, July 16 until Friday, July 17. 9 p.m. to 5 a.m. Full closure of westbound mainlanes from Ralph Fair Rd (FM 3351) to Old Fredericksburg Rd. for milling and overlay work. DETOUR: Take Exit 550, travel on the westbound frontage road and re-enter westbound mainlanes at ¾ mile west of Ralph Fair Rd.  

 

I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County 

  • All mainlane work suspended for the July 4 Independence Day Holiday weekend beginning Friday through Sunday, Work to resume on Monday, July 6.
  • Current until mid-September. Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
  • Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn left on Foster, and take the westbound frontage road to the westbound entrance ramp just west of Foster.
  • Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.

 

I-10 – Central San Antonio

  • None scheduled.

 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Monday, July 6 until Friday, July 10. 9 a.m. to 4 p.m. Northbound frontage road single lane closure from I-35 business turnaround to FM 306 to sidewalk improvements.
  • Monday, July 6 until Friday, July 10. 9 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Guadalupe River bridge to FM 306 bridge for guardrail replacement.

 

I-37 – Central/South San Antonio

  • None scheduled.

 

I-410 – West San Antonio

  • Monday, July 6 until Monday, July 13. 9 a.m. to 3 p.m. Southbound frontage road closure from NW Crossroads to Military Dr. for removal of concrete riprap.
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating northbound frontage road closures from SH-151 to Marbach Rd. for equipment staging.
  • Current until Monday, July 20. 8 p.m. to 5 a.m. Alternating southbound frontage road lane and shoulder closures, including ramps, from SH-151 to Marbach Rd.
  • Monday, July 6 until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from SH-151 to 3 p.m. for equipment staging.
  • Monday, July 6 until Monday, July 13. 9 a.m. to 3 p.m. Alternating frontage road closures, in both directions, from Marbach Rd. to Ingram Rd. for work to retaining wall and underground pipes.
  • Monday, July 6 until Monday, July 13. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for barrier installation.
  • Monday, July 6 until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions from SH-151 to US-90 for equipment staging.

 

US 90 – West San Antonio

  • Monday, July 6 until Friday, July 10. 9 a.m. to 3 p.m. Alternating lane and shoulder closures, in both directions, from W. Military Dr. to SW 36th St. for guardrail and concrete improvements.
  • Monday, July 6 until Friday, July 31. 9 a.m. to 3 p.m. Alternating frontage road lane closures, in both directions, from Hunt Lane to US-90 to allow for equipment staging.
  • Tuesday, July 7 until Thursday, July 9. 9 a.m. to 4 p.m. Eastbound frontage road lane and ramp closure from 500 feet before Loop 410S exit to Loop 410S exit for construction work.
  • Friday, July 10 until Friday, July 24. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from ½ mile before 36th St. to past the 36th St. exit for concrete traffic barrier work.
  • Saturday, July 11. 7 a.m. to 3 p.m. Westbound lane and shoulder closure from ½ mile before 36th St. to just past the 36th St. exit for guard rail work.

 

SH 151 – West San Antonio

 

SH 16 – Bandera Road

  • Monday, July 6 until Friday, July 10. 9:30 a.m. to 3:30 a.m. Alternating lane closures, in both directions, from Bresnahan St. to Braun Rd. for pole and utility installation.

 

FM 471 – Culebra Road

  • None scheduled.

 

FM 3351 – Ralph Fair Road

  • Current until August 7. 9 p.m. to 5 a.m. Alternating lane closures, in both directions, from westbound I-10 frontage road to Bexar/Comal County Line for pavement repairs.

 

PA 1502 – Wurzbach Parkway

  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 3 until Sunday July 5. 9 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from N.W. Military Rd. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 13 until Friday, July 17. 9 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from NW Military Rd. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Monday, July 13 until Friday, July 17. 9 a.m. to 4 p.m. Single lane closure, in both directions, from 0.5 miles from NW Military Dr. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow for construction trucks entering roadway.
  • City of San Antonio/PWD closure for Hardberger Park Land Bridge project. Friday, July 17 until Sunday, July 19. 9 p.m. to 5 a.m. Full closure of mainlanes, in both directions, from NW Military Dr. (FM 1535) to Blanco Rd. (FM 2696) for bridge decking. DETOUR: Traffic should utilize West Ave. and Lockhill Selma Rd.
  • City of San Antonio/PWD closure for Hardberger Park Lane Bridge project. Saturday, July 17 until Sunday, July 19. Single lane closure, in both directions, from 0.5 miles from NW Military Rd. (FM 1535) to 0.25 miles from Blanco Rd. (FM 2696) to allow for construction trucks entering roadway.

 

Loop 13 – S.W. Military Drive

  • Monday, July 6 until Friday, July 10. 7 p.m. to 5 a.m. Alternating lane closures, in both direction from Old Pearsall Rd. to Rockgate Dr. for pavement work.

 

FM 2252 – Nacogdoches Road

  • None scheduled.

 

FM 1560 – Hausman Road

  • Exit ramp from Loop 1604 eastbound closed until further notice starting Monday, March 16.

 

SH 218 – Pat Booker Road

  • Current until Monday, July 6. 9 a.m. to 3 p.m. Eastbound single lane closure at the Pat Booker Rd. bridge to allow for construction work.
  • Wednesday, July 8 until Thursday, July 9. 9 a.m. to 3 p.m. Westbound single lane closure at Pat Booker Rd. bridge to allow for construction work.
  • Friday, July 10 until Monday, July 13. 9 a.m. to 3 p.m. Westbound single lane closure at Pat Book Rd. bridge to allow for construction work.
  • Tuesday, July 14 until Wednesday, July 15. 9 am. to 3 p.m. Closure of southbound to northbound turnaround lane at Pat Booker Bridge to allow for construction work.

 

Spur 371 – General Hudnell Drive

 

FM 78 – Bexar County

  • Monday, July 6 until Friday, July 10. 9:30 a.m. to 3:30 p.m. Single lane closure, in both directions, from Woodlake Parkway to Firestone Parkway for pole and utility installation.

 

US 87 – Roland Avenue

  • None scheduled.

 

Spur 421 – Bandera Road

  • None scheduled.

 

FM 1976 – Walzem Road/Gibbs Sprawl Road

  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
  • Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.

 

Loop 353 – New Laredo Highway

  • None scheduled.

 

SS 371 – General Hudnell Drive

  • None scheduled.

 

Other Roads – Bexar County

  • Marbach Rd. Monday, July 6 until Friday, July 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Marbach Rd. and Loop 410 intersection for equipment staging.
  • Marbach Rd. Tuesday, July 7 until Saturday, July 18. 8 p.m. to 5 a.m. Alternating lane closures, in both directions at Marbach Rd and Loop 410 intersection for equipment staging.
  • Borgfeld Rd. Monday, July 13 until Friday, July 14. 9 p.m. to 5 a.m. Full street closure of Borgfeld Rd., in both directions, from US-281 to Bulverde Rd for construction work.

 

FM 306 – New Braunfels/Comal County

  • None scheduled.

 

Loop 337 – New Braunfels/Comal County

  • None scheduled.

 

TX 46/FM 311 – Comal County

  • None scheduled.

 

FM 1863 – Comal County

  • None scheduled.

 

FM 2673 – Canyon Lake/Comal County

  • None scheduled.

 

FM 1516 – South Seguin Road/Converse

  • None scheduled.

 

FM 2252 – Comal County

  • None scheduled.

 

SH 46 – Guadalupe County

  • None scheduled.

 

FM 78 – Guadalupe County

  • None scheduled.

 

FM 1518 – Schertz/Cibolo Guadalupe County

  • None scheduled.

 

US 90A – Seguin/Guadalupe County

  • None scheduled.

 

SH 123 – Seguin/Guadalupe County

  • None scheduled.

 

Business 123 – South Austin Street/Seguin/Guadalupe County

  • None scheduled.

 

I-35 – Atascosa County/Frio County

  • None scheduled.

 

US 181 – Floresville/Wilson County

  • None scheduled.

 

US 87 – Wilson County

  • None scheduled.

 

SH 46 – Boerne/Kendall County

  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).

 

RM/FM 1376 – Kendall County

  • None scheduled.

 

RM 474 – Blanco Road/Kendall County

  • None scheduled

 

FM 1333 – Atascosa County

  • None scheduled.

 

FM 140 – Atascosa County

  • None scheduled.

 

SH 16 – McMullen County

  • None scheduled.

 

FM 3009 – Comal County

  • Monday, July 6 until Friday, July 10. 6 p.m. to 6 a.m. Single lane closures, in both directions, from I-35 to FM 78 for intersection improvements.

 

I-10 – Kerr County

  • Current until Wednesday, July 8. Daylight to Dusk. Single mainlane closure, in both directions, from approximately one (1) mile west of Midway Road to Kerr/Kimble County Line to complete hot mix overlay.

 

FM 1044 – Comal County

  • Monday, July 6  until Friday, July 10. 7 a.m. to 7 p.m. Southbound single lane closure from just south of Lou Ann Dr. to south of the county line for roadway repairs.