Monday, August 10

New Flyover Ramps at US-281 and Loop 1604 Set to Open

Get ready for a smoother commute as two new flyover ramps at the US 281 and Loop 1604 interchange are set to open to traffic. Scheduled for the weekend of August 15, the two new flyover ramps will offer drivers a seamless and direct connection from the southbound mainlanes of US 281 to the east- and westbound mainlanes of Loop 1604.

These new flyover ramps mark a major milestone on Segment 1 of the US-281N Expansion project, designed to improve traffic flow and reduce congestion on the most congested corridor in the San Antonio area.

The addition of these flyover ramps will allow for seamless travel on six of the eight ramps planned for the US 281 and Loop 1604 interchange. The remaining two ramps are scheduled to open by the end of 2021.

Please note that construction is weather permitting and subject to change.

You can stay informed of lane closures by receiving alerts to your e-mail by registering here or by following us on our Twitter feed.