Loop 1604 – North West San Antonio/Bexar County

  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Kyle Seale Parkway to Bandera Road (SH 16) for bridge construction: caps, beams and rail demo.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Full closure of Hausman Road at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Sunday, March 27 until Friday, April 8. Weeknights 9 p.m. until 5 a.m. Full closure of Kyle Seale Parkway at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Monday, April 4 until Thursday, April 7. Weeknights 9 p.m. until 5 a.m. Full closure of Babcock Road at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 3 p.m. Westbound frontage road outside lane closure from IH-10 to Hausman Road for high mast illumination.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road outside lane closure from Hausman Road to John Peace Boulevard /La Cantera Parkway for sidewalk construction.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, March 28 until Monday, April 11. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Friday, March 25 until Monday, April 4. Weekends only 9 p.m. until 5 a.m. Northbound La Cantera Parkway/John Peace Boulevard full closure at the Loop 1604 intersection for storm drains.
  • Friday, April 1 at 9 p.m. until Saturday, April 2 at 12 p.m. Full closure of Hausman Road at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Friday, April 1 at 9 p.m. until Saturday, April 2 at 12 p.m. Eastbound mainlane inside lane closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction.
  • Saturday, April 2. 9 a.m. until 2 p.m. Westbound outside mainlane closure from 1000 feet before the Babcock Road exit ramp to 500 feet after the Babcock Road exit, including the Babcock Road exit ramp, for crash cushion repair. Drivers should exit the La Cantera exit and continue on the westbound frontage road to Babcock Road. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, April 3 until Friday, April 8. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, April 3 until Friday, April 8. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, April 3 until Friday, April 8. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road closure from Country Club Lane/West Blanco Road to Huebner Road for utility crossings.
  • Sunday, April 3 until Friday, April 8. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road closure from Huebner Road to Country Club Lane/West Blanco Road for utility crossings.
  • Sunday, April 10 7 a.m. until 4 p.m. Temporary full closure of Loop 1604 eastbound and westbound mainlanes and frontage roads from 1000 feet east of Blanco Road to 100 feet west of Blanco Road for utility work. Traffic will be stopped while wire is pulled across the lanes and raised, then will be allowed to proceed. There will be approximately 9 stops.
  • Sunday, April 24 7 a.m. until 4 p.m. Temporary full closure of Loop 1604 eastbound and westbound mainlanes and frontage roads from 1000 feet east of Blanco Road to 100 feet west of Blanco Road for utility work. Traffic will be stopped while wire is pulled across the lanes and raised, then will be allowed to proceed. There will be approximately 5 stops. 

Loop 1604 – North East San Antonio/Bexar County

  • Wednesday, April 6 until Thursday, April 7. 9 p.m. to 5 a.m. Westbound clover ramp closure to I-35 southbound for geotechnical and drilling work. Traffic on Loop 1604 westbound will take Lookout Road exit and make a U-turn to Loop 1604 eastbound to I-35 southbound.

US 281 – North San Antonio/Bexar County

  • Wednesday, April 6. 8 p.m. to 5 a.m. Full closure of Bulverde Rd. at US 281 for bridge work.
  • Monday, April 11. 8 p.m. to 5 a.m. Full closure of Wilderness Oak at US 281 for bridge work.
  • Wednesday, April 13. 8 p.m. to 5 a.m. Full closure of Marshall Rd. at US 281 for bridge work. 

I-10 – East San Antonio/Bexar County/Seguin/Guadalupe County 

  • Monday, April 4 until Thursday, April 14. Westbound exit ramp to FM 1518 closed for drainage work. Traffic will be diverted to exit at FM 2538.
  • Current until further notice. Graytown Road closed at I-10. DETOURS: Graytown Road traffic may use the frontage road and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, April 3 until Monday, April 4. 9 p.m. to 5 a.m. Southbound exit ramp for O’Connor Road (169) for geotechnical and drilling work. Traffic should use the Weidner exit ramp (168). Follow the detour signs.
  • Sunday, April 3 until Tuesday, April 5. 9 p.m. to 5 a.m. Northbound entrance ramp from O’Connor Road and single frontage road lane closure from O’Connor Road to Bladau Bishop for geotechnical and drilling work. Traffic should use the Toepperwein Road entrance ramp. Follow the detour signs.
  • Sunday, April 3 until Thursday, April 7. 9 p.m. to 5 a.m. Northbound clover ramp closure to Loop 1604 westbound for geotechnical and drilling work. Traffic on the I-35 northbound frontage road will make a U-turn at Forum Parkway to southbound frontage road to westbound Loop 1604. Follow the detour signs.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Northbound exit ramp (171) closure from Pat Booker Road and single lane closure on northbound frontage road from Toepperwein Road to Shin Oak Road for geotechnical and drilling work. Drivers must use the Toepperwein Road exit (170B).
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Northbound frontage road closure from Phoenix Avenue intersection to Forum Parkway intersection for geotechnical and drilling work. Traffic should use the Loop 1604 westbound to I-35 northbound. Follow the detour signs.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Northbound exit ramp (173) for Olympia Parkway and single frontage road lane closure from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic should use the Anderson Loop exit ramp (172). Follow the detour signs.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Northbound exit ramp (174A) and single lane closure from FM 1518 exit ramp to Pasatiempo for geotechnical and drilling work. Traffic should use the Olympia Parkway exit ramp (173). Follow the detour signs.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Single southbound mainlane closure from Fratt Road to Walzem Road for geotechnical and drilling work.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Single southbound mainlane closure from Fratt Road to Windcrest Drive for geotechnical and drilling work.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Single northbound mainlane closure on from Chelsea Place to Plaza Drive for geotechnical and drilling work.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Single southbound mainlane closure from Forum Parkway to McMorris Boulevard for geotechnical and drilling work.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Single northbound mainlane closure from Forum Parkway to McMorris Boulevard for geotechnical and drilling work.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Turnaround from south to northbound frontage road between FM 1518 and Chelsea Place for geotechnical and drilling work.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Double lane closure on northbound frontage road of I-35 from Bomar Lane to Judson Road for geotechnical and drilling work.
  • Sunday, April 3 until Friday, April 8. 9 p.m. to 5 a.m. Single lane closure on the northbound frontage road between Manchester United Road and North Weidner Road (including the northbound-to-southbound turnaround at North Weidner Road) for geotechnical and drilling work. All traffic will use the traffic signals to make the U-turn.
  • Monday, April 4 until Tuesday, April 5. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Toepperwein Road to Albrecht Lane for utility potholing.
  • Monday, April 4 until Tuesday, April 5. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Toepperwein Road to Judson Road for utility pothole.
  • Monday, April 4 until Wednesday, April 6. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Toepperwein Road to southbound Judson Road entrance ramp for wall investigation. 
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road from Forum Parkway to Old Austin Road for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road of from O’Connor Road to Bladau Bishop for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Pasatiempo Road to Valhalla Road for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Chelsea Place to Legacy Oaks Parkway for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Legacy Oaks Parkway to Schertz Parkway for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Schertz Parkway to Plaza Drive for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Fratt Road to Walzem Road for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Pat Booker Road to southbound Loop 1604 for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from Forum Parkway to McMorris Boulevard for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on southbound frontage road of I-35 from O’Connor Road to Thousand Oaks Drive for geotechnical and drilling work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 5:30 p.m. Single northbound frontage road lane from FM 2252 to Schwab Rd. for sidewalk and handrail work.
  • Tuesday, April 5 until Wednesday, April 6. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Judson Road to Crownpoint Drive for utility potholing.
  • Tuesday, April 5 until Thursday, April 7. 9 p.m. to 5 a.m. Southbound clover ramp closure to Loop 1604 eastbound for geotechnical and drilling work. Traffic on the I-35 southbound frontage road will make a U-turn at I-35 Access Road to northbound frontage road to eastbound Loop 1604. Follow the detour signs.
  • Wednesday, April 6 until Thursday, April 7. 9 a.m. to 4 p.m. Single lane closure on the northbound frontage road from O’Connor Road to Judson Road for utility potholing.
  • Thursday, April 7 until Thursday, April 7. 9 a.m. to 4 p.m. Shoulder closure on southbound-to-northbound turnaround at Thousand Oaks Drive for wall investigation.
  • Friday, April 8 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from Crownpoint Drive to O’Connor Road for utility potholing.
  • Friday, April 8 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road from O’Connor Road to Tech Com Drive for utility potholing.
  • Friday, April 8 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closure on the southbound frontage road between Whirlwind Drive andI-410 Loop westbound frontage road for utility potholing. 

I-410 – North East San Antonio

  • Sunday, April 3 until Tuesday, April 5. 9 p.m. to 5 a.m. Eastbound entrance ramp closure between Perrin Beitel and I-410 for geotechnical and drilling work. Traffic should use Austin Highway to I-35 for entrance ramp. Follow the detour signs.
  • Friday, April 8 until Friday, April 8. 9 a.m. to 4 p.m. Shoulder closure on the access road at Randolph Boulevard under the southbound I-35 main lane overpass for utility potholing. 

I-410 – East San Antonio

  • Continuing through Monday, April 11. DAYTIME alternating northbound I-410 lane closures between Houston Street and I-10 as well as I-10 EB between I-410 and Ackerman Road from 9 a.m. to 5 p.m. each day for detour work. 
  • Continuing through Monday, April 11. NIGHTTIME northbound I-410 left lane closures between Rigsby Avenue and I-10 from 9 p.m. to 5 a.m. on Monday through Thursday nights for barrier work. (No weekend work). 

I-410 – West San Antonio

  • Current until Monday, April 4. 8 p.m. to 5 a.m. Alternating mainlane closures from Marbach Rd. to Ingram Rd. for painting operations.
  • Current until Monday, April 4. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Meadow Breeze Dr. to SH 151 for barrier removal.
  • Current until Monday, April 4. 9 a.m. to 5 p.m. Full closure of the southbound bypass ramp to W. Military Dr. for construction operations.
  • Current until Monday, April 4. 9 p.m. to 5 a.m. Full closure of the southbound bypass rap to Marbach Rd. closed for painting operations.
  • Current until Monday, April 4. 9 a.m. to 3 p.m. Single southbound lane closure from W. Military Dr. to SH 151 for concrete work.
  • Current until Monday, April 4. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd. for concrete work.
  • Current until Monday, April 4. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for signal work.
  • Monday, April 4 until Monday, April 11. 9 a.m. to 3 p.m. Alternating westbound mainlane closures from W. Military Dr. to Ingram Rd. for pipe work.
  • Monday, April 4 until Monday, April 11. 8 a.m. to 5 p.m. Alternating closures of the turnarounds at Culebra Rd. for concrete work.
  • Monday, April 4 until Monday, April 11. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for signal work.
  • Monday, April 4 until Monday, April 11. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations. 

I-410 – Southwest San Antonio

  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

US 90 – West San Antonio/Bexar County

  • Monday, April 4 until Friday, April 8. 9 p.m. to 5 a.m. Full closure of the mainlanes at Montgomery Rd. for bridge work. Traffic will be diverted to frontage roads. 

SH 151 – West San Antonio

  • Monday, April 4 until Monday, April 11. 8 p.m. to 5 a.m. Full alternating mainlane closures, in both directions, at Loop 410 for bridge work. 

PA 1502 – Wurzbach Parkway

  • Sunday, April 3. 9 p.m. to 5 a.m. Full closure of the eastbound lanes from N.W. Military Highway to Blanco Rd. for sign removal.
  • Monday, April 4. 9 a.m. to 3 p.m. Various lane closures at the Blanco Rd. intersection for pothole and bore work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 3 p.m. Single westbound lane closure near Vista Del Norte for electrical work.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single eastbound lane closure at N.W. Military Highway intersection for material haul-off.
  • Monday, April 4 until Friday, April 8. 9 a.m. to 4 p.m. Single lane closures, in both directions, at Lockhill Selma Rd. for island work. 

Loop 337 – Comal County

  • Monday, April 4 until Friday, April 8. 8 a.m. to 5 p.m. Single northbound lane closure at River Rd. for bridge work. 

SH 123 – Guadalupe County

  • Current until Friday, April 15. 7 a.m. to 5 p.m. Single lane closures, in both directions, from Wilson County Line to 5 miles north of Wilson County Line for paving operations.    

I-10 – Kendall County

  • Current until Spring 2022. Full closure of the eastbound frontage road from Menger Springs to US 87 (Main St.) for road construction.