Friday, April 22

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

 


Loop 1604 – North West San Antonio/Bexar County

  • Sunday, April 10 until Friday, April 22. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, April 10 until Friday, April 22. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, April 10 until Friday, April 22. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, April 10 until Friday, April 22. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, April 10 until Friday, April 22. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Bandera Road (SH 16) to Kyle Seale Parkway for bridge construction: caps, beams and rail demo.
  • Sunday, April 10 until Friday, April 22. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Kyle Seale Parkway to Bandera Road (SH 16) for bridge construction: caps, beams and rail demo.
  • Sunday, April 10 until Friday, April 22. Weeknights 9 p.m. until 5 a.m. Full closure of Hausman Road at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Sunday, April 10 until Friday, April 22. Weeknights 9 p.m. until 5 a.m. Full closure of Kyle Seale Parkway at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Sunday, April 10 until Friday, April 22. Weeknights 9 p.m. until 5 a.m. Full closure of Babcock Road at the Loop 1604 intersection, including turnarounds, for bridge construction.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Hausman Road to John Peace Boulevard /La Cantera Parkway for sidewalk construction.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 5 p.m. eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 5 p.m. westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, April 11 until Monday, April 25. Weekdays 9 a.m. until 3 p.m. westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, April 24 until Thursday, April 28. 9 p.m. until 5 a.m. Westbound mainlane full closure from Lockhill Selma exit ramp to IH-10 for overhead sign bridge removal. Traffic should follow the detour signs.
  • Sunday, April 24 until Friday, April 29. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, April 24 until Friday, April 29. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, April 24 until Friday, April 29. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from IH-10 to NW Military Highway for MGBF removal and re-striping.
  • Sunday, April 24 until Friday, April 29. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from NW Military Highway to IH-10 for MGBF removal and re-striping.
  • Sunday, April 24 until Friday, April 29. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from the Blanco Road exit ramp to the Blanco Road intersection for re-striping.
  • Sunday, April 24 until Friday, April 29. Nightly 9 p.m. until 5 a.m. Short-term full closure of NW Military Highway at the Loop 1604 intersection, including turnarounds, for temporary illumination installation. Anticipated 2-hour closures.
  • Sunday, April 24 until Friday, April 29. Nightly 9 p.m. until 5 a.m. Eastbound frontage road left lane closure from the Lockhill Selma Road entrance ramp to the NW Military Highway exit ramp for temporary illumination installation.
  • Sunday, April 24 until Friday, April 29. Nightly 9 p.m. until 5 a.m. Westbound frontage road left lane closure from the NW Military Highway exit ramp to the Lockhill Selma Road entrance ramp for temporary illumination installation.
  • Monday, April 25 until Friday, April 29. Weekdays 9 a.m. until 3 p.m. eastbound to westbound turnaround closure at Loop 1604 and Lockhill Selma Road for concrete removal and traffic signal work.
  • Sunday, April 24 7 a.m. until 4 p.m. Temporary full closure of Loop 1604 eastbound and westbound mainlanes and frontage roads from 1000 feet east of Blanco Road to 100 feet west of Blanco Road for utility work. Traffic will be stopped while wire is pulled across the lanes and raised, then will be allowed to proceed. There will be approximately 5 stops. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, April 24 until Friday, April 29. 8 p.m. to 5 a.m. Single westbound mainlane closure from Pat Booker Road to Gateway Boulevard for geotechnical and drilling work.
  • Sunday, April 24 until Friday, April 29. 8 p.m. to 5 a.m. Single westbound mainlane between northbound I-35 and Gateway Boulevard for geotechnical and drilling work. 

US 281 – North San Antonio/Bexar County

  • Friday, April 29. 10 p.m. to 12 pm. Full closure of the Borgfeld Rd. intersection for bridge work.
  • Friday, May 13. 10 p.m. to 12 p.m. Full closure of Wilderness Oak intersection for bridge work.
  • Saturday, April 23 until Monday, April 25. Weekend Continuous 7 a.m. until 5 a.m. Alternating northbound mainlane closure from Thousand Oaks Drive to Stone Oak Parkway for camera work.
  • Saturday, April 23 until Monday, April 25. Weekend Continuous 7 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Thousand Oaks Drive for camera work.
  • Monday, April 25 until Thursday, April 28. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Monday, April 25 until Thursday, April 28. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Monday, April 25 until Friday, April 29. Continuous 9 a.m. until 3 p.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for signage installation and lane striping.
  • Monday, April 25 until Friday, April 29. Continuous 9 p.m. until 3 p.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for signage installation and lane striping.
  • Tuesday, April 26 until Wednesday, April 27. 8 p.m. to 5 a.m. Single northbound lane closure from Larson Rd. to Bulverde Rd. for striping operations.
  • Tuesday, April 26 until Wednesday, April 27. 9 p.m. to 5 a.m. Full closure of the Wilderness Oak intersection for signal work 

I-10 – North West San Antonio/Bexar County

  • Sunday, April 24. 7 a.m. to 2 p.m. Full mainlane closures, in both directions, from Camp Bullis Rd. to La Cantera Parkway for utility work. Intermittent closures will take place throughout the day in 15-minute intervals. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Friday, April 22 until Saturday, April 23. 9 p.m. to 5 a.m. Single lane closure in both directions from FM 306 to Parkway bridge for metal beam guardrail fence work.
  • Friday, April 22 until Monday, April 5. 8:30 p.m. to 5 a.m. Single lane closure on the northbound frontage road from south of FM 306 to north of FM 306 for sign work.
  • Sunday, April 24 until Friday, April 29. 8 p.m. to 5 a.m. Northbound exit ramp (173) to Olympia Parkway and single lane closure on the frontage road from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic should use the Anderson Loop exit ramp (172). Follow the detour signs.
  • Sunday, April 24 until Friday, April 29. 8 p.m. to 5 a.m. Single southbound mainlane closure from Forum Parkway to Pat Booker Road for geotechnical and drilling work.
  • Sunday, April 24 until Friday, April 29. 8 p.m. to 5 a.m. Single northbound mainlane closure from Pat Booker Road to Forum Parkway for geotechnical and drilling work.
  • Sunday, April 24 until Friday, April 29. 8 p.m. to 5 a.m. Northbound clover ramp closure to Loop 1604 westbound for geotechnical and drilling work. Traffic on the I-35 northbound frontage road will make a U-turn at Forum Parkway to southbound frontage road to westbound Loop 1604. Follow the detour signs.
  • Sunday, April 24 until Friday, April 29. 8 p.m. to 5 a.m. Southbound clover ramp closure to Loop 1604 eastbound for geotechnical and drilling work. Traffic on the I-35 southbound frontage road will make a U-turn at I-35 access road to northbound frontage road to eastbound Loop 1604. Follow the detour signs.
  • Sunday, April 24 until Friday, April 29. 8 p.m. to 5 a.m. Single lane closure on the northbound frontage road between Manchester United Road and North Weidner Road (including the northbound-to-southbound turnaround at North Weidner Road) for geotechnical and drilling work. All traffic will use the traffic signals to make the U-turn.
  • Monday, April 25 until Wednesday, April 27. 8 a.m. to 5 p.m. Shoulder closure on northbound frontage road from Crestway to Thousand Oaks Drive for utility pothole work.
  • Monday, April 25 to Wednesday, April 27. 8 a.m. to 5 p.m. Shoulder closure on southbound frontage road from Whirlwind Drive to Perrin Creek Road for utility pothole work.
  • Monday, April 25 until Friday, April 29. 8 a.m. to 5 p.m. Single lane closure on northbound frontage road from Pat Booker Road to southbound Loop 1604 for geotechnical and drilling work.
  • Monday, April 25 to Friday, April 29. 8 a.m. to 5 p.m. Shoulder closure on southbound frontage road from North Weidner Road to Thousand Oaks Drive for utility pothole work.
  • Monday, April 25 until Friday, April 29. 8 a.m. to 5 p.m. Single lane closure on the southbound frontage road from Judson Road to O’Connor Road for geotechnical and drilling work.
  • Monday, April 25 until Friday, April 29. 8 a.m. to 5 p.m. Single lane closure on the southbound frontage road of I-35 from O’Connor Road to Thousand Oaks Drive for geotechnical and drilling work.
  • Monday, April 25 until Friday, April 29. 8 a.m. to 5 p.m. Shoulder closure on the southbound frontage road from Forum Parkway to Old Austin Road for utility pothole work.
  • Monday, April 25 until Friday, April 29. 8 a.m. to 5 p.m. Double lane closure on northbound frontage road from Shin Oak Drive to Pat Booker Road for geotechnical and drilling work.
  • Monday, April 25 until Friday, April 29. 8 p.m. to 5 a.m. Northbound entrance ramp closure from Toepperwein Road for geotechnical and drilling work. Traffic should use Loop 1604 entrance ramp. Follow the detour signs.
  • Monday, April 25 until Friday, April 29. 8 a.m. to 5 p.m. Single lane closure on the northbound frontage road from Pat Booker Road to southbound Loop 1604 for geotechnical and drilling work.
  • Monday, April 25 until Friday, April 30. 8 p.m. to 5 a.m. Single lane closure in both directions from FM 306 to Parkway bridge for metal beam guardrail fence work.
  • Monday, April 25 until Saturday, April 30. 9 a.m. to 5:30 p.m. Single northbound frontage road lane from FM 2252 to Schwab Rd. for riprap and handrail work.
  • Monday, April 25 until Saturday, April 30. 9 a.m. to 5:30 p.m. Single southbound frontage road lane from Schwab Rd. to FM 1103 for rip rap work.
  • Wednesday, April 27 until Friday, April 29. 8 a.m. to 5 p.m. Single lane closure on southbound frontage road from Forum Parkway to Old Austin Road for utility pothole work. 

I-410 – North East San Antonio

  • Sunday, April 24 until Friday, April 29. 8 p.m. to 5 a.m. Eastbound entrance ramp closure between Perrin Beitel Road and I-35 for geotechnical and drilling work. Traffic should use Austin Highway to I-35 for entrance ramp. Follow the detour signs.
  • Sunday, April 24 to Friday, April 29. 8:00 p.m. to 5 a.m. Single westbound lane closure from Perrin Creek Road and Austin Highway for geotechnical and drilling work.
  • Monday, April 25 to Friday, April 29. 8:00 a.m. to 5 p.m. Single lane closure on the westbound frontage road from Perrin Creek Road and Perrin Beitel Road for geotechnical and drilling work. 

I-410 – East San Antonio

  • Continuing through Saturday, April 23. NIGHTTIME alternating northbound I-410 closures between I-10 and Rigsby Avenue from 9 p.m. to 5 a.m. for barrier and striping work.
  • Continuing through Monday, May 9. NIGHTTIME northbound I-410 left lane closures between Rigsby Avenue and I-10 from 9 p.m. to 5 a.m. on Monday through Thursday nights for barrier work. (No weekend work).
  • Continuing through May 9. DAYTIME alternating northbound I-410 lane closures between Houston Street and I-10 as well as I-10 EB between I-410 and Ackerman Road from 9 a.m. to 5 p.m. each day for detour work. 
  • Continuing through Monday, May 9. NIGHTTIME alternating southbound I-410 closures between I-10 and Rigsby Avenue from 9 p.m. to 5 a.m. for barrier and striping work. 

I-410 – West San Antonio

  • Monday, April 25 until Monday, May 9. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Ingram Rd. for painting operations.
  • Monday, April 25 until Monday, May 9. 8 p.m. to 5 a.m. Full northbound mainlane closure from US 90 to W. Military Dr. mill and overlay work.
  • Monday, April 25 until Monday, May 9. 8 a.m. to 5 p.m. Alternating closures of the turnarounds, in both directions, at Culebra Rd. for curb work.
  • Monday, April 25 until Monday, April 9. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Bandera Rd. for signal work. 

I-410 – Southwest San Antonio

  • Current until September 2022. Northbound frontage road turnaround to southbound frontage road closed at Medina Base Rd. 

SH 151 – West San Antonio

  • Monday, April 25 until Monday, May 9. 8 p.m. to 5 a.m. Full alternating mainlane closures at Loop 410 for painting operations.
  • Monday, April 25 until Monday, May 9. 9 a.m. to 3 p.m. Single westbound mainlane closure from W. Military Dr. to Ingram Rd. for pipe work. 

PA 1502 – Wurzbach Parkway

  • Monday, April 25 until Friday, May 6. 9 a.m. to 4 p.m. Single westbound lane closure at the Lockhill Selma Rd. intersection for island work.
  • Monday, April 25 until Friday, May 6. 9 a.m. to 4 p.m. Single eastbound lane closure at the Lockhill Selma Rd. intersection for island work.
  • Monday, April 25 until Friday, May 6. 9 a.m. to 4 p.m. Single westbound lane closure at the N.W. Military Highway intersection for pavement operations.
  • Monday, April 25 until Friday, May 6. 9 a.m. to 3 p.m. Various lane closures, in both directions, at West Ave. for pothole work.
  • Monday, April 25 until Wednesday, April 27. 9 a.m. to 3 p.m. Single lane closures, in both directions, from US 281 to Weidner Rd. for metal beam guard fence work.
  • Tuesday, April 26 until Thursday, April 28. 9 p.m. to 5 a.m. Various lane closures, in both directions, at Lockhill Selma Rd. for signal work. 

FM 1535 – N.W. Military Highway

  • Monday, April 25 until Friday, May 6. 9 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for pavement operations.
  • Monday, April 25 until Friday, May 6. 9 a.m. to 4 p.m. Single northbound lane closure at the Wurzbach Parkway intersection for pavement operations.
  • Tuesday, April 26 until Thursday, April 28. 9 p.m. to 5 a.m. Various southbound lane closures at Wurzbach Parkway intersection for signal work. 

Lockhill Selma Road – Bexar County

  • Monday, May 25 until Friday, May 6. 9 a.m. to 4 p.m. Singe northbound lane closure at the Wurzbach Parkway intersection for island work.
  • Monday, April 25 until Friday, May 6. 9 a.m. to 4 p.m. Single southbound lane closure at the Wurzbach Parkway intersection for curb work.
  • Tuesday, April 26 until Thursday, April 28. 9 p.m. to 5 a.m. Various lane closures, in both directions, at Wurzbach Parkway for signal work. 

SH 181 – Bexar County

  • Current until Saturday, April 30. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from I-37 to the Wilson County Line for roadway repairs. 

FM 306 – Comal County

  • Sunday, April 24 until Monday, April 25. 8:30 p.m. until 5 a.m. Various lane closures in both directions at I-35 for traffic signal modifications and signage. 

I-10 – Kendall County

  • Current until Spring 2022. Full closure of the eastbound frontage road from Menger Springs to US 87 (Main St.) for road construction. 

I-37 – Atascosa County

  • Monday, April 25 until Thursday, April 28. 9 a.m. to 5 p.m. Single northbound mainlane closure at the Atascosa River for bridge work.