Friday, July 22

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, July 17 until Friday, July 29. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, July 17 until Friday, July 29. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, July 17 until Friday, July 29. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, July 17 until Friday, July 29. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, July 17 until Friday, July 29. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Sunday, July 17 until Friday, July 29. Weeknights 9 p.m. until 5 a.m. Eastbound to westbound turnaround closure left inside lane at the Loop 1604 intersection at Bandera Road (SH 16) for bridge widening construction. Traffic will utilize the existing signalized intersection.
  • Sunday, July 17 until Friday, July 29. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams & rail demo.
  • Sunday, July 17 until Friday, July 29. Weeknights 9 p.m. until 5 a.m. Eastbound mainlane full closure from Kyle Seale Parkway to Chase Hill Boulevard for bridge construction.
  • Sunday, July 17 until Friday, July 29. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, July 18 until Friday, July 29. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Sunday, July 24 only. Nightly closure 9 p.m. until 5 a.m. Full closure of Bandera Road (SH 16) at the Loop 1604 intersection, both directions, including turnarounds for bridge construction.
  • Friday, July 22 at 9 p.m. until Monday, August 1 at 5 a.m. Weekends (Friday – Monday) Only. Eastbound mainlane entrance ramp full closure from La Cantera Parkway for storm drainage. Traffic will continue on the Loop 1604 eastbound frontage road to the IH-10 interchange. 

Loop 1604 – North Central San Antonio/Bexar County

  • Monday, July 25 until Friday, July 29. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Monday, July 25 until Friday, July 29. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Monday, July 25 until Friday, July 29. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Monday, July 25 until Friday, July 29. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Sunday, July 24 until Friday, July 29. Nightly 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and NW Military Highway for drilling shafts.
  • Monday, July 25 until Friday, July 29. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround full closure at Loop 1604 and Lockhill Selma Road for concrete
  • island demo and temporary traffic signal work.
  • Monday, July 25 until Friday, July 29. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround short term full closure at Loop 1604 and NW Military Highway for concrete placement and drill shafts.
  • Thursday, July 21 until Sunday, July 31. Weekdays/Weeknights 12 a.m. until 12 a.m. eastbound to westbound turnaround full closure at Loop 1604 and NW Military Highway for bridge widening construction.
  • Sunday, July 24 until Monday, July 25 from 9:00 p.m. until 5:00 a.m. Eastbound mainlane full closure from IH-10 to Lockhill Selma Road for OSB removal. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Multiple lane closures on westbound Loop 1604 frontage road from Lookout Road to Nacogdoches Road for geotechnical and drilling work.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Eastbound to westbound turnaround closure at Lookout Road for geotechnical and drilling work. Traffic will use the traffic signals at Lookout Road intersection to access westbound Loop 1604.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Right lane closure of Loop 1604 frontage road eastbound to westbound turnaround from Nacogdoches Road to Union Pacific Railroad for geotechnical and drilling work.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Left lane closure on Loop 1604 frontage road turnaround from Lookout Road to Union Pacific Railroad for geotechnical and drilling work.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m.  Alternating lane closures for westbound Loop 1604 entrance ramp and eastbound-to-westbound turnaround from Lookout Road to Union Pacific Railroad for striping and barrier work.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound Loop 1604 frontage road between Gateway Boulevard to Lookout Road for striping and barrier work.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Multiple lane closures on westbound Loop 1604 frontage road bypass between Union Pacific Railroad and Nacogdoches Road for striping and barrier work.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on Loop 1604 frontage road eastbound to westbound turnaround between Nacogdoches Road and Union Pacific Railroad for striping and barrier work.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on Loop 1604 frontage road westbound to eastbound turnaround between Lookout Road and Union Pacific Railroad for striping and barrier work.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Loop 1604 between Nacogdoches Road and I-35 for striping and barrier work.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound Loop 1604 between I-35 and Nacogdoches Road for striping and barrier work.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Left lane closure on Loop 1604 frontage road and entrance ramp to Loop 1604 between Nacogdoches Road and Union Pacific Railroad for striping and barrier work. Traffic must continue on eastbound frontage road bypass to access Loop 1604.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Loop 1604 bypass frontage road ramp to Lookout Road for striping and barrier work.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 frontage road exit ramp closure from IKEA-RBFCU Parkway to Lookout Road for striping and barrier work. Traffic must use Lookout Road Exit.
  • Sunday, July 24 until Saturday, July 30. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 entrance ramp closure from Union Pacific Railroad to Nacogdoches Road  for striping and barrier work. Traffic must use the next entrance ramp and follow the detour signs.
  • Monday, July 25 until Sunday, July 31 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Loop 1604 frontage road from Nacogdoches Road to Union Pacific Railroad for barrier work. 

US 281 – North San Antonio/Bexar County

  • Monday, July 25 until Thursday, August 4. 9 p.m. to 5 a.m. Wilderness Oak and Overlook Parkway intersection closed for bridge work. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, July 24 until Tuesday, July 26. 9 p.m. to 5 a.m. Alternating northbound mainlanes and ramps from Guadalupe River to FM 306 for paving work.
  • Sunday, July 24 until Thursday, July 28. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 and left lane closure on southbound frontage road of I-35 from Judson Road to O’Connor Road for sign and barrier work.
  • Sunday, July 24 until Thursday, July 28. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35, left lane closure on southbound frontage road and closure of southbound I-35 entrance ramp from Pat Booker Road to Ferrell Road for barrier work.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. FM 1518 exit ramp (exit 174A) closure on northbound I-35 and left lane closure on northbound frontage road of I-35 from exit 174A to Pasatiempo for geotechnical and drilling work. Traffic must follow the detour signs.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35, Pat Booker Road exit ramp closure, and left lane closure on northbound frontage road of I-35 from Toepperwein Road to Shin Oak Road for geotechnical and drilling work. All traffic must exit Toepperwein Road (exit 170B) and follow the signs.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Left lane closure on I-35 northbound frontage road from Pat Booker Road to Loop 1604 for geotechnical and drilling work.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Right lane closure of southbound I-35 connector ramp from IKEA-RBFCU Parkway to McMorris Boulevard for geotechnical and drilling work.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Northbound-to-southbound turnaround closure at Thousand Oaks Drive for geotechnical and drilling work. Traffic will use the traffic signals at Thousand Oaks intersection to access southbound I-35 frontage road.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Right shoulder closure on northbound I-35 connector ramp from Loop 1604 to Forum Parkway for geotechnical and drilling work.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 from Chelsea Place to Schertz Parkway for geotechnical and drilling work.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Olympia Parkway exit ramp (exit 173) closure on northbound I-35 and left lane closure on northbound frontage road of I-35 from Forum Access to Olympia Parkway for geotechnical and drilling work. Traffic must use the Loop 1604 exit ramp (exit 172) and follow the detour signs.
  • Sunday, July 24 until Friday, July 29. 9:00 p.m. to 5:00 a.m. Left lane closure on northbound frontage road of I-35 from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Monday, July 25 until Thursday, July 28. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 and left lane closure on southbound frontage road of I-35 between Judson Road and O’Connor Road for barrier and sign work.
  • Monday, July 25 until Thursday, July 28. 9:00 p.m. to 5:00 a.m. Multiple lane closures on southbound I-35 between Judson Road and O’Connor Road for striping and barrier work.  

I-10 – East San Antonio/Bexar County

  • Monday, July 25 until Tuesday, July 26. 8:30 p.m. to 5:30 a.m. Full eastbound mainlane closure at FM 1518 for bridge work.
  • Monday, July 25 until Thursday, July 28. 9 p.m. to 5 a.m. Full eastbound mainlane closure from FM 1516 to Weichold Rd. for bridge work.
  • Wednesday, July 20 to Saturday, August 20. I-10 EB exit to Ackerman closed continuously for overpass work. Detour: Eastbound I-10 traffic can exit at Foster Road, turnaround at intersection, and use westbound frontage road back to Ackerman. Click here for detour map.
  • Friday, July 22 through Wednesday, July 27. DAYTIME westbound I-10 frontage road left lane closure between FM 1516 and Loop 1604 from 6 a.m. to 4:30 p.m. for drainage work.   
  • Continuing through Saturday, August 20. I-10 EB exit to Ackerman closed continuously for overpass work. Detour: Eastbound I-10 traffic can exit at Foster Road, turnaround at intersection, and use westbound frontage road back to Ackerman. Click here for detour map.
  • Friday, July 22 through Wednesday, July 27. DAYTIME westbound I-10 frontage road left lane closure between FM 1516 and Loop 1604 from 6 a.m. to 4:30 p.m. for drainage work.
  • Monday, July 25 through Thursday, July 28 from 9 p.m. to 5 a.m.  NIGHTTIME full eastbound mainlane closure between FM 1516 and Weichold Road for overpass work. Detour: Eastbound I-10 traffic will take Loop 1604 exit, use the frontage road, and take next entrance ramp.   

I-410 – East San Antonio

  • Continuing through Monday, August 1. NIGHTTIME northbound I-410 exit to eastbound I-10 closure from 9 p.m. to 5 a.m. for overpass work. Click here for detour map.
  • Continuing through Monday, August 1. DAYTIME southbound I-410 frontage road alternating lane closures between I-10 and East Houston Street from 8 a.m. to 5 p.m. for concrete work.
  • Continuing through Monday, August 1. DAYTIME northbound I-410 frontage road alternating lane closures between East Houston Street and Ackerman Road from 8 a.m. to 5 p.m. for wall work.    

I-410 – West San Antonio

  • Current until Monday, July 25. 7 p.m. to 5 a.m. Full closure of the southbound mainlanes from Ingram Rd. to US 90 for mill and overlay work.
  • Current until Monday, August 1. 9 a.m. to 3 p.m. Alternating lane closures of the frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for road work.
  • Current until Monday, August 1. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Marbach Rd. to SH 151 for barrier work.
  • Current until Monday, August 1. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for road work.
  • Current until Monday, August 1. 8 p.m. to 5 a.m. Alternating full southbound mainlane closures from Bandera Rd. to Marbach Rd. for mill and overlay work. 

SH 151 – Bexar County

  • Current until Monday, August 1. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for traffic switch. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, July 29. 9 a.m. to 3 p.m. Various lane closures, in both directions, at Wurzbach Parkway intersection for pothole and ITS work.
  • Monday, August 1 until Wednesday, August 31. 9 a.m. to 3 p.m. Various lane closures, in both directions, from Blanco Rd. to Wetmore Rd. for road work. 

Lockhill Selma Rd. – Bexar County

  • Current until Friday, July 29. 9 a.m. to 4 p.m. Right turn lane closures, in all directions, at the Wurzbach Parkway intersection. 

FM 1535 – N.W. Military Highway

  • Current until Friday, July 29. 9 a.m. to 4 p.m. Various lane closures, in both directions, at the Wurzbach Parkway intersection. 

US 90 – Bexar County

  • Monday, July 25. 5 a.m. to 4 p.m. Westbound mainlane closure from Loop 410 to Medina County Line for mill and inlay operations.
  • Tuesday, July 26 until Thursday, July 28. 9 p.m. to 5 a.m. Single lane closures on the frontage roads, in both directions, at Montgomery Rd. for pavement marking installations. 

FM 2252 – Nacogdoches Road

  • Sunday, July 24 until Tuesday, July 26. 6 p.m. to 6 a.m. Single lane closures, in both directions, at the Evans Rd. intersection for hot mix operations. 

FM 725 – Comal County

  • Current until Thursday, September 1. Full closure of the northbound to southbound turnaround at I-35 for operational improvements.