Friday, July 29

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, July 31 until Friday, August 12. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, July 31 until Friday, August 12. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, July 31 until Friday, August 12. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Sunday, July 31 until Friday, August 12. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Sunday, July 31 until Friday, August 12. Weeknights 9 p.m. until 5 a.m. Westbound mainlane full closure from Chase Hill Boulevard/Brennan Avenue to Kyle Seale Parkway for bridge construction: caps, beams & rail demo.
  • Monday, August 1 until Monday, August 15. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Sunday, July 31 until Friday, August 12. Weeknights 10 p.m. until 12 p.m. Eastbound mainlane full closure from Babcock Road to La Cantera Parkway for bridge construction.
  • Sunday, July 31 until Friday, August 12. Weeknights 9 p.m. until 5 a.m. Full intersection closure at Loop 1604 and Bandera Road (SH 16), both directions, including turnarounds, for bridge construction.
  • Monday, August 1 until Friday, August 15. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for barrier setting.
  • Monday, August 1 until Friday, August 15. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for barrier setting.
  • Monday, August 1 until Friday, August 15. Weekdays 9 a.m. until 3 p.m. Eastbound frontage road right outside lane closure from Babcock Road to Chase Hill Boulevard/Brennan Avenue for gas utility work.
  • Monday, August 1 until Monday August 15. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, August 1 until Monday, August 15. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, August 1 until Monday, August 15. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, August 1 until Monday, August 15. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, August 1 until Monday, August 15. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, August 1 until Monday, August 15. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, August 1 until Monday, August 15. Weekdays 9 a.m. until 5 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Monday, August 1 until Friday, August 15. Weekdays 9 a.m. until 5 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Full alternating turnaround closures. Only one direction turnaround to be closed at a time.
  • Friday, July 28 at 9 p.m. until Monday, August 1 at 5 a.m. Weekend Only. Eastbound mainlane entrance ramp full closure from La Cantera Parkway for storm drainage. Traffic will continue on the Loop 1604 eastbound frontage road to the IH-10 interchange. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, July 31 until Friday, August 5. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to US 281 exit ramp for barrier setting and striping.
  • Sunday, July 31 until Friday, August 5. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from US 281 exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, July 31 until Friday, August 5. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to US 281 for barrier setting and striping.
  • Sunday, July 31 until Friday, August 5. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from US 281 to IH-10 for barrier setting and striping.
  • Sunday, July 31 until Friday, August 5. Nightly 9 p.m. until 5 a.m. Westbound to eastbound turnaround full closure at Loop 1604 and NW Military Highway for drilling shafts.
  • Monday, August 1 until Friday, August 5. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround full closure at Loop 1604 and Lockhill Selma Road for concrete island demo and temporary traffic signal work.
  • Monday, August 1 until Friday, August 5. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround short term full closure at Loop 1604 and NW Military Highway for concrete placement and drill shafts.
  • Sunday, July 31 until Sunday, August 7. Weekdays/Weeknights 12 a.m. until 12 a.m. Eastbound to westbound turnaround full closure at Loop 1604 and NW Military Highway for bridge widening construction.
  • Saturday, July 30 only from 5:00 a.m. to 5:00 p.m. Eastbound to westbound turnaround full closure at Loop 1604 and Lockhill Selma Rd for traffic signal work. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Loop 1604 frontage road from Nacogdoches Road to Union Pacific Railroad for barrier work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound Loop 1604 frontage road between Gateway Boulevard and Lookout Road for striping and barrier work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on Loop 1604 frontage road eastbound to westbound turnaround between Nacogdoches Road and Union Pacific Railroad for striping and barrier work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on Loop 1604 frontage road westbound to eastbound turnaround between Lookout Road and Union Pacific Railroad for striping and barrier work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Loop 1604 between Nacogdoches Road and I-35 for striping and barrier work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound Loop 1604 between I-35 and Nacogdoches Road for striping and barrier work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Left lane closure on eastbound Loop 1604 frontage road and entrance ramp to Loop 1604 between Nacogdoches Road and Union Pacific Railroad for striping and barrier work. Traffic must continue on eastbound frontage road bypass to access Loop 1604.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Loop 1604 bypass between Union Pacific Railroad and Lookout Road for striping and barrier work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 frontage road exit ramp closure from Gateway Boulevard to Lookout Road for striping and barrier work. Traffic must use Lookout Road Exit.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 entrance ramp closure from Union Pacific Railroad to Nacogdoches Road for striping and barrier work. Traffic must continue westbound on frontage road and use the next entrance ramp to access Loop 1604.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Lookout Road exit ramp closure on eastbound Loop 1604 and left lane frontage road closure between Nacogdoches Road and Union Pacific Railroad for striping work. Traffic must continue eastbound Loop 1604 and use the IKEA-RBFCU Parkway or Nacogdoches exit ramp to access Lookout Road.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on eastbound frontage road of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for utility inspection work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on Loop 1604 frontage road eastbound to westbound turnaround from Nacogdoches Road to Union Pacific Railroad for geotechnical and drilling work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Eastbound-to-westbound turnaround closure at Lookout Road for geotechnical and drilling work. Traffic will use the traffic signals at Lookout Road intersection to access westbound Loop 1604.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on Loop 1604 frontage road turnaround from Nacogdoches Road to Union Pacific Railroad for geotechnical and drilling work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Left lane closure on Loop 1604 frontage road turnaround from Lookout Road to Union Pacific Railroad for geotechnical and drilling work.
  • Monday, August 1 until Friday, August 5. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound Loop 1604 frontage road from Nacogdoches Road to Union Pacific Railroad for barrier work. 

US 281 – North San Antonio/Bexar County

  • Monday, July 25 until Thursday, August 4. 9 p.m. to 5 a.m. Wilderness Oak and Overlook Parkway intersection closed for bridge work.
  • Sunday, July 31. 8 p.m. to 5 a.m. Single lane closure on the southbound frontage road from Mountain Lodge to Oakland Bend for concrete paving operations. 

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Sunday, July 31 until Friday, August 5. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35, Pat Booker Road exit ramp closure, and left lane closure on northbound frontage road of I-35 from Toepperwein Road to Shin Oak Road for geotechnical and drilling work. All traffic must exit Toepperwein Road (exit 170B) and follow the signs.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from Toepperwein Road and Judson Road for utility inspection work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 connector ramp from IKEA-RBFCU Parkway to McMorris Boulevard for geotechnical and drilling work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Northbound-to-southbound turnaround closure at Thousand Oaks Drive for geotechnical and drilling work. Traffic will use the traffic signals at Thousand Oaks intersection to access southbound I-35 frontage road.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 frontage road from Randolph Boulevard to Fratt road for geotechnical and drilling work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. FM 1518 exit ramp (exit 174A) closure on northbound I-35 and left lane closure on northbound frontage road of I-35 from exit 174A to Pasatiempo for geotechnical and drilling work. Traffic must follow the detour signs.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on northbound I-35 mainlane from Olympia Parkway to Pasatiempo for geotechnical and drilling work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35 and left lane closure on southbound frontage road of I-35 between Judson Road and O’Connor Road for barrier and sign work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Multiple lane closures on southbound I-35 between Judson Road and O’Connor Road for striping and barrier work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound I-35, left lane closure on southbound frontage road and closure on southbound I-35 entrance ramp from Pat Booker Road to Ferrell Road for barrier work. Traffic must continue on southbound frontage road to access I-35.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Multiple lane closures on southbound I-35 between Pat Booker Road to Ferrell Road for striping and barrier work.
  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound frontage road of I-35 from Fratt Drive to Walzem Road for utility inspection work. 

I-10 – East San Antonio/Bexar County

  • Monday, August 1 until Thursday, August 4. 9 p.m. to 5 a.m. Full closure of the eastbound mainlanes at Loop 1604 for bridge work.
  • Continuing through Saturday, August 20. I-10 EB exit to Ackerman closed continuously for overpass work. Detour: Eastbound I-10 traffic can exit at Foster Road, turnaround at intersection, and use westbound frontage road back to Ackerman. Click here for detour map. 

I-410 – North San Antonio

  • Sunday, July 31 until Saturday, August 6. 9:00 p.m. to 5:00 a.m. Right lane closure on eastbound frontage road of I-410 from Starcrest Drive to Perrin Beitel Road for utility inspection work. 

I-410 – South San Antonio

  • Sunday, July 31. 7 a.m. to 4 p.m. Full closure of the mainlanes, in both directions, at Somerset Rd. for utility work. Traffic will be stopped intermittently throughout the day in 15 minute intervals. 

I-410 – East San Antonio

  • Continuing through Friday, August 12. NIGHTTIME northbound I-410 exit to eastbound I-10 closure from 9 p.m. to 5 a.m. for overpass work. Click here for detour map.
  • Continuing through Friday, August 12. DAYTIME southbound I-410 frontage road alternating lane closures between I-10 and East Houston Street from 8 a.m. to 5 p.m. for concrete work.
  • Friday, July 29 through Friday, August 12. DAYTIME northbound I-410 frontage road left lane closures between East Houston Street and Ackerman Road from 8 a.m. to 5 p.m. for wall work.    

I-410 – West San Antonio

  • Current until Monday, August 1. 9 a.m. to 3 p.m. Alternating lane closures of the frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for road work.
  • Current until Monday, August 1. 8 p.m. to 5 a.m. Full closure of the northbound frontage road from Marbach Rd. to SH 151 for barrier work.
  • Current until Monday, August 1. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for road work.
  • Current until Monday, August 1. 8 p.m. to 5 a.m. Alternating full southbound mainlane closures from Bandera Rd. to Marbach Rd. for mill and overlay work. 

SH 151 – Bexar County

  • Current until Monday, August 1. 8 p.m. to 5 a.m. Full closure of the westbound frontage road at Loop 410 for traffic switch. 

PA 1502 – Wurzbach Parkway

  • Monday, August 1 until Wednesday, August 31. 9 a.m. to 3 p.m. Various lane closures, in both directions, from Blanco Rd. to Wetmore Rd. for road work.
  • Monday, August 1 until Friday, August 12. 9 a.m. to 4 p.m. Right turn lane closure, in all directions, at the Lockhill Selma Rd. intersection for curb installation. 

Lockhill Selma Rd. – Bexar County

  • Monday, August 1 until Friday, August 12. 9 a.m. to 4 p.m. Right turn lane closure, in both directions, at the Wurzbach Parkway intersection for curb installation. 

FM 1535 – N.W. Military Highway

  • Monday, August 1 until Friday, August 12. 9 a.m. to 4 p.m. Right turn lane closures, in both directions, at Wurzbach Parkway intersection for curb installation. 

SH 181 – Bexar County

  • Monday, August 1 until Friday, August 5. 7 a.m. to 8 p.m. Single southbound lane closure from I-37 to Corpus Christi Rd. for seal coat work. 

FM 725 – Comal County

  • Current until Thursday, September 1. Full closure of the northbound to southbound turnaround at I-35 for operational improvements.