Friday, October 25

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North Central San Antonio
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
  • Saturday, November 2 until Monday, November 4. Full weekend closure 3 a.m. until 5 a.m. Full eastbound mainlane closure from the US 281 north exit ramp to the Redland Road entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 and Gold Canyon Road intersections and use the Gold Canyon Road entrance ramp.
  • Saturday, November 2 until Monday, November 4. Full weekend closure 3 a.m. until 5 a.m. Full westbound mainlane closure from the US 281 north exit ramp to the US 281 entrance ramp for direct connector work. DETOUR: Use the US 281 north exit ramp, continue through the US 281 intersection and use the US 281 entrance ramp.
Loop 1604 – Northeast San Antonio
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. One mainlane in both directions between Green Mountain Road and I-35 for installation of barrier and guardrail.
  • Monday, October 28 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Westbound right mainlane between Bulverde Road and Redland Road for entrance ramp paving work.
  • Monday, October 28 until Saturday, November 2. Daily 9 a.m. until 4 p.m. Eastbound left frontage road lane between Bulverde Road and Redland Road for exit ramp curb and concrete work.
  • Monday, October 28 until Saturday, November 2. Daily 9 a.m. until 4 p.m. Westbound right frontage road lane between Bulverde Road and Redland Road for guardrail work.
  • Thursday, October 31 until Friday, November 1. 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Green Mountain Road and Redland Road for base repair work.
Loop 1604 – West San Antonio
  • Monday, October 28 until Friday, November 1. Daily 9 a.m. unitl 5 p.m. Alternating lanes in both directions at FM 1957 (Potranco Road), Military Drive, and Wiseman Boulevard for sign work.
  • Monday, October 28 until Friday, November 1. Daily 9 a.m. until 7 p.m. Alternating northbound frontage road lanes between south of FM 1957 (Potranco Road) to SH 151 for driveway and sign work.
  • Monday, October 28 until Friday, November 1. Daily 9 a.m. until 7 p.m. Alternating southbound frontage road lanes between SH 151 to south of FM 1957 (Potranco Road) for driveway and sign work.
Loop 1604 – Northwest San Antonio
  • Friday, October 25 until Monday, October 28. Full weekend closure 9 p.m. until 5 a.m. Alternating frontage road lanes in both directions between Mia’s and HEB for milling and paving work.
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Alternating frontage road lanes in both directions between Golden Corral and Discount Tire for pavement marking work.
  • Sunday, October 27 until Thursday, October 31. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure at Tradesman for bridge beam repair work.
US 281 – North Central San Antonio
  • Saturday, October 26. 7 a.m. until 6 p.m. Both southbound mainlanes at Cibolo Creek for barrier setting work.
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road, continue through the Loop 1604 and Donella Drive intersections, and use the Donella Drive entrance ramp.
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard exit ramp for direct connector work. DETOUR: Take the frontage road exit ramp, continue through the Loop 1604 intersection and take the Sonterra Boulevard entrance ramp.
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Marshall Road for paving and bridge work.
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Marshall Road to Loop 1604 for paving and bridge work.
  • Saturday, November 2 until Monday, November 4. Full weekend closure 3 a.m. until 5 a.m. Full northbound mainlane closure from the frontage road exit ramp to the Sonterra Boulevard exit ramp for direct connector work. DETOUR: Take the frontage road exit ramp, continue through the Loop 1604 intersection and take the Sonterra Boulevard entrance ramp.
  • Saturday, November 2 until Monday, November 4. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Sonterra Boulevard exit ramp to the Donella Drive entrance ramp for direct connector work. DETOUR: Take the Sonterra Boulevard exit ramp, continue on the southbound frontage road through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
US 281 – Southeast San Antonio
  • Current until Saturday, November 2. Daily 9 a.m. until 4 p.m. Alternating lanes in both directions at Loop 1604 for bridge deck work.
  • Friday, November 8 until Friday, November 15. Nightly 8 p.m. until 4 a.m. All lanes in both directions at Loop 1604 for bridge deck pour work. SOUTHBOUND DETOUR: Traffic diverted to frontage road. NORTHBOUND DETOUR: Traffic diverted to Rockport Road.
I-10 – Northwest San Antonio/Bexar County/Kendall County/Kerr County
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Alternating mainlanes in both directions between Scenic Loop Road and SH 46 for moving barrier and pavement marking work.
  • Sunday, October 27 until Tuesday, October 29. Nightly 9 p.m. until 5 a.m. Full westbound frontage road closure between Scenic Loop Road and US 87 for barrier resetting and pavement marking work.
  • Sunday, October 27 until Saturday, November 2. Nightly 8 p.m. until 5 a.m. Westbound left mainlane between Fair Oaks Parkway and Bexar/Kendall county line for paving work and truck access.
  • Sunday, October 27 until Thursday, October 31. Nightly 9 p.m. until 5 a.m. Westbound left mainlane between Dominion Drive and Boerne Stage Road for paving work.
  • Monday, October 28 until Thursday, October 31. Nightly 9 p.m. until 6 a.m. Right mainlane in both directions between Scenic Loop Road and Balcones Creek for surveying work.
  • Tuesday, October 29 until Tuesday, December 19. Full-day closure. Westbound-to-eastbound turnaround at Boerne Stage Road long-term closure for bridge work.
  • Sunday, November 3 until Friday, November 7. Nightly 9 p.m. until 5 a.m. Eastbound left mainlane between Dominion Drive to Boerne Stage Road for paving work.
I-10 – Far East San Antonio/Bexar County/Seguin/Guadalupe County
  • Current until further notice. Eastbound entrance ramp from FM 1516. DETOUR: Take next entrance ramp east of Loop 1604.
  • Current until further notice. Eastbound Ackerman Road exit ramp will be closed through the fall. DETOUR: Eastbound I-10 and southbound I-410 traffic needing to access Ackerman Road must take southbound I-410, exit at FM 1346/E. Houston St., turn around, and take the northbound frontage road to Ackerman Road.
  • Friday, October 25 until Saturday, October 26. 9 p.m. until 5 a.m. Right eastbound mainlane from I-410 to Ackerman Road for Ackerman Road bridge deck placement.
  • Thursday, October 31. 9 a.m. until 4 p.m. West-to-eastbound turnaround will be closed at Foster Road. DETOUR: Westbound frontage road traffic needing to use the turnaround will turn left on Foster Road and then left on the eastbound frontage road.
I-10 –  Central San Antonio
  • Sunday, October 27 until Monday, October 28. 8:30 p.m. until 5 a.m. Westbound right mainlane and shoulder at I-35 interchange (including I-37 northbound ramp) for guard fence repair work;
I-35 – Northeast San Antonio & Comal County
  • Sunday, October 27 until Saturday, November 2. Nightly 9 p.m. until 5 a.m. Northbound left and center mainlanes as well as shoulder between FM 2252 and Schwab Road for pavement repair work.
I-37 – Central San Antonio
  • Monday, October 28 until Thursday, October 31. Nightly 8:30 p.m. until 5 a.m. Northbound right mainlane and shoulder at I-10 interchange (including I-10 eastbound exit ramp) for guard fence installation work.
I-410 – West San Antonio
  • Current until 3 p.m. Friday, November 1. Daily 9 a.m. to 3 p.m. Alternating northbound frontage road lanes between Bronco Lane to SH 151 for staging equipment and trucks.
  • Current until 3 p.m. Friday, November 1. Daily 9 a.m. to 3 p.m. Alternating southbound frontage road lanes between Waters Edge to Pilar Drive for staging equipment and trucks.
  • Friday, October 25 until Sunday, October 27. Continuous closure 8 p.m. until 5 a.m. The left frontage road lane in each direction and the intersection at Marbach Road for box culvert work. DETOUR: Traffic on westbound Marbach Road will turn right on northbound frontage road and turnaround at SH 151 to access southbound I-410. Traffic on eastbound Marbach Road will turn right on southbound frontage road and use the cloverleafs to access northbound I-410 to Marbach Road.
US 90 – West San Antonio
  • Current until 3 p.m. Friday, November 1. The left frontage road lane in both directions between I-410 to Hunt Lane for staging equipment and trucks.
  • Current until 3 p.m. Saturday, October 26. The westbound right frontage road lane between W. Military Drive to Colt Drive for sidewalk and driveway work.
  • Current until 3 p.m. Saturday, October 26. The eastbound right frontage road lane between Springvale Dr. to W. Military Drive for sidewalk and driveway work.
  • Monday, October 28 until Saturday, November 2. Daily 9 a.m. to 3 p.m. The westbound right frontage road lane between W. Military Drive to Colt Drive for sidewalk and driveway work.
  • Monday, October 28 until Saturday, November 2. Daily 9 a.m. to 3 p.m. The eastbound right frontage road lane between Springvale Dr. to W. Military Drive for sidewalk and driveway work.
I-37 – Central & South San Antonio
  • Current until Saturday, November 2. Daily 9 a.m. until 4 p.m. Alternating frontage road lanes in both directions at Loop 1604 for traffic light installation work.
  • Sunday, October 20 until Wednesday, October 23. Nightly 8:30 p.m. until 5 a.m. Northbound right mainlane and shoulder at I-10 interchange (including exit ramps to I-37 northbound and Carolina/Florida streets) for guard fence installation work.
SH 16 – Bandera Road
  • Friday, October 25 until Monday, October 28. Weekend closure 9 p.m. until 5 a.m. Alternating lanes between in both directions between Quincy Lee and Legend Trail for asphalt work.
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. to 5 a.m. Alternating lanes in both directions between Quincy Lee and Legend Trail for pavement marking and painting work.
PA 1502 – Wurzbach Parkway
  • City of San Antonio closure for Hardberger Park Landbridge project. Monday, October 28 until Friday, November 1. Daily 9 a.m. until 4 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
  • City of San Antonio closure for Hardberger Park Landbridge project. Saturday, November 2. 7 a.m. until 5 p.m. Right lane in both directions from FM 1535 (NW Military Hwy.) to FM 2696 (Blanco Road) for construction truck and equipment access.
Spur 371 – General Hudnell Drive
  • Monday, October 28 until Friday, November 1. 24-hour closure. The left lane in both directions between Frio City Road and Quintana Road for concrete barrier wall work.
  • Monday, October 28 until Friday, November 1. Daily 7 a.m. to 3 p.m. The northbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
  • Monday, October 28 until Friday, November 1. Daily 9 a.m. to 5 p.m. The southbound left lane between Billy Mitchell Boulevard and Cupples Road for removing existing guardrail and installing concrete barrier.
FM 1976 – Walzem Road/Gibbs Sprawl Road
  • Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
Loop 353 – New Laredo Highway/South San Antonio
  • Thursday, October 31 until Saturday, November 2. Daily 9 a.m. until 4 p.m. Alternating lanes in both directions at Indian Creek for barrier removal work, guardrail installation, milling, sealing and paving work.
Other Roads – Bexar County
  • Sunday, October 27 until Friday, November 1. Nightly 9 p.m. until 5 a.m. Full westbound closure of Encino Rio approaching the US 281 intersection for bridge work. DETOUR: Take a right on the US 281 northbound frontage road and use the northbound to southbound turnaround after Evans Road.
  • Saturday, November 2 until Monday, November 4. Weekend full closure 3 a.m. until 5 a.m. Full westbound closure of Encino Rio approaching the US 281 intersection for bridge work. DETOUR: Take a right on the US 281 northbound frontage road and use the northbound to southbound turnaround after Evans Road.
SH 46 – Boerne/Kendall County
  • Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
FM 1376 – Kendall County
  • Monday, October 28 until Friday, November 1. Daily 7 a.m. until 7 p.m. Alternating lanes in both directions at various culvert locations in the work zone for temporary pavement work.
FM 1863 – Comal County
  • Current until Friday, November 1. Daily 9 a.m. until 4 p.m. Eastbound lanes between US 281 and Cibolo Creek for asphalt work.
FM 1518 – Comal County
  • Current until Friday, November 1. Daily 8 a.m. until 3 p.m. Alternating lanes in both directions between FM 78 and Schaefer Road for paving work.
FM 2673 – Comal County
  • Monday, October 28 until Friday, November 1. Daily 7 p.m. until 6 p.m. Alternating lanes in both directions between FM 2722 and FM 306 for pavement repair work.
US 87 – Wilson County
  • Monday, October 28 until Monday, November 18. Daily 7 a.m. until 6 p.m. Northbound right lane at SH 97 for barrier setting and crash cushion installation work.
  • Wednesday, October 30. 7 a.m. until 6 p.m. Right lane in both directions approximately two miles south of FM 539 for barrier setting and crash cushion installation work.
SH 16 – McMullen County
  • Monday, October 28 until Friday, November 1. Daily 8 a.m. until 5 p.m. Alternating southbound lanes from FM 1962 to McMullen/Duval county line (mile markers 686-700) for barrier and excavation work.