Loop 1604 – North Central San Antonio
- Friday, October 23 until Monday, October 26. Weekend continuous closure 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Gold Canyon Road to Stone Oak Parkway for asphalt work. DETOUR: Use the northbound US 281 exit ramp, go through the US 281 intersection and use the Loop 1604 entrance ramp west of Stone Oak Parkway.
- Friday, October 23 until Monday, October 26. Weekend continuous closure 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for asphalt work. DETOUR: Use the Redland Road exit ramp and take the next turnaround.
- Saturday, October 24 until Monday, October 26. Weekend continuous closure 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Gold Canyon Road to Stone Oak Parkway for striping.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from Gold Canyon Road to Stone Oak Parkway for asphalt work. DETOUR: Use the northbound US 281 exit ramp, go through the US 281 intersection and use the Loop 1604 entrance ramp west of Stone Oak Parkway.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for asphalt work. DETOUR: Use the Redland Road exit ramp and take the next turnaround.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Gold Canyon Road to Stone Oak Parkway for asphalt work.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for asphalt work.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Full westbound mainlane closure from Gold Canyon Road to Stone Oak Parkway for asphalt work. DETOUR: Use the northbound US 281 exit ramp, go through the US 281 intersection and use the Loop 1604 entrance ramp west of Stone Oak Parkway.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Full eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for asphalt work. DETOUR: Use the Redland Road exit ramp and take the next turnaround.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Full westbound frontage road closure from Gold Canyon Road to Stone Oak Parkway for asphalt work.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for asphalt work.
- Friday, October 23 until Monday, October 26. 9 p.m. to 5 a.m. Single lane closure on eastbound frontage road from Bandera Rd. to Hausman Rd. for island reconfiguration.
- Monday, October 26 until Thursday, October 29. 9 a.m. to 4:30 p.m. Single lane closure on eastbound frontage road from Bandera Rd. to Hausman Rd. for median and curb work.
- Monday, October 26 until Friday, October 30. 9 a.m. to 3 p.m. Single lane closure on westbound frontage road at Green Mountain Road for concrete median installation.
- Saturday, October 24. 6 a.m. to 6 p.m. Single southbound lane closure from Cibolo Creek to Borgfeld Rd. for sidewalk construction.
- Monday, October 26 until Saturday, October 31. 8 p.m. to 5 a.m. Full lane closures, in both directions at Marshall Road for bridge work.
- Thursday, October 29. 9 a.m. to 5 p.m. Southbound mainlane closure from just south of Loop 1604 to just south of Brook Hollow Road for leveling of approach to bridge deck.
- Saturday, October 24 until Monday, October 26. Weekend continuous closure
9 p.m. until 5 a.m. Full southbound mainlane
closure from Sonterra Boulevard to the Donella Drive entrance ramp for
striping. DETOUR: Take the Sonterra Boulevard exit ramp, continue through the
Loop 1604 and Donella Drive intersections and use the Donella Drive entrance
ramp.
- Saturday, October 24 until Monday, October 26. Weekend continuous closure 9 p.m. until 5 a.m. Full northbound mainlane closure from the Donella Drive entrance ramp to Sonterra Boulevard for striping. DETOUR: Take the frontage road exit ramp near Donella Drive, continue through the interchange and use the Sonterra Boulevard entrance ramp.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from Sonterra Boulevard to the Donella Drive entrance ramp for striping. DETOUR: Take the Sonterra Boulevard exit ramp, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the Donella Drive entrance ramp to Sonterra Boulevard for striping. DETOUR: Take the frontage road exit ramp near Donella Drive, continue through the interchange and use the Sonterra Boulevard entrance ramp.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Full northbound frontage road closure from Loop 1604 to the Sonterra Boulevard exit ramp for concrete paving. DETOUR: Take the westbound Loop 1604 frontage road, turn left on the southbound US 281 frontage road use the turnaround at Donella Drive and take the Donella Drive entrance ramp.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Take the northbound US 281 frontage road exit ramp and go through the Loop 1604 intersection.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone OakParkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Monday, October 26 until Friday, October 30. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Full southbound mainlane closure from Sonterra Boulevard to the Donella Drive entrance ramp for concrete paving. DETOUR: Take the Sonterra Boulevard exit ramp, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Full northbound mainlane closure from the Donella Drive entrance ramp to Sonterra Boulevard for concrete paving. DETOUR: Take the frontage road exit ramp near Donella Drive, continue through the interchange and use the Sonterra Boulevard entrance ramp.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Take the northbound US 281 frontage road exit ramp and go through the Loop 1604 intersection.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
- Friday, October 23 until Monday, October 26. 9 p.m. to 5 a.m. Double lane closure on northbound mainlanes at Hildebrand Road for foundation drilling.
- Friday, October 23 until Monday, October 26. 9 p.m. to 5 a.m. Double lane closure on southbound mainlanes at Hildebrand Road for foundation drilling.
- Monday, October 19 until Friday, October 30. Daily 9 a.m. to 3 p.m. Single lane closure of westbound mainlanes from La Cantera Parkway to Ralph Fair Rd. for painting operations.
- Friday, October 23 from 10 p.m. to 5 a.m. Ackerman Road intersection under I-10 closed for deck concrete pour on westbound bridge over Ackerman Road. Westbound frontage road left lane between Rosillo Creek and Ackerman Road also closed. DETOURS:
- Northbound Ackerman traffic can take eastbound I-10 frontage road to Foster Road and take
turnaround.
- Southbound Ackerman traffic can take the westbound I-10 frontage road and continue to the northbound
I-410 frontage road, turn around at Seguin Road and enter southbound I-410, and
then take exit to I-10.
- Saturday, October 24 from 6 a.m. to 7 p.m. Westbound I-10 alternating lane closure from Pfeil Road to Salitrillo Creek for striping and traffic shift.
- Sunday, October 25 through Friday, October 30 from 7 p.m. to 5 a.m. each night. Westbound left lane closed from Graytown Road to Loop 1604 to reset traffic barrier.
- Wednesday, October 28 until Friday, October 30. 8 a.m. to 4 p.m. Full closure of westbound exit ramp to Loop 1604 for asphalt work. DETOUR: Traffic will be redirected to FM 1516 exit ramp.
- Current until further notice. East and westbound I-10 frontage road traffic have right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
- Current until mid-November: Westbound I-10 exit ramp to Foster Road closed. DETOUR: Use Woodlake Parkway exit ramp.
- Current until late-October: Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
- Southbound Ackerman traffic can travel south under the I-10 overpass, use the eastbound
frontage road to Foster Road, turn left on Foster, and take the westbound
frontage road to the westbound entrance ramp just west of Foster.
- Northbound Ackerman traffic can use the eastbound frontage road to Foster Road, turn
left on Foster, and take the westbound frontage road to the westbound entrance
ramp just west of Foster.
- Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
- Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.
- Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
- Monday, October 19 until Saturday, October 24. 9 a.m. to 5:30 p.m. Single lane closure on southbound frontage road from Schwab Rd. to Hubertus Rd. for flatwork.
- Monday, October 26 until Saturday, October 31. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Hubertus Road to Schwab Road for excavation.
- Monday, October 26 until Saturday, October 31. 9 a.m. to 5:30 p.m. Single lane closures on southbound frontage road from Schwab Rd. to Hubertus Rd. for wall paint.
- Monday, October 26. 8:30 a.m. to 4 p.m. Southbound exit ramp closed to eastbound I-10 for mow strip installation.
- Tuesday, October 27. 8:30 a.m. to 4 p.m. Northbound exit ramp to westbound I-10 for mow strip installation.
- Friday, October 30. 8:30 a.m. to 4 p.m. Northbound and southbound exit ramp to eastbound and westbound I-10 closed for mow strip installation.
- Friday, October 23 until Monday, October 26. 9 p.m. to 5 a.m. Double northbound lane closures, including exit ramp, at Loop 353 (New Laredo Highway) for foundation drilling.
- Monday, October 26 until Tuesday, October 27. Southbound lane closures on both mainlanes and frontage roads from just north of Somerset Road to SP 422 for maintainer leveling.
I-37 - Central San Antonio
- Wednesday, October 28. 8:30 a.m. to 4 p.m. Northbound exit ramp to Commerce St. for mow strip installation.
- Thursday, October 29. 8:30 a.m. to 4 p.m. Northbound mainlane closure from westbound I-10 exit ramp to the Florida/Carolina exit ramp for mow strip installation.
- Thursday, October 29. 8:30 a.m. to 4 p.m. Southbound mainlane closure from Florida/Carolina exit ramp to Florida/Carolina entrance ramp for mow strip installation.
I-410 – West San Antonio
- Monday, October 19 until Monday, October 26. 9 a.m. to 3:00 p.m. Alternating frontage road lane closures, from Marbach Rd. to Ingram Rd., including the Culebra Rd. turnarounds, for retaining wall work.
- Monday, October 19 until Monday, October 26. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Marbach Rd. to Culebra Rd. for concrete pouring.
- Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for bridge work.
- Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Alternating full closures of mainlanes, in both directions, from Marbach Rd. to Military Dr. for work on direct connectors.
- Monday, October 19 until Monday, October 26. 8 a.m. to 5 p.m. Full closure of southbound frontage road from N.W. Crossroads to Military Dr. for beam setting.
- Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Marbach Rd. to Ingram Rd. for work on direct connectors.
- Saturday, October 24. 7 a.m. to 7 p.m. Full closure of northbound frontage road from Military Dr. to Culebra Rd. for installation of drainage system.
- Sunday, October 25. 9 a.m. to 4 p.m. Full closure of mainlanes and frontage roads, in both directions, from Marbach Rd. to US 90 for utility line transfers.
- Monday, October 28 until Monday, November 2. 9 a.m. to 3 p.m. Alternating lane closures on frontage road, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
- Monday, October 26 until Monday, November 2. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for concrete pouring and barrier movement.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 a.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for construction of flyover ramp.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 a.m. Alternating full closure of mainlanes, in both directions, from Marbach Rd. to Military Dr. for construction of flyover ramp.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 a.m. Full closure of southbound frontage road N.W. Crossroads to Military Dr. for beam setting.
- Monday, October 26 until Monday, November 2. 7 a.m. to 7 p.m. Full closure of northbound frontage road from Military Dr. to Culebra Rd. for installation of drainage system.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Marbach Rd. to Ingram Rd. for bridge work.
- Saturday, October 31. 6 a.m. to 6 p.m. Full closure of southbound mainlanes from Culebra Rd. to Military Dr. for removal of high-mast light.
- Monday, October 26 until Saturday, October 31. 7 a.m. to 7 p.m. Single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for paving operations.
- Monday, October 26 until Friday, October 30. 9 a.m. to 3 p.m. Single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for signal improvements.
- Monday, October 26 until Friday, October 30. 9 a.m. to 3 p.m. Single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for guardrail and concrete improvements.
- Sunday, October 25 until Friday, October 30. 7:30 p.m. to 6 a.m. Single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for paving operations.
- Monday, October 19 until Monday, October 26. 9 a.m. to 3 p.m. Alternating single mainlane closures, in both directions, from Ingram Rd. to Loop 410 for work on direct connectors.
- Monday, October 19 until Monday, October 26. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Loop 410 to Ingram Rd. for work on direct connectors.
- Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for work on direct connectors.
- Monday, October 19 until Monday, October 26. 8 p.m. to 5 a.m. Full mainlane closure and SH 151 turnarounds, in both directions, from Ingram Rd. to Loop 410 for work on direct connectors.
- Monday, October 26 until Monday, November 2. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Ingram Rd. to Loop 410 for construction of flyover ramps.
- Monday, October 26 until Monday, November 2. 9 a.m. to 3 p.m. Alternating lane closures on frontage road, in both directions, from Loop 410 to Ingram Rd. for construction of flyover ramps.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 p.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for construction of flyover ramps.
- Saturday, October 24. 4 a.m. to 4 p.m. Single lane closure, in both directions, from just south of Wurzbach Parkway to just north of Wurzbach Parkway for median removal and new roadway installation.
- Tuesday, October 27 until Wednesday, October 28. 9 p.m. to 5 a.m. Single southbound lane closure from just south of Wurzbach Parkway to just north of Wurzbach Parkway for barrier installation.
- Monday, October 26 until Wednesday, October 28. 9 p.m. to 5 a.m. Single eastbound lane closure from just west of N.W. Military Hwy. to just east of N.W. Military Hwy. for striping and barrier installation.
- Monday, October 26 until Wednesday, October 28. 9 p.m. to 5 a.m. Single westbound lane closure from just east of N.W. Military Hwy. to just west of N.W. Military Hwy. for striping and barrier installation.
- Tuesday, October 27 until Friday, October 30. 8:30 a.m. to 4:30 p.m. Alternating lane closure, in both directions, from Starcrest Dr. to Weidner Rd. for paving operations.
- Sunday, October 25 until Tuesday, October 27. 9 p.m. to 5 a.m. Full closure of eastbound lanes from Village Oak Dr. to Athenian Dr. for bridge work.
- Tuesday, October 27 until Thursday, October 29. 9 p.m. to 5 a.m. Full closure of westbound lanes from Athenian Dr. to Village Oak Dr. for bridge work.
- Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
- Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
- Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
- Monday, October 19 until Saturday, October 24. Daily, 8:30 a.m. to 7 p.m. Single lane closures, in both directions, from N. School St. to 0.5 miles past Wasp Creek Rd. for culvert work and roadway reconstruction.
- Saturday, October 24. 8 a.m. to 5 p.m. Alternating lane closures, in both directions, at SH 41, SH 27 and Midway Road for sign installations.
- Saturday, October 24. 8 a.m. to 10 a.m. Full closure of mainlanes, in both directions, at FM 479 for sign installations.
- Saturday, October 31. 8 a.m. to 10 a.m. Full closure of mainlanes, in both directions, at FM 479 for sign installations.
- Current until Friday, October 30. 6:30 a.m. to 7 p.m. Alternating lane closures, in both directions, from FM 539 to SH 123 for pavement improvements.
- Monday, October 26 until Saturday, October 31. 6:30 a.m. to 7 p.m. Ramp closures, in both directions, from Main Street to just east of Stockdale.
- Current until Saturday, October 31. 6:30 a.m. to 7 p.m. Single eastbound lane closures from FM 484 to Carpers Creek for roadway improvements.
- Monday, November 9 until March 2021. Full closure of bridge at Mill Creek for bridge replacement.