- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Full westbound frontage road closure from Gold Canyon Road to Stone Oak Parkway for asphalt work.
- Saturday, October 31 until Monday, November 2. Weekend continuous closure 2 a.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for asphalt work.
- Sunday, November 1 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the southbound US 281 exit ramp, turn right on the southbound US 281 frontage road and use the Donella Drive entrance ramp.
- Sunday, November 1 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure of the west- to southbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the Gold Canyon Road /Redland Road exit ramp, continue on the westbound Loop 1604 frontage road through the Gold Canyon Road /Redland Road intersections, turn left on the southbound US 281 frontage road and use the Donella Drive entrance ramp.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Full westbound mainlane closure from Gold Canyon Road to Stone Oak Parkway for striping. DETOUR: Use the northbound US 281 exit ramp, continue through the US 281 intersection and use the Loop 1604 entrance ramp west of Stone Oak Parkway.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Full eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for striping. DETOUR: Use the Redland Road exit ramp and take the next turnaround.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Gold Canyon Road to Stone Oak Parkway for asphalt work.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for asphalt work.
- Friday, November 6 until Monday, November 9. Weekend continuous 9 p.m. until 5 a.m. Full westbound mainlane closure from Gold Canyon Road to Stone Oak Parkway for striping. DETOUR: Use the northbound US 281 exit ramp, go through the US 281 intersection and use the Loop 1604 entrance ramp west of Stone Oak Parkway.
- Friday, November 6 until Monday, November 9. Weekend continuous 9 p.m. until 5 a.m. Full eastbound mainlane closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for striping. DETOUR: Use the Redland Road exit ramp and take the next turnaround.
- Friday, November 6 until Monday, November 9. Weekend continuous 9 p.m. until 5 a.m. Full westbound frontage road closure from Gold Canyon Road to Stone Oak Parkway for striping.
- Saturday, November 7 until Monday, November 9. Weekend continuous 2 a.m. until 5 a.m. Full eastbound mainlane closure of the east- to southbound direct connector ramp to US 281 for concrete paving. DETOUR: Take the southbound US 281 exit ramp, turn right on the southbound US 281 frontage road and use the Donella Drive entrance ramp.
- Saturday, November 7 until Monday, November 9. Weekend continuous 2 a.m. until 5 a.m. Alternating eastbound frontage road closure from the Stone Oak Parkway entrance ramp to the Gold Canyon Road exit ramp for concrete paving.
- Monday, November 9 until Friday, November 13. 9 a.m. to 3 p.m. Single lane closure on westbound frontage road at Green Mountain Rd. for concrete median installation.
- Monday, November 2 until Tuesday, November 3. 8 a.m. to 5 p.m. Single mainlane closures, in both directions, from US 90 to SH 16 for crack sealing repairs.
US 281 – North Central San Antonio/Bexar County
- Saturday, October 31. 5 a.m. to 5 p.m. Alternating northbound lane closures from Overlook Parkway to Bulverde Road for traffic switch.
- Saturday, October 31. 5 a.m. to 5 p.m. Alternating northbound lane closures from TPC Parkway to Marshall Road for traffic switch.
- Saturday, October 31. 6 a.m. to 6 p.m. Single southbound lane closure from Cibolo Creek to Borgfeld Dr. for sidewalk construction.
- Wednesday, November 4 until Thursday, November 5. 8 p.m. to 5 a.m. Full closure at Marshall Road in both directions for setting of deck panels.
- Saturday, October 31. Weekend continuous 2 a.m. until 11 p.m. Alternating southbound mainlane closure from the Redland Road exit ramp to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
- Saturday, October 31. Weekend continuous 2 a.m. until 11 p.m. Alternating northbound frontage road closure from Encino Rio to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Saturday, October 31 until Monday, November 2. Weekend continuous 2 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Evans Road for concrete paving.
- Monday, November 2 until Tuesday, November 3. Overnight 9 p.m. until 5 a.m. Full southbound mainlane closure from the Evans Road entrance ramp to Encino Rio for material hauling. DETOUR: Take the southbound US 281 entrance ramp and use the Redland Road exit ramp.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Full southbound mainlane closure from the Redland Road exit ramp to the Donella Drive entrance ramp for striping. DETOUR: Take the Redland Road exit ramp, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Full northbound mainlane closure from the Donella Drive entrance ramp to Sonterra Boulevard for striping. DETOUR: Take the frontage road exit ramp near Donella Drive, continue through the interchange and use the Sonterra Boulevard entrance ramp.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Take the northbound US 281 frontage road exit ramp and go through the Loop 1604 intersection.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Monday, November 2 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
- Wednesday, November 4 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure of the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Take the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
- Wednesday, November 4 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure of the north- to westbound both turn lanes at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Take the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
- Wednesday, November 4 until Friday, November 6. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure of the south- to eastbound both turn lanes at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Take the south- to northbound turnaround at Evans Road.
- Friday, November 6 until Monday, November 9. Weekend continuous 9 p.m. until 5 a.m. Full southbound mainlane closure of the Redland Road exit ramp to the Donella Drive entrance ramp for striping. DETOUR: Take the Redland Road exit ramp, continue through the Loop 1604 and Donella Drive intersections and use the Donella Drive entrance ramp.
- Friday, November 6 until Monday, November 9. Weekend continuous 9 p.m. until 5 a.m. Full northbound mainlane closure from the Donella Drive entrance ramp to Sonterra Boulevard for striping. DETOUR: Take the frontage road exit ramp near Donella Drive, continue through the interchange and use the Sonterra Boulevard entrance ramp.
- Friday, November 6 until Monday, November 9. Weekend closure 9 p.m. until 5 a.m. Northbound frontage road closure of the north- to southbound turnaround at Stone Oak/Tournament Players Club (TPC) Parkway for bridge road. DETOUR: Use the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway. Closure will not happen concurrently with other turnaround closures in the same direction.
- Friday, November 6 until Monday, November 9. Nightly 9 p.m. until 5 a.m. Northbound frontage road closure of the north- to westbound both turn lanes at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Take the turnaround north of Stone Oak/Tournament Players Club (TPC) Parkway.
- Friday, November 6 until Monday, November 9. Nightly 9 p.m. until 5 a.m. Southbound frontage road closure of the south- to eastbound both turn lanes at Stone Oak/Tournament Players Club (TPC) Parkway for bridge work. DETOUR: Take the south- to northbound turnaround at Evans Road.
- Saturday, November 7 until Monday, November 9. Weekend continuous 2 a.m. until 5 a.m. Alternating northbound mainlane closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving. DETOUR: Take the northbound US 281 frontage road exit ramp and go through the Loop 1604 intersection.
- Saturday, November 7 until Monday, November 9. Weekend continuous closure 2 a.m. until 5 a.m. Alternating southbound mainlane closure from Stone Oak Parkway to Loop 1604 for concrete paving. DETOUR: Take the southbound US 281 entrance ramp at Donella Drive.
- Saturday, November 7 until Monday, November 9. Weekend continuous 2 a.m. until 5 a.m. Alternating northbound frontage road closure from Loop 1604 to Stone Oak/Tournament Players Club (TPC) Parkway for concrete paving.
- Saturday, November 7 until Monday, November 9. Weekend continuous 2 a.m. until 5 a.m. Alternating southbound frontage road closure from Stone Oak Parkway to Loop 1604 for concrete paving.
Bulverde Road – Bexar County
- Monday, November 2 until Tuesday, November 3. 8 p.m. to 5 a.m. Full closure of lanes, in both directions, from US 281 to Cotillion Park for bridge setting.
- Tuesday, November 3 until Wednesday, November 4. 8 p.m. to 5 a.m. Full closure of lanes, in both directions, from US 281 to Cotillion Park for bridge work.
- Monday, November 2 until Tuesday, November 3. 9 a.m. to 4 p.m. Single northbound lane closure from just south of Huebner Rd. to just north of Huebner Rd. for utility work.
- Sunday, November 8. 7:30 a.m. to 4 p.m. Single lane closure on frontage roads and ramps, in both directions, from Vance Jackson Rd. to Fresno Rd. for utility work.
- Sunday, November 1 until Friday, November 6. 9 p.m. to 5 a.m. Multiple lane closures, in both directions, from Fulton Rd. to West Ave. for replacement of overhead signs.
- Monday, November 2 until Friday, November 6. 7 a.m. to 5 p.m. Alternating lane and shoulder closures from the Kerr/Gillespie County Line to the Kerr/Kimble County Line for pavement edge improvements.
- Tuesday, November 3 until Wednesday, November 4. 8 a.m. to 3 p.m. Single eastbound mainlane closure, including exit ramp to Dominion Dr., from Boerne Stage Road and Dominion Drive for completion of pavement markings.
- Tuesday, November 3 until Wednesday, November 4. 8 a.m. to 3 p.m. Single eastbound mainlane closure, including exit ramp to Camp Bullis Rd., from Dominion Dr. to Camp Bullis Rd. for completion of pavement markings.
- Tuesday, November 3 until Wednesday, November 3. 8 a.m. to 3 p.m. Single eastbound mainlane closure, including exit ramp to La Cantera Parkway, from Camp Bullis Road to La Cantera Parkway for completion of pavement markings.
- Monday, November 2 until Thursday, November 5. 7 a.m. to 8 p.m. Single westbound mainlane closure from US 183 to FM 2438 for armor joint work.
- Tuesday, November 3 until Wednesday, November 4. 8 a.m. to 5 a.m. Single lane closure on frontage road, in both directions, at Foster Rd. intersection for asphalt milling.
- Current until further notice. East and westbound I-10 frontage road traffic have right-of-way at Woodlake Parkway intersection. Woodlake traffic must stop before proceeding.
- Current until mid-November: Westbound I-10 exit ramp to Foster Road closed. DETOUR: Use Woodlake Parkway exit ramp.
- Current until late-November: Westbound I-10 entrance ramp from Ackerman Road closed. DETOURS:
- Southbound Ackerman traffic can travel south under the I-10
overpass, use the eastbound frontage road to Foster Road, turn left on Foster,
and take the westbound frontage road to the westbound entrance ramp just west
of Foster.
- Northbound Ackerman traffic can use the eastbound frontage
road to Foster Road, turn left on Foster, and take the westbound frontage road
to the westbound entrance ramp just west of Foster.
- Current until further notice. Graytown Road bridge at I-10. DETOURS: Graytown Road traffic will use the frontage roads and the Pfeil Road underpass or Loop 1604 turnaround to cross I-10.
- Current until further notice. Eastbound entrance ramp from Foster Road. DETOUR: Take next entrance ramp east of Woodlake Parkway.
- Monday, November 2 until Tuesday, November 3. 8:30 a.m. to 4 p.m. Eastbound exit ramp to I-35 closed for mow strip installation.
- Wednesday, November 4 until Thursday, November 4. 8:30 a.m. to 4 p.m. Single northbound mainlane closure, including ramps, at Florida/Carolina for mow strip installation.
- Thursday, November 4 until Friday, November 5. 8:30 a.m. to 4 p.m. Single southbound mainlane closure, including ramp, at Florida/Carolina for mow strip installation.
- Thursday, November 5. 8 a.m. to 5 p.m. Single lane closures, in both directions, from 8 miles south of Loop 1604 to the San Antonio River for crack sealing repairs.
- Thursday, November 5. 8 a.m. to 5 p.m. Single frontage road lane closures, in both directions, from Southton Rd. to the San Antonio River for crack sealing repairs.
- Until further notice, the southbound entrance ramp at Schwab Rd. is closed.
- Monday, October 26 until Saturday, October 31. 9 a.m. to 5 p.m. Single lane closure on northbound frontage road from Hubertus Road to Schwab Road for excavation.
- Monday, October 26 until Saturday, October 31. 9 a.m. to 5:30 p.m. Single lane closures on southbound frontage road from Schwab Rd. to Hubertus Rd. for wall paint.
- Monday, November 2 until Tuesday, November 3. 8:30 a.m. to 4 p.m. Southbound exit ramp to eastbound I-10 closed for mow strip installation.
- Tuesday, November 3 until Wednesday, November 4. 9 a.m. to 5 p.m. Alternating southbound mainlane and frontage road closures from just north of Somerset Road to SP 422 for maintainer leveling.
- Sunday, November 1 until Tuesday, November 3. 9 p.m. to 5 a.m. Single mainlane closure, in both directions, from Medina River to Atascosa County Line for crack sealing repairs.
I-410 – West San Antonio
- Monday, October 28 until Monday, November 2. 9 a.m. to 3 p.m. Alternating lane closures on frontage road, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
- Monday, October 26 until Monday, November 2. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marbach Rd. to Culebra Rd. for concrete pouring and barrier movement.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 a.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for construction of flyover ramp.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 a.m. Alternating full closure of mainlanes, in both directions, from Marbach Rd. to Military Dr. for construction of flyover ramp.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 a.m. Full closure of southbound frontage road N.W. Crossroads to Military Dr. for beam setting.
- Monday, October 26 until Monday, November 2. 7 a.m. to 7 p.m. Full closure of northbound frontage road from Military Dr. to Culebra Rd. for installation of drainage system.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Marbach Rd. to Ingram Rd. for bridge work.
- Saturday, October 31. 6 a.m. to 6 p.m. Full closure of southbound mainlanes from Culebra Rd. to Military Dr. for removal of high-mast light.
- Monday, November 2 until Monday, November 9. 9 a.m. to 3 p.m. Single lane closure, in both directions, from Marbach Rd. to Culebra Rd. for concrete pouring.
- Monday, November 2 until Monday, November 9. 8 p.m. to 5 a.m. Alternating single lane closures on frontage roads, in both directions, from Marbach Rd. to Ingram Rd. to bridge work.
- Monday, November 2 until Monday, November 9. 9 a.m. to 3 p.m. Alternating single lane closures on frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for retaining wall work.
- Tuesday, November 3 until Wednesday, November 4. 8 p.m. to 5 a.m. Alternating lane closures on frontage roads, in both directions, from Marbach Rd. to Ingram Rd. for signal light work.
- Monday, November 2 until Monday, November 9. 8 p.m. to 5 a.m. Full closure of northbound mainlanes from Marbach Rd. to Military Dr. for bridge deck work.
- Sunday, November 1 until Monday, November 9. 8 p.m. to 5 a.m. Full closure of northbound frontage road from Marbach Rd. to Ingram Rd. for concrete beam setting.
- Monday, October 26 until Saturday, October 31. 7 a.m. to 7 p.m. Single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for paving operations.
- Sunday, November 1 until Friday, November 6. 9 a.m. to 3 p.m. Single lane closures on frontage roads, in both directions, from W. Military Dr. to S.W. 36th St. for signal improvements.
- Monday, October 26 until Monday, November 2. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Ingram Rd. to Loop 410 for construction of flyover ramps.
- Monday, October 26 until Monday, November 2. 9 a.m. to 3 p.m. Alternating lane closures on frontage road, in both directions, from Loop 410 to Ingram Rd. for construction of flyover ramps.
- Monday, October 26 until Monday, November 2. 8 p.m. to 5 p.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for construction of flyover ramps.
- Monday, November 2 until Monday, November 9. 8 p.m. to 5 a.m. Alternating single mainlane closures, in both directions, from Ingram Rd. to Loop 410 for work on flyover ramps.
- Monday, November 2 until Monday, November 9. 9 a.m. to 3 p.m. Alternating single mainlane closures, in both directions, from Ingram Rd. to Loop 410 for work on flyover ramps.
- Monday, November 2 until Monday, November 9. 9 a.m. to 3 p.m. Alternating lane closures on frontage roads, in both directions, from Loop 410 to Marbach Rd. for work on flyover ramps.
- Monday, November 2 until Monday, November 9. 8 p.m. to 5 a.m. Full closure of eastbound frontage road from Loop 410 to Ingram Rd. for bridge rail demolition.
PA 1535 – N.W. Military Highway
- Sunday, November 1 until Monday, November 2. 9 p.m. to 5 a.m. Double southbound lane closure from just south of Wurzbach Parkway to just north of Wurzbach Parkway for striping operations.
- Wednesday, November 4 until Thursday, November 5. 9 p.m. to 5 a.m. Single lane closures, in both directions, from Loop 410 to Huebner Road for crack sealing repairs.
- Sunday, November 1 until Tuesday, November 3. 9 p.m. to 5 a.m. Single eastbound lane closure from just west of N.W. Military Hwy. to just east of N.W. Military Hwy. for striping operations and barrier installation.
- Sunday, November 1 until Tuesday, November 3. 9 p.m. to 5 a.m. Single westbound lane closure from just east of N.W. Military Hwy. to just west of N.W. Military Hwy. for striping operations and barrier installation.
- Monday, November 2 until Friday, November 6. 8:30 a.m. to 4:30 p.m. Alternating lane closures, in both directions, from Starcrest Dr. to Weidner Rd. for paving operations.
- Tuesday, November 3 until Thursday, November 5. 9 p.m. to 5 a.m. Single lane closures, in both directions, from Lockhill Selma Rd. to US 281 for crack seal repairs.
- Monday, November 9 until Friday, November 13. 8 p.m. to 6 a.m. Full closure, in both directions, from N.W. Military Hwy. to Blanco Rd. for bridge deck cleaning. DETOUR: Traffic will utilize West Ave. and Lockhill Selma Rd.
- Current until further notice. Daily 7 a.m. until 7 p.m. Alternating southbound lanes between Woodlake Parkway and Gibbs Sprawl Road for barrier/pavement work (existing seven total lanes narrowed to three, with one in each direction and a two-way turn lane in the middle).
- Current until further notice. Full-day closure. Southbound lane between Toepperwein Road and Walzem Road for barrier setting work and road rehab work.
- Current until further notice. 9 p.m. until 5 a.m. Eastbound left lane from East Sharon Drive to Charger Boulevard for traffic switch (drivers diverted to the right side for construction access on the right side; left turn lane remains open).
- Wednesday, November 4. 8 a.m. to 5 p.m. Single lane closures, in both directions from US 281 to Loop 1604 for crack sealing repairs.
- Wednesday, November 4. 8 a.m. to 5 p.m. Single lane closures, in both directions, from US 281 to Pleasanton Rd. for crack sealing repairs.
- Friday, November 9. 8 a.m. to 5 p.m. Single lane closures, in both directions, from FM 476 to Loop 1604 for crack sealing repairs.
- Thursday, November 5. 8 a.m. to 5 p.m. Single lane closures, in both directions, from US 90 to FM 1957 for creak sealing repairs.
- Saturday, October 31. 8 a.m. to 10 a.m. Full closure of mainlanes, in both directions, at FM 479 for sign installations.
- Monday, October 26 until Saturday, October 31. 6:30 a.m. to 7 p.m. Ramp closures, in both directions, from Main Street to just east of Stockdale.
RM 32 – Comal County
- Current until Saturday, October 31. 6:30 a.m. to 7 p.m. Single eastbound lane closures from FM 484 to Carpers Creek for roadway improvements.
RM 337 – Bandera County
- Monday, November 9 until March 2021. Full closure of bridge at Mill Creek for bridge replacement.