Friday, July 7

UPCOMING SCHEDULED CONSTRUCTION CLOSURES

Loop 1604 – North West San Antonio/Bexar County

  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Alternating westbound mainlane closure from IH-10 to Bandera Road (SH 16) for portable concrete barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for portable concrete traffic barrier installation. Nightly alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway/John Peace Boulevard for bridge construction. Only one turnaround to be closed at a time on each direction. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Bandera Road (SH 16) full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Hausman Road full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Loop 1604 and Kyle Seale Parkway full intersection closure (both directions, including turnarounds) for bridge construction – concrete rail demolition. Only one intersection to be closed at a time. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 8 p.m. until 5 a.m. Eastbound frontage road lane full closure from John Peace Boulevard/La Cantera Parkway to IH-10 for eastbound direct connector bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 8 p.m. until 5 a.m. Westbound frontage road lane full closure from IH-10 to John Peace Boulevard/La Cantera Parkway for westbound collector distributor bridge construction. Nightly frontage road full closure. Only one full frontage lane closure to occur per direction. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Eastbound I-10 mainlane exit ramp closure to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Sunday, July 9 until Monday, July 17. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf closure from westbound IH-10 to westbound Loop 1604 for westbound collector distributor bridge construction on the bridge at Leon Creek. Nightly closure. Excluding weekends.
  • Monday, July 10 until Monday, July 17. Weekdays 9 a.m. until 3 p.m. Alternating eastbound frontage road lane closure from Bandera Road (SH 16) to IH-10 for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, July 10 until Monday, July 17. Weekdays 9 a.m. until 3 p.m. Alternating westbound frontage road lane closure from IH-10 to Bandera Road (SH 16) for traffic barrier, sidewalk construction and beam placement/bridge construction. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, July 10 until Monday, July 17. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, July 10 until Monday, July 17. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Kyle Seale Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, July 10 until Monday, July 17. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, July 10 until Monday, July 17. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, July 10 until Monday, July 17. Weekdays 9 a.m. until 3 p.m. Eastbound to Westbound turnaround closure at Loop 1604 and Chase Hill Boulevard/Brennan Avenue for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, July 10 until Monday, July 17. Weekdays 9 a.m. until 3 p.m. Westbound to eastbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, July 10 until Monday, July 17. Weekdays 9 a.m. until 3 p.m. Eastbound to westbound turnaround closure at Loop 1604 and La Cantera Parkway for bridge widening. Only one turnaround to be closed at a time. Excluding weekends.
  • Monday, July 10 until Monday, July 17. 12 a.m. until 12 a.m. Eastbound mainlane entrance ramp closure after La Cantera Parkway for eastbound direct connector bridge construction. Weather permitting.
  • Monday, July 10 until Monday, July 17. 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, July 10 until Monday, July 17. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and Hausman Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, July 10 until Monday, July 17. 12 a.m. until 12 a.m. Eastbound to westbound turnaround closure at Loop 1604 and Babcock Road for bridge widening/retaining walls. Only one turnaround to be closed at a time.
  • Monday, July 10 until Monday, July 17. 12 a.m. until 12 a.m. Westbound to eastbound turnaround closure at Loop 1604 and Babcock Road for bridge widening/retaining walls. Only one turnaround to be closed at a time. 

Loop 1604 – North Central San Antonio/Bexar County

  • Sunday, July 9 until Friday July 14. Nightly 9 p.m. until 5 a.m. Alternating eastbound mainlane closure from Tradesman Road to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, July 9 until Friday July 14. Nightly 9 p.m. until 5 a.m. Alternating westbound mainlane closure from Stone Oak Parkway exit ramp to Tradesman Road for barrier setting and striping.
  • Sunday, July 9 until Friday July 14. Nightly 9 p.m. until 5 a.m. Alternating eastbound frontage road closure from IH-10 to Stone Oak Parkway exit ramp for barrier setting and striping.
  • Sunday, July 9 until Friday July 14.  Nightly 9 p.m. until 5 a.m. Alternating westbound frontage road closure from Stone Oak Parkway exit ramp to IH-10 for barrier setting and striping.
  • Sunday, July 9 until Thursday, July 13. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road at the Loop 1604 intersection lane closures for electrical work at the Blanco bridge.
  • Sunday, July 9 until Thursday, July 13. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road at the Loop 1604 intersection lane closures for electrical work at the Blanco bridge.
  • Sunday, July 9 until Sunday, July 16. Daily/Nightly 12 a.m. until 12 p.m. Westbound to Eastbound turnaround long term closure at Loop 1604 and NW Military Highway for bridge substructure. This closure will remain in place for approximately 4 weeks.
  • Thursday, July 13 until Friday, July 14. Nightly 9 p.m. until 5 a.m. Alternating northbound Blanco Road at the Loop 1604 intersection lane closures for traffic switch.
  • Thursday, July 13 until Friday, July 14. Nightly 9 p.m. until 5 a.m. Alternating southbound Blanco Road at the Loop 1604 intersection lane closures for traffic switch.
  • Friday, July 14 at 9 p.m. until Monday, July 17 at 5 a.m. FULL WEEKEND CLOSURE Eastbound mainlane full closure from the Bitters Road exit ramp to the Blanco Road entrance ramp for Blanco bridge demolition, Panther Creek bridge deck pour. Lane closures will remain in place for the entire duration. Mainlane traffic will detour to the frontage roads.
  • Friday, July 14 at 9 p.m. until Monday, July 17 at 5 a.m. FULL WEEKEND CLOSURE Westbound mainlane full closure from the Blanco Road exit ramp to Blanco entrance ramp for Blanco bridge demolition, Panther Creek bridge deck pour; draining crossing at NW Military Highway and level up pavement (westbound mainlane only). Lane closures will remain in place for the entire duration. Mainlane traffic will detour to the frontage roads. 

Loop 1604 – North East San Antonio/Bexar County

  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Full closure on eastbound mainlanes of Loop 1604 from Lookout Road to I-35 for overhead sign removal.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604, right lane entrance ramp closure, and turnaround closure from Nacogdoches Road to Union Pacific Railroad for striping work. Traffic should use Lookout Road intersection.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure from Nacogdoches Road to Union Pacific Railroad for retaining wall demolition work. Traffic should use Lookout Road intersection.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of Loop 1604 from Lookout Road to I-35 for striping and barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Eastbound to westbound Loop 1604 turnaround closure at Lookout Road for construction work. Traffic should use Lookout Road intersection.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604 from Nacogdoches Road to I-35 and exit ramp closure to Nacogdoches Road for barrier work. Traffic should use next exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 to Lookout Road for striping work. Traffic should use prior exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic should use next entrance ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound bypass ramp and entrance ramp closure of Loop 1604 from Nacogdoches Road to Lookout Road for striping work. Traffic should use next entrance ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures on eastbound Loop 1604, entrance ramp closure, and exit ramp closure on eastbound Loop 1604 from Nacogdoches Road to I-35 for striping work. Traffic should use prior exit and next entrance ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Exit ramp closure on eastbound mainlanes of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for striping work. Traffic should use prior exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on the eastbound Loop 1604 collector ramp at the I-35 intersection for striping work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Full closure on westbound mainlanes of Loop 1604 from I-35 to Lookout Road for overhead sign removal.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure at Lookout Road for demolition work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating mainlane closures, exit ramp closure, and entrance ramp closure on westbound Loop 1604 from I-35 to Nacogdoches Road for barrier work. Traffic should use prior exit and next entrance ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road, exit ramp closure, and entrance ramp closure of Loop 1604 from Union Pacific Railroad and Nacogdoches Road for barrier work. Traffic should use next available ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road of Loop 1604 from I-35 to Lookout Road for construction entrance and temporary pavement work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound mainlanes of Loop 1604 to Lookout Road for pavement and striping work. Traffic should use next exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Exit ramp closure on westbound Loop 1604 connector ramp from southbound I-35 to Lookout Road for striping work. Traffic should use next exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Westbound to eastbound Loop 1604 turnaround closure from Lookout Road to Union Pacific Railroad for retaining wall demolition work. Traffic must use Nacogdoches Road turnaround. 

I-10 – North West San Antonio/Bexar County

  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound frontage road closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound frontage road closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating frontage closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 westbound mainlane closure from De Zavala Road to Camp Bullis Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Alternating IH-10 eastbound mainlane closure from Camp Bullis Road to De Zavala Road for portable concrete traffic barrier installation. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from Loop 1604 eastbound to IH-10 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound frontage road entrance ramp to IH-10 mainlanes before La Cantera Parkway (braided ramp) full closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. IH‑10 westbound mainlane exit ramp to Camp Bullis Road closure for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. IH‑10 eastbound frontage road entrance ramp to IH-10 mainlanes after Loop 1604 interchange full closure for bridge construction. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Exit ramp full closure from IH-10 westbound to Loop 1604 eastbound for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from eastbound IH-10 to eastbound Loop 1604 for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound Loop 1604 to eastbound IH-10 for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Ramp/cloverleaf full closure from westbound IH-10 to westbound Loop 1604 for portable concrete traffic barrier installation. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 westbound mainlane closure from the exit ramp at Lockhill Selma Road to Valero Way overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Alternating Loop 1604 eastbound mainlane closure from the Valero Way exit ramp to the Lockhill Selma Road entrance ramp for overhead sign bridge removal. Nightly alternating mainlane closures. One lane to remain open at all times. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. IH-10 westbound frontage road full closure from UTSA Boulevard to the Loop 1604 interchange for bridge construction. Nightly frontage road closure. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Loop 1604 westbound collector distributor from Vance Jackson Road to Valero Way and the Loop 1604 westbound to IH-10 eastbound cloverleaf closure for micropile construction under the IH-10 and Loop 1605 interchange. Nightly closures. Excluding weekends.
  • Sunday, July 9 until Friday, July 14. Weeknights 9 p.m. until 5 a.m. Loop 1604 eastbound collector distributor from Valero Way to Vance Jackson Road closure for micropile construction under the IH-10 and Loop 1605 interchange. Nightly closures. Excluding weekends.
  • Monday, July 10 until Friday, July 14. Weekdays 9 a.m. until 3 p.m. Alternating westbound IH-10 frontage road lane closure from De Zavala Road to Camp Bullis Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends.
  • Monday, July 10 until Friday, July 14. Weekdays 9 a.m. until 3 p.m. Alternating eastbound IH-10 frontage road lane closure from Camp Bullis Road to De Zavala Road to set portable concrete barrier. Daily alternating frontage road closures. One lane to remain open at all times. Excluding weekends. 

US 281 – North San Antonio/Bexar County

  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Borgfeld Rd. for paving operations.
  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Bulverde Rd. for paving operations.
  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Marshall Rd. for paving operations.
  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, at Overlook Parkway for paving operations.
  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, from Marshall Rd. to Borgfeld Rd. of painting operations.
  • Monday, July 10 until Friday, July 14. 9 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from Marshall Rd. to Borgfeld Rd. for stripping operations.
  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from Marshall Rd. to Borgfeld Rd. for concrete work.
  • Monday, July 10 until Thursday, July 13. 8 p.m. to 5 a.m. Single mainlane closures, in both directions, at Cibolo Creek for overlay work.   

I-35 – Central San Antonio/Northeast San Antonio/New Braunfels/Comal County

  • Current until Saturday, July 15, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Fratt Road for construction work.
  • Current until Wednesday, August 2, long term closure (24/7). Left lane closure on southbound I-35 frontage road between Toepperwein Road and Judson Road for soil nail wall, drill shaft, column, and cap work.
  • Current until Tuesday, August 15, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for temporary pavement, striping, barrier, column, and cap work. Traffic should follow detour signs.
  • Current until Saturday, December 23 long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Rolling closure project-wide for sweeping operation.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway. for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes and entrance ramp closure of I-35 from Roy Richard Drive to Evans Road for striping, barrier, and temporary pavement work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Schertz Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should follow signs to next available ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Roy Richard Drive to Schertz Parkway for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Roy Richard Drive to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next entrance ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Schertz Parkway. for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road of I-35 at Forum Parkway for striping, barrier, and temporary pavement work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Full closure of northbound frontage road of I-35 from Loop 1604 to Forum Parkway for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound I-35 mainlanes from Forum Parkway to Evans Road for striping, barrier, and temporary pavement work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for temporary pavement, striping, and barrier work. Traffic should follow detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Olympia Parkway to Gateway Boulevard for bridge foundation, temporary pavement, striping and barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Evans Road to Olympia Parkway for bridge foundation, striping, barrier work, and temporary pavement work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Southbound I-35 entrance ramp closure from Old Austin Road to Forum Parkway for striping and barrier work. Traffic must use the Forum Parkway turnaround and follow detour signs to access southbound I-35.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Corporate Drive to Olympia Parkway for striping, barrier, and temporary pavement work. Traffic should use prior exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes and entrance ramp closure of I-35 from Retama Parkway to Forum Parkway for striping work. Traffic should use next entrance ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Traffic shift to the left on eastbound Evans Road and alternating lane closures on southbound frontage road of I-35 at Evans Road for temporary pavement work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to northbound I-35 connector ramp closure for striping and barrier work. Traffic should follow detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Northbound I-35 to westbound Loop 1604 connector ramp closure for striping and barrier work. Traffic should follow the detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 collector to southbound I-35 connector ramp closure for barrier work. Traffic should follow the detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Eastbound Loop 1604 to southbound I-35 connector ramp closure for striping and barrier work. Traffic must exit at IKEA-RBFCU Parkway and follow the detour signs to southbound I-35.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Westbound Loop 1604 to southbound I-35 connector ramp closure for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Southbound I-35 to eastbound Loop 1604 connector ramp closure for striping, barrier, and earthwork. Traffic must exit at westbound Loop 1604 and follow the detour signs to access eastbound Loop 1604.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Southbound I-35 collector ramp closure at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic must use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Southbound I-35 to westbound Loop 1604 connector ramp closure and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for striping and barrier work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, and flagging operation on I-35 Access Road from I-35 Access Road to Loop 1604 interchange for striping, barrier, and temporary pavement work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Full closure on northbound frontage road of I-35 and entrance ramp closure from Shin Oak Road to Pat Booker Road for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Full closure of northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Pat Booker Road to Loop 1604 interchange for striping, barrier, and temporary pavement work. Traffic should follow detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road to Forum Parkway for striping, barrier, and temporary pavement work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound mainlanes of I-35, alternating exit ramp closures, and entrance ramp closure from Toepperwein Road to Loop 1604 for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Southbound frontage road of I-35 traffic must follow detour.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road for striping and barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to Ferrell Road for striping, barrier, and temporary pavement work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (3) on southbound mainlanes of I-35 from Pat Booker Road to I-35 Access Road for bridge substructure work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, entrance ramp closure, and alternating exit ramp closures of I-35 from Judson Road to Shin Oak Drive for barrier work. Traffic should follow the detour sign to the available ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound frontage road, right lane closure on northbound mainlanes, and exit ramp closure of I-35 from Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and westbound at the intersection of Judson Road and Randolph Boulevard and left lane closure on Randolph Boulevard at Judson Road for temporary pavement and signal works. Traffic should use the next exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on northbound mainlanes of I-35, entrance ramp closure, and alternating exit ramp closures from O’Connor Road to Toepperwein Road for barrier setting and structures work. Traffic should follow the detour signs to the available ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple right lane closures (2) on southbound I-35 mainlanes, entrance ramp closure, exit ramp closure, and left lane closures (2) on southbound frontage road of I-35 from Judson Road to O’Connor Road for striping, barrier, and paving work. Traffic should use next entrance and exit ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Judson Road to O’Connor Road for striping work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Toepperwein Road at I-35 for barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 from Judson Road to O’Connor Road for earthwork, paving, striping, and barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35, exit ramp closure, and left lane closure on southbound frontage road of I-35 from Toepperwein Road to Judson Road for earthwork and barrier work. Traffic should use next exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Pat Booker Road to Judson Road for structures work. Traffic should use next entrance and exit ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35, entrance ramp closure, and exit ramp closure from O’Connor Road to Weidner Road for earthwork, paving, striping, and barrier work. Traffic should use next entrance and exit ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Right lane closure on westbound and eastbound of Weidner Road at I-35 for barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and entrance ramp closure from Weidner Road to Thousand Oaks Drive for earthwork and barrier work. Traffic should use prior entrance ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, alternating entrance and exit ramp closures, and alternating lane closures on southbound frontage road of I-35 from O’Connor Road to Weidner Road for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on southbound mainlanes, entrance ramp closure, exit ramp closure, and alternating lane closures on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for striping work. Traffic should use the next exit and entrance ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for permanent widening, striping, and barrier work. Traffic should follow detour signs. Accommodations will be made for local traffic.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on southbound frontage road of I-35 and exit ramp closure from Thousand Oaks Drive to Randolph Boulevard for permanent widening work. Traffic should use prior exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on northbound and southbound of Interchange Parkway from Austin Highway (Loop 368) to Walzem Road and multiple lane closures (2) on eastbound and westbound of Fratt Road from I-35 southbound frontage road to Austin Highway (Loop 368) for barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Exit ramp closure on northbound mainlanes and left lane closure on northbound frontage road of I-35 from Walzem Road to Crestwind Drive for drilled shaft work. Traffic should use prior exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance ramp closure of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Exit ramp closure on southbound mainlanes and alternating lane closures on southbound frontage road of I-35 from Randolph Boulevard to Walzem Road for geotechnical, drilled shaft, and column work. Traffic to use next exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Right lane closure on southbound mainlanes of I-35 from Randolph Boulevard to Walzem Road for cap work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on southbound frontage road of I-35 from Fratt Drive to Walzem Road for drilled shaft and column work. Traffic to use next entrance ramp. 

I-10 – East San Antonio/Bexar County/Guadalupe County

  • Friday, July 7 until Monday, July 10. 9 p.m. to 5 a.m. Full closure of the mainlanes, in both directions, at Santa Clara for bridge demolition.
  • Friday, July 14, 9 p.m. to Sunday, July 16 5 a.m. Full closure of the eastbound mainlanes at FM 1518 for traffic switch.
  • Continuing through Saturday, July 15. NIGHTLY full westbound I-10 closure at I-410 from 9 p.m. to 5 a.m. for bridge work. Detour:  WB I-10 traffic can take the exit towards the I-410 collector ramp and continue straight to reenter I-10. (No closures on Friday and Saturday nights).
  • Continuing through Saturday, July 15. DAYTIME westbound I-10 frontage road alternating lane closures from Ackerman Rd. to I-410 from 9 a.m. to 4 p.m. for overpass work. (No closures on Sunday) 

I-410 – North East San Antonio

  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound I-410 connector ramp to southbound I-35 for column work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on eastbound mainlane of I-410 from Austin Highway (Loop 368) to Randolph Boulevard for barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and eastbound to westbound turnaround closure between Starcrest Drive and Perrin Beitel for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work. Traffic should follow detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Entrance ramp closure on westbound frontage road and exit ramp closure of I-410 to Austin Highway (Loop 368) for barrier work. Traffic should follow detour signs.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (3) on westbound mainlanes and exit ramp closure of I-410 from I-35 to Perrin Beitel for striping and barrier work. Traffic should use next exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple lane closures (2) on westbound I-410 mainlanes from I-35 to Austin Highway (Loop 368) for cap and barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on westbound frontage road and exit ramp closure of I-410 from Perrin Creek to Perrin Beitel for drilled shaft work. Traffic to use next exit ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway (Loop 368) connector ramp to westbound I-410 for barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on northbound Austin Highway (Loop 368) from Walzem Road to Interchange Parkway for barrier work.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Multiple left lane closures (2) and entrance ramp closure on eastbound frontage road of I-410 from Nacogdoches Road to Harry Wurzbach Road for striping and barrier work. Traffic should use next entrance ramp.
  • Sunday, July 9 until Saturday, July 15. 9:00 p.m. to 5:00 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and exit ramp closure from Harry Wurzbach Road to Starcrest Drive for striping and barrier work. Traffic should use prior entrance and exit ramps. 

I-410 – East San Antonio

  • Continuing through Saturday, July 15. NIGHTLY full southbound I-410 mainlane closures at the I-10 interchange from 9 p.m. to 5 a.m. for bridge construction. Detour: SB I-410 traffic can take the exit towards the I-10 collector ramp and continue straight to reenter I-410. (No closures on Friday and Saturday nights).
  • Continuing through Saturday, July 15. NIGHTLY periodic alternating northbound I-410 mainlane closures at the I-10 interchange from 9 p.m. to 5 a.m. for bridge construction. (No closures on Friday and Saturday nights).
  • Continuing through Saturday, July 15. DAILY periodic alternating northbound and southbound I-410 frontage road closures between the I-10 interchange and Rigsby Rd. from 9 a.m. to 4 p.m. for bridge and road work.
  • Friday, August 4 through Sunday, August 6. I-10 and I-410 interchange CLOSED. All east and westbound I-10 and all north and southbound I-410 traffic diverted to frontage roads and other routes. Expect long delays. Seek alternate routes. 

I-410 – West San Antonio

  • Friday, July 7 until Monday, July 10. 8 p.m. to 5 a.m. Alternating mainlane closures, in both directions, from US 90 to SH 151 for striping operations.
  • Sunday, July 9 until Monday, July 10. 9 p.m. to 5 a.m. Single lane closures, in both directions, from Valley Hi Dr. to Aldrich Dr. for overlay work. 

PA 1502 – Wurzbach Parkway

  • Current until Friday, August 4. 8 p.m. to 5 a.m. Various lane closures, in both directions, from N.W. Military Highway to Wetmore Rd. for paving operations.
  • Current until Monday, July 31. 9 a.m. to 3 p.m. Alternating lane closures, in both directions from N.W. Military Highway to Weidner Rd. for roadway improvements. 

FM 1535 – Northwest Military Highway

  • Monday, July 10 until Friday, July 14. 7 a.m. to 6 p.m. Alternating lane closures from Loop 1604 to Huebner Rd. for traffic switch. 

US 90 – West San Antonio/Bexar County/Medina County

  • Current until Friday, July 21. 8:30 p.m. to 5 a.m. Single eastbound lane closures from I-35 to Loop 410 for guard rail repairs.
  • Current until Tuesday, July 11. 9 a.m. to 3 p.m. Single eastbound mainlane closure from Enrique Barrera overpass to S. Callaghan Rd. for deck repairs.
  • Sunday, July 9 until Friday, July 28. 8:30 p.m. to 5 a.m. Single lane closures on the frontage road, in both directions, from Loop 410 to W. Military Dr. for mill and overlay operations. 

SH 16 – Bandera Road

  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A for sidewalk and curb installation.
  • Monday, July 10 until Friday, July 14. 7 a.m. to 7 p.m. Alternating lane closures, in both directions, from Loop 1604 to Circle A for asphalt work. 

SH 151 – West San Antonio/Bexar County

  • Thursday, July 13 until Friday, July 14. 9 p.m. to 5 a.m. Single lane closures, in both directions, from W. Military Dr. to Potranco Rd. for striping operations. 

I-10 Kendall County

  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating mainlane closures, in both directions, at Fredericks Creek Bridge for bridge work.
  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating lane closures on the frontage roads, in both directions, from SH 46 to US 87 for painting operations.
  • Monday, July 10 until Friday, July 14. 9 a.m. to 3 p.m. Alternating lane closures, in both directions, from Scenic Loop Rd. to Fredericks Creek for vegetation work.
  • Monday, July 10. 9 a.m. to 3 p.m. Single eastbound mainlane closure from Johns Rd. to SH 46, including exit ramp 540, for metal beam guard fence work.