Wednesday, November 22

Mail Bag: Turnarounds along I-10 East, resurfacing on Lp 1604 and more

I recently discovered a historical marker on Ammann Rd just east of SH 46, celebrating the Pinta Trail. If I had not checked out the Historical Commission of Texas' website, I would have never knew it existed. Are there not a lot of historical marker directional signage on state-maintained roads in Kendall County? I seem to see them in many other portions of the State, but maybe I'm missing the forest for the trees in my own area.
- Mark

This question caused us to go back to our Manual for Uniform Traffic Control Devices and our traffic operations gurus to find a good answer. Section 2M.11 covers these specific signs.
You're welcome to peruse the MUTCD on your own at any time. It's a handy guide for understanding the why's behind the what's with our signs.
Alright ... the answer (in plain English): We provide signs for all historical markers that are within our right-of-way and are outside city limits. In this case, the marker may have fallen outside our right-of-way and may even be in city limits.
If there are any markers you're seeing without these call-out signs that fit the bill of being in our right-of-way and are outside city limits, let us know!

The schematic for the IH 10 E & FM 1516 intersection calls for a complete reconfiguration, with turnarounds in both directions (for 1516) and two lanes in each direction for the underpass, including replacing existing riprap with retaining wall. Presently TSC has used the eastern half of the 1516 overpass to install an east-to-west turnaround. Why does this differ from the project schematic? And when will the 1516 intersection be reconfigured to match the schematic? If TSC bid an alternate to the schematic, why wasn't the public notified?
- Marshall

Great questions, Marshall. For argument's sake, let's use the schematics posted online as our base for this conversation. Fair?
These schematics are preliminary and used to explain what our overall vision for the project is. This vision remains.
Yes, we fully intend to construct turnarounds at the FM 1516 intersection as we had presented during our public meetings on the work being done. During the detailed design stages of the project we discovered an elevation issue with this intersection, however. If we were to construct the turnarounds under the current bridge, as shown in the preliminary schematics, we would end up with either (1) turnarounds rendered unusable by large trucks because the clearance under the bridge is too short or (2) major flooding problems from turnarounds cut deeply into the ground and set well below the elevation of the roadway around it.
The solution? Build a new bridge.
That's happening during the expansion of I-10 set to begin later next year. We're adding a lane in each direction between I-410 and Loop 1604. In doing this, we're also replacing many of the overpass bridges - including the bridge over FM 1516 - and making them longer, taller and wider. After this bridge work is done the turnarounds will be built permanently.
The turnarounds you're seeing built right now to serve eastbound-to-westbound traffic is a temporary turnaround conceived to ease traffic pressures at the intersection with the one-way roads. We've actually change-ordered this temporary turnaround into the contract Texas Sterling has; their plans never included the turnarounds earlier.

Why is the Thousand Oaks exit off I-35 closed and is this permanent?
- Lucille

It is permanent - and rather than call it "closed" we would call it "moved". We discussed this in a video post earlier, but we moved the exit south a bit to improve the overall operation of the highway out there.

I noticed Asphalt Milling Machines and rollers parked on this of 1604 West bound close to La Cantera. If this for a TxDOT project on 1604 or something else?
- Zane

Nope, that's us! We are resurfacing Loop 1604 (main lanes and frontage roads) between Bandera Road and Rogers Ranch/Bitters Road. Work started back in October and will continue until summer 2018. Expect to see daytime work on the frontage roads. We'll stay off the main lanes during the day, though. Don't expect to see that overnight activity until temperatures heat up, this upcoming spring.

On the SH 16 & 1604 project I see that the base is layers of asphalt. What's the life span for this method? It doesn't seem to work long on normal street traffic.
- Pamela

This is actually pretty standard for us. There are several layers to a roadway. The Express-News did a really interesting story about the Recipe for a Roadway almost two years ago. It's definitely worth a look.
Any roadway is a lot like an onion - there are several layers most of us never see or fully understand. What's more, those layers are not all asphalt - we often mistake other layers as mere digging or blading, when we're really building those additional non-asphalt layers.
Our depths are different than what you see on a city street or in your subdivision - that's important to keep in mind. While many municipal roadways measure their depth in inches, ours are measured in feet. That base of asphalt is at least 18 inches deep and rests atop base layers of a variety of compacted soils.

What is the status of putting the steel beams in place for hwy 151 over 410? I remember a while back it was supposed to occur in November. Now there appears to be no word of it. In fact it seems the hwy 90 work is going faster than 151.
- Steve

The beams should be here in January, and we could be setting beams as soon as February. This falls within the timeframe given back in June.
As for project pace, please do not refer to a single aspect of the projects to make an overall assessment of the progress of projects. Doing so can set yourself up for an unreasonable expectation on both projects.
To be honest, both jobs are on their predetermined pace; the 151-410 project is set to wrap up late summer 2018 as promised when we broke ground. The 410-90 project still has quite a bit of work remaining. While you're seeing steel beams placed, you'll carefully note the frontage work now nearly done on the 151-410 project has a long way to go. You'll also note the bridge work and work on the ramps at Marbach has just begun and has more than a year before that's complete. That sort of work on the 410-151 job has nearly finished.
Hopefully that helps.

Wednesday, November 15

Mail Bag: new signal in New Braunfels, turnarounds at Marbach, 410-151 intersection

First, I want to say I am happy to see a traffic light at the intersection of Hwy 46 and FM 758 in New Braunfels! I travel through this intersection twice a day and it is very dangerous attempting to turn left onto 46 from FM 758. I would like to ask if we will see a flashing yellow left turn for 758 bound traffic from 46.
An instructive gif we used when we turned away
from the left turn yield on green arrangment in San Antonio.
I can already see a red left turn light there causing unnecessary congestion/delay and even making access to Clear Springs restaurant an issue for opposite 46 traffic.
- John

To paraphrase our traffic operations engineer: Yessir! This signal cycle will include a flashing yellow arrow signal. For those who don't know what that means, the flashing yellow arrow allows drivers taking a left to proceed cautiously if the coast is clear. This allows a better traffic flow and minimizes the need for long green time for a secondary movement at a signal.
Timing of the signal, once it's been installed and good to go, will be managed by our friends with the city of New Braunfels.

Closure of the turnarounds at Marbach was very bad planning. It is creating very bad traffic jams on the access roads. I can't believe this bad situation is going to last more than a year.
- Ed

We understand it's difficult, but it's necessary. With the amount of overhead work we're doing and the fact we need to work on the bridge support shelves (called abutments) it's simply impossible to keep the turnarounds open at a location like this. The closure is pretty standard for any construction of the type we're doing.
To mitigate the impact we are working with San Antonio Transportation and Capital Improvements, the city department with oversight for traffic signals and other roadway issues, to optimize the signal timing at the intersection to handle the additional traffic.
As for the duration ... well, we could have them opened back up a LOT faster if we were able to build the bridge all in one shot. That would mean, of course, fully closing I-410 for about eight months while we totally rebuilt the bridge. We'd carry all the main lanes traffic on the frontage roads through the Marbach intersection.

The last major rain event saw pretty bad puddling on the southbound I-410 exit for Hwy 151. What are you doing to fix this?
- Several

We added new asphalt to reverse the flow of water, and so far it's been working wonderfully. The water now runs to the area between the frontage road and exit ramp and drains to the north on up to Leon Creek. Barring a major rain storm, which brings puddling everywhere no matter what we do, we shouldn't see any major issues at this location as long as this temporary ramp is still in use.
Long-term, the exit ramp for Military Drive and the Westover Marketplace shopping center will move back to the north of Leon Creek. That's still on its way.

Wednesday, November 1

Hwy 46 getting a new road surface next few weeks

If your commute in New Braunfels includes Hwy 46 between I-35 and FM 758 expect minor delays due to construction between November 6 and November 17.


What/When
Overnight closures of the middle portion of Hwy 46 between I-35 and FM 758 tomorrow (Thursday) night, Friday night, Saturday night and Sunday night. Each night crews will begin about 8 p.m. and will be cleared out by 6 a.m. each morning.
Daytime closures of alternating lanes on Hwy 46 between I-35 and FM 758 begin Monday, November 6 and will run through Friday, November 17. Work will begin 9 a.m. and wrap up by 4 p.m. each day.
During the daytime closures we will make sure we have one lane open in each direction. The last few days of this closure will be a "rolling" closure, with crews slowly progressing along the route.


Why/How
We are resurfacing Hwy 46, and we're almost done with the work we've been tackling out there the last few months. The overnight work will let us mill the middle of the road to just about match what's out there on the rest of the road right now.
The daytime work will allow asphalt crews to do their thing. The top layer of asphalt we're laying is a fairly thin layer of specialized surface asphalt. Because of the way it's made up and because of how thin it is, we have to have temperatures of 70 degrees and rising. This pretty much prevents us from doing work overnight this time of the year.
Once pavers are done with their work a striping crew will follow to set lane markers.


By the way
A new traffic signal on Hwy 46 at FM 758 will be installed November 6. It should only take a day to install, so if you drive through the area expect to see those flashing beacons replaced by a full signal during your evening commute.
If something pops up to delay us at all, that signal will be in action by November 7.
Ordinarily we put new signals on "flash" mode to drum up awareness of the signal. In this case, since a beacon already exists at this spot, we're going to go ahead and immediately turn the signal on with full functionality.

Wednesday, January 18

Mail Bag: Loop 1604, Bandera Rd, I-35, I-10, Hwy 46

So ... we recently re-discovered a number of questions that were sitting un-answered in our blog post drafts list for well over a month. Without any further ado, here are the answers.

Are there any plans on reducing congestion on 1604 around Bandera? There are just way too many vehicles during morning and evening commute times that make getting to or from I-10 a 30-plus minute ordeal.
- Rudy
In a word, yes. However, we're still quite a while away from getting to anything. The real traffic issues here are the ramp configurations at both ends. On one side you have some capacity issues amplified by the cloverleaf intersection. On the other you have traffic slowing and backing up onto the highway main lanes because the ramp is near the cross road.
First there's the issue of that intersection of Loop 1604 and I-10. This whole issue is being taken up by the Metropolitan Planning Organization, which determines our strategic approach to transportation planning in the region, and the Alamo RMA (they're the lead agency on Loop 1604, actually).
At this point a lot of stuff is still up in the air, but we're estimating a cost of about $575 million to add two managed lanes in each direction between Bandera Road and US 281. Right now this is listed in our Project Tracker as something we'll get after early 2020 - but all that really means at this point is we've got it on our radar and we're working to make it happen, but it's currently unfunded.
The cloverleaf issue will partially be addressed with direct connectors running from managed lanes of Loop 1604 to managed lanes on I-10. the current $85 million project on our list addresses traffic outside Loop 1604 but won't help those headed from, say, Bandera Road to the USAA complex.
Again, right now we're still in the planning stages of all this, working out configurations and funding sources and all sorts of stuff. But it is on our radar!
As for that evening commute headed through Bandera ... that's a solve we're looking into as a part of potential stop-gap measures between now and the managed lanes projects. For that westbound movement to Bandera, a simple ramp reversal project - where we swap the entrance and exit ramps between Hausman and Bandera roads - could work wonders. This is something we're just looking into as a possibility to do in the nearer term, and we do not have details yet.
We do not yet have schematics or drawings for any of these jobs we're ready to make public.

What is the status of the re-do of the environmental survey required for expanding 1604 from I-35 to Bandera Rd? When can we expect to see this much needed project get started. I have a one hour commute home daily from Stone Oak to the Fair Oaks area, with most of the congestion on 1604 west bound.
- Peter
Simply put, the environmental survey is on hold at the moment. The Alamo Regional Mobility Authority is the lead agency on this, and they are waiting to identify a viable finance plan (see above) before they invest again in the environmental documents process.

I noticed construction going on at I-35/North New Braunfels. Are there plans to widen the North New Braunfels bridge over I-35?
- William
We're not just widening the bridge, William, we're totally replacing it. A major closure of I-35 a couple of weeks ago really got this kicked off. Right now we've got one lane of traffic in each direction on the bridge while crews replace the first half; we'll go into a second phase in a few months where we'll swap traffic over and finish the job. Bottom line: we'll be wrapping up this project by early 2018.
By the way, the new bridge will look a lot fancier. It's designed to look more like the Walters bridge, which should improve the aesthetics of the area.

When will construction begin on the north overpasses (connectors) of 1604 and 281?.
- Jose
This year! We're working to plan our ground-breaking ceremony (spoiler: the governor will come down for this!) in the early spring. We're receiving bids in February and should be underway around the end of the school year.
This project includes the expansion of US 281 between Loop 1604 and Stone Oak Parkway.

I noticed construction zone signage in place on State Hwy 46 just east of the Boerne city limits. What type of project is planned?
- Mark
A project that's not in San Antonio? You don't say! We have a lot of projects out of the metro area, and this is one of them. It's a pretty up-front job out there; we're adding passing lanes at strategic locations between Boerne city limits and the Kendall-Comal county line. This is a project we just got going with and we still have plenty to go; expect to see completion in 2018.

I've read about the zipper merge and how some states are 'retraining' their drivers to use it. I think TxDOT should do a retraining campaign. This is great info and more people need to see it. I, too, thought it was rude to go to the front of the line. But it's a good thing.
- Carolyn
We're working on one! You've likely seen our post on the zipper merge already. Share it with friends! We are working with our friends in Austin to begin state-wide awareness campaigns. The zipper works!

Question: Are you really not going to make I-10 a three-lane road each way? This is ridiculous or just job preservation (built-in functional obsolescence). You have everything set-up to make it a three-lane road, but won't. Why? It's going to cost so much more to do it in two or three years. I don't expect you to respond, but I just had to mention this.
- John
Our notes remind us, John, you're talking about the I-10 work between Ralph Fair Road and Fair Oaks Parkway that's going right now. That project adds an overpass at Old Fredericksburg Road and converts the frontage roads to one-way.
No, we're not adding any lanes. Really, really.
Why not? A couple of reasons. First, money. We simply don't have it in the budget at the moment. We also don't have the environmental clearance to do that yet.
Now, we do have clearance to add lanes (making a total of four in each way) between La Cantera Parkway and Ralph Fair Road. That's set to start later this year (likely mid- to late-summer).

Tuesday, October 25

Mail Bag: A month-plus worth of questions

Does TxDOT evaluate drainage conditions on major roads after a major rain?
The left lane of the southbound 281 access road between Bitters and Wurzbach Parkway was under water Monday morning (9/26). The on-ramp to 281 was also under water with a stalled car on the ramp. Since there was not a flood gauge on the side of the road, it was hard to know how much water was on the on-ramp.
- Tom

We do take a look for problem areas and find ways to address these areas as needed after our major flood events. At your location we don't have a posted flood gauge because it's not the location of a creek bed. Per our Manual for Uniform Traffic Control Devices:
"If used, the Depth Gauge sign shall be in addition to the ROAD MAY FLOOD, WATER CROSSING, or WHEN FLOODED TURN AROUND DON'T DROWN sign and shall indicate the depth of the water at the deepest point on the roadway." (Section 2C.35.03)
That same section tells us not to post a "water crossing" sign where water only occasionally or temporarily crosses due to flash floods, like this instance. The "road may flood" sign is for areas with frequent flooding issues. This little section of the southbound frontage road of US 281 does not qualify for one of these signs.

Do you know when will they begin to finish the clover on 1604 and 281? What is the projected duration of the project? Will they be expanding 281 from 1604 to Overlook Parkway and be adding bridges across the highway - for example, at Evans Road? Thanks.
- Sal
Are you talking about the other direct connectors at the intersection of Lp 1604 and US 281? Those are part of a project expanding US 281 to include overpasses and frontage roads through Stone Oak Parkway. That project is set to begin spring 2017 and will take more than three years to complete. Continuing the expressway from Stone Oak Parkway through the Comal County line is targeted for the winter of 2018-2019.

Can VIA provide new or modified bus route(s) to relieve traffic congestion in the Alamo Ranch area (e.g, Wiseman west of 1604, Alamo Ranch Parkway, Culebra & FM 1560, etc.)?
- Richard
This would be a fantastic question to pose to VIA; we can't speak on their behalf.

Regarding the "zipper merge", does the "merge at the last minute" rule apply to lanes which are used for entrance and exit ramps such as the ones on Loop 1604 between I-10 and Blanco Rd? Would it be possible to post "zipper merge" signs at several needed places in San Antonio?
-Tom
To be honest, we're still fleshing out the best places for us to use the late merge or "zipper" as well as signing policies. One place you should always use it is when you're approaching a construction zone or a crash scene that's got lanes closed off. Remember - this really only applies during heavy traffic. If traffic is free flowing and not all that congested, merge as soon as you feel comfortable.
As for what to do at those ramp merge points, a good rule of thumb is to not cross a solid line. Wait for the broken line. That's supposed to show drivers where merging is to be done, but not everyone has gotten that memo.

Hi, I think someone wrote up the construction notices incorrectly this week. Your notice said "Current through Wednesday, October 19. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, at Hwy 151. Alternating lanes will close while crews do overhead bridge work. Traffic will use the frontage roads to reach its destination."
1604 was closed off in the middle of the day all day Saturday, causing backups and gridlock. What happened here?
- Rick
Rick, you're absolutely correct. We completely missed the note regarding that closure and dropped the ball. We depend on contractors sending in closure alerts weekly by Thursday night in order to allow our communication staff time to get everything compiled into a weekly report. Sometimes a contractor misses this Thursday deadline, and we're working on getting accountability written into our contracts to prevent this. We're also working to ensure accountability exists when no notice is given.
In this case, it was an oversight - one that won't soon be repeated.

How far towards Canyon Lake is the FM 306 expansion project going to go?
All the way thru to Hgy 281?
- LD
The current work we have going runs from about Hunter Road and ends at River Chase. We have another project at the intersection of Bravo, near Canyon Lake, but that's constructing a left-turn lane at that location and won't expand the road beyond that.

What is the purpose of the new overpass at I-10 and Leon Spring Road?
- Jim
Jim, we're assuming you're talking about the work at Old Fredericksburg Road. If we're wrong, let us know.
We do get asked about the purpose from time to time, and some folks assume it's a widening project that will add capacity to the I-10 main lanes. It's not. All we're doing is adding this new overpass at Old Fred and converting the frontage roads to one-way.
The frontage road conversion is the key here; it's about safety, really. We're hoping to eliminate the excuse those on two-way frontage roads have when they end up driving the wrong way on an interstate. In order to do that, though, we need to shorten the distance for folks between their access point to I-10 and their feeder road. Old Fred cuts the distance between Ralph Fair and Fair Oaks roughly in half.
It also provides an additional distribution route for traffic from the growing Leon Springs/Fair Oaks Ranch area to reach I-10. Right now all that traffic is squeezed into Ralph Fair and through Fair Oaks. With this overpass and its accompanying entrances and exits, we're effectively adding a third option for folks to use in order to reach I-10 and commute into town as they are.

When will the construction of the north bound I-10 off ramp at Hwy 46 in Boerne be completed? This has been going on with little completion for over a year and there doesn't seem to be much current effort to complete it. This intersection is a daily mess. Thanks!
- Mike
We're still looking at spring 2017 for completion of this project. We don't have anything going on at the intersection, though, so we shouldn't really be impacting that much at all. None of the lane shifts we've had there actually impacts the operation of the intersection. What you're likely seeing in your daily commute is additional traffic from a rapidly growing section of Boerne.

On Hwy 46 just East of Boerne the speed limits coming into town are way to fast. There has already been a fatality accident in that area. Traffic should slow down before the Esperonza sub division. Traffic from there to Charger Blvd should not be 50 mph, and from there to the bend at the Kendall County Fair Grounds should be lower than 45. Speed is a proven factor in all accidents. This area is becoming very populated. The limits really need to be lowered. Please!
- Rodney
Rodney, there's a specific process for setting our speed limits and our processes rarely yield a lowered speed limit. That said, we checked with our traffic engineer, who dug this information out for us about a rarely used provision in our policy allowing local governments to conduct their own speed studies on state highways, then make their own recommendation to us:

==================================================
TxDOT’s Procedures for Establishing Speed Zones, Chapter 4, Section 2Speed Zones Unacceptable to a CityAlthough TxDOT has the authority to alter the speed limits on highways within the corporate limits of cities or override a speed limit set by city ordinance on such highways, it is intended that studies be made and recommendations be presented to the city for their acceptance and passage of a city ordinance to establish city speed zones. TxDOT should make every effort to have reasonable speed limits established.In the event that a city will not accept the zones within its corporate limits as submitted by the district, and it is not possible to reach an agreement with the city on reasonable and prudent speed limits, then the district should prepare one strip map showing the city’s preference and one strip map showing TxDOT’s  recommendation. Both strip maps should be submitted to TRF along with the district’s request for Transportation Commission action for making one of the zones effective.  When the commission minute order has been passed, the district should send a copy of the minute order, along with a copy of the strip map, to the city.The setting of speed limits within a city by commission minute order should only be used as a last resort; TxDOT should make every effort to secure the cooperation of the city so that the zones will be set by city ordinance.
==================================================

Monday, August 29

Mail Bag: What's happening on I-10 between Foster and Graytown roads?

When are the project for improvements to I-10 between Foster Road and Graytown Road, including the Woodlake Pkwy overpass scheduled to begin? Will the frontage roads be rebuilt before they are converted to one way? How soon will traffic lights be added to the 10/1516 intersection?
- Marshall

Those who don't know what Marshall is talking about can check out our project information page here.
The $65.3 million project was awarded to Texas Sterling Construction earlier this summer, and we've been working out some details in some materials used. See, our pavement engineer has marked this job to conduct a pavement materials experiment that could help us save tens of millions statewide and improve the life of our roadway. We had to make sure the supply of materials needed - geogrid - was available for the project.
We'd like to get started on this project before Halloween (we're still getting our contracts drafted, and a three-month gap between letting and project start is fairly standard). The frontage roads won't be converted to one-way until the third phase of work, which comes once the new overpass at Woodlake Parkway is finished up. Don't expect to see that happen until 2018.
As for the traffic signals at the intersection of I-10 and FM 1516 ... those will be completed near the end of the project, after we've got the frontage roads and intersections reconstructed. (It's called for in Phase V Step 4B, if you're really interested in the detailed timing.)

Concerning the work activity at Hwy 46 and Hwy 281: Before the construction, two lanes were allowed to turn left from westbound Hwy 46 to southbound Hwy 281 (the middle lane could optionally go straight or turn left). Why has this configuration changed to only one left turn lane?
- Tom

Thanks for your note, Tom. You weren't the only one to reach out and ask about this issue. Unfortunately incorrect signs were installed and, for a while, it seemed as though the dual-left option was being removed.
This was corrected 18 August. The current configuration should be: Left lane is left only, middle lane is optional through or left, right lane is through only.

Is there any QA/QC project acceptance done by TxDOT? The firm working the Boerne Stage Rd-Leon Springs project has a lot of rough patches. The only ramp between Ralph Fair and BSR has a big tilt halfway along the length. The new on ramp at Leon Springs going west is the same.
- Matt

Having driven this length ourselves a few times, we're guessing you're talking about the rougher base surface that's now out there when compared to completed ramps and roadway, where things are a bit smoother. This is a common observation on our projects.
See, when we put our contracts together, we require a warranty on the asphalt that's put in. If the asphalt deteriorates under traffic, the contractor is required to replace it at their own cost. Because of this, contractors typically wait until the very end of the project to lay down that final surface of asphalt that's more expensive and tends to wear out a little faster (has to do with the size of the aggregate in the mix).
So what you're driving on is a temporary surface ... well, sort of. It's actually the base layer of asphalt on which we'll lay down the final surface later. That final surface is 1-2 inches thick while the base is 12-18 inches thick.
As for the westbound exit to Ralph Fair ... that ramp is a temporary ramp and will be replaced with a permanent ramp anyway.
So ... yes, we do have quality assurance and project acceptance on every TxDOT project. However, we're not ready to accept the project and are waiting for the project to be complete - which, in this instance, is around the end of the year.

Old Fredericksburg road at Ralph Fair Road is now a very dangerous intersection. Attempting to cross four lanes of traffic here is extremely unsafe at many busy times of the day. While visibility is close to zero many people still attempt the crossing. Even crossing two lanes from Ralph Fair onto Old Fred behind the Valero is difficult. Are any changes planned for this intersection?
- Deb

Part of your issue here is traffic volume, to be perfectly honest. We've seen a five-year low of 7,800 vehicles per day on Ralph Fair, capped by more than 11,000 cars per day in our five-year high. While we do see some flux from year to year, the trend is upward - and the range there is pretty significant.
So, what's the plan for the future? That's a complicated question, though it may not seem like it should be.
The state's responsibility here is Ralph Fair Road, and our plans include expanding that road (which shouldn't really help your specific observation much) in the future. We're working on plans to expand Ralph Fair to four lanes all the way up to Hwy 46 by time we're all done.
We could add a traffic signal at the location, but that would significantly add to the traffic delays folks are experiencing already at the intersection of I-10 and Ralph Fair. Frankly, Old Fred isn't much of a problem except for about four hours each day and a signal at that location would do more harm, overall, than good.
The real solution is providing another way for traffic on Old Fred to reach I-10. That's happening with our I-10 Fair Oaks project, which adds that overpass at Old Fred and I-10. When the intersection there is finished - by early 2018 - you'll see a bunch of that traffic trying to cross Ralph Fair or get through that intersection there dissipate and use the new route.

Is there any info regarding extending Galm Road thru Fm 471 and beyond?
- Gary
Will Alamo Ranch Parkway eventually meet up with the new part of 211 (yet to be built)?
- Carolyn

We're bunching your questions together, Gary and Carolyn, because the answer isn't something we have within TxDOT. Galm Road and Alamo Ranch Parkway are both county roads, not state roads. Their development is all handled by Bexar County Public Works (sort of).
In the case of ARP, that's being done by private developers as the Alamo Ranch area continues to expand.
That said, Galm Road isn't slated to extend any further than it is now, but Talley Road and Old 471 are set for some upgrades. That info is here. Carolyn, you'll also find at that link information on the extension of Hwy 211 so private developers can connect ARP with Hwy 211 at some point in the future.
I saw they said West Avenue would be closed by Wurzbach Parkway beginning September 12 through March of 2017. Any idea how far along that closure is?
Is it just from Wurzbach to Nakoma or is it farther than that?
- Robert
Great question, Robert. Unfortunately, we're not the agency running that project. Give the city a call - their TCI group is heading up that work.

Tuesday, August 16

Mail Bag: Potranco Road traffic, city and county projects, I-10

Could you tell me how many cars drive down Potranco Road daily? I mostly interested in the part of Potranco behind Redbird Ranch. Thank you!
-Kristi

Kristi, you're asking a question we typically get via phone. It's a great question! And, to help you really get the info you're wanting, I'll give you source material.
We have, posted online, a five-year record of our traffic counts. This will allow you to see what that segment of Potranco has been doing for five years, giving you an idea of what to expect in the future. (We don't house more than five years online for two reasons: first, records retention requires five years posted like this; second, we already host tens of thousands of pages of data online, and capping info at five years helps us minimize our IT expense.)
That said, it's worth noting there's a trick to using the data we've got posted.

When will UTEX from UTSA Blvd and the I-10 access road be completed? 
-Tim
This question is really a question for the city of San Antonio - UTEX is a city roadway. That said, the work there may be more associated with private development than with city work. That's a question to ask the folks with the city's TCI group when you visit with them.

I see construction on 471 is to begin 8-15. Is there a map of the project and what's being done, and for how long? Also, what is the plan for connecting 151/Alamo Ranch/211? and when does that start?Thanks.
- Michael
You've got a few different questions going on here, Michael. So, one at a time.
First, the Culebra Road work (FM 471) that started this week is being handled entirely by Bexar County. They've got our logo up on the project sign boards because we approved the design and, when the county is done with the project, we'll buy it back from them. It's a funding option that gets projects delivered through local participation called pass-through financing, but we digress (to be clear, this application of pass-through financing does not involve tolls). Bottom line: the county has a project information page available here, and if you've got questions at all they can be reached here.
The county also has some information about the extension of Alamo Ranch Parkway on that same info page. The biggest thing to note is ARP is being developed by private developers as they continue to build up the area and add homes (and shopping options). This is not being built by your tax dollars. Though, when developers finish, they turn it over for public maintenance. Because it's being built by private folks, though, we don't have an exact timeline on when to expect ARP to reach Hwy 211.
Oh, yeah, and Hwy 211 needs to be extended so ARP can actually connect with it. That $24 million effort is also being done by Bexar County and isn't slated to start until next year, provided all the funds match up next year.

What will happen to the (I-10) access roads from Ralph Fair Road toward 46 going west? Will they switch to one way? Will they remain two way? Right now they are still working on them. Will they widen them eventually?
What will happen at Old Fredericksburg Road coming toward the access road from Village Green and Fallbrook? Will there eventually be and underpass or overpass? I have heard both stories. Will they improve the Fair Oaks Bridge across 10. It's shaky!
- Mike
So back in March we started work on a project between Ralph Fair Road and Fair Oaks Parkway. Basically we're converting the frontage roads to one-way (which requires some widening for shoulders, curbs and sidewalks) and adding an overpass on I-10 at Old Fred Road - it'll take I-10 over a new intersection that connects Old Fred with Buckskin Drive.
We're also reconstructing the bridge at Fair Oaks and I-10, basically expanding it a la Ralph Fair. That project starts here in the fall and will wrap up in 2018.
What about beyond Fair Oaks Parkway? Well, eventually we will have one-way frontage road. Our goal is to eliminate one-way frontage roads wherever we've got a developed, metro area. We're not quite ready to do that - we need more money first - but it is on the agenda. Once we're nearing that work beyond Fair Oaks Parkway, we'll host a series of open house discussions to show y'all what we've got.

Concerning the work activity at hwy 46 and hwy 281: There needs to be a sign informing east bound Hwy 46 traffic that two lanes will merge to one. The existing one was removed for construction and has not been replaced.
Thank you for addressing this matter. It will require a follow-up with the poorly performing contractor that is presently on site. With out this sign there will be a collision and a fair amount of road rage played out.
-Tom
I'll start with the really good news: we've only got a few really light items left to have this job finished (finally) and it looks like we should wrap up this month. We're seeing CRG on the site daily (with the exception of Monday, due to weather) and we're seeing good progress. Rest assured they'll be held very accountable for dragging this project out the way they have, but we're looking at a finish in a matter of days.
As for the sign? We checked the plan sheets and no such sign is called for in the plans. That said, we've made our maintenance guys and our operations guys aware of the issue so we can have it addressed as appropriately and quickly as possible.

Tuesday, June 28

Mail Bag: 151 direct connector, turn lanes at Boerne Stage Road, 281-46 progress

It's been a while since our last Mail Bag post, so we're sifting through the questions now. We hope to have another round of questions answered next week - keep telling us what you want to know!

In the March 16 post you stated, "the direct connector for southbound Lp 1604 to eastbound Hwy 151 is the most visible piece of the intersection improvements, and is on pace to be ready for use this fall." Does this intersection have an estimated completion date and any word on the southbound 1604 to eastbound 151 connector opening early still?
- Kevin
Great question, Kevin. Some of us have been asking the same thing as May rain storms really pushed back work across the district.
The overall completion for this intersection has a deadline of early 2017, but is still on pace to wrap up before the end of the year. As for the new direct connector, it's clearly not going to open by the end of June. By the end of summer, though? That's a distinct possibility.

When will you stripe the two left turn lanes onto Beorne Stage Rd? Right now it's quite likely someone in the right turn lane won't go far enough out not to clip the inside turn lane.
- Chris
This is a problem, quite frankly, even where we have the final striping in place. In many states, it's the law to turn lane-to-lane. That is, if you start in the far left lane to turn left, you had better land in the far left lane of the road you're turning onto.
For whatever reason, Texas law isn't written the same. (By the way, we're not advocating any law here - just pointing out what drivers from other states experience.)
The bottom line: drivers here are woefully unaccustomed to the safe practice of turning into the same lane from which you've turned. Frankly, drivers need to take the responsibility and catch up with best practices implemented by drivers across the nation. But that aside, those pavement markers are darned important.
We'll make sure those are in place and maintained properly moving forward for you!

Now that you've addressed the no right turn rationale on BSR, can you attempt to explain the dual turnaround lane configuration at RFR? The issue is that you have two lanes of the feeder set to turn left onto RFR in addition to the dedicated turnaround lane. The left most left turn lane, the left turn only, turns directly into another left turn only lane making it another turnaround. The middle lane on the feeder that is straight or left turn is directed into the middle lane which is straight through the light into Rialto Village. This center lane that is straight or left always backs up with the people going straight through, so a lot of us turning left will use the left lane, and just cross the other two lanes to turn right to head north on the feeder. The issue is that sometimes there is someone actually turning left from that center lane.
- Dan
A lot of this has to do with what you'll have, final product, when we're all done with the frontage road and new overpass work between Ralph Fair and Fair Oaks (actually, turning that optional lane into an optional left/straight lane was a modification of the original plan, based on public input). Remember when we're all done you'll not be turning left on Ralph Fair to turn right onto what will then be the eastbound (only) frontage road.
We're also trying to take into account the future development at that location. While you're right that the left-left option effectively creates a dual turnaround, folks coming from the actual turnaround shouldn't be trying to skip across a few lanes to reach the Whataburger right there. Those folks should use the left-left lanes you've mentioned.
So we really do have a method to the madness.
That said, we can take a look at the layout and have our engineers try to find a way to address the issues you've brought up.

When will the turn-around at 281/46 be completed in Comal county? Why has this project progressing at such a slow rate?
- Donald
For those not familiar with this project, this is the construction of new turnarounds for US 281 at Hwy 46 in Bulverde. The contractor out there is CRG, and should have finished up about a year ago. To be frank, since this project started an entire commercial development - including a Wal-Mart store and its surrounding infrastructure - has been constructed.
Unfortunately we don't have a good answer for why the project has progressed as slowly as it has. We've been working to encourage CRG as much as we can, including assessing liquidated damages for late completion of the project.
The good news: our current schedule shows we should be all done out there before the start of the school year.

Thursday, May 26

Walnut Avenue to open TODAY (and other New Braunfels updates)

It's been a while since our last update on projects in the New Braunfels area ... and now we've got something kind of major happening today. Here's the scoop:

Walnut Avenue
Lead with the biggest story, right? By the end of business today we'll have Walnut Avenue opened up to traffic. It'll only be one lane in each direction (so, basically, exactly what was out there when we shut things down last year).
Traffic will be using the center lanes to traverse the hill. Crews are still doing concrete work across the project, so we're keeping those outside lanes closed the next several weeks while crews wrap things up.
The center line is striped and traffic cones mark the closed-off outside lanes. Walnut Ave should be ready to open today.
Once concrete work is complete paving crews will lay the final surface of asphalt to give a final product. We hope that final product will be delivered by the end of July.

FM 306
One of the biggest issues along FM 306 near New Braunfels is the traffic load at the intersection of Hoffman Lane - largely due to school in the mornings and in the afternoons.
We currently have a project going between Hoffman and Hunter that's expanding FM 306 to four lanes (plus a center left-turn lane and shoulders large enough for bicycles), and we're right now about one-third the way through this project. By the way, we have another project set to go for bids later this year that will extend this work on out to River Chase.
At any rate, we've been asked about the impact on that approach to Hoffman Elementary School. Here's what we'll have things looking like when we're finished:
Just for comparison, here's what's out there now:
Note only one through lane in each direction and the lack of sidewalks and bike areas ... the finished product will be a huge help to folks driving through the region on the daily.

Hwy 46 at US 281
If you're thinking how embarrassing it must be for us to see so much infrastructure pop up around us faster than it's taken for us to build some simple turnarounds, you're absolutely right. Those turnarounds should have been finished months ago, and we're still docking CRG about $20,000 each month we're not finished. The latest estimates show the project wrapping up before school starts this fall; we plan to do all we can to see this job finished earlier than that, even, if possible.

FM 1101
Most of the utility conflicts that have kept us from doing this work (and, yes, we've been waiting more than a year and a half on this now) are out of the way. At this point the project hinges on some discussions between our higher administrative folks and their counterparts with Hunter Industries. When Hunter bid the project in 2014, they did so under prices valid in 2014. Well, it's been two years and things have changed. Both parties are looking for an equitable middle ground to settle on and allow work to get going.
Once work begins - which we hope will be very soon - we expect about a year and a half of overall construction time.

Wednesday, May 18

Mail Bag: Last words (for now) on Lp 1604, work on I-410, turn lane on BSR

I've been wondering about the frontage road work at I-10 and Hwy 46 in Boerne. It started several months ago, but then just stopped. What happened and is it still going to move forward?
- Corey
Great question, Corey. this project constructs a westbound frontage road between about Crosspoint and West Bandera Rd (Hwy 46). Work began more than a year ago and was initially projected to take no more than eight months to wrap up. Well, Zimmerman Construction wasn't getting work done on schedule nor to the standard of quality we require, so we issued a notice of default before Christmas, removing Zimmerman from the project. Since then we've been working to negotiate a takeover agreement. Zimmerman will likely remain involved, though the personnel - particularly the project superintendent and management team - will be very different. We expect to resume work this summer.
In the meantime, we're continually charging liquidated damages against the contract for the late delivery. As of the end of April, those damages have totaled over $100,000.
The last time something like this happened was on the I-10 project between Loop 1604 and Huebner Road, when Ballenger Construction declared bankruptcy. That default left projects on Loop 1604 and Wurzbach Parkway similarly in the lurch. All of those projects are now complete.

I am seeing construction barrels and signs on I-410 (on the south side) between I-37 and I-35, but I am unable to find information on the website as to what will be happening. Can you point me in the right direction for information?
- Robert
The only place we'll have significant information is on our project tracker web application. The project number is 0521-05-139.
It's a pretty simple and low-key project, which is why you won't find a lot of fanfare on our web site about it. Key details on the project:

  • $6.7 million construction cost
  • Angel Brothers Construction
  • Started late 2014
  • Project replaces guardrail, repairs concrete erosion measures and resurfaces the highway
  • Work runs between about Medina Base Road and I-37

Work has gone a bit slow on this project due to its dependence on good weather. Right now we're about halfway through the work but have taken up almost all the time allowed. We're working with our contractor to get a project delivery this summer.

When do we get a right-turn signal from Boerne Stage Road eastbound onto the I-10 frontage road in front of HEB? The fact that the right turn is only a yield is what's backing up traffic on Boerne Stage so far in the mornings.
- Timothy
Signal timing and phasing - including a "right-only" signal as you've suggested - is done through the city of San Antonio. We don't have plans for a right-only signal at all. What we do have plans for is a right-turn lane:
This is the final striping plan for the intersection of Boerne Stage Rd and the eastbound frontage road of I-10.
Before we can get there, though, we'll need to build the new lane. Also notice the final layout of two active lanes on the eastbound frontage road running east from the BSR intersection - and that's in addition to the merge lane from the west-to-east turnaround. Right now we don't have the two through lanes:
The orange area is the construction zone today.
Right now we've got one active lane and we've got a makeshift merge lane for the turnaround traffic. We've still got to reconstruct the frontage road, one  half at a time, and that work will take us through the summer to complete. Once we're all done, though, you'll have that turn lane and a smoother traffic flow.
As for the right-only signal ... well, that's an issue to discuss with folks from the city. Hope that helps!

Do we have a projection for when the frontage roads between Bandera and Braun (southbound and northbound Loop 1604) will be completed? Northbound is a disaster in the mornings right now and it causes people to cut through our neighborhood at freeway speeds at times - no joke. Braun is backed up solid clear back to Wildhorse during rush hour each morning. Keep up the great work!
- Rick
We're a month from finishing up. Hopefully the opening of the main lanes eased up the stress you've witnessed in your subdivision. And thanks for the kudos!

How many lanes on the access will Leslie Road have going southbound from Shaenfield to Culebra? Will the northbound section between Culebra and Shaenfield have more than two lanes on the access road?
- Sandra
This is a moment where a picture is worth a thousand words (which would describe how it varies between two and three lanes):
Click to enlarge ... arrows represent lanes. Two arrows is two lanes, three arrows is three lanes.
I am sure you have noticed there are several "personal exit ramps" (worn into the median between the main lanes of 1604 and frontage road, particularly around the 1604 and Bandera area where drivers decide to cross the median). Is anything being done to prevent this behavior as it is very dangerous and I have witnessed several near-collisions caused by this during rush hours. Would this be considered reckless driving and what would the fines be if a driver is caught doing this? Thanks for keeping us all well informed about TxDOT projects in the San Antonio Area.
- Zane
We've seen this. We're confident SAPD and the BCSO has seen it as well. As pointed out before, this is an illegal move per sections 545.063 and 545.064. The actual fine schedule isn't really our domain, but if folks are caught it'd be pretty significant. It's up to law enforcement to discover and cite these folks.
Just a few of the culprits forming their own on-ramps along Lp 1604 near Bandera Road over the weekend.
On our end, we're working on ways to stop this - but short of us putting concrete barriers or guardrail everywhere, stopping this sort of behavior is really up to your cohorts sharing your commute. That, or understand if we catch you doing it and can safely snap a pic, you may just end up on the blog here.

How can you open 1604 without a Shaenfield exit on the north bound lanes??!! All that did was create more congestion at the Culebra light thus not solving any congestion issues!!!
- Yvonne
We had the exit to Shaenfield wide open and working for every morning and evening commute since we opened the new northbound express lanes. This has been consistent. Not sure when you drove through, Yvonne, but the exit ramp has been active the whole time - it exists where it's always existed. That said, we've still got an overhead highway sign to place at this location - so it's understandable if you missed it the first few days. Those signs are being placed as quickly as we can!

Great job on the 1604 express lanes. I really enjoy reading the updates and whoever is writing them needs to stay in that job forever - always informative and always entertaining. As for the naysayers, people can always find something to complain about. If you handed out 100 dollar bills to everyone, some people would complain that theirs wasn't in perfect condition or find some other reason to be disgruntled. Getting the 1604 express lanes open was like handing out thousand dollar bills to everyone who had to sit through gobs of traffic on the frontage road over the past year while the expressway was being built. Forget the naysayers and keep up the good work!
- Bob
Thanks for the kind words, Bob - they're very appreciated by all involved at every level of the project!

Thursday, February 4

Comal County projects roundup

It's been a while - like, since at least last year. Isn't it about time we gave a run-down on the happenings in and around Comal County?
Here's a look:

Walnut Hill
To put it simply, Dean Word Company is nearly three-quarters the way done with the project. The most visible portion of the project, though - the full closure of Walnut Avenue between Grandview and Floral - has been stretched even further over the last month. Initially slated to reopen mid-December, we are now looking at waiting for late March to reopen the roadway. The biggest reason here is safety.
The original plan called for opening Walnut Avenue to one lane each way. Concerns of rubber-necking through a canyon with limited sight distances has led project bosses to work with city officials and come to a later opening agreement.
A lot of work remains, but construction is progressing well. Crews have begun setting up a sound wall along the canyon and are finishing up drain structures. Perhaps nicest for those living in the immediate vicinity, cleanup at the top of the hill has begun while crews prepare to do concrete work.


Loop 337 at Ridge Hill
The striping contractor is scheduled to come through early next week to restripe the roadway and provide for a new left-turn lane. We are also working to add a new ditch line to the project and fix the barricades that have occasionally drifted into the travel lanes.

FM 1101
To be completely honest, we're still waiting on a private utility to complete work they began more than a year ago. Current estimates place completion of the utility work sometime this spring. We will then move forward with the project.

US 281 at Hwy 46
The biggest thing to report her is we're more than 80 percent of the way finished with this project. This project has admittedly moved extremely slow and we are assessing the contractor, CRG, appropriate liquidated damages. With the walls nearly complete, dirt crews will begin grading the new turnarounds next week with the aim to start laying asphalt by the middle of the month. We are holding bi-weekly meetings with the contractor to keep them moving, and hope to have work complete in time for summer.

FM 306
Hunter Industries is moving along well, working primarily on drain structures and extensions to existing box culverts. As a relatively new project, we don't have much else to report at this time. This project is scheduled to finish up in 2017.

I-35 ramp reversals
The only thing we really have left at this point is a quick resurfacing of the southbound frontage road. That should eliminate the issues we have with the glare during certain times of the day.

Upcoming projects
Lots of work is coming on the horizon, but here are the highlights:
  • Resurfacing of I-35 between Solms Rd and the river. This work should start late spring or early summer. This should only feature overnight work.
  • Pedestrian and bike facility improvements along Landa Street. This work will begin this summer.
  • Rehabilitate Hwy 46 between I-35 and FM 758. This is an extensive repair job that will start this fall.
  • Reconstruct the I-35 bridge at FM 1103 and widen FM 1103 between I-35 and Steele High School. This work is programmed for early 2017.
  • Loop 337 expansion. We're actually working to make this a one-piece project rather than complete work in segments as initially planned. We hope to begin work mid-2017.
  • Expansion of Hwy 46 in Bulverde. This is currently planned for late 2017.

Upcoming meetings
You're getting everything with this post! Don't miss out on some MAJOR meetings we have coming up. Mark these on your calendar and be sure to join us to give your thoughts on some very important issues:
  • Feb. 16, 6p-8p at Eden Hill. Open house forum regarding future work on Loop 337.
  • March 1, 6p-8p at the New Braunfels Civic Center. Metropolitan Planning Organization presentation on projects being considered for federal funding.
  • March 3, 5p-7p at Smithson Valley High School. Open house forum regarding the expansion of Hwy 46 in Bulverde.
  • March 29, 5p-7p at Steele High School. Open house forum regarding future work on FM 1103.

Thursday, July 9

Projects wrapping up - Hill Country area

This month has been really light on posts - we know. We've got a TON of information to get out, and the logjam of info has led to a dearth of posts. So, we're just going to start taking a bite at a time to get this info out to you.

Today, we're starting with a brief rundown of projects about to wrap up in the Hill Country area. For the purposes of this post, this includes Comal, Kendall and Kerr counties. We'll actually go in that order ... so, here's a look at Comal County area projects:

FM 306

Beginning Monday, July 13, Hunter Industries will begin laying a final course of asphalt on the road between I-35 and a little west of Hunter Road. This work will require daily alternating lane closures to allow for paving crews to do their work, but folks should have at least one lane each way to push through the area.

After about a week or so of paving, paint crews will lay pavement markings and you'll have a final product. Concrete work is finished already and crews have already set sod in place. All that's left, really, is the pavement and paint. That, and a final tweak of the traffic signals (which will be done while painters do their thing).

All told this project should be completed and done by the end of the month.

I-35 resurfacing

For those unfamiliar with this, what we're talking about here is the stretch of I-35 between FM 3009 and Solms Road. This is a $9.9 million project that's been going on since spring of 2014. We've had some delays due to materials, equipment failures or weather - pushing us back from what should have been a four-month project duration. Despite the delays, we're happy with the product and the drive between Schertz and New Braunfels is pretty darned smooth!

Now, on to Kendall County:

Ralph Fair Road

Yes, this isn't actually in Kendall County ... but it sort of feels like it is so we're including it on this list. And yes, we're almost done with the work at Ralph Fair Road and I-10. That work could be finished - meaning no more overnight closures, no more daytime closures, no more anything - as early as the first half of next week.

Huge credit for working a quick, clean project to Sundt Construction. The $7.5 million project widened the Ralph Fair Road bridge to five lanes (it used to be just two), and converted some of the frontage roads between Boerne Stage Road and Ralph Fair Road to one-way.

Hwy 46 at Esser

This project was literally days - days - from being finished when we discovered a pavement failure issue with the sub-base that's now being addressed. The $2 million project reconstructed a portion of the roadway and improved the intersection - particularly for westbound traffic on Hwy 46 - right there at the intersection of Hwy 46 and Esser Road. One of the major reasons for the work is to fit the intersection to the Kendall County project to expand the Herff Road bridge; well, mission accomplished there. And with the new right-turn lane in place for westbound traffic that would be headed to Boerne High School, school traffic this fall should see a better drive than they've seen in a while.

And, finally, a look at Kerr County:

Hwy 39 Ingram

This project seemed to be the project that simply would not end! The $8.6 million project began 2013 with the intent of adding a center left-turn lane, bike lanes and sidewalks to Hwy 39 between Hwy 27 and the Ingram Dam out in, well, Ingram.

The project got off to a rough start, but over the last year work moved as fast as the weather allowed. Final asphalt surface will be laid as soon as some curb and sidewalk - under way right now - is finished, and and final striping will come immediately thereafter. That work is currently slated for the last week of July, which means completion should come by the first week of August.

Hunt Crossing

This is another project on Hwy 39, this time a bridge over the south fork of the Guadalupe River in the area of Hunt, Texas. If you've not been, by the way, you should - a gem of the Hill Country, Hunt is!

The $2.5 million project replaced the old bridge with a wider, upgraded version. The wider bridge still only carries one lane in each direction, but it now includes space for shoulders and improved rails. The water flow volume is improved as well. This one shouldn't see water run over top very often, and improve the drive through the area.

Hwy 16 Kerrville

This project - a $2.7 million effort to widen and improve Hwy 16 between Hwy 173 and River Hills Blvd on the south side of Kerrville - was marred by a crash in September that landed five workers, including two TxDOT inspectors, in the hospital. The crash was caused by a suspected drunk driver who sped through an active work zone, passing officers who tried to slow or stop the driver prior to the work zone. The driver was chased by police to his home, where he was arrested.

Despite that drama, crews with Zimmerman Construction have been able to eke out a decent project. Yes, the work has taken longer than estimated. However, notice was given this week paving crews will work all week next week to lay that final surface of asphalt.

The final product should be delivered by the end of the week, if all goes well. That product includes beefed up shoulders and a turn lane.

Monday, May 18

Mail bag: I-10 Leon Springs, Wurzbach Parkway and much more.

In the last week, we've gotten a number of questions in the mail bag. Thanks for the questions and for your involvement! This blog is for you; please keep letting us know what kind of questions you'd like us to answer and we'll get the best info we can for you. Here are the answers you've sought this week:

What is the latest status on Wurzbach Parkway? Do you finally have a timeline to connect the east side with 281? The west side with 281? All? Will the lights on NW Military be removed or are they here to stay (that is fine too, just wanted to know)? Thank you!
- Gonzalo

So many questions at once! We'll try to answer appropriately.
The final segment of Wurzbach Parkway, connecting West Avenue to Jones-Maltsberger, will be finished in a single piece. The remaining contract time shows this project finishing near the end of this year, but Williams Brothers is running ahead of schedule. The reason we don't have an exact timeline beyond "this summer" is because the actual promised delivery is late 2015.
That aside, we are still anticipating opening the parkway - including exit ramps to U.S. 281 - later this summer. Weather, obviously, can impact this, but the contractor is motivated to get this work finished so crews can be moved to other projects.
As for the lights at NW Military and Wurzbach Parkway, we do not currently have plans to build over or around them. That might come in the future at some point - that all depends on folks who participate in the public input process through the Alamo Area MPO as it seeks to prioritize transportation projects (that could include you!). For now, it's not on our radar.

When will the turn north to south turn around south of Nakoma be reopened?I thought I read that it would be closed for 6 months but it has been more like 1 1/2 years. Most days there has been no work done from the day before. 
- Tom

That's a great question, Tom. You're right - the original plan was to have that turnaround closed just six months while the new northbound exit ramp to Wurzbach Parkway was constructed.
In the process, though, Williams Brothers ran into some issues with the electrical connections and the TransGuide lines. Those issues were all engineering and placement focused - and the segment of the turnaround to be rebuilt had already been demolished when these issues were discovered. In fact, it was through the demolition we found them.
In the meantime other portions of the project needed to progress, so crews kept working. We are working on the exit ramp, as well as other features along the northbound frontage road. While it may not seem like actual work is happening at that location a lot of work that needs to occur north of Nakoma in order for the work at Nakoma to be finished is happening every day. Well, every day we don't have monsoon-like rains.
Additionally, the project needed to wait for the right crews to finish the turnaround work. The same crew that digs ditches doesn't do the work on concrete for a bridge. That'd be like asking a finance clerk to handle marketing for a major corporation; both are incredibly qualified at their jobs, but not at each others. With the construction of the new south-to-north turnaround ramping up, expect to see those crews working on what's left of the north-to-south turnaround.
Also, expect to see more activity finishing the new northbound exit to Wurzbach Parkway (located about where the Bitters Road exit is now). That new exit should be active in a few short weeks.
All in all - and the real, bottom-line answer you're looking for - is we'll have that turnaround working again early summer. 

What is up with all of the construction on Babcock, specifically near the Huebner/Wurzbach area?  It seems like the construction has been going on for forever.  By the way, love the blog. I'm glad there is something that lets everyone know what is going on in the city. 
- Chris

Great question! Babcock Road is a city road, and the projects to which you're referring are maintained by the city of San Antonio. Looking at the city's capital projects widget, it looks like the work at the intersection of Hamilton Wolfe and Babcock ("Imp. Ph IX") should be wrapping up in the next few weeks. For other areas along Babcock, reach out to the city's Transportation and Capital Improvements department.
Thanks for keeping up with the blog, Chris - we'll do what we can to keep you up to speed on TxDOT projects throughout the area!

What is the completion date for the work on U.S. 281 at Hwy 46? It seems like it's been going on forever.
- Michael

This project will build turnarounds on U.S. 281 at Hwy 46 in Bulverde. CRG, the contractor on the project, initially approached us with a proposal to build the retaining walls (the bulk of the work on the project) in a different way than we had designed.
Because they couldn't show us an adequate cost savings (or an improvement in quality), we declined this proposal.
CRG has subcontracted some of the work (they weren't fully equipped to construct the walls as planned), but they're moving a lot slower than we'd like. Some of that is due to weather (seriously, this is the wettest winter/spring we've had in like five or six years) but weather can't be blamed for everything. We're holding their feet to the fire with all the avenues available - all of which involve money. As long as the contractor is prosecuting the contract (even if it's slow) we can't just default them and move on.

I was wondering if you could open up the lane that is blocked off at the corner of Old Fredericksburg and Ralph Fair (on corner there is a dirt mound). It seems that there isn't construction that is to be done on  the turn lane as you are headed toward I-10 on Ralph Fair and turning right (west) onto Old Fredericksburg Rd. Can you open up that turn lane for the time being for all those that live in the subdivisions along Old Fred Rd.? 
- Robin

After pinging the project engineer on that project, it seems we still need to complete a driveway and widening in that area - which will likely be the focus of work once the bridge is complete and opened to full capacity in a couple of weeks. We would already have that intersection opened up if we were completed
For the record, a right turn lane onto Old Fred Rd is not in the plans for this project. Once the road creeps east/north of Old Fred, it transitions from a two-lane road to a four-lane road to match the new bridge. You'll still be turning onto Old Fred from an active lane, just like you are today.

Can you expand on the I-10 Leon Springs project just a bit? Primarily concerning the traffic signal plan at the new off ramp onto Boerne Stage Road? My understanding, by looking at the plans, is that there will be a traffic signal at the off-ramp, another one at Boerne Stage Road and yet another at the HEB entrance. Will there really be three stop lights in that short distance? If so, how will this keep traffic congestion from getting worse in that area? 
- Beau

You bet! There's a good bunch of information online already right here. As for the signals - yes, we are building a new signalized intersection at Boerne Stage Road with the new westbound frontage road that's running through the old park-and-ride location at Leon Springs. That would mean you've got a signal right there by Rudy's, the new intersection we're now constructing, the intersection with the eastbound frontage road and the new signal at HEB.
Excessive? Perhaps. But growth is continuous in the area, and we're trying to do our best to keep folks safe.
We don't really have much say about the signals along Boerne Stage Road - that's all the city and the county. We can't not build a signal at the intersection of Boerne Stage and the new frontage road, though.
The good news is those signals are all "smart" - they talk to one another and operate on a detection system. That system, called a VIVD system, helps stream cars through these intersections - even if there are several intersections to work through.

The proposed managed lanes extend such a short distance, would it really be cost-beneficial? What are the benefits?
- Regina

Regina, this would be an amazing question to ask the folks at tomorrow night's open house - all the experts will be on hand to discuss the issue in-depth.
Truthfully, this blog isn't the right format to delve into all the issues surrounding the question. There are a few basics, though, and folks should understand those. The real issue here is funding, and the lack of available funds through the means currently given to the state. Building highways is extremely expensive (a single interchange, done in full, can cost nearly a billion dollars in most instances!), and in order to get some projects built state and local officials are getting increasingly creative with funding options.
That's part of what you'll talk about tomorrow night.
Anyone with questions like Regina's, or any questions at all about how managed lanes work, should simply attend the public meeting. It runs from 5 until 7 and is in an open house format - no formal presentations here - at the Leon Springs Baptist Church. That's the absolute level-best way to get answers on this topic, and get them fast.